UNDERGROUND<br />

CONSTRUCTION MANUAL<br />

PADMOUNTED SUBSTATIONS<br />

Back to MAIN INDEX<br />

Go to SECTION INDEX


CONSTRUCTION DESCRIPTION DWG CONSTRUCTION DESCRIPTION DWG<br />

PMF11<br />

A ORIGINAL ISSUE<br />

D 11.08.10<br />

E 10.01.12<br />

F 17.07.12<br />

<strong>Construction</strong> code guide - 11kV Padmounted<br />

substations including LV switchgear<br />

<strong>Construction</strong> code guide - 11kV Padmounted<br />

substations with LV switchgear and HV Switchgear<br />

<strong>Construction</strong> code guide - 11kV Padmounted<br />

substations foundation and site finish<br />

<strong>Construction</strong> code guide - 22kV Padmounted<br />

substations including LV switchgear<br />

5099/1<br />

5099/2<br />

5099/3<br />

5043/1<br />

<strong>Construction</strong> code guide - 22kV Padmounted 5043/2<br />

substations LV switchgear & HV RMU switchgear<br />

<strong>Construction</strong> code guide - 22kV Padmounted<br />

substation and foundations<br />

11kV PADMOUNTED SUBSTATION<br />

CONSTRUCTION<br />

Front entry type installation<br />

Front entry type installation<br />

Front entry type installation<br />

Front entry type installation<br />

Front entry type location in council parklands<br />

Front entry type location in council parklands<br />

Front entry type location in residential allotments<br />

Front entry type - site requirement separate<br />

HV & LV earthing<br />

Front entry type on 5 x 3.5m site placement<br />

options<br />

Front entry type site preparation sloping site<br />

maximum cut & fill<br />

Front entry type site finish concrete surround<br />

5043/3<br />

5000/1<br />

5000/2<br />

5000/3<br />

5000/4<br />

5010/1<br />

5010/2<br />

5174<br />

5175<br />

5002<br />

5003<br />

5004<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

11.08.10<br />

T.Borg<br />

Front entry type uniculvert foundation details<br />

retaining wall - maximum height 1.2m<br />

PADMOUNTED SUBSTATIONS<br />

INDEX<br />

FILE: 5 55 5097 1<br />

1<br />

5005/1<br />

PMF11U Front entry type uniculvert foundation details 5005/2<br />

PMF11BP<br />

PM11<br />

Front entry type pier foundation details<br />

Front entry type pier foundation details<br />

Front entry type site preparation retaining<br />

wall construction<br />

Front entry type site preparation retaining<br />

wall construction<br />

Cut sloping site uniculvert foundation<br />

5009/1<br />

5009/2<br />

5001/1<br />

5001/2<br />

5007/1<br />

Cut sloping site pier foundation retaining 5007/2<br />

wall - maximum height 2.0m<br />

Filled sloping site uniculvert foundation<br />

retaining wall maximum height 1.2m<br />

Filled sloping site pier foundation retaining<br />

wall maximum height 2.0m<br />

Site preparation safety fence retaining wall<br />

mounting details<br />

Front entry type material Contract No.2004/037/T<br />

Front entry type with LV switchgear construction<br />

Contract No. 2004/037/T<br />

Front entry type with LV switchgear and ABB<br />

SafeLink RMU, 2 switch 1 fuse material<br />

Contract No.2004/037/T<br />

PM11xxxASL Front entry type with LV switchgear and ABB<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C.Noel<br />

A.Bletchly<br />

SafeLink RMU, 2 switch 1 fuse construction<br />

Contract No.2004/037/T<br />

Front entry type schematic LV switchgear only<br />

Contract No.2004/037/T<br />

Front entry type schematic LV switchgear only<br />

Contract No.2004/037/T<br />

UNDERGROUND DISTRIBUTION<br />

Dwg Sh<br />

5008/1<br />

5008/2<br />

5011<br />

5189/1<br />

5189/2<br />

5191/1<br />

5191/2<br />

5190/1<br />

5190/2<br />

F


CONSTRUCTION DESCRIPTION DWG CONSTRUCTION DESCRIPTION DWG<br />

PM11, PM11SW<br />

PM11xxxASD<br />

PM11xxxFBX<br />

A ORIGINAL ISSUE<br />

C 08.08.05<br />

D 11.08.10<br />

E 10.01.12<br />

11kV PADMOUNTED SUBSTATION<br />

CONSTRUCTION CONT’D<br />

Front entry type schematic ABB SafeLink<br />

HV switchgear and LV switchgear<br />

Contract No.2004/037/T<br />

Front entry type schematic ABB SafeLink<br />

HV switchgear and LV switchgear<br />

Contract No.2004/037/T<br />

Front entry type material Contract QESI 30/98<br />

Front entry type construction Contract QESI 30/98<br />

Front entry type with LV switchgear and<br />

RMU ABB SDAF3, 2 switch 1 fuse - material<br />

Contract QESI 30/98<br />

Front entry type with LV switchgear and<br />

RMU ABB SDAF3, 2 switch 1 fuse - construction<br />

Contract QESI 30/98<br />

Front entry type schematic LV switchgear only<br />

Contract QESI 30/98<br />

Front entry type schematic<br />

ABB HV switchgear and LV switchgear<br />

Contract QESI 30/98<br />

Front entry type schematic<br />

Magnefix HV switchgear and LV switchgear<br />

Contract QESI 30/98<br />

Front entry type schematic<br />

ABB HV switchgear and LV switchgear<br />

Contract QESI 30/98<br />

Front entry type schematic<br />

ABB HV switchgear and LV switchgear<br />

Contract QESI 30/98<br />

5192/1<br />

5192/2<br />

5091/1<br />

5091/2<br />

5184/1<br />

5184/2<br />

5094<br />

5095<br />

5096/1<br />

5096/2<br />

5096/3<br />

Front entry type with LV switchgear and 5264/1<br />

Schneider Electric FBX, 2 switch 1 fuse - material<br />

Contract No. 08088EECL<br />

HARD COPY<br />

UNCONTROLLED<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

PMRF22<br />

11.08.10<br />

T.Borg<br />

22kV PADMOUNTED SUBSTATION<br />

CONSTRUCTION<br />

Rectangular type installation<br />

Rectangular type installation<br />

Rectangular type installation<br />

Rectangular type installation<br />

Rectangular type location in council parklands<br />

Rectangular type location in council parklands<br />

Rectangular type location in residential allotments<br />

Rectangular type - site requirement<br />

separate HV & LV earthing<br />

Rectangular type - site requirement without<br />

retaining wall<br />

Rectangular type site finish without retaining wall<br />

Rectangular type - schematic LV switchgear only<br />

PADMOUNTED SUBSTATIONS<br />

INDEX<br />

55 5097 2<br />

2<br />

5114/1<br />

5114/2<br />

5114/3<br />

5114/4<br />

5116/1<br />

5116/2<br />

5176<br />

5177<br />

5117<br />

5118<br />

Rectangular type - material 5105/1<br />

PMR22, PM22SW Rectangular type - construction<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C.Noel<br />

A.Bletchly<br />

Front entry type with LV switchgear and 5264/2<br />

Schneider Electric FBX, 2 switch 1 fuse - construction<br />

Contract No. 08088EECL<br />

Front entry type schematic<br />

Schneider Electric FBX HV switchgear and LV switchgear<br />

Contract No. 08088EECL<br />

Front entry type schematic<br />

Schneider Electric FBX HV switchgear and LV switchgear<br />

Contract No. 08088EECL<br />

Rectangular type - schematic F&G HV<br />

switchgear and LV switchgear<br />

Rectangular type - schematic F&G HV<br />

switchgear and LV switchgear<br />

Rectangular type - schematic F&G HV<br />

switchgear and LV switchgear<br />

Rectangular type - schematic F&G HV<br />

switchgear and LV switchgear<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

5265/1<br />

5265/2<br />

5105/2<br />

5104<br />

5082/1<br />

5082/2<br />

5082/3<br />

5082/4<br />

E


CONSTRUCTION DESCRIPTION DWG CONSTRUCTION DESCRIPTION DWG<br />

PMR22<br />

A ORIGINAL ISSUE<br />

22kV PADMOUNTED SUBSTATION<br />

CONSTRUCTION CONT’D<br />

Front entry type - site preparation<br />

Retaining wall construction<br />

Front entry type - site preparation<br />

Retaining wall construction<br />

Cut sloping site - Uniculvert foundation<br />

Retaining wall - maximum height 1.2m<br />

Filled sloping site - Uniculvert foundation<br />

Retaining wall - maximum height 1.2m<br />

Rectangular type - Material<br />

Contract No. 08088EECL<br />

Rectangular type - <strong>Construction</strong><br />

Contract No. 08088EECL<br />

Rectangular type - schematic<br />

Schneider Electric HV switchgear & LV switchgear<br />

Rectangular type - schematic<br />

Schneider Electric HV switchgear & LV switchgear<br />

Rectangular type - schematic<br />

Schneider Electric HV switchgear & LV switchgear<br />

Rectangular type - schematic<br />

Schneider Electric HV switchgear & LV switchgear<br />

5283/1<br />

5283/2<br />

5281/1<br />

5281/2<br />

5266/1<br />

5266/2<br />

5267/1<br />

5267/2<br />

5267/3<br />

5267/4<br />

Rectangular type - schematic 5272<br />

Schneider Electric LV switchgear only<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C.Noel<br />

17.07.12<br />

A.Bletchly<br />

T.Borg<br />

Rectangular 3.7m long, 800mm maximum above<br />

ground foundation, earthing & site finish details<br />

Rectangular 3.7m long, 800mm maximum above<br />

ground foundation, earthing & site finish details<br />

Rectangular 3.7m long, 800mm maximum above<br />

ground foundation, earthing & site finish details<br />

Rectangular 4.1m long, 800mm maximum above<br />

ground foundation, earthing & site finish details<br />

Rectangular 4.1m long, 800mm maximum above<br />

ground foundation, earthing & site finish details<br />

Rectangular 4.1m long, 800mm maximum above<br />

ground foundation, earthing & site finish details<br />

PADMOUNTED SUBSTATIONS<br />

INDEX<br />

FILE: 5 55 5097 3<br />

3<br />

5273/1<br />

5273/2<br />

5273/3<br />

5274/1<br />

5274/2<br />

5274/3<br />

Rectangular 3.7m long, 1400mm maximum above 5275/1<br />

ground foundation, earthing & site finish details<br />

Rectangular 3.7m long, 1400mm maximum above 5275/2<br />

ground foundation, earthing & site finish details<br />

Rectangular 3.7m long, 1400mm maximum above 5275/3<br />

ground foundation, earthing & site finish details<br />

Rectangular 4.1m long, 1400mm maximum above 5276/1<br />

ground foundation, earthing & site finish details<br />

Rectangular 4.1m long, 1400mm maximum above 5276/2<br />

ground foundation, earthing & site finish details<br />

Rectangular 4.1m long, 1400mm maximum above 5276/3<br />

ground foundation, earthing & site finish details<br />

Rectangular HV & LV service platform details<br />

Rectangular HV & LV service platform details<br />

Rectangular HV & LV service platform details<br />

UNDERGROUND DISTRIBUTION<br />

Dwg Sh<br />

5280/1<br />

5280/2<br />

5280/3


1 SITE<br />

1.1<br />

PADMOUNTED SUBSTATION INSTALLATION<br />

1.2<br />

General<br />

The site shall be to the satisfaction of <strong>Ergon</strong> <strong>Energy</strong>, including<br />

Stable (soil conditions)<br />

Flood free<br />

Level (topography) where possible<br />

Free from steep batters<br />

Site Size<br />

The minimum area required to accommodate a front entry<br />

Padmounted substation shall be:<br />

Retaining wall sites - provided retaining walls are contained<br />

within 3400mm width x 3000mm depth no increase in the<br />

12000mm width x 7200mm depth is necessary.<br />

1.3 Substation Orientation<br />

Front entry padmounted substations shall be oriented such that<br />

the LV and HV panels are easily accessible from the dedicated<br />

footpath.<br />

A ORIGINAL ISSUE<br />

B 10.2.04<br />

C 7.3.08<br />

Along coastal areas the site must be located as far as possible<br />

from the shoreline and sheltered from salt spray.<br />

A site should not be located where impact by traffic is likely and,<br />

if at a truncated section of the street alignment or other non-regular<br />

shaped site the following shall apply:<br />

The front edge of the substation plinth shall be 200mm from<br />

and as near to parallel as possible to the R.P. Street Alignment.<br />

The specified rectangular size of the site shall not be reduced.<br />

Common earthing sites<br />

Level sites - 3000mm width x 2800mm depth.<br />

Retaining wall sites - 3400mm width x 3000mm depth.<br />

Separate Earthing Sites<br />

12000mm width x 7200mm depth.<br />

HARD COPY<br />

UNCONTROLLED<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

1.4<br />

URD<br />

The developer shall provide a padmounted substation site(s) as<br />

required by <strong>Ergon</strong> <strong>Energy</strong> at no cost to <strong>Ergon</strong> <strong>Energy</strong>. The site shall<br />

be included in the road reserve, or located on freehold property.<br />

No padmounted substations are to be located in Trustee Reserves.<br />

Where the developer required the padmount to be included:<br />

a) In the Road Reserve:-<br />

The Developer shall obtain all necessary approvals from the<br />

Department of Transport or the Local Authority.<br />

b) On Freehold property (including residential or parkland):-<br />

The Developer shall provide <strong>Ergon</strong> <strong>Energy</strong> with a registered<br />

easement at no cost to <strong>Ergon</strong> <strong>Energy</strong>.<br />

Acceptable separation of padmount to adjacent dwellings is provided<br />

if the front of dwellings are set back 6.0m from the R.P. Street<br />

Alignment and the padmount is located as shown in drawings No.<br />

5174, 5010 Sheets 1 or 2.<br />

Developments including streets where the allowable dwelling set back<br />

is less than 6.0m will require padmount siting on either an alternative<br />

street, where the dwelling set back is 6.0m, or in Parklands.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

3/2/03<br />

D. M K. c<br />

D. M K.<br />

UNDERGROUND DISTRIBUTION<br />

11kV PADMOUNTED SUBSTATIONS<br />

FRONT ENTRY TYPE<br />

INSTALLATION<br />

FILE: 5<br />

55 5000 1<br />

5000<br />

Dwg Sh<br />

1<br />

C


1 SITE<br />

1.5<br />

(CONT’D)<br />

Commercial and Industrial or Landscaped Areas<br />

Whether the padmounted substation is for the sole use of that<br />

complex, or is required as part of the distribution network, the<br />

owner is required to grant <strong>Ergon</strong> <strong>Energy</strong> an easement for the<br />

padmounted site, access and cabling.<br />

Separation of 5.0m between padmount transformer LV bushings<br />

and the nearest room or habitable area should be provided<br />

where possible.<br />

1.6 Parklands - for other than URD<br />

1.7<br />

Acceptable separation of padmount to adjacent dwellings is<br />

shown in drawings No. 5010 Sheets 1 & 2.<br />

Cabling and Access<br />

Cabling Only<br />

Should the cabling route not be available in conjunction with<br />

access, a 1.0m wide cable easement is required to the front<br />

of the padmount. Additionally 2.0m x 3.0m (padmount site<br />

width) is required immediately in front to allow spreading of<br />

cables for entry to the padmount and also include the buried<br />

earth cable.<br />

A ORIGINAL ISSUE<br />

B<br />

4.3.04<br />

C 3.7.08<br />

Obtain the necessary approval for an easement to accommodate<br />

the padmounted substation, cabling and access to site.<br />

Cabling and Access Requirement<br />

A 3.0m wide easement, or road reserve, from the front of<br />

the site is required for cabling and access.<br />

HARD COPY<br />

UNCONTROLLED<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

2 SITE PREPARATION<br />

Sites shall be prepared in accordance with the included<br />

construction drawings.<br />

3 CONSTRUCTION OF RETAINING WALLS<br />

Retaining walls shall be constructed around the perimeter of a<br />

padmounted substation site where:<br />

A change in ground level of 300mm or more occurs within 2.0m<br />

of the boundary of the padmounted substation site.<br />

4 PADMOUNTED SUBSTATION FOUNDATION<br />

4.1 Uniculvert<br />

4.2<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

Uniculvert foundations shall not be constructed where site and<br />

ground conditions do not provide an even or equal bearing<br />

capacity for the padmounted substation, or where no HV<br />

switchgear is fitted and the cable is connected directly to the<br />

transformer HV terminals.<br />

Uniculvert foundations for both stable and unstable soil conditions<br />

shall be constructed in accordance with Drawing No. 5005.<br />

Concrete Piers<br />

Concrete piers shall be installed where the site ground conditions<br />

do not provide an even or equal bearing capacity for the<br />

padmounted substation foundation, or where no HV switchgear<br />

is fitted and the cable is connected directly to the transformer<br />

HV terminals.<br />

At sites where shallow rock is encountered use the uniculvert<br />

foundation type if applicable.<br />

Concrete piers shall be constructed in accordance with<br />

Drawing No. 5009.<br />

3/2/03<br />

D. M K. c<br />

D. M K.<br />

UNDERGROUND DISTRIBUTION<br />

11kV PADMOUNTED SUBSTATIONS<br />

FRONT ENTRY TYPE<br />

INSTALLATION<br />

FILE: 5<br />

55 5000 2<br />

5000<br />

Dwg Sh<br />

2<br />

C


Plinth over<br />

shown dashed.<br />

For details of<br />

reinforced concrete<br />

surround slab refer<br />

to drawing 5004.<br />

FOOTPATH<br />

A<br />

Truncate foundation<br />

F<br />

250<br />

to allow cable access<br />

into padmount.<br />

Use formwork.<br />

R.P. Street<br />

Alignment<br />

Fence refer<br />

drawing 5011.<br />

Footpath<br />

Ground Line<br />

Backfill<br />

600<br />

Min<br />

A ORIGINAL ISSUE<br />

B 3.12.03<br />

C 11.07.12<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

700<br />

F<br />

F<br />

F F<br />

F<br />

3000<br />

2800<br />

2450<br />

Masonry<br />

block wall<br />

PLAN<br />

SECTION<br />

A<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

100<br />

2800<br />

F<br />

F<br />

F<br />

3000<br />

F<br />

F<br />

3400<br />

Site<br />

Retaining wall<br />

foundation<br />

Boundary<br />

Natural Ground<br />

Line<br />

F<br />

Uniculvert<br />

foundation<br />

Weepholes<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

F<br />

F<br />

For earth rod location<br />

refer EARTHING:<br />

Drawing No. 5013<br />

or 5014.<br />

Filter material<br />

100mm dia conduit through<br />

footing for each spike.<br />

Trim top of conduit as req’d<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

CONCRETE STRENGTHS<br />

23/11/01<br />

Foundation<br />

200 series<br />

blockwork<br />

F’c Slump Aggregate Cement<br />

Concrete infill to<br />

be rounded to form<br />

watershed capping<br />

F<br />

F<br />

850<br />

F<br />

RETAINING WALL DETAIL<br />

NOTE:<br />

25MPa<br />

Blockwork /<br />

17.5MPa<br />

Core Filling<br />

N16 at 400 crs<br />

20 cover to<br />

inside face<br />

N16 at 400 crs<br />

lap 500 at<br />

corners & where<br />

necessary<br />

N12 at 300 crs<br />

lap 400<br />

C.Noel<br />

A.Bletchly<br />

T.Borg<br />

SL62 mesh with<br />

60 cover top<br />

50<br />

75<br />

150<br />

F<br />

F<br />

F<br />

Size (Max) Content (Min)<br />

300<br />

F<br />

20mm<br />

F<br />

-<br />

10mm 300kg/cu. m<br />

Site<br />

Boundary<br />

Backfill<br />

material<br />

Filter<br />

material<br />

75 cover to bottom<br />

Where a retaining wall greater than 1.2 metres<br />

high is required a Pier Foundation must be used.<br />

RETAINING WALL - MAXIMUM HEIGHT 1.2m<br />

5007<br />

500<br />

11kV PADMOUNTED SUBSTATIONS<br />

CUT SLOPING SITE - UNICULVERT FOUNDATION<br />

55 5007 1<br />

F<br />

N16 at 400 crs<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

1<br />

1200 Max.<br />

250<br />

C


Plinth over<br />

shown dashed.<br />

For details of<br />

reinforced concrete<br />

surround slab Refer<br />

Padmounted Subs<br />

drawing 5004.<br />

FOOTPATH<br />

A<br />

Truncate foundation<br />

to allow cable access<br />

into padmount.<br />

Use formwork.<br />

R.P. Street<br />

Alignment<br />

Fence refer<br />

drawing 5011.<br />

Footpath<br />

Ground Line<br />

600<br />

Min<br />

A ORIGINAL ISSUE<br />

B 3.12.03<br />

C 11.07.12<br />

F<br />

F<br />

F<br />

250<br />

Backfill<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

700 for B1<br />

1200 for B2<br />

F<br />

F<br />

3000<br />

2800<br />

2450<br />

Masonry<br />

block wall<br />

SECTION<br />

PLAN<br />

A<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

100<br />

2800<br />

Pier<br />

F F<br />

F<br />

F<br />

3000<br />

3400<br />

foundation<br />

Site<br />

Retaining wall<br />

foundation<br />

(1300 wide<br />

shown)<br />

Boundary<br />

Line<br />

Weepholes<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

F<br />

F<br />

F<br />

F<br />

For earth rod location<br />

refer EARTHING:<br />

Drawing No. 5013<br />

or 5014.<br />

Natural Ground<br />

Filter material<br />

100mm dia conduit<br />

through footing for<br />

earth rod. Trim top<br />

of conduit as req’d.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

23/11/01<br />

CONCRETE STRENGTHS<br />

Foundation<br />

F’c<br />

25MPa<br />

Blockwork /<br />

17.5MPa<br />

Core Filling<br />

F<br />

Concrete infill to<br />

be rounded to form<br />

watershed capping<br />

200 series<br />

blockwork<br />

N16 at 400 crs<br />

lap 500 at corners<br />

& where necessary<br />

N16 at 400 crs<br />

B1=850<br />

B2=1300<br />

50<br />

20 cover to inside face<br />

N12 at 300 crs<br />

lap 400<br />

C.Noel<br />

A.Bletchly<br />

T.Borg<br />

SL62 mesh with<br />

60 cover top<br />

F<br />

F<br />

F<br />

F<br />

Slump Aggregate<br />

F<br />

75<br />

150<br />

F<br />

RETAINING WALL DETAIL<br />

Size (Max) Content (Min)<br />

300<br />

20mm<br />

10mm<br />

CUT SLOPING SITE - PIER FOUNDATION<br />

RETAINING WALL - MAXIMUM HEIGHT 2.0m<br />

5007<br />

Site<br />

Boundary<br />

500<br />

11kV PADMOUNTED SUBSTATIONS<br />

55 5007 2<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

Cement<br />

-<br />

300kg/cu. m<br />

Backfill<br />

material<br />

Filter<br />

material<br />

N16 at 400 crs<br />

75 cover to bottom<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

2<br />

H1=1200 (Use B1 footing width)<br />

250<br />

F<br />

F<br />

F<br />

F<br />

H2=2000 (Use B2 footing width)<br />

C


Plinth over<br />

shown dashed.<br />

For details of<br />

reinforced concrete<br />

surround slab refer<br />

to drawing 5004.<br />

FOOTPATH<br />

A<br />

Truncate foundation<br />

F<br />

250<br />

to allow cable access<br />

into padmount.<br />

Use formwork.<br />

R.P. Street<br />

Alignment<br />

Fence refer<br />

drawing 5011.<br />

Footpath<br />

Ground Line<br />

600<br />

F<br />

Min<br />

F<br />

Backfill<br />

A ORIGINAL ISSUE<br />

B 3.12.03<br />

C 11.07.12<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

700<br />

F<br />

F<br />

3000<br />

2800<br />

2450<br />

Masonry<br />

block wall<br />

SECTION<br />

PLAN<br />

A<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

100<br />

2800<br />

F<br />

F<br />

F<br />

F<br />

3000<br />

Uniculvert<br />

foundation<br />

F<br />

F<br />

F<br />

3400<br />

F<br />

Site<br />

Boundary<br />

Finished<br />

Site Level<br />

Filter material<br />

Weepholes<br />

Natural Ground<br />

Line<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

For earth rod location<br />

refer EARTHING:<br />

Drawing No. 5013<br />

or 5014.<br />

Retaining wall<br />

foundation<br />

100mm dia conduit<br />

through footing for<br />

earth spike. Trim top<br />

of conduit as req’d.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

CONCRETE STRENGTHS<br />

Foundation<br />

F<br />

NOTE:<br />

F<br />

F’c<br />

25MPa<br />

Blockwork /<br />

17.5MPa<br />

Core Filling<br />

Filter<br />

Backfill<br />

material<br />

material<br />

23/11/01<br />

Concrete infill to<br />

F<br />

F<br />

850<br />

Slump<br />

75<br />

be rounded to form<br />

watershed capping<br />

N16 at 400 crs<br />

20 cover to<br />

inside face<br />

SL62 mesh with<br />

60 cover top<br />

N12 at 300 crs<br />

lap 400<br />

C.Noel<br />

A.Bletchly<br />

T.Borg<br />

F<br />

300<br />

150 10mm<br />

F<br />

RETAINING WALL DETAIL<br />

F<br />

Where a retaining wall greater than 1.2 metres<br />

50<br />

Aggregate<br />

20mm<br />

high is required a Pier Foundation must be used.<br />

500<br />

5008<br />

Boundary<br />

11kV PADMOUNTED SUBSTATIONS<br />

F<br />

F<br />

Size (Max) Content (Min)<br />

Site<br />

-<br />

300kg/cu. m<br />

200 series<br />

blockwork<br />

Cement<br />

FILLED SLOPING SITE - UNICULVERT F’DN<br />

RETAINING WALL - MAXIMUM HEIGHT 1.2m<br />

55 5008 1<br />

F<br />

F<br />

F<br />

N16 at 400 crs<br />

lap 500 at<br />

corners & where<br />

necessary<br />

F<br />

F<br />

N16 at 400 crs<br />

75 cover to bottom<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

1<br />

250 1200 Max.<br />

F<br />

F<br />

F<br />

F<br />

C


Plinth over<br />

shown dashed.<br />

For details of<br />

reinforced concrete<br />

surround slab Refer<br />

Padmounted Subs<br />

drawing 5004.<br />

FOOTPATH<br />

A<br />

Truncate foundation<br />

to allow cable access<br />

into padmount.<br />

Use formwork.<br />

R.P. Street<br />

Alignment<br />

Fence refer<br />

250<br />

drawing 5011.<br />

Footpath<br />

Ground Line<br />

600<br />

F<br />

Min<br />

F<br />

Backfill<br />

A ORIGINAL ISSUE<br />

B 3.12.03<br />

C 11.07.12<br />

F<br />

F<br />

F<br />

F<br />

F<br />

700 for B1<br />

1200 for B2<br />

F<br />

3000<br />

2800<br />

2450<br />

F F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

Masonry<br />

block wall<br />

SECTION<br />

PLAN<br />

A<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

Pier<br />

F<br />

100<br />

2800<br />

F<br />

F<br />

F<br />

F<br />

foundation<br />

F<br />

3000<br />

F<br />

3400<br />

Site<br />

F<br />

F<br />

Boundary<br />

Finished<br />

Site Level<br />

Filter material<br />

Weepholes<br />

Natural<br />

shown)<br />

Ground Line<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

For earth rod location<br />

refer EARTHING:<br />

Drawing No. 5013<br />

or 5014.<br />

Retaining wall<br />

foundation<br />

(1300 wide<br />

100mm dia conduit<br />

through footing for<br />

earth spike. Trim top<br />

of conduit as req’d.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

CONCRETE STRENGTHS<br />

Foundation<br />

Blockwork /<br />

17.5MPa<br />

Core Filling<br />

Backfill<br />

Material<br />

Filter material<br />

SL62 mesh with<br />

60 cover top<br />

N12 at 300 crs<br />

lap 400<br />

F<br />

C.Noel<br />

23/11/01<br />

A.Bletchly<br />

T.Borg<br />

F<br />

F<br />

F<br />

F’c Slump Aggregate Cement<br />

25MPa<br />

Concrete infill to<br />

be rounded to form<br />

watershed capping<br />

F<br />

B1=850<br />

B2=1300<br />

300<br />

F<br />

75<br />

150<br />

F<br />

F<br />

50<br />

500<br />

RETAINING WALL DETAIL<br />

11kV PADMOUNTED SUBSTATIONS<br />

F<br />

F<br />

F<br />

F<br />

Size (Max) Content (Min)<br />

20mm<br />

10mm<br />

-<br />

300kg/cu. m<br />

FILLED SLOPING SITE - PIER FOUNDATION<br />

RETAINING WALL - MAXIMUM HEIGHT 2.0m<br />

55 5008 2<br />

F<br />

F<br />

F F<br />

F<br />

Site<br />

F<br />

5008<br />

Boundary<br />

200 series<br />

blockwork<br />

N16 at 400 crs<br />

lap 500 at<br />

corners & where<br />

necessary<br />

N16 at 400 crs<br />

20 cover to<br />

inside face<br />

N16 at 400 crs<br />

75 cover to bottom<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

2<br />

F<br />

H1=1200 (Use B1 footing width)<br />

H2=2000 (Use B2 footing width)<br />

250<br />

F<br />

F F<br />

C


Galvanised<br />

steel posts<br />

Concrete surface<br />

must fall away<br />

from edge of<br />

steel posts<br />

600 MIN. INTO CONCRETE<br />

GALVANISED STEEL<br />

POST CONSTRUCTION IN<br />

MASONRY BLOCK WALL.<br />

A ORIGINAL ISSUE<br />

B 7.3.08<br />

F<br />

F<br />

Not suitable for use at padmounted substations<br />

with separate LV & HV earthing<br />

F<br />

2 x M12 S/Steel<br />

trubolts embedded<br />

110mm minimum.<br />

(Ramset T16175SS or<br />

approved equivalent)<br />

Natural<br />

Ground<br />

Line<br />

F<br />

Earth Face<br />

120 0 +_<br />

200 MIN.<br />

HARD COPY<br />

UNCONTROLLED<br />

F<br />

F<br />

F<br />

Fence inside<br />

boundary<br />

Aluminium<br />

Posts<br />

ALUMINIUM POST<br />

Earth Face<br />

SIDE MOUNTED CONSTRUCTION<br />

TO MASONRY BLOCK WALL<br />

FOR CUT SLOPING SITES<br />

F<br />

Natural<br />

Ground<br />

F<br />

Line<br />

(Use this construction as an alternative)<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

10mm thick aluminium<br />

base plate fully welded<br />

to aluminium post in<br />

accordance with AS 1657<br />

and AS 1665.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

2 x M12 S/Steel<br />

trubolts embedded<br />

110mm minimum.<br />

(Ramset T16100SS or<br />

approved equivalent)<br />

30/5/00<br />

D. M K. c<br />

C.Lindsay<br />

NOTES:<br />

1.<br />

2.<br />

3.<br />

Aluminium<br />

Posts<br />

F<br />

F<br />

200 MIN.<br />

ALUMINIUM POST<br />

DECK MOUNTED CONSTRUCTION<br />

TO MASONRY BLOCK WALL<br />

A safety fence shall be constructed on retaining wall<br />

sloping sites where the difference between ground<br />

level and padmount site is 300mm or greater.<br />

Chain wire infill and the support cables shall be PVC<br />

or baked polyester coated and coloured black or green.<br />

All construction of safety fences to be:<br />

(a)<br />

(b)<br />

In accordance with AS 1657 / AS 1926 including<br />

latest amendments.<br />

Of a type where infill is between top and toe<br />

board / bottom rails.<br />

UNDERGROUND DISTRIBUTION<br />

PADMOUNTED SUBSTATIONS<br />

SITE PREPARATION - SAFETY FENCE<br />

RETAINING WALL MOUNTING DETAILS<br />

FILE: 5<br />

55 5011 1<br />

5011<br />

Dwg Sh<br />

F<br />

Watershed<br />

Capping<br />

B 1/2 DISC<br />

B


PADMOUNT VOLTAGE<br />

PMR = Rectangular Type<br />

EXAMPLE:-<br />

A ORIGINAL ISSUE<br />

B 7.4.08<br />

Padmounted Substation<br />

22kV PADMOUNTED SUBSTATION (INCLUDING LV SWITCHGEAR) CONSTRUCTION CODE<br />

Code shown within dashed box<br />

appears on relevant construction<br />

detail drawings in this manual.<br />

A<br />

22 = 22kV<br />

PMR 22/5/41<br />

CAPACITY (kVA)<br />

PMR22/5/41 = Rectangular type padmounted substation, 22kV, 500kVA, 4.1m long.<br />

HARD COPY<br />

UNCONTROLLED<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

3 = 315<br />

5 = 500<br />

1k = 1000<br />

21/1/03<br />

D. M K. c<br />

C.Lindsay<br />

ENCLOSURE LENGTH<br />

22kV PADMOUNTED SUBSTATIONS<br />

CONSTRUCTION CODE GUIDE<br />

INCLUDING LV SWITCHGEAR<br />

55 5043 1<br />

41 = 4.1m<br />

CONTRACT No. 2006/0061/T<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

5043<br />

Dwg Sh<br />

1<br />

B


B 7.4.08<br />

PADMOUNT<br />

PMR = Rectangular Type<br />

EXAMPLE:-<br />

C 4.7.08<br />

D<br />

02.11.11<br />

22kV PADMOUNTED SUBSTATION WITH LV SWITCHGEAR AND F&G HV RMU CONSTRUCTION CODE<br />

Code shown within dashed box<br />

appears on relevant construction<br />

detail drawings in this manual.<br />

Padmounted Substation<br />

VOLTAGE<br />

22 = 22kV<br />

CAPACITY (kVA)<br />

3 = 315<br />

5 = 500<br />

A<br />

1k = 1000<br />

PMR 22/5/41 FGA 21<br />

ENCLOSURE LENGTH<br />

41 = 4.1m (ONLY)<br />

TYPE<br />

FGA = F&G GA...-C<br />

RM6 = Schneider Electric RM6<br />

20/12/01<br />

22kV PADMOUNTED SUBSTATIONS<br />

CONSTRUCTION CODE GUIDE<br />

55 5043 2<br />

SWITCH ARRANGEMENT<br />

21 = 2 switchable feeder units + 1 fuse protected tee<br />

31 = 3 switchable feeder units + 1 fuse protected tee<br />

22 = 2 switchable feeder units + 2 fuse protected tees<br />

PMR 22/5/41 RM6 21 = Rectangular type padmounted substation, 22kV, 500kVA, 4.1m long, Schneider Electric RM6 RMU,<br />

A ORIGINAL ISSUE<br />

with 2 switchable feeder units and 1 fuse protected tee-off unit<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C.Noel<br />

A.Bletchly<br />

T.Borg<br />

UNDERGROUND DISTRIBUTION<br />

WITH LV SWITCHGEAR AND HV RMU SWITCHGEAR<br />

FILE: 5<br />

5043<br />

Dwg Sh<br />

2<br />

D


PADMOUNT FOUNDATION<br />

PMRF = Rectangular Type<br />

EXAMPLE:-<br />

B 9.4.08<br />

Code shown within dashed box<br />

appears on relevant construction<br />

detail drawings in this manual.<br />

NOTE:-<br />

Padmounted Substation<br />

Foundation<br />

22kV PADMOUNTED SUBSTATION FOUNDATION & SITE FINISH CONSTRUCTION CODE<br />

VOLTAGE<br />

22 = 22kV<br />

1. No materials are included in constructions<br />

A ORIGINAL ISSUE<br />

A<br />

PMRF 22/41/8 HL<br />

ENCLOSURE LENGTH HEIGHT ABOVE SERVICE PLATFORM<br />

21/1/03<br />

D. M K. c<br />

C.Lindsay<br />

Required only where foundation<br />

is not provided by others.<br />

GROUND<br />

8 = 800mm Max.<br />

14 = 1400mm Max.<br />

(Omit where not req"d)<br />

22kV PADMOUNTED SUBSTATIONS<br />

CONSTRUCTION CODE GUIDE<br />

FOUNDATION AND SITE FINISH<br />

55 5043 3<br />

H = High Voltage<br />

L = Low Voltage<br />

HL = High & Low Voltage<br />

PMRF22/41/8HL = Rectangular type padmounted substation foundation, 22kV, 4.1m enclosure, 800mm max. above ground,<br />

high & low voltage service platforms.<br />

HARD COPY<br />

UNCONTROLLED<br />

41 = 4.1m<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

5043<br />

Dwg Sh<br />

3<br />

B


B 12.3.08<br />

HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

BLANK<br />

22kV PADMOUNTED SUBSTATION<br />

with F&G GA 1K1T-C RING MAIN UNIT<br />

(1 SWITCHABLE FEEDER UNIT & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

A ORIGINAL ISSUE<br />

C 26.5.11<br />

BLANK<br />

RATING<br />

200kVA<br />

BLANK<br />

BLANK<br />

xxx/400A<br />

xxx/400A<br />

CONTRACT No. 2006/0061/T<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

F<br />

23/5/01<br />

C.Lindsay<br />

BLANK<br />

22kV PADMOUNTED SUBSTATION<br />

with F&G GA 2K1TS-C RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

A. Bletchly<br />

xxx/400A<br />

RATING<br />

500kVA<br />

RECTANGULAR TYPE - SCHEMATIC<br />

xxx/400A<br />

xxx/400A<br />

5082<br />

xxx/400A<br />

22kV PADMOUNTED SUBSTATIONS<br />

F&G HV SWITCHGEAR AND LV SWITCHGEAR<br />

55 5082 1<br />

315kVA<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

xxx/400A<br />

1<br />

C


B 12.3.08<br />

HV SWITCHGEAR SIDE<br />

22kV PADMOUNTED SUBSTATION<br />

with F&G GA 3K1TS-C RING MAIN UNIT<br />

(3 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

BLANK<br />

xxx/400A<br />

xxx/400A<br />

LV SWITCHGEAR SIDE<br />

F F F<br />

A ORIGINAL ISSUE<br />

C 25.5.11<br />

D 20.04.12<br />

RATING<br />

315kVA<br />

500kVA<br />

xxx/400A<br />

xxx/400A<br />

xxx/400A<br />

CONTRACT No. 2006/0061/T<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

22kV PADMOUNTED SUBSTATION<br />

with F&G GA 2K2TS-C RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 2 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

22/1/03<br />

A. Bletchly<br />

C.Lindsay<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR TYPE - SCHEMATIC<br />

F&G HV SWITCHGEAR AND LV SWITCHGEAR<br />

55 5082 2<br />

BLANK<br />

RATING<br />

315kVA<br />

500kVA<br />

xxx/400A<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

xxx/400A<br />

xxx/400A<br />

5082<br />

xxx/400A<br />

Dwg Sh<br />

2<br />

xxx/400A<br />

D


HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

22kV PADMOUNTED SUBSTATION<br />

with F&G GA 2K1TS-C RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

B 8.4.08<br />

CONSUMERS MAINS<br />

ISOLATOR<br />

RATING<br />

BLANK<br />

xxx/630A<br />

F F F<br />

A ORIGINAL ISSUE<br />

C 25.5.11<br />

xxx/630A<br />

HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

22kV PADMOUNTED SUBSTATION<br />

with F&G GA 3K1TS-C RING MAIN UNIT<br />

(3 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

1000kVA 1000kVA<br />

CONTRACT No. 2006/0061/T<br />

HARD COPY<br />

UNCONTROLLED<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

23/5/01<br />

A. Bletchly<br />

C.Lindsay<br />

CONSUMERS MAINS<br />

ISOLATOR<br />

RATING<br />

UNDERGROUND DISTRIBUTION<br />

BLANK<br />

xxx/630A<br />

xxx/630A<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR TYPE - SCHEMATIC<br />

F&G HV SWITCHGEAR AND LV SWITCHGEAR<br />

FILE: 5<br />

55 5082 3<br />

5082<br />

Dwg Sh<br />

3<br />

C


F<br />

HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

22kV PADMOUNTED SUBSTATION<br />

with F&G GA 2K2TS-C RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 2 FUSE PROTECTED TEE<br />

and LV FUSE SWITCH<br />

A ORIGINAL ISSUE<br />

B 8.4.08<br />

C 25.5.11<br />

CONSUMERS MAINS<br />

ISOLATOR<br />

RATING<br />

1000kVA<br />

BLANK<br />

xxx/630A<br />

HARD COPY<br />

UNCONTROLLED<br />

xxx/630A<br />

CONTRACT No. 2006/0061/T<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

22/1/03<br />

A. Bletchly<br />

C.Lindsay<br />

UNDERGROUND DISTRIBUTION<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR TYPE - SCHEMATIC<br />

F&G HV SWITCHGEAR AND LV SWITCHGEAR<br />

FILE: 5<br />

55 5082 4<br />

5082<br />

Dwg Sh<br />

4<br />

C


MATERIAL - PADMOUNTED SUBSTATION INCLUDING LV SWITCHGEAR<br />

ASSY<br />

537-1<br />

537-2<br />

537-3<br />

537-4<br />

537-5<br />

537-6<br />

ASSY<br />

554-3<br />

Padmounted Substation 100kVA with LV Switchgear<br />

Padmounted Substation 200kVA with LV Switchgear<br />

Padmounted Substation 315kVA with LV Switchgear<br />

Padmounted Substation 500kVA with LV Switchgear<br />

Padmounted Substation 750kVA with LV Switchgear<br />

DESCRIPTION<br />

DESCRIPTION<br />

MATERIAL - ABB SD SERIES HV SWITCHGEAR<br />

538-2 Ring Main Unit ABB, 2 Switch 1 Fuse<br />

ASSY<br />

538-1<br />

538-3<br />

538-4<br />

Cartridge fuse link 16A<br />

554-5 Cartridge fuse link 25A<br />

554-6<br />

Cartridge fuse link 31.5A<br />

554-8 Cartridge fuse link 50A<br />

554-9 Cartridge fuse link 63A<br />

554-11 Cartridge fuse link 80A<br />

MATERIAL - MAGNEFIX MD SERIES HV SWITCHGEAR<br />

DESCRIPTION<br />

Ring Main Unit Magnefix, 3 Switch 1 Fuse<br />

Ring Main Unit Magnefix, 2 Switch 1 Fuse<br />

Switch Fuse Unit Magnefix, 1 Switch 1 Fuse<br />

QTY<br />

1<br />

QTY<br />

100kVA 200kVA 315kVA 500kVA 750kVA 1000kVA<br />

1 1 1 1 1 1<br />

100kVA<br />

555-2 Cartridge fuse link 10A 3<br />

555-4 Cartridge fuse link 20A<br />

555-5 Cartridge fuse link 25A<br />

555-7 Cartridge fuse link 40A<br />

555-8 Cartridge fuse link 50A<br />

A ORIGINAL ISSUE<br />

B<br />

6.10.05<br />

C 3.3.11<br />

Padmounted Substation 1000kVA with LV Board<br />

HARD COPY<br />

UNCONTROLLED<br />

3<br />

3<br />

1<br />

3<br />

200kVA<br />

1<br />

3<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

3<br />

QTY<br />

315kVA<br />

1<br />

3<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

3<br />

500kVA<br />

1<br />

3<br />

C. Noel<br />

20/10/00<br />

A. Bletchly<br />

C.Lindsay<br />

3<br />

750kVA<br />

1<br />

3<br />

MATERIAL - LV FUSE<br />

ASSY<br />

529-11<br />

NOTES:<br />

1.<br />

2.<br />

3.<br />

4.<br />

11kV PADMOUNTED SUBSTATIONS<br />

FRONT ENTRY TYPE<br />

MATERIAL<br />

DESCRIPTION QTY<br />

Fuse link 125A din size 2<br />

529-13 Fuse link 200A din size 2<br />

529-14 Fuse link 250A din size 2<br />

529-16 Fuse link 355A din size 2<br />

529-17 Fuse link 400A din size 2<br />

5.<br />

55 5091 1<br />

HV Switchgear is supplied separately<br />

as required.<br />

5091<br />

3<br />

All Padmounted Substations are<br />

supplied with LV Switchgear fitted.<br />

Ensure correct phasing, HV switchgear<br />

to transformer cabling, prior to<br />

installation of switchgear.<br />

Designer to nominate LV fuse link<br />

current rating.<br />

HV fuse links are provided with<br />

switchgear construction.<br />

Assy 537-6 fitted with LV board<br />

transformer disconnector only<br />

CONTRACT No. 2004 / 037 / T<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

1<br />

C


Concrete<br />

Plinth<br />

Assy Selection<br />

538-2 and<br />

554-3 to 11<br />

or<br />

538-1, 3 or 4 and<br />

555-2 to 8<br />

HV SWITCHGEAR<br />

COMPARTMENT<br />

For feeder cable connection,<br />

Refer HV CONSTRUCTION<br />

drawing. No. 5051 (ABB RMU)<br />

or<br />

A ORIGINAL ISSUE<br />

B<br />

6.10.05<br />

C 11.08.10<br />

D 3.3.11<br />

F<br />

F<br />

drawing. No. 5054 (Magnefix<br />

RMU & SFU or Transformer)<br />

HARD COPY<br />

UNCONTROLLED<br />

F<br />

TRANSFORMER<br />

PLAN<br />

LV SWITCHGEAR<br />

COMPARTMENT<br />

F<br />

F<br />

For mains distribution<br />

cable connection, Refer<br />

LV CONSTRUCTION<br />

drawing. No. 5209.<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

Assy Selection<br />

529-11 to 17<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

18/10/00<br />

A. Bletchly<br />

C.Lindsay<br />

SIDE VIEW<br />

FRONT ENTRY TYPE<br />

CONSTRUCTION<br />

F<br />

Assy Selection<br />

537-1 to 6<br />

CONTRACT No. 2004 / 037 / T<br />

Concrete<br />

Plinth<br />

11kV PADMOUNTED SUBSTATIONS<br />

55 5091 2<br />

5091<br />

F<br />

F<br />

<strong>Construction</strong> Type<br />

PM11<br />

PM11SW<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

2<br />

D


HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE HV SWITCHGEAR SIDE<br />

LV SWITCHGEAR SIDE<br />

A ORIGINAL ISSUE<br />

B 3.8.05<br />

C 3.3.11<br />

RATING<br />

100kVA<br />

125 / 400A<br />

11kV PADMOUNTED SUBSTATION<br />

with LV FUSE SWITCH ONLY<br />

HARD COPY<br />

UNCONTROLLED<br />

CONTRACT No. 2004 / 037 / T<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

30/1/03<br />

A. Bletchly<br />

C.Lindsay<br />

RATING<br />

200kVA<br />

315kVA<br />

500kVA<br />

750kVA<br />

1000kVA<br />

11kV PADMOUNTED SUBSTATIONS<br />

FRONT ENTRY TYPE - SCHEMATIC<br />

LV SWITCHGEAR ONLY<br />

xxx / 400A<br />

11kV PADMOUNTED SUBSTATION<br />

with LV FUSE SWITCH ONLY<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

55 5094 1<br />

5094<br />

xxx / 400A<br />

Dwg Sh<br />

xxx / 630A<br />

BLANK<br />

C


HV SWITCHGEAR SIDE<br />

TEST<br />

OFF<br />

ON<br />

EARTH<br />

FEEDER<br />

CABLE<br />

11kV PADMOUNTED SUBSTATION<br />

with ABB SDAF3 RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

A ORIGINAL ISSUE<br />

B 29.07.03<br />

C 3.8.05<br />

D 3.3.11<br />

TEST<br />

ON<br />

EARTH<br />

OFF<br />

TEST<br />

ON<br />

EARTH<br />

OFF<br />

FEEDER<br />

CABLE<br />

RATING<br />

100kVA<br />

HARD COPY<br />

UNCONTROLLED<br />

LV SWITCHGEAR SIDE<br />

125 / 400A<br />

HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

TEST<br />

ON<br />

EARTH<br />

OFF<br />

FEEDER<br />

CABLE<br />

CONTRACT No. 2004 / 037 / T<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

11kV PADMOUNTED SUBSTATION<br />

with ABB SDAF3 RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

TEST<br />

C. Noel<br />

30/1/03<br />

A. Bletchly<br />

C.Lindsay<br />

ON<br />

EARTH<br />

OFF<br />

TEST<br />

RATING<br />

200kVA<br />

315kVA<br />

500kVA<br />

750kVA<br />

1000kVA<br />

xxx / 400A<br />

1000kVA<br />

FRONT ENTRY TYPE - SCHEMATIC<br />

5095<br />

TRANSFORMER<br />

LV ISOLATOR RATING<br />

200kVA<br />

315kVA<br />

500kVA<br />

750kVA<br />

xxx / 400A<br />

11kV PADMOUNTED SUBSTATIONS<br />

55 5095 1<br />

ON<br />

EARTH<br />

OFF<br />

FEEDER<br />

CABLE<br />

UNDERGROUND DISTRIBUTION<br />

xxx / 630A<br />

1000A<br />

1000A<br />

1000A<br />

2000A<br />

2000A<br />

ABB HV SWITCHGEAR AND LV SWITCHGEAR<br />

FILE: 5<br />

Dwg Sh<br />

BLANK<br />

D


HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE HV SWITCHGEAR SIDE<br />

LV SWITCHGEAR SIDE<br />

FEEDER<br />

CABLE<br />

FEEDER<br />

CABLE<br />

11kV PADMOUNTED SUBSTATION<br />

with MAGNEFIX MD451 RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

A ORIGINAL ISSUE<br />

B 3.8.05<br />

C 8.3.11<br />

RATING<br />

100kVA<br />

HARD COPY<br />

UNCONTROLLED<br />

125 / 400A<br />

FEEDER<br />

CABLE<br />

CONTRACT No. 2004 / 037 / T<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

11kV PADMOUNTED SUBSTATION<br />

with MAGNEFIX MD414 SWITCH FUSE UNIT<br />

(1 SWITCHABLE FEEDER UNIT & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

23/5/01<br />

A. Bletchly<br />

C.Lindsay<br />

RATING<br />

100kVA<br />

UNDERGROUND DISTRIBUTION<br />

125 / 400A<br />

11kV PADMOUNTED SUBSTATIONS<br />

FRONT ENTRY TYPE - SCHEMATIC<br />

MAGNEFIX HV SWITCHGEAR & LV SWITCHGEAR<br />

FILE: 5<br />

55 5096 1<br />

5096<br />

Dwg Sh<br />

1<br />

C


HV SWITCHGEAR SIDE<br />

FEEDER<br />

CABLE<br />

FEEDER<br />

CABLE<br />

11kV PADMOUNTED SUBSTATION<br />

with MAGNEFIX MD451 RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

A ORIGINAL ISSUE<br />

B 3.8.05<br />

C 8.3.11<br />

RATING<br />

200kVA<br />

315kVA<br />

FEEDER<br />

CABLE<br />

11kV PADMOUNTED SUBSTATION<br />

with MAGNEFIX MD414 SWITCH FUSE UNIT<br />

(1 SWITCHABLE FEEDER UNIT & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

500kVA 500kVA<br />

CONTRACT No. 2004 / 037 / T<br />

HARD COPY<br />

UNCONTROLLED<br />

LV SWITCHGEAR SIDE<br />

xxx / 400A<br />

TRANSFORMER<br />

LV ISOLATOR RATING<br />

200kVA<br />

315kVA<br />

xxx / 400A<br />

xxx / 630A<br />

1000A<br />

1000A<br />

500kVA 1000A<br />

BLANK<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

HV SWITCHGEAR SIDE<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

30/1/03<br />

A. Bletchly<br />

C.Lindsay<br />

RATING<br />

200kVA<br />

315kVA<br />

200kVA<br />

500kVA<br />

FRONT ENTRY TYPE - SCHEMATIC<br />

LV SWITCHGEAR SIDE<br />

xxx / 400A<br />

TRANSFORMER<br />

LV ISOLATOR RATING<br />

315kVA<br />

UNDERGROUND DISTRIBUTION<br />

5096<br />

xxx / 400A<br />

11kV PADMOUNTED SUBSTATIONS<br />

55 5096 2<br />

2<br />

xxx / 630A<br />

1000A<br />

1000A<br />

1000A<br />

MAGNEFIX HV SWITCHGEAR & LV SWITCHGEAR<br />

FILE: 5<br />

Dwg Sh<br />

BLANK<br />

C


A ORIGINAL ISSUE<br />

B 3.8.05<br />

C 8.3.11<br />

FEEDER FEEDER<br />

CABLE<br />

HARD COPY<br />

UNCONTROLLED<br />

HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

CABLE<br />

FEEDER<br />

CABLE<br />

11kV PADMOUNTED SUBSTATION<br />

with MAGNEFIX MD442 RING MAIN UNIT<br />

(3 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

RATING<br />

200kVA<br />

315kVA<br />

500kVA<br />

750kVA<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

30/1/03<br />

A. Bletchly<br />

C.Lindsay<br />

xxx / 400A<br />

xxx / 400A<br />

200kVA<br />

315kVA<br />

500kVA<br />

750kVA<br />

xxx / 630A<br />

TRANSFORMER<br />

BLANK<br />

LV ISOLATOR RATING<br />

1000A<br />

1000A<br />

1000A<br />

2000A<br />

11kV PADMOUNTED SUBSTATIONS<br />

FRONT ENTRY TYPE - SCHEMATIC<br />

MAGNEFIX HV SWITCHGEAR & LV SWITCHGEAR<br />

55 5096 3<br />

CONTRACT No. 2004 / 037 / T<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

5096<br />

Dwg Sh<br />

3<br />

C


EXAMPLE:-<br />

A ORIGINAL ISSUE<br />

B 8.8.05<br />

C 10.01.12<br />

11kV PADMOUNTED SUBSTATION (INCLUDING LV SWITCHGEAR) CONSTRUCTION CODE<br />

Code shown within dashed box<br />

appears on relevant construction<br />

detail drawings in this manual.<br />

PADMOUNT<br />

PM = Front Entry Type<br />

Padmounted Substation<br />

PM11/500 = Padmounted Substation, 11kV, 500kVA<br />

HARD COPY<br />

UNCONTROLLED<br />

A<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

PM 11/500<br />

VOLTAGE CAPACITY (kVA)<br />

11 = 11kV<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

20/12/01<br />

D. M K. c<br />

C.Lindsay<br />

11kV PADMOUNTED SUBSTATIONS<br />

CONSTRUCTION CODE GUIDE<br />

INCLUDING LV SWITCHGEAR<br />

55 5099 1<br />

100<br />

315<br />

500<br />

750<br />

1000<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

5099<br />

Dwg Sh<br />

1<br />

C


EXAMPLE:-<br />

A ORIGINAL ISSUE<br />

B<br />

6.10.05<br />

C 02.11.11<br />

PADMOUNT<br />

PM = Front Entry Type<br />

11kV PADMOUNTED SUBSTATION WITH LV SWITCHGEAR AND HV RMU CONSTRUCTION CODE<br />

Code shown within dashed box<br />

appears on relevant construction<br />

detail drawings in this manual.<br />

Padmounted Substation<br />

VOLTAGE<br />

11 = 11kV<br />

A<br />

PM 11/500/ASL 2S1F<br />

CAPACITY (kVA)<br />

315<br />

500<br />

750<br />

1000<br />

TYPE<br />

ASL = ABB SafeLink<br />

SWITCH ARRANGEMENT<br />

2S1F = 2 Switchable feeder units + 1 Fuse protected Tee<br />

FBX = Schneider Electric FBX<br />

PM11/500/FBX2S1F = 11kV padmounted substation, 500 kVA Capacity, Schneider Electric FBX HV RMU with<br />

HARD COPY<br />

UNCONTROLLED<br />

2 switchable feeder units and 1 fuse protected tee-off unit<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C.Noel<br />

4/3/04<br />

A.Bletchly<br />

T.Borg<br />

UNDERGROUND DISTRIBUTION<br />

11kV PADMOUNTED SUBSTATIONS<br />

CONSTRUCTION CODE GUIDE<br />

WITH LV SW/GEAR AND HV RMU SW/GEAR<br />

FILE: 5<br />

55 5099 2<br />

5099<br />

Dwg Sh<br />

2<br />

C


HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

A ORIGINAL ISSUE<br />

B 12.3.08<br />

BLANK<br />

xxx/400A<br />

22kV PADMOUNTED SUBSTATION<br />

with LV FUSE SWITCH ONLY<br />

RATING<br />

315kVA<br />

500kVA<br />

xxx/400A<br />

xxx/400A<br />

HARD COPY<br />

UNCONTROLLED<br />

xxx/400A<br />

xxx/400A<br />

CONTRACT No. 2006/0061/T<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

22/5/01<br />

D. M K. c<br />

C.Lindsay<br />

CONSUMERS MAINS<br />

ISOLATOR<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR TYPE - SCHEMATIC<br />

LV SWITCHGEAR ONLY<br />

55 5104 1<br />

BLANK<br />

xxx/630A<br />

xxx/630A<br />

22kV PADMOUNTED SUBSTATION<br />

with LV FUSE SWITCH ONLY<br />

RATING<br />

1000kVA<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

5104<br />

Dwg Sh<br />

B


MATERIAL - PADMOUNTED SUBSTATION INCLUDING LV SWITCHGEAR<br />

ASSY DESCRIPTION<br />

542-3<br />

542-4<br />

542-5<br />

B 2.4.08<br />

Padmounted Substation 4.1m Long 500kVA with LV Switchgear<br />

Padmounted Substation 4.1m Long 1000kVA with LV Switchgear<br />

Padmounted Substation 4.1m Long 315kVA with LV Switchgear<br />

513-1 Connection earth bar to cover plate 2<br />

QTY<br />

MATERIAL - PADMOUNTED SUBSTATION INCLUDING LV AND HV SWITCHGEAR<br />

ASSY DESCRIPTION<br />

576-1<br />

576-2<br />

576-3<br />

576-4<br />

576-5<br />

576-6<br />

576-7<br />

576-8<br />

576-9<br />

576-10<br />

556-3<br />

556-4<br />

556-7<br />

1<br />

22kV PADMOUNTED SUBSTATIONS<br />

14/2/03<br />

RECTANGULAR TYPE<br />

c MATERIAL<br />

D. M K.<br />

C.Lindsay<br />

MATERIAL - LV FUSE<br />

ASSY DESCRIPTION QTY<br />

529-13 Fuse link 200A din size 2<br />

529-14 Fuse link 250A din size 2<br />

529-15 Fuse link 315A din size 2<br />

529-16<br />

Padmounted Substation 200kVA 4.1m Long with LV Switchgear & RMU F & G 1 Switch 1 Fuse<br />

Padmounted Substation 315kVA 4.1m Long with LV Switchgear & RMU F & G 2 Switch 1 Fuse<br />

Padmounted Substation 315kVA 4.1m Long with LV Switchgear & RMU F & G 3 Switch 1 Fuse<br />

Padmounted Substation 315kVA 4.1m Long with LV Switchgear & RMU F & G 2 Switch 2 Fuse<br />

Padmounted Substation 500kVA 4.1m Long with LV Switchgear & RMU F & G 2 Switch 1 Fuse<br />

Padmounted Substation 500kVA 4.1m Long with LV Switchgear & RMU F & G 3 Switch 1 Fuse<br />

Padmounted Substation 500kVA 4.1m Long with LV Switchgear & RMU F & G 2 Switch 2 Fuse<br />

Padmounted Substation 1000kVA 4.1m Long with LV Switchgear & RMU F & G 2 Switch 1 Fuse<br />

Padmounted Substation 1000kVA 4.1m Long with LV Switchgear & RMU F & G 3 Switch 1 Fuse<br />

Padmounted Substation 1000kVA 4.1m Long with LV Switchgear & RMU F & G 2 Switch 2 Fuse<br />

Cartridge fuse link 16A - 200kVA & 315kVA transformers<br />

Cartridge fuse link 20A - 500kVA transformers<br />

Cartridge fuse link - 40A 1000kVA transformers<br />

529-17 Fuse link 400A din size 2<br />

Refer note 4<br />

513-1 Connection earth bar to cover plate 2<br />

1. All padmount substations are supplied fitted with either LV switchgear or LV and HV switchgear as required<br />

2. Padmount substations for new installations shall be 4.1m long.<br />

3. Designers to nominate LV fuse link current rating<br />

4. HV fuse links provided with the padmounted substation construction.<br />

Those fitted with 2 switch 2 fuse RMU are supplied with 3 fuse links to suit that transformer only.<br />

Designer to nominate required fuse links for the remaining fuse unit<br />

A ORIGINAL ISSUE<br />

HARD COPY<br />

UNCONTROLLED<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

55 5105 1<br />

Fuse link 355A din size 2<br />

QTY<br />

1<br />

3<br />

5105<br />

1<br />

3<br />

CONTRACT No. 2006/0061/T<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

B


B 2.4.08<br />

F<br />

For mains distribution<br />

cable connection, Refer<br />

LV CONSTRUCTION<br />

drawing No. 5087.<br />

For feeder cable connection,<br />

Refer HV CONSTRUCTION<br />

drawing No. 5044 (F & G RMU)<br />

or<br />

A ORIGINAL ISSUE<br />

F<br />

drawing No. 5120 (Transformer)<br />

F<br />

Assy 513-1<br />

Assy Selection<br />

529-13, 14, 15, 16 or 17<br />

HARD COPY<br />

UNCONTROLLED<br />

F<br />

F<br />

Assy Selection<br />

556-3, 4 or 7<br />

HV<br />

Compartment<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

F<br />

22kV PADMOUNTED SUBSTATIONS<br />

29/1/03<br />

RECTANGULAR TYPE<br />

c CONSTRUCTION<br />

D. M K.<br />

C.Lindsay<br />

Assy 513-1<br />

Transformer<br />

Compartment<br />

CONTRACT No. 2006/0061/T<br />

55 5105 2<br />

F<br />

Assy Selection<br />

542-3 to 5 or<br />

576-1 to 10<br />

LV<br />

Compartment<br />

5105<br />

<strong>Construction</strong> Type<br />

PMR22<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

2<br />

B


1 SITE<br />

B<br />

C<br />

1.1<br />

PADMOUNTED SUBSTATION INSTALLATION<br />

General<br />

The site shall be to the satisfaction of <strong>Ergon</strong> <strong>Energy</strong>, including<br />

Stable (soil conditions)<br />

Flood free 1.4<br />

Free from steep batters<br />

1.2 Site Size<br />

4.3.04<br />

3.7.08<br />

Where possible, level or gently sloping ground<br />

Along coastal areas the site must be located as far as possible<br />

from the shoreline and sheltered from salt spray.<br />

A site should not be located where impact by traffic is likely and,<br />

if at a truncated section of the street alignment or other<br />

non regular shaped site, the specified rectangular size<br />

shall not be reduced.<br />

The minimum area required to accommodate a rectangular type<br />

Padmounted substation shall be:<br />

Common earthing sites<br />

Sites without retaining walls - 4000mm width x 6000mm depth.<br />

Sites requiring retaining walls - assessed on an individual basis<br />

and to include sufficient clearance to allow, without adverse<br />

impact on cables, passage of underground cables on site.<br />

Sites requiring retaining walls should be avoided if possible.<br />

Note the site size shall be increased to include retaining walls<br />

& footings<br />

A ORIGINAL ISSUE<br />

Separate Earthing Sites<br />

12000mm width x 10000mm depth.<br />

Sites requiring retaining walls - assessed on an individual basis,<br />

however, these sites should be avoided if possible.<br />

HARD COPY<br />

UNCONTROLLED<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

1.3 Substation Orientation<br />

Except where not practicable, padmounted substations shall<br />

be oriented such that the LV cabinet end is facing the dedicated<br />

footpath.<br />

URD<br />

The developer shall provide a padmounted substation site(s) as<br />

required by <strong>Ergon</strong> <strong>Energy</strong> at no cost to <strong>Ergon</strong> <strong>Energy</strong>. The site shall<br />

be included in the road reserve, or located on freehold property.<br />

No padmounted substations are to be located in Trustee Reserves.<br />

a) In the Road Reserve:-<br />

The Developer shall obtain all necessary approvals from the<br />

Department of Transport or the Local Authority.<br />

b) On Freehold property (including residential or parkland):-<br />

The Developer shall provide <strong>Ergon</strong> <strong>Energy</strong> with a registered<br />

easement at no cost to <strong>Ergon</strong> <strong>Energy</strong>.<br />

Acceptable separation of padmount to adjacent dwellings is provided<br />

if the front of dwellings are set back 6.0m from the R.P. Street<br />

Alignment and the padmount is located as shown in drawings No.<br />

5176, 5116 Sheets 1 or 2.<br />

Developments including streets where the allowable dwelling set<br />

back is less than 6.0m will require padmount siting on either<br />

an alternative street, where the dwelling set back is 6.0m, or in<br />

Parklands.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

3/2/03<br />

D. M K. c<br />

D. M K.<br />

c<br />

UNDERGROUND DISTRIBUTION<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR TYPE<br />

INSTALLATION<br />

FILE: 5<br />

55 5114 1<br />

5114<br />

Dwg Sh<br />

1<br />

C


1 SITE (CONT’D)<br />

B<br />

1.5 Commercial and Industrial or Landscaped Areas<br />

Whether the padmounted substation is for the sole use of that<br />

complex, or is required as part of the distribution network, the<br />

owner is required to grant <strong>Ergon</strong> <strong>Energy</strong> an easement for the<br />

padmounted site, access and cabling.<br />

Separation of 5.0m between padmount transformer LV bushings<br />

and the nearest room or habitable area should be provided<br />

where possible.<br />

1.6 Parklands - for other than URD<br />

1.7<br />

A ORIGINAL ISSUE<br />

16.3.04<br />

C 3.7.08<br />

D 16.04.12<br />

Obtain the necessary approval for an easement to accommodate<br />

the padmounted substation, cabling and access to site.<br />

Acceptable separation of padmount to adjacent dwellings is<br />

shown in drawings No. 5116 Sheets 1 & 2.<br />

Cabling and Access Requirement<br />

Cabling and Access<br />

A 4.0m wide easement, or road reserve, from the front of the<br />

site is required for cabling and access.<br />

Cabling Only<br />

Should the cabling route not be available in conjunction with<br />

access, a 1.0m wide cable easement is required to the front<br />

of the padmount (to align with the front left side where applicable).<br />

Additionally 2.0m x 4.0m (padmount site width) is required<br />

immediately in front to allow spreading of cables for entry to the<br />

padmount and also include the buried earth cable.<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

2 SITE PREPARATION<br />

3<br />

2.1 Generally<br />

Sites shall be prepared in accordance with the included<br />

construction drawings.<br />

2.2 Filled Sites<br />

Sites requiring fill shall be provided with compacted fill<br />

in accordance with the following:<br />

For less than 300mm fill, Rolled or Compacted; or<br />

For greater than 300mm fill, Controlled.<br />

as defined in AS 2870.<br />

SLOPING SITES<br />

3.1 Retaining walls<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

Retaining walls shall be constructed around the perimeter of the<br />

padmounted substation site where the change in round level<br />

within the boundary of the site exceeds:<br />

200mm in site width<br />

400mm in site length or diagonally<br />

Retaining walls shall be:<br />

Constructed in 200 series concrete masonary block<br />

in accordance with AS/NZS 4455<br />

Outside the 4000mm width x 6000mm depth<br />

The site size shall be increased to include retaining walls,<br />

their footings and safety fence<br />

Note the retaining walls & footings must be located such that<br />

the cable routes within the site and in front of the site are not<br />

altered or restricted.<br />

Refer applicable TRENCHING folder drawings<br />

C.Noel<br />

3/2/03<br />

A.Bletchly<br />

T.Borg<br />

UNDERGROUND DISTRIBUTION<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR TYPE<br />

INSTALLATION<br />

FILE: 5<br />

55 5114 2<br />

5114<br />

Dwg Sh<br />

2<br />

D


4 PADMOUNTED SUBSTATION FOUNDATION<br />

B 18.11.03<br />

C<br />

4.1 Generally<br />

A ORIGINAL ISSUE<br />

16.3.04<br />

D 3.7.08<br />

E 16.04.12<br />

A safety fence shall be provided on retaining wall sloping sites<br />

where the difference between ground level and the finished<br />

surface of the padmount site is 300mm or greater.<br />

Refer drawing No. 5011<br />

The developer shall provide a certified design from a<br />

Civil Engineer (RPEQ) for <strong>Ergon</strong> <strong>Energy</strong>’s consideration.<br />

No special designs for wall construction<br />

shall be used without the approval of <strong>Ergon</strong> <strong>Energy</strong>.<br />

3.2 Rural Sites Only<br />

For padmounted substation sites in rural developments or<br />

similar where large allotments are provided and a change<br />

in ground level of 300mm or more occurs within 2m of the<br />

boundary of the site a 1:4 batter slope in lieu of the retaining<br />

wall may be allowed at the sole discretion of <strong>Ergon</strong> <strong>Energy</strong>.<br />

On cut battered sites a concrete barrier kerb and channel shall<br />

be provided outside the 4000mm x 6000mm to ensure this area<br />

remains free of water, silt or similar that could require periodic<br />

removal or maintenances. The site size shall be extended as<br />

necessary to include the kerb and channel.<br />

At stable padmounted substation sites a foundation shall be<br />

constructed in accordance with the following:<br />

4.1m long substation, base 800mm maximum above ground<br />

- refer Drawing No. 5280.<br />

4.1m long substation, base 1400mm maximum above ground<br />

- refer Drawing No. 5276.<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

At coastal locations in FN Region, unless agreed otherwise by<br />

<strong>Ergon</strong> <strong>Energy</strong>, foundations shall be constructed to ensure the<br />

base of a padmounted substation is above storm surge level<br />

for that location. e.g. In Cairns city, minimum level to the base<br />

of a substation shall be AHD 3.6m<br />

(R.L. 103.600 Cairns City Council Datum 1976).<br />

LV and/or HV Service Platforms shall be provided where the<br />

distance above site surface to top of blockwork at access<br />

doors exceeds 400mm.<br />

4.2 Unstable Sites<br />

Where sites are very unstable, and conventional foundation<br />

construction techniques as described in this document cannot<br />

be applied, a special design shall be required.<br />

In such circumstances, the developer shall obtain a certified<br />

design from a Civil Engineer (RPEQ) for <strong>Ergon</strong> <strong>Energy</strong>’s<br />

consideration. No special designs for padmounted substation<br />

foundation construction shall be used without the approval of<br />

<strong>Ergon</strong> <strong>Energy</strong>.<br />

5 BACKFILLING AND FINAL SITE FINISH<br />

Earthing, conduits and cables shall be installed prior to final site finish.<br />

All backfill of the site must be compacted before final site finish in<br />

accordance with the applicable drawing.<br />

5.1 Common Earthing Sites<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

The substation 6.0m x 4.0m site surface is to be finished with<br />

interlocking masonary paving (Besser "Interlock" or equivalent<br />

approved by <strong>Ergon</strong> <strong>Energy</strong>) installed in accordance with the<br />

manufacturer’s installation specification. A concrete slab shall<br />

not be provided.<br />

C.Noel<br />

3/2/03<br />

A.Bletchly<br />

T.Borg<br />

UNDERGROUND DISTRIBUTION<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR TYPE<br />

INSTALLATION<br />

FILE: 5<br />

55 5114 3<br />

5114<br />

Dwg Sh<br />

3<br />

E


6<br />

5.2 Separate Earthing Sites<br />

ADDITIONAL REQUIREMENTS<br />

6.1<br />

A ORIGINAL ISSUE<br />

B 18.6.08<br />

In addition to the requirements of Clause 5.1 the remaining<br />

ground surface between the barrier kerb (around the paving)<br />

and site extremities shall be finished in accordance with<br />

drawing No. 5177.<br />

Commercial and Industrial Installation<br />

The preferred location of padmounted substation sites at<br />

commercial and industrial developments is at the real property<br />

street alignment with the LV cabinet end of the padmounted<br />

substation facing the adjoining footpath.<br />

Should the padmounted substation site be located elsewhere<br />

on the development, clear all weather access to the site shall<br />

be provided for personnel and heavy equipment at all times.<br />

Easy access for a mobile crane must be available for the<br />

purpose of installation or replacement.<br />

<strong>Ergon</strong> <strong>Energy</strong> cable conduits for the development may be<br />

placed in the substation site and shall pass down the sides<br />

of the foundation. No conduits shall pass through or under<br />

the foundation.<br />

Refer Clause 5 for Backfilling and Final Site Finish.<br />

HARD COPY<br />

UNCONTROLLED<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

6.2 Padmounted Substations in Landscaped Areas<br />

When planting vegetation in landscaped areas and gardens,<br />

ensure vegetation does not encroach on the padmounted<br />

substation site. Take into consideration the fully matured size<br />

of vegetation to allow continuing access to the site.<br />

<strong>Ergon</strong> <strong>Energy</strong> cable conduits for the development may be<br />

placed in the substation site and shall pass down the sides<br />

of the foundation. No conduits shall pass through or under<br />

the foundation.<br />

Refer Clause 5 for Backfilling and Final Site Finish.<br />

6.3 Padmounted Substations Installation in Parklands<br />

Where the padmounted substation is located in Council<br />

Parklands, the installation shall be in accordance with the<br />

requirements of drawing No. 5116 Sheets 1 or 2.<br />

7 SPACING BETWEEN PADMOUNTED SUBSTATION AND<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

OTHER METAL OBJECTS - SEPARATE EARTHING SITES<br />

No buildings/residences, fences, including their foundations, LV<br />

switchboard earths, or metalic objects are permitted within the<br />

clearance zone around the padmount.<br />

Clearance to Telstra assets shall be as noted on EARTHING<br />

drawing No. 5125 Sheet 1.<br />

16/3/04<br />

D. M K. c<br />

D. M K.<br />

UNDERGROUND DISTRIBUTION<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR TYPE<br />

INSTALLATION<br />

FILE: 5<br />

55 5114 4<br />

5114<br />

Dwg Sh<br />

4<br />

B


Site<br />

A _<br />

Boundary<br />

Ground<br />

Line<br />

F<br />

F<br />

A ORIGINAL ISSUE<br />

B 4.3.08<br />

F<br />

6000 Min.<br />

PLAN<br />

Cabinet<br />

SECTION A<br />

_<br />

HARD COPY<br />

UNCONTROLLED<br />

F<br />

800<br />

F<br />

F<br />

1150<br />

F<br />

F<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

F<br />

F<br />

FOOTPATH<br />

4000 Min.<br />

F<br />

F<br />

R.P.Street<br />

Alignment<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

29/1/03<br />

D. M K. c<br />

C.Lindsay<br />

NOTES:<br />

1.<br />

2.<br />

Refer drawing No. 5114 Clause 1 for general site<br />

requirements.<br />

Refer drawing No. 5114 clauses for sloping<br />

site requirements<br />

3. No services other than the <strong>Ergon</strong> <strong>Energy</strong>’s<br />

electric cables shall pass through this<br />

padmounted substation site.<br />

4. Clear access to the padmounted substation<br />

shall be maintained for <strong>Ergon</strong> <strong>Energy</strong>’s<br />

personnel and heavy equipment.<br />

5. Mature landscaping (including trees, sprinklers<br />

etc) shall not encroach onto the padmounted<br />

substation site.<br />

FOR SEPARATE HV & LV EARTHING SITES,<br />

SIZE AND OTHER REQUIREMENTS.<br />

REFER DRAWING No. 5177.<br />

UNDERGROUND DISTRIBUTION<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR TYPE - SITE REQUIREMENT<br />

WITHOUT RETAINING WALL<br />

FILE: 5<br />

55 5117 1<br />

5117<br />

Dwg Sh<br />

B


Site<br />

B 4.3.04<br />

C 4.5.08<br />

800<br />

F<br />

F<br />

Finished<br />

Ground<br />

Line<br />

A _<br />

Boundary<br />

F<br />

F<br />

A ORIGINAL ISSUE<br />

F<br />

300 Min<br />

F<br />

F<br />

6000<br />

H.V. L.V.<br />

Paved Area<br />

Refer note 3<br />

PLAN<br />

F<br />

Cabinet<br />

SECTION A<br />

_<br />

HARD COPY<br />

UNCONTROLLED<br />

F<br />

F<br />

Service Platform<br />

Refer note 4<br />

1150<br />

F<br />

F<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

F<br />

F<br />

FOOTPATH<br />

4000<br />

F<br />

F<br />

R.P.Street<br />

Alignment<br />

Base of<br />

substation<br />

Refer note 2<br />

4/2/03<br />

D. M K. c<br />

C.Lindsay<br />

NOTES:<br />

1.<br />

Foundation & Duct Covers<br />

Refer note 1<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

2.<br />

3.<br />

4.<br />

For foundation, earthing, site finish and cover<br />

plate details:<br />

4.1m long substation, base 800mm maximum<br />

above ground. Refer drawing No. 775498.<br />

4.1m long substation, base 1400mm maximum<br />

above ground. Refer drawing No. 775500.<br />

At coastal locations in FN region, unless agreed<br />

otherwise by <strong>Ergon</strong> <strong>Energy</strong>, the base of substation<br />

is to be above storm surge level for that location.<br />

e.g. in Cairns City ONLY = AHD 3.6m<br />

(R.L. 103.600 Cairns City Council Datum 1976)<br />

The padmounted substation site shall be<br />

paved. Refer drawing No. 5114.<br />

Where the distance above paving to the<br />

base of substation at HV and/or LV cabinet<br />

access doors exceeds 400mm, provide<br />

service platform/s and access ladder/s.<br />

Refer drawing No. 775501.<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR TYPE - SITE FINISH<br />

WITHOUT RETAINING WALL<br />

55 5118 1<br />

5118<br />

<strong>Construction</strong> Type<br />

PMRF22<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

C


MATERIAL - PADMOUNTED SUBSTATION<br />

ASSY DESCRIPTION QTY<br />

563-3 Padmounted Substation 315kVA with LV Switchgear & Ring Main Unit ABB, SDAF3, 2 Switch 1 Fuse<br />

563-4 Padmounted Substation 500kVA with LV Switchgear & Ring Main Unit ABB, SDAF3, 2 Switch 1 Fuse<br />

563-5 Padmounted Substation 750kVA with LV Switchgear & Ring Main Unit ABB, SDAF3, 2 Switch 1 Fuse<br />

563-6 Padmounted Substation 1000kVA with LV Switchgear & Ring Main Unit ABB, SDAF3, 2 Switch 1 Fuse<br />

554-6<br />

554-8<br />

554-9<br />

554-11<br />

MATERIAL - LV FUSE<br />

ASSY<br />

529-11<br />

DESCRIPTION QTY<br />

Fuse link 125A din size 2<br />

529-13 Fuse link 200A din size 2<br />

529-14 Fuse link 250A din size 2<br />

529-16 Fuse link 355A din size 2<br />

529-17 Fuse link 400A din size 2<br />

A ORIGINAL ISSUE<br />

Cartridge fuse link 31.5A (to suit 315kVA padmounted substation)<br />

Cartridge fuse link 50A (to suit 500kVA padmounted substation)<br />

Cartridge fuse link 63A (to suit 750kVA padmounted substation)<br />

Cartridge fuse link 80A (to suit 1000kVA padmounted substation)<br />

B 6.10.05 HARD COPY<br />

C 3.3.11<br />

UNCONTROLLED<br />

3<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

NOTES:<br />

1.<br />

2.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

All Padmounted Substations are supplied with LV Switchgear<br />

and Ring Main Unit ABB SDAF3, 2 switch 1 fuse fitted.<br />

Designer to nominate LV fuse link current rating.<br />

HV fuse links are provided with switchgear construction.<br />

C. Noel<br />

15/3/04<br />

A. Bletchly<br />

C.Lindsay<br />

11kV PADMOUNTED SUBSTATIONS<br />

55 5184 1<br />

1<br />

3<br />

CONTRACT No. 2004 / 037 / T<br />

UNDERGROUND DISTRIBUTION<br />

FRONT ENTRY TYPE WITH LV SWITCHGEAR AND<br />

RMU ABB SDAF3 2 SWITCH 1 FUSE - MATERIAL<br />

FILE: 5<br />

5184<br />

Dwg Sh<br />

1<br />

C


Concrete<br />

Plinth<br />

Assy Selection<br />

554-6 to 11<br />

A ORIGINAL ISSUE<br />

B 6.10.05<br />

C 11.08.10<br />

D 3.3.11<br />

F<br />

HV SWITCHGEAR<br />

COMPARTMENT<br />

F<br />

For feeder cable connection,<br />

Refer HV CONSTRUCTION<br />

drawing No. 5051 (ABB RMU)<br />

HARD COPY<br />

UNCONTROLLED<br />

F<br />

TRANSFORMER<br />

PLAN<br />

LV SWITCHGEAR<br />

COMPARTMENT<br />

F<br />

F<br />

Assy Selection<br />

529-11 to 17<br />

For mains distribution cable connection,<br />

Refer LV CONSTRUCTION<br />

drawing No. 5209.<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

9/3/04<br />

A. Bletchly<br />

C.Lindsay<br />

F<br />

Assy Selection<br />

563-3 to 6<br />

SIDE VIEW<br />

CONTRACT No. 2004 / 037 / T<br />

Concrete<br />

Plinth<br />

11kV PADMOUNTED SUBSTATIONS<br />

55 5184 2<br />

5184<br />

F<br />

F<br />

<strong>Construction</strong> Type<br />

UNDERGROUND DISTRIBUTION<br />

PM11xxxASD<br />

FRONT ENTRY TYPE WITH LV SWITCHGEAR AND<br />

RMU ABB SDAF 3, 2 SWITCH 1 FUSE - CONSTRUCTION<br />

FILE: 5<br />

Dwg Sh<br />

2<br />

D


Sub-Station &<br />

Transformer<br />

Lifting Point<br />

A ORIGINAL ISSUE<br />

B 11.08.10<br />

F<br />

Concrete Plinth<br />

F<br />

TRANSFORMER<br />

HV SWITCHGEAR LV SWITCHGEAR<br />

NOT APPLICABLE<br />

PLAN<br />

HARD COPY<br />

UNCONTROLLED<br />

F<br />

F<br />

F<br />

F<br />

COMPARTMENT<br />

Transformer<br />

Lifting Point<br />

Sub-Station<br />

Lifting Point<br />

Assy Selection<br />

529-11 to 17<br />

For mains distribution cable connection,<br />

Refer LV CONSTRUCTION<br />

drawing No. 5209.<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

4/8/05<br />

D. M K. c<br />

C.Lindsay<br />

Transport Tie Down<br />

Point places<br />

F<br />

SIDE VIEW<br />

CONTRACT No. 2004/037/T<br />

11kV PADMOUNTED SUBSTATIONS<br />

F<br />

Concrete<br />

Plinth<br />

<strong>Construction</strong> Type<br />

UNDERGROUND DISTRIBUTION<br />

FRONT ENTRY TYPE WITH LV SWITCHGEAR<br />

CONSTRUCTION<br />

FILE: 5<br />

55 5189 2<br />

F<br />

Assy Selection<br />

565-3 to 6<br />

5189<br />

F<br />

Dwg Sh<br />

PM11<br />

2<br />

F<br />

B


Sub-Station &<br />

Transformer<br />

Lifting Point<br />

Assy Selection<br />

555-5 to 10<br />

A ORIGINAL ISSUE<br />

B 11.08.10<br />

F<br />

Concrete Plinth<br />

HV SWITCHGEAR<br />

COMPARTMENT<br />

F<br />

For feeder cable connection,<br />

Refer HV CONSTRUCTION<br />

drawing No. 5206 or 5207<br />

(ABB SafeLink RMU)<br />

F<br />

F<br />

TRANSFORMER<br />

PLAN<br />

HARD COPY<br />

UNCONTROLLED<br />

LV SWITCHGEAR<br />

COMPARTMENT<br />

F<br />

F<br />

F<br />

F<br />

Transformer<br />

Lifting Point<br />

Sub-Station<br />

Lifting Point<br />

Assy Selection<br />

529-11 to 17<br />

For mains distribution cable connection,<br />

Refer LV CONSTRUCTION<br />

drawing No. 5209.<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

4/8/05<br />

D. M K. c<br />

C.Lindsay<br />

Transport Tie Down<br />

Point places<br />

F<br />

SIDE VIEW<br />

11kV PADMOUNTED SUBSTATIONS<br />

F<br />

Concrete<br />

Plinth<br />

<strong>Construction</strong> Type<br />

UNDERGROUND DISTRIBUTION<br />

PM11xxxASL<br />

FRONT ENTRY TYPE WITH LV SWITCHGEAR AND<br />

ABB SAFELINK RMU, 2 SW. 1 FUSE - CONSTRUCTION<br />

FILE: 5<br />

55 5191 2<br />

F<br />

Assy Selection<br />

566-3 to 6<br />

CONTRACT No. 2004/037/T<br />

5191<br />

F<br />

Dwg Sh<br />

2<br />

F<br />

B


HV SWITCHGEAR SIDE<br />

FEEDER<br />

CABLE<br />

NOTE:<br />

FEEDER<br />

CABLE<br />

Alternator connection point provided on LV Bus Bars.<br />

A ORIGINAL ISSUE<br />

B 8.3.11<br />

C 30.12.11<br />

RATING<br />

315kVA<br />

500kVA<br />

HARD COPY<br />

UNCONTROLLED<br />

LV SWITCHGEAR SIDE<br />

xxx / 630A<br />

xxx / 400A<br />

xxx / 400A<br />

xxx / 400A<br />

HV SWITCHGEAR SIDE<br />

FEEDER<br />

CABLE<br />

NOTE:<br />

C.Lindsay<br />

FEEDER<br />

CABLE<br />

11kV PADMOUNTED SUBSTATION<br />

with ABB SafeLink RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCHES<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

3 x Right angle adaptor brackets with bolts etc.<br />

RATING<br />

LV SWITCHGEAR SIDE<br />

to connect to LV busbars are supplied in plastic bag.<br />

Brackets will accept 3 x 300mm† cables per phase.<br />

Alternator connection point provided on LV Bus Bars.<br />

C. Noel<br />

14/12/05<br />

A. Bletchly<br />

11kV PADMOUNTED SUBSTATIONS<br />

FRONT ENTRY TYPE - SCHEMATIC<br />

ABB SAFELINK HV SWITCHGEAR & LV SWITCHGEAR<br />

55 5192 1<br />

750kVA<br />

xxx / 630A<br />

5192<br />

xxx / 630A<br />

xxx / 630A<br />

1<br />

xxx / 630A<br />

CONTRACT No. 2004/037/T<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

C


HV SWITCHGEAR SIDE<br />

FEEDER<br />

CABLE<br />

NOTE:<br />

FEEDER<br />

CABLE<br />

3 x Right angle adaptor brackets with bolts etc.<br />

RATING<br />

LV SWITCHGEAR SIDE<br />

to connect to LV busbars are supplied in plastic bag.<br />

Brackets will accept 3 x 300mm† cables per phase.<br />

Alternator connection point provided on LV Bus Bars.<br />

A ORIGINAL ISSUE<br />

B 8.3.11<br />

C 30.12.11<br />

1000kVA<br />

HARD COPY<br />

UNCONTROLLED<br />

SPARE<br />

SPARE<br />

SPARE<br />

SPARE<br />

11kV PADMOUNTED SUBSTATION<br />

with ABB SafeLink RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV DISCONNECTOR<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

4/8/05<br />

A. Bletchly<br />

C.Lindsay<br />

11kV PADMOUNTED SUBSTATIONS<br />

FRONT ENTRY TYPE - SCHEMATIC<br />

ABB SAFELINK HV SWITCHGEAR & LV SWITCHGEAR<br />

55 5192 2<br />

CONTRACT No. 2004 / 037 / T<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

5192<br />

Dwg Sh<br />

2<br />

C


MATERIAL - PADMOUNTED SUBSTATION<br />

ASSY DESCRIPTION QTY<br />

587-3<br />

587-4<br />

587-5<br />

587-6<br />

555-5<br />

555-7<br />

555-9<br />

555-10<br />

ASSY<br />

529-11<br />

Cartridge fuse link 25A (to suit 315kVA padmounted substation)<br />

Cartridge fuse link 40A (to suit 500kVA padmounted substation)<br />

Cartridge fuse link 63A (to suit 750kVA padmounted substation)<br />

Cartridge fuse link 80A (to suit 1000kVA padmounted substation)<br />

MATERIAL - LV FUSE - EACH CIRCUIT<br />

DESCRIPTION QTY<br />

Fuse link 125A din size 2<br />

529-13 Fuse link 200A din size 2<br />

529-14 Fuse link 250A din size 2<br />

529-15 Fuse link 315A din size 2<br />

529-16 Fuse link 355A din size 2<br />

529-17 Fuse link 400A din size 2<br />

A ORIGINAL ISSUE<br />

Padmounted Substation 315kVA with LV Switchgear & Schneider Electric FBX, 2 Switch 1 Fuse<br />

Padmounted Substation 500kVA with LV Switchgear & Schneider Electric FBX, 2 Switch 1 Fuse<br />

Padmounted Substation 750kVA with LV Switchgear & Schneider Electric FBX, 2 Switch 1 Fuse<br />

Padmounted Substation 1000kVA with LV Switchgear & Schneider Electric FBX, 2 Switch 1 Fuse<br />

3<br />

HARD COPY<br />

UNCONTROLLED<br />

NOTES:<br />

1.<br />

2.<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

All Padmounted Substations are supplied with LV Switchgear<br />

and Ring Main Unit fitted - Schneider Electric FBX, 2 switch 1 fuse.<br />

Designer to nominate LV fuse link current rating.<br />

HV fuse links are provided in construction.<br />

3. All LV fuse - switch- disconnector bases are 630A rated.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C.Noel<br />

15.11.11<br />

A.Bletchly<br />

T.Borg<br />

11kV PADMOUNTED SUBSTATIONS<br />

55 5264 1<br />

1<br />

3<br />

CONTRACT No. 08088EECL<br />

UNDERGROUND DISTRIBUTION<br />

FRONT ENTRY TYPE WITH LV SWITCHGEAR AND<br />

SCHNEIDER ELECTRIC FBX RMU, 2 SW. 1 FUSE - MATERIAL<br />

FILE: 5<br />

5264<br />

Dwg Sh<br />

1


Sub-Station &<br />

Transformer<br />

Lifting Point<br />

Assy Selection<br />

555-5 to 10<br />

A ORIGINAL ISSUE<br />

F<br />

Concrete Plinth<br />

HV SWITCHGEAR<br />

COMPARTMENT<br />

F<br />

For feeder cable connection,<br />

Refer HV CONSTRUCTION<br />

drawing No. 5270<br />

(FBX RMU)<br />

F<br />

F<br />

TRANSFORMER<br />

PLAN<br />

HARD COPY<br />

UNCONTROLLED<br />

LV SWITCHGEAR<br />

COMPARTMENT<br />

F<br />

F<br />

F<br />

F<br />

Transformer<br />

Lifting Point<br />

Sub-Station<br />

Lifting Point<br />

Assy Selection<br />

529-11 to 17<br />

For mains distribution cable connection,<br />

Refer LV CONSTRUCTION<br />

drawing No. 5209.<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C.Noel<br />

15.11.11<br />

A.Bletchly<br />

T.Borg<br />

Transport Tie Down<br />

Point places<br />

F<br />

SIDE VIEW<br />

CONTRACT No. 08088EECL<br />

11kV PADMOUNTED SUBSTATIONS<br />

Concrete<br />

Plinth<br />

<strong>Construction</strong> Type<br />

UNDERGROUND DISTRIBUTION<br />

PM11xxxFBX<br />

FRONT ENTRY TYPE WITH LV SWITCHGEAR AND<br />

55 5264 2<br />

F<br />

Assy Selection<br />

587-3 to 6<br />

F<br />

SCHNEIDER ELECTRIC FBX, 2 SW. 1 FUSE - CONSTRUCTION<br />

FILE: 5<br />

5264<br />

F<br />

Dwg Sh<br />

2<br />

F


HV SWITCHGEAR SIDE<br />

FEEDER<br />

CABLE<br />

NOTE:<br />

RATING<br />

315kVA<br />

500kVA<br />

LV SWITCHGEAR SIDE<br />

xxx / 400A<br />

HV SWITCHGEAR SIDE<br />

F F<br />

FEEDER<br />

xxx / 400A<br />

xxx / 400A<br />

CABLE<br />

NOTE:<br />

RATING<br />

LV SWITCHGEAR SIDE<br />

Alternator connection point provided on LV Bus Bars. Alternator connection point provided on LV Bus Bars.<br />

A ORIGINAL ISSUE<br />

B<br />

28.06.12<br />

FEEDER<br />

CABLE<br />

xxx / 630A<br />

3 x Right angle adaptor brackets with bolts etc.<br />

to connect to LV busbars are supplied in plastic bag.<br />

Brackets will accept 3 x 300mm† cables per phase.<br />

11kV PADMOUNTED SUBSTATION<br />

750kVA<br />

with SCHNEIDER ELECTRIC FBX RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCHES<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

15.11.11<br />

A. Bletchly<br />

T.Borg<br />

FEEDER<br />

CABLE<br />

11kV PADMOUNTED SUBSTATIONS<br />

FRONT ENTRY TYPE - SCHEMATIC<br />

SCHNEIDER ELECTRIC FBX HV SWITCHGEAR & LV SWITCHGEAR<br />

55 5265 1<br />

xxx / 630A<br />

5265<br />

xxx / 630A<br />

xxx / 630A<br />

1<br />

xxx / 630A<br />

CONTRACT No. 08088EECL<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

B


HV SWITCHGEAR SIDE<br />

FEEDER<br />

CABLE<br />

NOTE:<br />

3 x Right angle adaptor brackets with bolts etc.<br />

RATING<br />

LV SWITCHGEAR SIDE<br />

to connect to LV busbars are supplied in plastic bag.<br />

Brackets will accept 3 x 300mm† cables per phase.<br />

Alternator connection point provided on LV Bus Bars.<br />

A ORIGINAL ISSUE<br />

B<br />

28.06.12<br />

F<br />

FEEDER<br />

CABLE<br />

1000kVA<br />

SPARE<br />

SPARE<br />

SPARE<br />

SPARE<br />

11kV PADMOUNTED SUBSTATION<br />

with SCHNEIDER ELECTRIC FBX RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV DISCONNECTOR<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

16.11.11<br />

A. Bletchly<br />

T.Borg<br />

11kV PADMOUNTED SUBSTATIONS<br />

FRONT ENTRY TYPE - SCHEMATIC<br />

SCHNEIDER ELECTRIC FBX HV SWITCHGEAR & LV SWITCHGEAR<br />

55 5265 2<br />

CONTRACT No. 08088EECL<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

5265<br />

Dwg Sh<br />

2<br />

B


MATERIAL - PADMOUNTED SUBSTATION INCLUDING LV SWITCHGEAR<br />

ASSY DESCRIPTION<br />

542-3<br />

542-4<br />

542-5<br />

Padmounted Substation 4.1m Long 500kVA with LV Switchgear<br />

Padmounted Substation 4.1m Long 1000kVA with LV Switchgear<br />

Padmounted Substation 4.1m Long 315kVA with LV Switchgear<br />

513-1 Connection earth bar to cover plate 2<br />

QTY<br />

MATERIAL - PADMOUNTED SUBSTATION INCLUDING LV AND HV SWITCHGEAR<br />

ASSY DESCRIPTION<br />

590-1<br />

590-2<br />

590-3<br />

590-4<br />

590-5<br />

590-6<br />

590-7<br />

590-8<br />

590-9<br />

590-10<br />

556-3<br />

556-4<br />

556-7<br />

Cartridge fuse link 16A - 200kVA & 315kVA transformers<br />

Cartridge fuse link 20A - 500kVA transformers<br />

Cartridge fuse link - 40A 1000kVA transformers<br />

1<br />

Refer note 4<br />

16.11.11<br />

MATERIAL - LV FUSE<br />

ASSY DESCRIPTION QTY<br />

529-13 Fuse link 200A din size 2<br />

529-14 Fuse link 250A din size 2<br />

529-15 Fuse link 315A din size 2<br />

529-16<br />

513-1 Connection earth bar to cover plate 2<br />

1. All padmount substations are supplied fitted with either LV switchgear or LV and HV switchgear as required<br />

2. Padmount substations for new installations shall be 4.1m long.<br />

3. Designers to nominate LV fuse link current rating<br />

4. HV fuse links provided with the padmounted substation construction.<br />

Those fitted with 2 switch 2 fuse RMU are supplied with 3 fuse links to suit that transformer only.<br />

Designer to nominate required fuse links for the remaining fuse unit<br />

5. All LV fuse - switch - disconnectors bases are 630A rated.<br />

A ORIGINAL ISSUE<br />

Padmounted Substation 200kVA 4.1m Long with LV Switchgear & RM6 1 Switch 1 Fuse<br />

Padmounted Substation 315kVA 4.1m Long with LV Switchgear & RM6 2 Switch 1 Fuse<br />

Padmounted Substation 315kVA 4.1m Long with LV Switchgear & RM6 3 Switch 1 Fuse<br />

Padmounted Substation 315kVA 4.1m Long with LV Switchgear & RM6 2 Switch 2 Fuse<br />

Padmounted Substation 500kVA 4.1m Long with LV Switchgear & RM6 2 Switch 1 Fuse<br />

Padmounted Substation 500kVA 4.1m Long with LV Switchgear & RM6 3 Switch 1 Fuse<br />

Padmounted Substation 500kVA 4.1m Long with LV Switchgear & RM6 2 Switch 2 Fuse<br />

Padmounted Substation 1000kVA 4.1m Long with LV Switchgear & RM6 2 Switch 1 Fuse<br />

Padmounted Substation 1000kVA 4.1m Long with LV Switchgear & RM6 3 Switch 1 Fuse<br />

Padmounted Substation 1000kVA 4.1m Long with LV Switchgear & RM6 2 Switch 2 Fuse<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C.Noel<br />

A.Bletchly<br />

T.Borg<br />

529-17 Fuse link 400A din size 2<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR TYPE<br />

MATERIAL<br />

Fuse link 355A din size 2<br />

QTY<br />

1<br />

3<br />

55 5266 1<br />

5266<br />

1<br />

3<br />

CONTRACT No. 08088EECL<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh


F<br />

For mains distribution<br />

cable connection, Refer<br />

LV CONSTRUCTION<br />

drawing No. 5087.<br />

or<br />

A ORIGINAL ISSUE<br />

F<br />

F<br />

Assy 513-1<br />

For feeder cable connection,<br />

Refer HV CONSTRUCTION<br />

Assy Selection<br />

drawing No. 5279 (RM6 RMU)<br />

drawing No. 5120 (Transformer)<br />

529-13, 14, 15, 16 or 17<br />

F<br />

F<br />

Assy Selection<br />

556-3, 4 or 7<br />

HV<br />

Compartment<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

F<br />

C.Noel<br />

16.11.11<br />

A.Bletchly<br />

T.Borg<br />

Assy 513-1<br />

Transformer<br />

Compartment<br />

CONTRACT No. 08088EECL<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR TYPE<br />

CONSTRUCTION<br />

55 5266 2<br />

F<br />

Assy Selection<br />

542-3 to 5 or<br />

590-1 to 10<br />

LV<br />

Compartment<br />

5266<br />

<strong>Construction</strong> Type<br />

PMR22<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

2


HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

BLANK<br />

BLANK<br />

22kV PADMOUNTED SUBSTATION<br />

with SCHNEIDER ELECTRIC RM6 NE-Q1 RING MAIN UNIT<br />

(1 SWITCHABLE FEEDER UNIT & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

A ORIGINAL ISSUE<br />

F<br />

RATING<br />

200kVA<br />

BLANK<br />

xxx/400A<br />

xxx/400A<br />

BLANK<br />

CONTRACT No. 08088EECL<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

02.04.12<br />

F<br />

22kV PADMOUNTED SUBSTATION<br />

with SCHNEIDER ELECTRIC RM6 NE-1Q1 RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

A. Bletchly<br />

T.Borg<br />

xxx/400A<br />

RATING<br />

315kVA<br />

500kVA<br />

RECTANGULAR TYPE - SCHEMATIC<br />

xxx/400A<br />

xxx/400A<br />

22kV PADMOUNTED SUBSTATIONS<br />

SCHNEIDER ELECTRIC HV SWITCHGEAR AND LV SWITCHGEAR<br />

55 5267 1<br />

xxx/400A<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

5267<br />

Dwg Sh<br />

xxx/400A<br />

1<br />

BLANK


HV SWITCHGEAR SIDE<br />

F<br />

xxx/400A<br />

xxx/400A<br />

LV SWITCHGEAR SIDE<br />

22kV PADMOUNTED SUBSTATION<br />

with SCHNEIDER ELECTRIC RM6 NE-1Q1 RING MAIN UNIT<br />

(3 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

A ORIGINAL ISSUE<br />

xxx/400A<br />

RATING<br />

315kVA<br />

500kVA<br />

xxx/400A<br />

xxx/400A<br />

BLANK<br />

CONTRACT No. 08088EECL<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

F<br />

22kV PADMOUNTED SUBSTATION<br />

with SCHNEIDER ELECTRIC RM6 NE-11Q1 RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 2 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

RATING<br />

315kVA<br />

500kVA<br />

22kV PADMOUNTED SUBSTATIONS<br />

02.04.12<br />

RECTANGULAR TYPE - SCHEMATIC<br />

A. Bletchly<br />

T.Borg<br />

55 5267 2<br />

xxx/400A<br />

xxx/400A<br />

UNDERGROUND DISTRIBUTION<br />

xxx/400A<br />

SCHNEIDER ELECTRIC HV SWITCHGEAR AND LV SWITCHGEAR<br />

FILE: 5<br />

5267<br />

xxx/400A<br />

Dwg Sh<br />

2<br />

xxx/400A<br />

BLANK


HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

CONSUMERS MAINS<br />

ISOLATOR<br />

RATING<br />

xxx/630A<br />

xxx/630A<br />

BLANK<br />

F F<br />

22kV PADMOUNTED SUBSTATION<br />

with SCHNEIDER ELECTRIC RM6 NE-1Q1 RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

A ORIGINAL ISSUE<br />

HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

1000kVA 1000kVA<br />

CONTRACT No. 08088EECL<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

02.04.12<br />

CONSUMERS MAINS<br />

ISOLATOR<br />

22kV PADMOUNTED SUBSTATION<br />

with SCHNEIDER ELECTRIC RM6 NE-11Q1 RING MAIN UNIT<br />

(3 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />

and LV FUSE SWITCH<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

A. Bletchly<br />

T.Borg<br />

RATING<br />

UNDERGROUND DISTRIBUTION<br />

RECTANGULAR TYPE - SCHEMATIC<br />

xxx/630A<br />

xxx/630A<br />

22kV PADMOUNTED SUBSTATIONS<br />

SCHNEIDER ELECTRIC HV SWITCHGEAR AND LV SWITCHGEAR<br />

FILE: 5<br />

55 5267 3<br />

5267<br />

BLANK<br />

Dwg Sh<br />

3


HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

F<br />

CONSUMERS MAINS<br />

ISOLATOR<br />

22kV PADMOUNTED SUBSTATION<br />

with SCHNEIDER ELECTRIC RM6 NE-Q1Q1 RING MAIN UNIT<br />

(2 SWITCHABLE FEEDER UNITS & 2 FUSE PROTECTED TEE<br />

and LV FUSE SWITCH<br />

A ORIGINAL ISSUE<br />

RATING<br />

1000kVA<br />

xxx/630A<br />

xxx/630A<br />

BLANK<br />

CONTRACT No. 08088EECL<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

02.04.12<br />

A. Bletchly<br />

T.Borg<br />

UNDERGROUND DISTRIBUTION<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR TYPE - SCHEMATIC<br />

SCHNEIDER ELECTRIC HV SWITCHGEAR AND LV SWITCHGEAR<br />

FILE: 5<br />

55 5267 4<br />

5267<br />

Dwg Sh<br />

4


HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

A ORIGINAL ISSUE<br />

xxx/400A<br />

xxx/400A<br />

22kV PADMOUNTED SUBSTATION<br />

Schneider Electric with LV FUSE SWITCH ONLY<br />

RATING<br />

315kVA<br />

500kVA<br />

xxx/400A<br />

xxx/400A<br />

xxx/400A<br />

BLANK<br />

CONTRACT No. 08088EECL<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />

C.Noel<br />

CONSUMERS MAINS<br />

ISOLATOR<br />

22kV PADMOUNTED SUBSTATION<br />

Schneider Electric with LV FUSE SWITCH ONLY<br />

RATING<br />

1000kVA<br />

22kV PADMOUNTED SUBSTATIONS<br />

02.04.12<br />

RECTANGULAR TYPE - SCHEMATIC<br />

A.Bletchly<br />

T.Borg<br />

55 5272 1<br />

xxx/630A<br />

UNDERGROUND DISTRIBUTION<br />

xxx/630A<br />

SCHNEIDER ELECTRIC LV SWITCHGEAR ONLY<br />

FILE: 5<br />

BLANK<br />

5272<br />

Dwg Sh


1 CONSTRUCTION CO-ORDINATION<br />

Co-ordination is required during foundation construction and finish of the<br />

Padmounted Substation site to ensure installation of conduit, earthing and sand bedding under paving. Terminate top reinforcement bar each side<br />

(where required) service platforms. The Civil Service Provider is<br />

responsible for co-ordination of works, notifying <strong>Ergon</strong> <strong>Energy</strong> or other<br />

Service Provider(s), as required.<br />

2 SERVICE PLATFORMS<br />

Where the distance above paving to the top of blockwork at HV and/or<br />

LV cabinet access doors exceeds 400mm, provide service platform(s)<br />

and access ladder(s).<br />

Refer PADMOUNTED SUBSTATIONS dwg No. 5280 for details.<br />

3 CONCRETE<br />

(a) All concrete work shall be in accordance with AS 3600 & AS 2870.<br />

(b) Concrete for footings and slabs shall be grade N20 to AS 3600.<br />

(c) Minimum cover to reinforcement - 40mm.<br />

4 CABLE CONDUITS<br />

Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong> TRENCHING:<br />

Drawing 5142 for HV and LV conduit locations.<br />

5 EARTHING CABLE PROTECTION CONDUITS<br />

Provide 25 dia UPVC conduit at earth penetrations through<br />

50mm thick unreinforced concrete slab.<br />

A ORIGINAL ISSUE<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

6<br />

7<br />

8<br />

DRAINAGE SLOTS<br />

Provide approx. 5mm wide slots down to finished ground level to drain<br />

of slot. On flat sites provide slots at 2m max. spacing on all sides and on<br />

sloping sites at 2m max. spacing on ’down hill’ sides.<br />

MASONRY BLOCKWORK<br />

(a) Concrete blocks shall be grade 15 in accordance with AS2733<br />

and AS3700.<br />

(b) Mortar shall be class M3 in accordance with AS 3700.<br />

(c) Grout shall be 20MPa at 28 days - 10mm maximum aggregate size.<br />

(d) Concrete masonry material and workmanship shall comply with<br />

AS 3700.<br />

(e) Masonry blocks shall be 200 series and comply with AS/NZS 4455.<br />

(f) All cores containing reinforcement shall be grout filled. Provide an<br />

opening in bottom course to permit clean out of cell space.<br />

(g) Vertical reinforcement to block walls shall be 1/Y12 at corners,<br />

beside openings and at 1200mm max. centres.<br />

(h) Reinforce single course bond beam at top of wall with 2/Y12 bars<br />

horizontally.<br />

ALUMINIUM COVER PLATES & SUPPORT ANGLES<br />

Provide 3mm marine grade Aluminium cover plates fitted to Aluminium<br />

support Lat<br />

(2) openings in blockwork. Obtain final dimensions on site.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

10.04.12<br />

A. Bletchly<br />

T.Borg<br />

UNDERGROUND DISTRIBUTION<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR 3.7m LONG, 800mm MAXIMUM ABOVE<br />

GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />

FILE: 5<br />

Dwg 5273 Sh1<br />

55 5273 1


A ORIGINAL ISSUE<br />

RP Boundary<br />

A<br />

F<br />

4000<br />

F<br />

RP Boundary<br />

F<br />

800<br />

F<br />

F<br />

1390<br />

F<br />

F<br />

1390<br />

F<br />

F<br />

300<br />

F<br />

FF<br />

F 190 1010<br />

F<br />

F<br />

300<br />

F<br />

190 F<br />

RP Boundary<br />

F<br />

F<br />

Barrier Kerb<br />

1060<br />

Besser "Interlock" Pavers<br />

F<br />

F<br />

50<br />

F<br />

F<br />

F 190<br />

F<br />

F<br />

F<br />

F<br />

340 F<br />

1010<br />

Barrier Kerb<br />

F<br />

100<br />

B<br />

C<br />

F<br />

890<br />

F<br />

F<br />

F150<br />

190<br />

F<br />

F<br />

6000<br />

3790<br />

Barrier Kerb<br />

HV Service Platform (if required)<br />

Refer Note 2<br />

Barrier Kerb<br />

PLAN<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

1610<br />

200 Series Masonary Blocks<br />

F<br />

F<br />

190<br />

Drainage SlotF<br />

Refer Note 6<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

F<br />

C. Noel<br />

10.04.12<br />

C<br />

A. Bletchly<br />

T.Borg<br />

F<br />

F<br />

Barrier Kerb<br />

F<br />

600 F<br />

F<br />

250<br />

F<br />

600<br />

50<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F F<br />

50<br />

F<br />

100<br />

F<br />

100<br />

50<br />

F<br />

340<br />

F<br />

340 F<br />

LV Service Platform (if required)<br />

Refer Note 2<br />

F<br />

F<br />

550<br />

F<br />

1800<br />

1150<br />

F<br />

F<br />

F<br />

Barrier Kerb<br />

F<br />

F<br />

300<br />

F<br />

F<br />

FOOTPATH<br />

R.P.Street<br />

Alignment<br />

Earthing<br />

UNDERGROUND DISTRIBUTION<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR 3.7m LONG, 800mm MAXIMUM ABOVE<br />

GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />

FILE: 5<br />

Dwg 5273 Sh2<br />

55 5273 2


150 F<br />

Earthing<br />

A ORIGINAL ISSUE<br />

F<br />

F<br />

300 Min<br />

F<br />

F<br />

F<br />

200 series Bond Beam<br />

2/N12 bars horizontally<br />

F<br />

F<br />

150mm thick concrete slab ( Grade N20 )<br />

placed centrally<br />

Cable Conduits<br />

Refer Note 4<br />

F<br />

F<br />

25<br />

F<br />

F<br />

N12 bars Vertically<br />

reinforced with one layer SL72 mesh<br />

SECTION<br />

A<br />

Cable conduit omitted from view<br />

M10 Galv. Masonary Anchors<br />

@ 400 max crs.<br />

F<br />

75 x 50 x 6 Al.L<br />

Refer Note 8 F 20<br />

F<br />

F<br />

F<br />

20<br />

F<br />

25dia Earthing Protection<br />

Conduit. Refer Note 5.<br />

F<br />

F<br />

F<br />

F<br />

F F<br />

F45<br />

40<br />

F<br />

5<br />

F<br />

F<br />

F<br />

35<br />

F<br />

20<br />

F<br />

F<br />

F<br />

35<br />

F<br />

F<br />

50<br />

F<br />

3mm Alum Cover P L<br />

Refer Note 8<br />

800 Max<br />

200 Min.<br />

Earthing<br />

Barrier Kerb<br />

50mm thick unreinforced concrete<br />

Vapour Barrier<br />

Orange Caution Tape<br />

Earthing. Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong><br />

EARTHING Dwg 5123 Common Earth, 5125 Seperate Earth.<br />

F<br />

F<br />

D<br />

F<br />

F<br />

Cover Plate<br />

SECTION C<br />

VIEW<br />

SCALE 1:10 SCALE 1:10<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

10 thick x 50mm dia Backing Plate<br />

Stitch weld<br />

Drill & tap M12 (2 places) for lifting holes<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

10.04.12<br />

F<br />

F<br />

F<br />

A. Bletchly<br />

T.Borg<br />

F<br />

100<br />

F<br />

F<br />

250<br />

F<br />

F<br />

500<br />

F<br />

F<br />

F<br />

F<br />

14 dia hole for<br />

Earth Connection<br />

F<br />

F<br />

F<br />

D<br />

Compacted, well graded,<br />

course bedding sand.<br />

F<br />

150<br />

F<br />

F<br />

F<br />

Besser "Interlock" Pavers<br />

laid in accordance with<br />

manufacturers specification<br />

F<br />

Min Fal 1 in 50 F<br />

F<br />

40mm Min. levelling layer<br />

of compacted, well graded,<br />

course bedding sand.<br />

25<br />

5<br />

F F<br />

F<br />

SECTION<br />

B<br />

Cable conduit omitted from view<br />

6 Thick x 25mm dia Backing Plate<br />

Stitch weld<br />

Drill & tap for M10 SS ’D’ Head Bolts<br />

200<br />

55 5273 3<br />

F<br />

F<br />

50<br />

F<br />

F<br />

85<br />

F<br />

400 max.crs.<br />

F<br />

5273<br />

F<br />

F<br />

2/N12 Bars<br />

Min 600 Lap, 40 Cover<br />

F<br />

F<br />

F150<br />

22kV PADMOUNTED SUBSTATIONS<br />

F<br />

Barrier Kerb<br />

F<br />

100 200<br />

F<br />

Earthing<br />

F<br />

F<br />

Cable Trench<br />

UNDERGROUND DISTRIBUTION<br />

3<br />

Natural Surface<br />

RECTANGULAR 3.7m LONG, 800mm MAXIMUM ABOVE<br />

GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />

FILE: 5<br />

Dwg Sh


1 CONSTRUCTION CO-ORDINATION<br />

Co-ordination is required during foundation construction and finish of the<br />

2 SERVICE PLATFORMS<br />

3 CONCRETE<br />

(a) All concrete work shall be in accordance with AS 3600 & AS 2870.<br />

(b) Concrete for footings and slabs shall be grade N20 to AS 3600.<br />

(c) Minimum cover to reinforcement - 40mm.<br />

4 CABLE CONDUITS<br />

Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong> TRENCHING:<br />

Drawing 5142 for HV and LV conduit locations.<br />

5 EARTHING CABLE PROTECTION CONDUITS<br />

Provide 25 dia UPVC conduit at earth penetrations through<br />

50mm thick unreinforced concrete slab.<br />

7<br />

8<br />

DRAINAGE SLOTS<br />

Padmounted Substation site to ensure installation of conduit, earthing and sand bedding under paving. Terminate top reinforcement bar each side<br />

(where required) service platforms. The Civil Service Provider is<br />

responsible for co-ordination of works, notifying <strong>Ergon</strong> <strong>Energy</strong> or other<br />

Service Provider(s), as required.<br />

Where the distance above paving to the top of blockwork at HV and/or<br />

LV cabinet access doors exceeds 400mm, provide service platform(s)<br />

and access ladder(s).<br />

Refer PADMOUNTED SUBSTATIONS dwg No. 5280 for details.<br />

A ORIGINAL ISSUE<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

6<br />

Provide approx. 5mm wide slots down to finished ground level to drain<br />

of slot. On flat sites provide slots at 2m max. spacing on all sides and on<br />

sloping sites at 2m max. spacing on ’down hill’ sides.<br />

MASONRY BLOCKWORK<br />

(a) Concrete blocks shall be grade 15 in accordance with AS2733<br />

and AS3700.<br />

(b) Mortar shall be class M3 in accordance with AS 3700.<br />

(c) Grout shall be 20MPa at 28 days - 10mm maximum aggregate size.<br />

(d) Concrete masonry material and workmanship shall comply with<br />

AS 3700.<br />

(e) Masonry blocks shall be 200 series and comply with AS/NZS 4455.<br />

(f) All cores containing reinforcement shall be grout filled. Provide an<br />

opening in bottom course to permit clean out of cell space.<br />

(g) Vertical reinforcement to block walls shall be 1/Y12 at corners,<br />

beside openings and at 1200mm max. centres.<br />

(h) Reinforce single course bond beam at top of wall with 2/Y12<br />

bars horizontally.<br />

ALUMINIUM COVER PLATES & SUPPORT ANGLES<br />

Provide 3mm marine grade Aluminium cover plates fitted to Aluminium<br />

support Lat<br />

(2) openings in blockwork. Obtain final dimensions on site.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

10.04.12<br />

A. Bletchly<br />

T.Borg<br />

UNDERGROUND DISTRIBUTION<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR 4.1m LONG, 800mm MAXIMUM ABOVE<br />

GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />

FILE: 5<br />

Dwg 5274 Sh1<br />

55 5274 1


A ORIGINAL ISSUE<br />

RP Boundary<br />

A<br />

F<br />

4000<br />

F<br />

RP Boundary<br />

F<br />

800<br />

F<br />

F<br />

1390<br />

F<br />

F<br />

300<br />

F<br />

F<br />

F 190 1010<br />

F<br />

F<br />

300<br />

F<br />

190 F<br />

RP Boundary<br />

F<br />

F<br />

Barrier Kerb<br />

660<br />

F<br />

200<br />

F<br />

F<br />

F<br />

F 190<br />

F<br />

F<br />

F<br />

490 F<br />

Besser "Interlock" Pavers<br />

F<br />

F<br />

100<br />

1410<br />

B<br />

C<br />

Barrier Kerb<br />

750 F<br />

F<br />

F<br />

F150<br />

190<br />

HV Service Platform (if required)<br />

Refer Note 2<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

F<br />

ABN 50 087 646 062<br />

F<br />

6000<br />

4190<br />

Barrier Kerb<br />

Barrier Kerb<br />

PLAN<br />

1610<br />

200 Series Masonary Blocks<br />

Drainage Slot<br />

Refer Note 6<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

F<br />

C. Noel<br />

10.04.12<br />

A. Bletchly<br />

F<br />

T.Borg<br />

F<br />

190<br />

C<br />

F<br />

F<br />

F<br />

Barrier Kerb<br />

F<br />

600 F<br />

F<br />

250<br />

F<br />

F<br />

F<br />

F<br />

F<br />

50<br />

F<br />

50<br />

F<br />

F<br />

F<br />

550<br />

F<br />

1800<br />

LV Service Platform (if required)<br />

Refer Note 2<br />

1150<br />

22kV PADMOUNTED SUBSTATIONS<br />

Barrier Kerb<br />

RECTANGULAR 4.1m LONG, 800mm MAXIMUM ABOVE<br />

GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />

FILE: 5<br />

600<br />

50 F<br />

F<br />

F<br />

F<br />

100<br />

F<br />

100<br />

340<br />

F<br />

F<br />

340<br />

Dwg 5274 Sh2<br />

55 5274 2<br />

F<br />

F<br />

F<br />

F<br />

F<br />

300<br />

F<br />

F<br />

FOOTPATH<br />

R.P.Street<br />

Alignment<br />

Earthing<br />

UNDERGROUND DISTRIBUTION


A ORIGINAL ISSUE<br />

F<br />

150 F<br />

F<br />

300 Min<br />

F<br />

Earthing<br />

F<br />

F<br />

F<br />

200 Series Bond Beam<br />

2/N12 bars Horizontally<br />

150mm thick concrete slab ( Grade N20 )<br />

reinforced with one layer SL72 mesh<br />

placed centrally<br />

F<br />

Cable Conduits<br />

Refer Note 4<br />

F<br />

F<br />

SECTION<br />

M10 Galv. Masonary Anchors<br />

@ 400 max crs.<br />

25<br />

F<br />

F<br />

F<br />

75 x 50 x 6 Al.L<br />

Refer Note 8 F 20<br />

F<br />

A<br />

Cable conduit omitted from view<br />

F<br />

F<br />

20<br />

C<br />

F<br />

25dia Earthing Protection<br />

Conduit. Refer Note 5.<br />

SECTION<br />

N12 bars Vertically<br />

F<br />

F<br />

F<br />

F<br />

F F<br />

F45<br />

40<br />

F<br />

5<br />

F<br />

F<br />

F<br />

35<br />

F<br />

20<br />

F<br />

F<br />

F<br />

35<br />

F<br />

F<br />

50<br />

F<br />

3mm Alum Cover P L<br />

Refer Note 8<br />

F<br />

F<br />

F<br />

Earthing<br />

Barrier Kerb<br />

800 Max<br />

200 Min.<br />

50mm thick unreinforced concrete<br />

Vapour Barrier<br />

Orange Caution Tape<br />

Earthing. Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong><br />

EARTHING Dwg 5123 Common Earth, 5125 Seperate Earth.<br />

D<br />

F<br />

Cover Plate<br />

SCALE 1:10 SCALE 1:10<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

10 thick x 50mm dia Backing Plate<br />

Stitch weld<br />

Drill & tap M12 (2 places) for lifting holes<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

F<br />

100<br />

F<br />

C. Noel<br />

10.04.12<br />

A. Bletchly<br />

T.Borg<br />

F<br />

F<br />

F<br />

14 dia Hole for<br />

Earth Connection<br />

VIEW<br />

F<br />

D<br />

F<br />

F<br />

F<br />

F<br />

F<br />

150<br />

F<br />

250<br />

F<br />

F<br />

F<br />

Compacted, well graded,<br />

course bedding sand.<br />

F<br />

500<br />

F<br />

F<br />

F<br />

F<br />

25<br />

F F<br />

5<br />

F<br />

50<br />

F<br />

F<br />

F<br />

85<br />

F<br />

400 max.crs.<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR 4.1m LONG, 800mm MAXIMUM ABOVE<br />

GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />

55 5274 3<br />

Besser "Interlock" Pavers<br />

laid in accordance with<br />

manufacturers specification<br />

Min Fal 1 in 50 F<br />

6 Thick x 25mm dia Backing Plate<br />

Stitch weld<br />

Drill & tap for M10 SS ’D’ Head Bolts<br />

200<br />

F<br />

F<br />

40mm Min. levelling layer<br />

of compacted, well graded,<br />

course bedding sand.<br />

SECTION<br />

B<br />

Cable conduit omitted from view<br />

F<br />

5274<br />

F<br />

F<br />

2/N12 Bars<br />

Min 600 Lap, 40 Cover<br />

F<br />

F<br />

F150<br />

F<br />

3<br />

Barrier Kerb<br />

F<br />

100 200<br />

F<br />

Earthing<br />

F<br />

F<br />

Cable Trench<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

Natural Surface


1 CONSTRUCTION CO-ORDINATION<br />

Co-ordination is required during foundation construction and finish of the<br />

2 SERVICE PLATFORMS<br />

3 CONCRETE<br />

(a) All concrete work shall be in accordance with AS 3600 & AS 2870.<br />

(b) Concrete for footings and slabs shall be grade N20 to AS 3600.<br />

(c) Minimum cover to reinforcement - 40mm.<br />

4 CABLE CONDUITS<br />

Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong> TRENCHING:<br />

Drawing 5142 for HV and LV conduit locations.<br />

5 EARTHING CABLE PROTECTION CONDUITS<br />

Provide 25 dia UPVC conduit at earth penetrations through<br />

50mm thick unreinforced concrete slab.<br />

7<br />

8<br />

DRAINAGE SLOTS<br />

Padmounted Substation site to ensure installation of conduit, earthing and sand bedding under paving. Terminate top reinforcement bar each side<br />

(where required) service platforms. The Civil Service Provider is<br />

responsible for co-ordination of works, notifying <strong>Ergon</strong> <strong>Energy</strong> or other<br />

Service Provider(s), as required.<br />

Where the distance above paving to the top of blockwork at HV and/or<br />

LV cabinet access doors exceeds 400mm, provide service platform(s)<br />

and access ladder(s).<br />

Refer PADMOUNTED SUBSTATIONS dwg No. 5280 for details.<br />

A ORIGINAL ISSUE<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

6<br />

Provide approx. 5mm wide slots down to finished ground level to drain<br />

of slot. On flat sites provide slots at 2m max. spacing on all sides and on<br />

sloping sites at 2m max. spacing on ’down hill’ sides.<br />

MASONRY BLOCKWORK<br />

(a) Concrete blocks shall be grade 15 in accordance with AS2733<br />

and AS3700.<br />

(b) Mortar shall be class M3 in accordance with AS 3700.<br />

(c) Grout shall be 20MPa at 28 days - 10mm maximum aggregate size.<br />

(d) Concrete masonry material and workmanship shall comply with<br />

AS 3700.<br />

(e) Masonry blocks shall be 200 series and comply with AS/NZS 4455.<br />

(f) All cores containing reinforcement shall be grout filled. Provide an<br />

opening in bottom course to permit clean out of cell space.<br />

(g) Vertical reinforcement to block walls shall be 1/Y12 at corners,<br />

beside openings and at 1200mm max. centres.<br />

(h) Reinforce single course bond beam at top of wall with 2/Y12<br />

bars horizontally.<br />

ALUMINIUM COVER PLATES & SUPPORT ANGLES<br />

Provide 3mm marine grade Aluminium cover plates fitted to Aluminium<br />

support Lat<br />

(2) openings in blockwork. Obtain final dimensions on site.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

10.04.12<br />

A. Bletchly<br />

T.Borg<br />

UNDERGROUND DISTRIBUTION<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR 3.7m LONG, 1400mm MAXIMUM ABOVE<br />

GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />

FILE: 5<br />

Dwg 5275 Sh1<br />

55 5275 1


A ORIGINAL ISSUE<br />

RP Boundary<br />

A<br />

F<br />

4000<br />

F<br />

RP Boundary<br />

F<br />

800<br />

F<br />

F<br />

1390<br />

F<br />

F<br />

1390<br />

F<br />

F<br />

300<br />

F<br />

F<br />

F 190 1010<br />

F<br />

F<br />

300<br />

F<br />

190 F<br />

RP Boundary<br />

F<br />

F<br />

Barrier Kerb<br />

1060<br />

Besser "Interlock" Pavers<br />

F<br />

F<br />

50<br />

F<br />

F<br />

F 190<br />

F<br />

F<br />

F<br />

F<br />

340 F<br />

Barrier Kerb<br />

F<br />

100<br />

B<br />

1010<br />

C<br />

F<br />

890<br />

F<br />

F<br />

F150<br />

190<br />

F<br />

F<br />

6000<br />

3790<br />

Barrier Kerb<br />

HV Service Platform (if required)<br />

Refer Note 2<br />

Barrier Kerb<br />

PLAN<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

1610<br />

200 Series Masonary Blocks<br />

Drainage Slot<br />

Refer Note 6<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

F<br />

F<br />

F<br />

C. Noel<br />

10.04.12<br />

A. Bletchly<br />

T.Borg<br />

190<br />

C<br />

F<br />

F<br />

F<br />

Barrier Kerb<br />

F<br />

600 F<br />

F<br />

250<br />

F<br />

600<br />

50 F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

50<br />

F<br />

100<br />

F<br />

100<br />

F<br />

50<br />

F<br />

340<br />

F<br />

340 F<br />

F<br />

F<br />

550<br />

F<br />

1800<br />

LV Service Platform (if required)<br />

Refer Note 2<br />

1150<br />

22kV PADMOUNTED SUBSTATIONS<br />

F<br />

F<br />

F<br />

Barrier Kerb<br />

F<br />

F<br />

300<br />

RECTANGULAR 3.7m LONG, 1400mm MAXIMUM ABOVE<br />

GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />

FILE: 5<br />

Dwg 5275 Sh2<br />

55 5275 2<br />

F<br />

F<br />

FOOTPATH<br />

R.P.Street<br />

Alignment<br />

Earthing<br />

UNDERGROUND DISTRIBUTION


200 series Bond Beam<br />

2/N12 bars horizontally<br />

Earthing<br />

150 F<br />

F<br />

A ORIGINAL ISSUE<br />

F<br />

F<br />

F<br />

F<br />

placed centrally<br />

F<br />

N12 bars Vertically<br />

150mm thick concrete slab ( Grade N20 )<br />

reinforced with one layer SL72 mesh<br />

SECTION<br />

A<br />

Cable conduit omitted from view<br />

F<br />

Cable Conduits<br />

Refer Note 4<br />

M10 Galv. Masonary Anchors<br />

@ 400 max crs.<br />

25<br />

75 x 50 x 6 Al.L<br />

Refer Note 8 F 20<br />

F<br />

F<br />

F<br />

20<br />

C<br />

F<br />

F<br />

40<br />

5<br />

F<br />

F<br />

F<br />

35<br />

20<br />

FF<br />

35<br />

FF<br />

FF<br />

F<br />

SCALE 1:10<br />

F<br />

25dia Earthing Protection<br />

Conduit. Refer Note 5.<br />

SECTION<br />

F<br />

F<br />

200 Min.<br />

F45<br />

FF<br />

F<br />

50<br />

F<br />

3mm Alum L Cover PL<br />

Refer Note 8<br />

F<br />

F<br />

D<br />

Barrier Kerb<br />

Cover Plate<br />

F<br />

F<br />

100<br />

14 dia hole for<br />

Earth Connection<br />

F<br />

10 thick x 50mm dia Backing Plate<br />

Stitch weld<br />

Drill & tap M12 (2 places) for lifting holes<br />

VIEW<br />

F<br />

D<br />

F<br />

SCALE 1:10<br />

F<br />

F<br />

F<br />

6 Thick x 25mm dia Backing Plate<br />

Stitch weld<br />

Drill & tap for M10 SS ’D’ Head Bolts<br />

200<br />

150<br />

F<br />

Min Fal 1 in 50 F<br />

F<br />

F<br />

F<br />

F<br />

25<br />

F F<br />

5<br />

F<br />

50<br />

F<br />

F<br />

F<br />

85<br />

400 max.crs.<br />

(typical)<br />

F<br />

F F<br />

F F<br />

F150<br />

F<br />

Barrier Kerb<br />

100 200<br />

FF<br />

F F<br />

Orange Caution Tape<br />

Earthing. Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong><br />

EARTHING Dwg 5123 Common Earth, 5125 Seperate Earth.<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

1400 Max<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

F<br />

F<br />

F<br />

Earthing<br />

FF 250<br />

500 F<br />

F<br />

F<br />

C. Noel<br />

10.04.12<br />

A. Bletchly<br />

T.Borg<br />

50mm thick<br />

unreinforced concrete<br />

Vapour Barrier<br />

F<br />

F<br />

Compacted, well graded,<br />

course bedding sand.<br />

Besser "Interlock" Pavers<br />

laid in accordance with<br />

manufacturers specification<br />

F<br />

40mm Min. levelling layer<br />

of compacted, well graded,<br />

course bedding sand.<br />

SECTION<br />

B<br />

Cable conduit omitted from view<br />

22kV PADMOUNTED SUBSTATIONS<br />

F<br />

F<br />

F<br />

F<br />

F<br />

Earthing<br />

F<br />

F<br />

Cable Trench<br />

Natural Surface<br />

RECTANGULAR 3.7m LONG, 1400mm MAXIMUM ABOVE<br />

GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />

FILE: 5<br />

Dwg 5275 Sh3<br />

55 5275 3<br />

2/N12 Bars<br />

Min 600 Lap, 40 Cover<br />

UNDERGROUND DISTRIBUTION


1 CONSTRUCTION CO-ORDINATION<br />

Co-ordination is required during foundation construction and finish of the<br />

2 SERVICE PLATFORMS<br />

3 CONCRETE<br />

(a) All concrete work shall be in accordance with AS 3600 & AS 2870.<br />

(b) Concrete for footings and slabs shall be grade N20 to AS 3600.<br />

(c) Minimum cover to reinforcement - 40mm.<br />

4 CABLE CONDUITS<br />

Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong> TRENCHING:<br />

Drawing 5142 for HV and LV conduit locations.<br />

5 EARTHING CABLE PROTECTION CONDUITS<br />

Provide 25 dia UPVC conduit at earth penetrations through<br />

50mm thick unreinforced concrete slab.<br />

7<br />

8<br />

DRAINAGE SLOTS<br />

Padmounted Substation site to ensure installation of conduit, earthing and sand bedding under paving. Terminate top reinforcement bar each side<br />

(where required) service platforms. The Civil Service Provider is<br />

responsible for co-ordination of works, notifying <strong>Ergon</strong> <strong>Energy</strong> or other<br />

Service Provider(s), as required.<br />

Where the distance above paving to the top of blockwork at HV and/or<br />

LV cabinet access doors exceeds 400mm, provide service platform(s)<br />

and access ladder(s).<br />

Refer PADMOUNTED SUBSTATIONS dwg No. 5280 for details.<br />

A ORIGINAL ISSUE<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

6<br />

Provide approx. 5mm wide slots down to finished ground level to drain<br />

of slot. On flat sites provide slots at 2m max. spacing on all sides and on<br />

sloping sites at 2m max. spacing on ’down hill’ sides.<br />

MASONRY BLOCKWORK<br />

(a) Concrete blocks shall be grade 15 in accordance with AS2733<br />

and AS3700.<br />

(b) Mortar shall be class M3 in accordance with AS 3700.<br />

(c) Grout shall be 20MPa at 28 days - 10mm maximum aggregate size.<br />

(d) Concrete masonry material and workmanship shall comply with<br />

AS 3700.<br />

(e) Masonry blocks shall be 200 series and comply with AS/NZS 4455.<br />

(f) All cores containing reinforcement shall be grout filled. Provide an<br />

opening in bottom course to permit clean out of cell space.<br />

(g) Vertical reinforcement to block walls shall be 1/Y12 at corners,<br />

beside openings and at 1200mm max. centres.<br />

(h) Reinforce single course bond beam at top of wall with 2/Y12<br />

bars horizontally.<br />

ALUMINIUM COVER PLATES & SUPPORT ANGLES<br />

Provide 3mm marine grade Aluminium cover plates fitted to Aluminium<br />

support Lat<br />

(2) openings in blockwork. Obtain final dimensions on site.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

10.04.12<br />

A. Bletchly<br />

T.Borg<br />

UNDERGROUND DISTRIBUTION<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR 4.1m LONG, 1400mm MAXIMUM ABOVE<br />

GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />

FILE: 5<br />

Dwg 5276 Sh1<br />

55 5276 1


A ORIGINAL ISSUE<br />

RP Boundary<br />

A<br />

F<br />

4000<br />

F<br />

RP Boundary<br />

F<br />

800<br />

F<br />

F<br />

1390<br />

F<br />

F<br />

1390<br />

F<br />

F<br />

300<br />

F<br />

F<br />

F 190 1010<br />

F<br />

F<br />

300<br />

F<br />

190 F<br />

RP Boundary<br />

F<br />

F<br />

Barrier Kerb<br />

660<br />

F<br />

200<br />

F<br />

F<br />

F<br />

F 190<br />

F<br />

F<br />

F<br />

490 F<br />

Besser "Interlock" Pavers<br />

F<br />

F<br />

100<br />

1410<br />

B<br />

C<br />

Barrier Kerb<br />

750 F<br />

F<br />

F<br />

F150<br />

190<br />

HV Service Platform (if required)<br />

Refer Note 2<br />

F<br />

F<br />

6000<br />

4190<br />

Barrier Kerb<br />

Barrier Kerb<br />

PLAN<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

1610<br />

200 Series Masonary Blocks<br />

Drainage Slot<br />

Refer Note 6<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

F<br />

F<br />

F<br />

C. Noel<br />

10.04.12<br />

A. Bletchly<br />

T.Borg<br />

190<br />

C<br />

F<br />

F<br />

F<br />

Barrier Kerb<br />

F<br />

600 F<br />

F<br />

250<br />

F<br />

600<br />

50 F<br />

F<br />

F<br />

F<br />

F<br />

F<br />

50<br />

F<br />

100<br />

F<br />

F<br />

100<br />

F<br />

50<br />

F<br />

340<br />

F<br />

F<br />

340<br />

F<br />

F<br />

550<br />

F<br />

1800<br />

LV Service Platform (if required)<br />

Refer Note 2<br />

1150<br />

22kV PADMOUNTED SUBSTATIONS<br />

F<br />

F<br />

F<br />

Barrier Kerb<br />

F<br />

F<br />

300<br />

RECTANGULAR 4.1m LONG, 1400mm MAXIMUM ABOVE<br />

GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />

FILE: 5<br />

Dwg 5276 Sh2<br />

55 5276 2<br />

F<br />

F<br />

FOOTPATH<br />

R.P.Street<br />

Alignment<br />

Earthing<br />

UNDERGROUND DISTRIBUTION


200 Series bond Beam<br />

2/N12 bars Horizontally<br />

150 F<br />

F<br />

Earthing<br />

A ORIGINAL ISSUE<br />

F<br />

F<br />

F<br />

F<br />

150mm thick concrete slab (Grade N20)<br />

reinforced with one layer SL72 mesh<br />

placed centrally.<br />

F<br />

N12 bars Vertically<br />

F<br />

SECTION<br />

A<br />

Cable conduit omitted from view<br />

Cable Conduits<br />

Refer Note 4<br />

M10 Galv. Masonary Anchors<br />

@ 400 max crs.<br />

25<br />

F<br />

F<br />

F<br />

20<br />

75 x 50 x 6 Al.L<br />

Refer Note 8<br />

FF<br />

F<br />

F<br />

20<br />

C<br />

F<br />

25dia Earthing Protection<br />

Conduit. Refer Note 5.<br />

SECTION<br />

F<br />

F<br />

40<br />

F<br />

5<br />

F<br />

F<br />

F<br />

35<br />

F<br />

20<br />

F<br />

F<br />

F<br />

35<br />

F<br />

F<br />

50<br />

F<br />

F<br />

F<br />

3mm Alum Cover PL<br />

Refer Note 8<br />

F F<br />

F45<br />

1400 Max<br />

200 Min.<br />

F<br />

F<br />

Orange Caution Tape<br />

Earthing. Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong><br />

EARTHING Dwg 5123 Common Earth, 5125 Seperate Earth.<br />

D<br />

F<br />

Earthing<br />

Cover Plate<br />

Barrier Kerb<br />

F<br />

F<br />

F 250<br />

500 F<br />

SCALE 1:10 SCALE 1:10<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

F<br />

F<br />

C. Noel<br />

10.04.12<br />

A. Bletchly<br />

F<br />

T.Borg<br />

F<br />

100<br />

14 dia Hole for<br />

Earth Connection<br />

F<br />

F<br />

F<br />

F<br />

Vapour Barrier<br />

F<br />

D<br />

F<br />

150<br />

F<br />

6 Thick x 25mm dia Backing Plate<br />

Stitch weld<br />

Drill & tap for M10 SS ’D’ Head Bolts<br />

200<br />

10 thick x 50mm dia Backing Plate<br />

Stitch weld<br />

Drill & tap M12 (2 places) for lifting holes<br />

VIEW<br />

50mm thick<br />

unreinforced concrete<br />

F<br />

F<br />

F<br />

FF<br />

F<br />

F<br />

Compacted, well graded,<br />

course bedding sand.<br />

25<br />

F F<br />

5<br />

50<br />

F<br />

F<br />

F<br />

85<br />

400 max.crs.<br />

(typical)<br />

F<br />

F<br />

FF<br />

F F<br />

Besser "Interlock" Pavers<br />

laid in accordance with<br />

manufacturers specification<br />

Min Fal 1 in 50 F<br />

40mm Min. levelling layer<br />

of compacted, well graded,<br />

course bedding sand.<br />

F150<br />

22kV PADMOUNTED SUBSTATIONS<br />

F<br />

SECTION<br />

RECTANGULAR 4.1m LONG, 1400mm MAXIMUM ABOVE<br />

GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />

Dwg 5276 Sh3<br />

55 5276 3<br />

B<br />

Cable conduit omitted from view<br />

F<br />

F<br />

F<br />

2/N12 Bars<br />

Min 600 Lap, 40 Cover<br />

F<br />

F<br />

F<br />

Barrier Kerb<br />

F<br />

100 200<br />

F<br />

Earthing<br />

F<br />

F<br />

Cable Trench<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Natural Surface


A ORIGINAL ISSUE<br />

MATERIAL:<br />

TOLERANCES:<br />

FABRICATION:<br />

PROTECTIVE<br />

COAT:<br />

CONCRETE:<br />

NOTES:<br />

Structural steel bars and sections shall be in accordance with AS/NZS 3679 - 250.<br />

Circular hollow sections shall be in accordance with AS 1163 - C250.<br />

+<br />

-2mm<br />

except where otherwise specified on drawing.<br />

(a) Welds shall be categorg SP in accordance with AS/NZS 1554.1.<br />

All joints shall be full seal welds unless noted otherwise.<br />

Fillet welds shall be 5mm.<br />

(b) Remove sharp edges, burrs and weld spatter prior to galvanizing.<br />

(c) Remove slag after galvanizing.<br />

Hot dip galvanize after fabrication in accordance with AS/NZS 4680.<br />

(a) All concrete work shall be in accordance with AS 3600.<br />

(b) Concrete shall be grade N20 in accordance with AS 3600.<br />

(c) Minimum cover to reinforcement - 65mm.<br />

(a) Fix Gridmesh to support frame using galv. clamps in accordance with manufactures<br />

requirements.<br />

(b) Chain to be hooked on Padmount side of Platform. Chain and hook to be clear of<br />

ladder access when in unhooked position.<br />

(c) Establish height of service platforms and ladders on site.<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C. Noel<br />

04.07.12<br />

A. Bletchly<br />

T.Borg<br />

UNDERGROUND DISTRIBUTION<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR HV AND LV SERVICE PLATFORM<br />

DETAILS<br />

FILE: 5<br />

Dwg 5280 Sh1<br />

55 5280 1


A ORIGINAL ISSUE<br />

95<br />

14 dia holes (4 places) for<br />

12mm Chemset masonary anchors<br />

Back of MS<br />

F<br />

+ 5<br />

850-<br />

0<br />

F<br />

Back of MS<br />

F<br />

+ 5<br />

900-<br />

0<br />

Top Grating<br />

Refer Detail 1<br />

F<br />

F<br />

+ 5<br />

1400-<br />

0<br />

F<br />

F<br />

450<br />

F<br />

F<br />

150<br />

F<br />

F<br />

F<br />

80 F<br />

F<br />

FF F<br />

F<br />

F<br />

F<br />

FF<br />

F<br />

300 dia<br />

F<br />

F<br />

F<br />

F<br />

F<br />

300 Min.<br />

1200<br />

33.7 x 2 CHS top rail<br />

26.9 x 2 CHS Mid.Rail<br />

48.3 x 3.2 CHS posts<br />

60.3 OD x 3.6Tk posts<br />

4/N12 Vertical Bars<br />

W8 Ties @ 600crs Max<br />

F<br />

F<br />

300<br />

F<br />

Refer Detail 4<br />

F<br />

+ 5<br />

2600<br />

-0<br />

+ 5<br />

2440<br />

-0<br />

2440<br />

400 810<br />

F<br />

F F 250<br />

F<br />

F F 250<br />

80<br />

F<br />

F<br />

F 330<br />

F<br />

F 600 F 220<br />

F<br />

F<br />

30<br />

F<br />

1390<br />

F<br />

Back of MS<br />

Edge of Blockwork<br />

Back of MS<br />

C. Noel<br />

22kV PADMOUNTED SUBSTATIONS<br />

04.07.12<br />

RECTANGULAR HV AND LV SERVICE PLATFORM<br />

A. Bletchly<br />

T.Borg<br />

F<br />

FF<br />

FF<br />

FF<br />

300<br />

F<br />

F<br />

Galvanised GR50110<br />

gridmesh floor<br />

75 x 75 x 6 Fl. Base Plates<br />

Refer galvanizing note above<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

F<br />

PLAN<br />

Refer Detail 3<br />

Provide internal holes in handrails and posts<br />

as required by Galvanizer to vent and drain<br />

zinc during galvanizing.<br />

F<br />

14 dia holes (2 places) for<br />

12mm Chemset masonary anchors<br />

ELEVATION<br />

F<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

95<br />

F<br />

F<br />

1200<br />

F<br />

F<br />

F<br />

300<br />

F<br />

F<br />

F<br />

F<br />

300<br />

F<br />

F<br />

F<br />

90<br />

600<br />

F<br />

F<br />

500 Min<br />

F<br />

F<br />

F<br />

F<br />

F<br />

150<br />

F<br />

F<br />

+ 5<br />

850-0<br />

Refer Detail 4<br />

Refer Detail 2<br />

F<br />

F<br />

180<br />

F<br />

65<br />

F<br />

300<br />

F<br />

F<br />

790<br />

Galvanised GR50110<br />

gridmesh floor<br />

600<br />

600<br />

450<br />

F<br />

600<br />

F<br />

300 dia<br />

F<br />

F<br />

F<br />

F<br />

Back of MS<br />

F<br />

F<br />

F<br />

F<br />

F<br />

DETAILS<br />

F<br />

F<br />

F<br />

+ 5<br />

2100-<br />

0<br />

F<br />

F<br />

Back of MS<br />

F<br />

Back of MS<br />

8mm galv. chain<br />

at ladder access.<br />

Refer note.<br />

Rungs to be equaly spaced<br />

200min - 300max<br />

65 x 10 Fl Stiles<br />

Top of top rung level<br />

with top Gridmesh<br />

W8 Ties @ 600crs.<br />

55 5280 2<br />

20mm dia. MS Rungs.<br />

Full seal fillet weld<br />

to Stiles.<br />

<strong>Construction</strong> joint if reqd.<br />

4/N12 Vertical Bars<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

5280<br />

Dwg Sh<br />

2


A ORIGINAL ISSUE<br />

75 F<br />

FF 35<br />

Edge of blockwork<br />

F<br />

F<br />

F<br />

40<br />

F F<br />

12<br />

70<br />

150<br />

F<br />

40 x 40 x 5 L<br />

75 Long<br />

F F<br />

12<br />

100<br />

60 x 8 Plate 150 Long<br />

75 TFC frame<br />

F<br />

40<br />

F<br />

PLAN<br />

SCALE 1:5<br />

Edge of blockwork<br />

F<br />

F<br />

F<br />

ELEVATION<br />

F<br />

DETAIL 2<br />

22 F<br />

F F<br />

10<br />

Gridmesh omitted for clarity<br />

F<br />

F<br />

75 x 75 x 6 L x 150 Long<br />

F<br />

75 TFC<br />

F<br />

60<br />

F<br />

SECTION A<br />

14 dia holes (2 places) for<br />

12mm galv. Chemset masonary anchors<br />

75 x 75 x 6 L x 150 Long<br />

48.3 x 3.2 CHS post<br />

5 FF<br />

5 FF<br />

F<br />

F<br />

20 FF<br />

F<br />

DETAIL 1<br />

SCALE 1:5<br />

12<br />

80<br />

F<br />

75 TFC<br />

150 F<br />

12<br />

40 x 40 x 5 L 75 Long<br />

PLAN<br />

F<br />

Galvanised GR50110<br />

gridmesh floor<br />

F<br />

20<br />

FF<br />

A<br />

M12 galv. bolts<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

33.7 x 2 CHS top rail<br />

Galvanised GR50110<br />

gridmesh floor<br />

75TFC<br />

75 TFC<br />

5 FF<br />

75 TFC<br />

40<br />

C. Noel<br />

04.07.12<br />

A. Bletchly<br />

T.Borg<br />

FFF<br />

38<br />

FF<br />

Fabricate 150 x 75 x 6 L x 600 Long<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

75 TFC<br />

F<br />

12<br />

F<br />

150<br />

5 FF<br />

20 x 6 Fl. 600 Long<br />

Stitch Weld<br />

F<br />

48.3 x 3.2 CHS posts<br />

F<br />

F<br />

F<br />

20 F<br />

F<br />

F<br />

F<br />

F<br />

65 x 6 Fl. 80 Long<br />

65 x 10 Fl.<br />

100r F<br />

195<br />

F<br />

Edge of blockwork<br />

PLAN<br />

SCALE 1:5<br />

F<br />

DETAIL 4<br />

SCALE 1:2.5<br />

188<br />

ELEVATION<br />

M12 bolt<br />

F<br />

F 100<br />

F<br />

F<br />

F<br />

14 dia. hole<br />

32 x 5 Fl. x 60 Long<br />

For earth connection<br />

22kV PADMOUNTED SUBSTATIONS<br />

RECTANGULAR HV AND LV SERVICE PLATFORM<br />

DETAILS<br />

55 5280 3<br />

F<br />

220<br />

F<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

5280<br />

Dwg Sh<br />

3


F<br />

F<br />

4400 Min.<br />

R.P.Street<br />

Alignment<br />

A ORIGINAL ISSUE<br />

FOOTPATH<br />

F<br />

F<br />

F<br />

F<br />

1150<br />

F<br />

F<br />

1000<br />

F<br />

1750<br />

6200 Min.<br />

PLAN<br />

Cabinet<br />

SECTION A<br />

_<br />

F<br />

F<br />

100<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

F<br />

CONCRETE STRENGTHS<br />

Foundation<br />

F’c Slump Aggregate Cement<br />

25MPa<br />

Blockwork /<br />

17.5MPa<br />

Core Filling<br />

N16 at 400 crs<br />

80mm Vertical<br />

20 cover to<br />

Conduit<br />

inside face<br />

A<br />

_<br />

200 series<br />

F<br />

F<br />

F<br />

F<br />

1390<br />

Site<br />

Boundary<br />

200<br />

200<br />

Ground<br />

Line<br />

F<br />

Conduit installed through RETAINING WALL DETAIL<br />

the slab and continue to<br />

C.Noel<br />

10.07.12<br />

A.Bletchly<br />

T.Borg<br />

blockwork<br />

N16 at 400 crs<br />

lap 500 at<br />

corners & where<br />

necessary<br />

SL72 mesh with<br />

60 cover top<br />

N12 at 300 crs<br />

lap 400<br />

250<br />

ground level for ease of<br />

finding. This can be cut<br />

to suit later.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

F<br />

F<br />

75<br />

150<br />

Concrete infill to<br />

be rounded to form<br />

watershed capping<br />

F<br />

F<br />

F<br />

F<br />

Size (Max) Content (Min)<br />

20mm<br />

22kV PADMOUNTED SUBSTATIONS<br />

F<br />

F<br />

-<br />

10mm 300kg/cu. m<br />

75 cover to bottom<br />

RETAINING WALL - MAXIMUM HEIGHT 1.2m<br />

55 5281 1<br />

50<br />

800<br />

F<br />

CUT SLOPING SITE<br />

F<br />

300<br />

5281<br />

Site<br />

Boundary<br />

500<br />

1<br />

Backfill<br />

material<br />

Filter<br />

material<br />

N16 at 400 crs<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

1200 Max.<br />

500


F<br />

F<br />

4400 Min.<br />

Fence refer<br />

FOOTPATH<br />

drawing 5011.<br />

Footpath<br />

Ground Line<br />

600<br />

F<br />

Min<br />

F<br />

Backfill<br />

A ORIGINAL ISSUE<br />

F<br />

F<br />

F<br />

1150<br />

F<br />

F<br />

1000<br />

F<br />

1750<br />

F<br />

F<br />

Cabinet<br />

SECTION<br />

6200 Min.<br />

PLAN<br />

A<br />

F<br />

F<br />

F<br />

F<br />

F<br />

Site<br />

F<br />

Boundary<br />

Finished<br />

Site Level<br />

F<br />

F<br />

F<br />

F<br />

1390<br />

Filter material<br />

Weepholes<br />

F<br />

A _<br />

200<br />

200<br />

Natural Ground<br />

Line<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

100mm dia conduit<br />

through footing for<br />

earth spike. Trim top<br />

of conduit as req’d.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C.Noel<br />

10.07.12<br />

A.Bletchly<br />

T.Borg<br />

CONCRETE STRENGTHS<br />

Foundation<br />

F<br />

F’c<br />

25MPa<br />

Blockwork /<br />

17.5MPa<br />

Core Filling<br />

Filter<br />

20 cover to<br />

inside face<br />

Backfill<br />

material<br />

material<br />

Concrete infill to<br />

RETAINING WALL DETAIL<br />

22kV PADMOUNTED SUBSTATIONS<br />

RETAINING WALL - MAXIMUM HEIGHT 1.2m<br />

55 5281 2<br />

F<br />

Slump<br />

75<br />

be rounded to form<br />

watershed capping<br />

N16 at 400 crs<br />

N12 at 400<br />

with 55 cover<br />

300<br />

150 10mm<br />

F<br />

F<br />

F<br />

300<br />

FILLED SLOPING SITE<br />

Size (Max) Content (Min)<br />

50<br />

F<br />

F<br />

Aggregate<br />

F<br />

F<br />

20mm<br />

F<br />

500<br />

800<br />

5281<br />

Site<br />

Boundary<br />

lap 500 at<br />

necessary<br />

F<br />

F<br />

2<br />

-<br />

300kg/cu. m<br />

N16 at 400 crs<br />

200 series<br />

blockwork<br />

N12 at 400<br />

Cement<br />

corners & where<br />

SL72 mesh<br />

F<br />

F<br />

55 cover<br />

250<br />

UNDERGROUND DISTRIBUTION<br />

FILE: 5<br />

Dwg Sh<br />

F<br />

500<br />

1400 Max.<br />

N16 at 400 crs<br />

F<br />

F


RETAINING WALL CONSTRUCTION<br />

1 SETTING OUT<br />

The Contractor shall be responsible for the correct setting out of<br />

works. The Contractor shall establish the actual position of all<br />

services on site before commencing work on the site.<br />

2 COMPLIANCE<br />

The Contractor shall comply with acts of parliament, statutory,<br />

municipal and other regulations or bylaws, that in any way<br />

affect the works, with particular regard to:<br />

Workplace Health & Safety<br />

Protection of Public Utilities<br />

Traffic Hazards and Public Safety.<br />

3 DAMAGE RESPONSIBILITY<br />

The Contractor shall be responsible for any damage to public<br />

utility service installations such as water, gas and sewer pipes,<br />

electrical, traffic signal or telephone conduits and shall bear the<br />

costs of reinstating any service damaged during consturction of<br />

the works.<br />

4 SPECIAL CONDITIONS<br />

The retaining wall construction drawings provided by <strong>Ergon</strong><br />

<strong>Energy</strong> are to be applied in normal situations.<br />

Where special conditions exist, (in the opinion of a Civil<br />

Engineer RPEQ) such as:<br />

Extra heavy surcharge<br />

Unstable ground conditions<br />

Property boundary limitations<br />

Excavation or backfilling restrictions<br />

A ORIGINAL ISSUE<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

The developer shall provide a certified design from a Civil Engineer<br />

(RPEQ) for <strong>Ergon</strong> <strong>Energy</strong>’s consideration. No special designs for retaining<br />

wall construction shall be used without the approval of <strong>Ergon</strong> <strong>Energy</strong>.<br />

5 ADDITIONAL REQUESTS<br />

Additional requests will be required if the developer, or the developer’s<br />

representative, choose to:<br />

Construct the padmounted substation on a slope where the retaining<br />

wall would be higher than 2.0m, or<br />

Use a different method of construction for the retaining wall.<br />

Requests shall be accompanied by a certified design from a Civil Engineer<br />

(RPEQ) for <strong>Ergon</strong> <strong>Energy</strong>’s consideration. No special designs for retaining<br />

wall construction shall be used without the approval of <strong>Ergon</strong> <strong>Energy</strong>.<br />

6 MASONRY<br />

Concrete masonry materials and workmanship shall comply with AS3700.<br />

Masonry blocks shall be 200 series and shall comply with AS/NZS 4455.<br />

Mortar shall consist of 1 part cement, 1/10 part slaked lime and 3 parts<br />

sand measured by volume complying with the requirements of AS 3700<br />

- masonry structures.<br />

The bottom course blocks shall contain an opening to permit clean out of<br />

the cell space.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C.Noel<br />

12.07.12<br />

A.Bletchly<br />

T.Borg<br />

UNDERGROUND DISTRIBUTION<br />

22kV PADMOUNTED SUBSTATIONS<br />

SITE PREPARATION<br />

RETAINING WALL CONSTRUCTION<br />

FILE: 5<br />

55 5283 1<br />

5283<br />

Dwg Sh<br />

1


7<br />

8<br />

9<br />

FOUNDATIONS<br />

Where the bearing surface under the foundation is silt or clay<br />

soil, a 100mm layer of compacted sand or gravel bedding<br />

material shall be placed under the concrete foundation.<br />

Foundation must be undisturbed material which is firm and dry.<br />

Wall not to be founded on uncompacted fill material.<br />

CONCRETE<br />

Concrete work shall comply with AS3600<br />

Concrete:-<br />

Foundation - F’c = 25MPa; 75mm Slump; 20mm Max Agg.<br />

Core Filling - F’c = 17.5MPa; 150mm Slump; 10mm Max<br />

Agg.<br />

Concrete foundation slab with continuous reinforcement over-<br />

lapped at joints shall be poured MONOLITHICALLY (in one<br />

operation).<br />

REINFORCEMENT<br />

Reinforcement:-<br />

Hot rolled deformed bar - "TEMPCORE" complying with<br />

AS 1302<br />

Hard-drawn steel wire reinforcement fabric complying with<br />

AS 1303 and AS 1304.<br />

A ORIGINAL ISSUE<br />

<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />

ABN 50 087 646 062<br />

10 DRAINAGE<br />

50mm weepholes at 1200 centres shall be provided through walls.<br />

A porous backfill such as gravel or coarse sand shall be provided directly<br />

behind the wall to allow water to reach the weepholes. It is essential to<br />

have suitable filter material between the wall and the natural ground.<br />

11 BACKFILLING<br />

Clay soils and organic silts shall not be used as backfill as they have poor<br />

drainage characteristics.<br />

Backfill should not be placed or compacted until the wall has cured (14<br />

days minimum for 17.5 MPa concrete) so as to have sufficient strength to<br />

withstand backfilling loads.<br />

Backfill shall be compacted to 95% of the maximum dry density as defined<br />

in the Modified Compaction Test - Test AS 1289 - E2.1.<br />

After installation of the padmounted substation and cables has been<br />

completed, the ground within the enclosure shall be backfilled,<br />

compacted, levelled and finished in accordance with Drawing No. 5004.<br />

APPROVED<br />

DATE<br />

PASSED<br />

DRAWN<br />

C.Noel<br />

12.07.12<br />

A.Bletchly<br />

T.Borg<br />

UNDERGROUND DISTRIBUTION<br />

22kV PADMOUNTED SUBSTATIONS<br />

SITE PREPARATION<br />

RETAINING WALL CONSTRUCTION<br />

FILE: 5<br />

55 5283 2<br />

5283<br />

Dwg Sh<br />

2