UNDERGROUND<br />
CONSTRUCTION MANUAL<br />
PADMOUNTED SUBSTATIONS<br />
Back to MAIN INDEX<br />
Go to SECTION INDEX
CONSTRUCTION DESCRIPTION DWG CONSTRUCTION DESCRIPTION DWG<br />
PMF11<br />
A ORIGINAL ISSUE<br />
D 11.08.10<br />
E 10.01.12<br />
F 17.07.12<br />
<strong>Construction</strong> code guide - 11kV Padmounted<br />
substations including LV switchgear<br />
<strong>Construction</strong> code guide - 11kV Padmounted<br />
substations with LV switchgear and HV Switchgear<br />
<strong>Construction</strong> code guide - 11kV Padmounted<br />
substations foundation and site finish<br />
<strong>Construction</strong> code guide - 22kV Padmounted<br />
substations including LV switchgear<br />
5099/1<br />
5099/2<br />
5099/3<br />
5043/1<br />
<strong>Construction</strong> code guide - 22kV Padmounted 5043/2<br />
substations LV switchgear & HV RMU switchgear<br />
<strong>Construction</strong> code guide - 22kV Padmounted<br />
substation and foundations<br />
11kV PADMOUNTED SUBSTATION<br />
CONSTRUCTION<br />
Front entry type installation<br />
Front entry type installation<br />
Front entry type installation<br />
Front entry type installation<br />
Front entry type location in council parklands<br />
Front entry type location in council parklands<br />
Front entry type location in residential allotments<br />
Front entry type - site requirement separate<br />
HV & LV earthing<br />
Front entry type on 5 x 3.5m site placement<br />
options<br />
Front entry type site preparation sloping site<br />
maximum cut & fill<br />
Front entry type site finish concrete surround<br />
5043/3<br />
5000/1<br />
5000/2<br />
5000/3<br />
5000/4<br />
5010/1<br />
5010/2<br />
5174<br />
5175<br />
5002<br />
5003<br />
5004<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
11.08.10<br />
T.Borg<br />
Front entry type uniculvert foundation details<br />
retaining wall - maximum height 1.2m<br />
PADMOUNTED SUBSTATIONS<br />
INDEX<br />
FILE: 5 55 5097 1<br />
1<br />
5005/1<br />
PMF11U Front entry type uniculvert foundation details 5005/2<br />
PMF11BP<br />
PM11<br />
Front entry type pier foundation details<br />
Front entry type pier foundation details<br />
Front entry type site preparation retaining<br />
wall construction<br />
Front entry type site preparation retaining<br />
wall construction<br />
Cut sloping site uniculvert foundation<br />
5009/1<br />
5009/2<br />
5001/1<br />
5001/2<br />
5007/1<br />
Cut sloping site pier foundation retaining 5007/2<br />
wall - maximum height 2.0m<br />
Filled sloping site uniculvert foundation<br />
retaining wall maximum height 1.2m<br />
Filled sloping site pier foundation retaining<br />
wall maximum height 2.0m<br />
Site preparation safety fence retaining wall<br />
mounting details<br />
Front entry type material Contract No.2004/037/T<br />
Front entry type with LV switchgear construction<br />
Contract No. 2004/037/T<br />
Front entry type with LV switchgear and ABB<br />
SafeLink RMU, 2 switch 1 fuse material<br />
Contract No.2004/037/T<br />
PM11xxxASL Front entry type with LV switchgear and ABB<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C.Noel<br />
A.Bletchly<br />
SafeLink RMU, 2 switch 1 fuse construction<br />
Contract No.2004/037/T<br />
Front entry type schematic LV switchgear only<br />
Contract No.2004/037/T<br />
Front entry type schematic LV switchgear only<br />
Contract No.2004/037/T<br />
UNDERGROUND DISTRIBUTION<br />
Dwg Sh<br />
5008/1<br />
5008/2<br />
5011<br />
5189/1<br />
5189/2<br />
5191/1<br />
5191/2<br />
5190/1<br />
5190/2<br />
F
CONSTRUCTION DESCRIPTION DWG CONSTRUCTION DESCRIPTION DWG<br />
PM11, PM11SW<br />
PM11xxxASD<br />
PM11xxxFBX<br />
A ORIGINAL ISSUE<br />
C 08.08.05<br />
D 11.08.10<br />
E 10.01.12<br />
11kV PADMOUNTED SUBSTATION<br />
CONSTRUCTION CONT’D<br />
Front entry type schematic ABB SafeLink<br />
HV switchgear and LV switchgear<br />
Contract No.2004/037/T<br />
Front entry type schematic ABB SafeLink<br />
HV switchgear and LV switchgear<br />
Contract No.2004/037/T<br />
Front entry type material Contract QESI 30/98<br />
Front entry type construction Contract QESI 30/98<br />
Front entry type with LV switchgear and<br />
RMU ABB SDAF3, 2 switch 1 fuse - material<br />
Contract QESI 30/98<br />
Front entry type with LV switchgear and<br />
RMU ABB SDAF3, 2 switch 1 fuse - construction<br />
Contract QESI 30/98<br />
Front entry type schematic LV switchgear only<br />
Contract QESI 30/98<br />
Front entry type schematic<br />
ABB HV switchgear and LV switchgear<br />
Contract QESI 30/98<br />
Front entry type schematic<br />
Magnefix HV switchgear and LV switchgear<br />
Contract QESI 30/98<br />
Front entry type schematic<br />
ABB HV switchgear and LV switchgear<br />
Contract QESI 30/98<br />
Front entry type schematic<br />
ABB HV switchgear and LV switchgear<br />
Contract QESI 30/98<br />
5192/1<br />
5192/2<br />
5091/1<br />
5091/2<br />
5184/1<br />
5184/2<br />
5094<br />
5095<br />
5096/1<br />
5096/2<br />
5096/3<br />
Front entry type with LV switchgear and 5264/1<br />
Schneider Electric FBX, 2 switch 1 fuse - material<br />
Contract No. 08088EECL<br />
HARD COPY<br />
UNCONTROLLED<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
PMRF22<br />
11.08.10<br />
T.Borg<br />
22kV PADMOUNTED SUBSTATION<br />
CONSTRUCTION<br />
Rectangular type installation<br />
Rectangular type installation<br />
Rectangular type installation<br />
Rectangular type installation<br />
Rectangular type location in council parklands<br />
Rectangular type location in council parklands<br />
Rectangular type location in residential allotments<br />
Rectangular type - site requirement<br />
separate HV & LV earthing<br />
Rectangular type - site requirement without<br />
retaining wall<br />
Rectangular type site finish without retaining wall<br />
Rectangular type - schematic LV switchgear only<br />
PADMOUNTED SUBSTATIONS<br />
INDEX<br />
55 5097 2<br />
2<br />
5114/1<br />
5114/2<br />
5114/3<br />
5114/4<br />
5116/1<br />
5116/2<br />
5176<br />
5177<br />
5117<br />
5118<br />
Rectangular type - material 5105/1<br />
PMR22, PM22SW Rectangular type - construction<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C.Noel<br />
A.Bletchly<br />
Front entry type with LV switchgear and 5264/2<br />
Schneider Electric FBX, 2 switch 1 fuse - construction<br />
Contract No. 08088EECL<br />
Front entry type schematic<br />
Schneider Electric FBX HV switchgear and LV switchgear<br />
Contract No. 08088EECL<br />
Front entry type schematic<br />
Schneider Electric FBX HV switchgear and LV switchgear<br />
Contract No. 08088EECL<br />
Rectangular type - schematic F&G HV<br />
switchgear and LV switchgear<br />
Rectangular type - schematic F&G HV<br />
switchgear and LV switchgear<br />
Rectangular type - schematic F&G HV<br />
switchgear and LV switchgear<br />
Rectangular type - schematic F&G HV<br />
switchgear and LV switchgear<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
5265/1<br />
5265/2<br />
5105/2<br />
5104<br />
5082/1<br />
5082/2<br />
5082/3<br />
5082/4<br />
E
CONSTRUCTION DESCRIPTION DWG CONSTRUCTION DESCRIPTION DWG<br />
PMR22<br />
A ORIGINAL ISSUE<br />
22kV PADMOUNTED SUBSTATION<br />
CONSTRUCTION CONT’D<br />
Front entry type - site preparation<br />
Retaining wall construction<br />
Front entry type - site preparation<br />
Retaining wall construction<br />
Cut sloping site - Uniculvert foundation<br />
Retaining wall - maximum height 1.2m<br />
Filled sloping site - Uniculvert foundation<br />
Retaining wall - maximum height 1.2m<br />
Rectangular type - Material<br />
Contract No. 08088EECL<br />
Rectangular type - <strong>Construction</strong><br />
Contract No. 08088EECL<br />
Rectangular type - schematic<br />
Schneider Electric HV switchgear & LV switchgear<br />
Rectangular type - schematic<br />
Schneider Electric HV switchgear & LV switchgear<br />
Rectangular type - schematic<br />
Schneider Electric HV switchgear & LV switchgear<br />
Rectangular type - schematic<br />
Schneider Electric HV switchgear & LV switchgear<br />
5283/1<br />
5283/2<br />
5281/1<br />
5281/2<br />
5266/1<br />
5266/2<br />
5267/1<br />
5267/2<br />
5267/3<br />
5267/4<br />
Rectangular type - schematic 5272<br />
Schneider Electric LV switchgear only<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C.Noel<br />
17.07.12<br />
A.Bletchly<br />
T.Borg<br />
Rectangular 3.7m long, 800mm maximum above<br />
ground foundation, earthing & site finish details<br />
Rectangular 3.7m long, 800mm maximum above<br />
ground foundation, earthing & site finish details<br />
Rectangular 3.7m long, 800mm maximum above<br />
ground foundation, earthing & site finish details<br />
Rectangular 4.1m long, 800mm maximum above<br />
ground foundation, earthing & site finish details<br />
Rectangular 4.1m long, 800mm maximum above<br />
ground foundation, earthing & site finish details<br />
Rectangular 4.1m long, 800mm maximum above<br />
ground foundation, earthing & site finish details<br />
PADMOUNTED SUBSTATIONS<br />
INDEX<br />
FILE: 5 55 5097 3<br />
3<br />
5273/1<br />
5273/2<br />
5273/3<br />
5274/1<br />
5274/2<br />
5274/3<br />
Rectangular 3.7m long, 1400mm maximum above 5275/1<br />
ground foundation, earthing & site finish details<br />
Rectangular 3.7m long, 1400mm maximum above 5275/2<br />
ground foundation, earthing & site finish details<br />
Rectangular 3.7m long, 1400mm maximum above 5275/3<br />
ground foundation, earthing & site finish details<br />
Rectangular 4.1m long, 1400mm maximum above 5276/1<br />
ground foundation, earthing & site finish details<br />
Rectangular 4.1m long, 1400mm maximum above 5276/2<br />
ground foundation, earthing & site finish details<br />
Rectangular 4.1m long, 1400mm maximum above 5276/3<br />
ground foundation, earthing & site finish details<br />
Rectangular HV & LV service platform details<br />
Rectangular HV & LV service platform details<br />
Rectangular HV & LV service platform details<br />
UNDERGROUND DISTRIBUTION<br />
Dwg Sh<br />
5280/1<br />
5280/2<br />
5280/3
1 SITE<br />
1.1<br />
PADMOUNTED SUBSTATION INSTALLATION<br />
1.2<br />
General<br />
The site shall be to the satisfaction of <strong>Ergon</strong> <strong>Energy</strong>, including<br />
Stable (soil conditions)<br />
Flood free<br />
Level (topography) where possible<br />
Free from steep batters<br />
Site Size<br />
The minimum area required to accommodate a front entry<br />
Padmounted substation shall be:<br />
Retaining wall sites - provided retaining walls are contained<br />
within 3400mm width x 3000mm depth no increase in the<br />
12000mm width x 7200mm depth is necessary.<br />
1.3 Substation Orientation<br />
Front entry padmounted substations shall be oriented such that<br />
the LV and HV panels are easily accessible from the dedicated<br />
footpath.<br />
A ORIGINAL ISSUE<br />
B 10.2.04<br />
C 7.3.08<br />
Along coastal areas the site must be located as far as possible<br />
from the shoreline and sheltered from salt spray.<br />
A site should not be located where impact by traffic is likely and,<br />
if at a truncated section of the street alignment or other non-regular<br />
shaped site the following shall apply:<br />
The front edge of the substation plinth shall be 200mm from<br />
and as near to parallel as possible to the R.P. Street Alignment.<br />
The specified rectangular size of the site shall not be reduced.<br />
Common earthing sites<br />
Level sites - 3000mm width x 2800mm depth.<br />
Retaining wall sites - 3400mm width x 3000mm depth.<br />
Separate Earthing Sites<br />
12000mm width x 7200mm depth.<br />
HARD COPY<br />
UNCONTROLLED<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
1.4<br />
URD<br />
The developer shall provide a padmounted substation site(s) as<br />
required by <strong>Ergon</strong> <strong>Energy</strong> at no cost to <strong>Ergon</strong> <strong>Energy</strong>. The site shall<br />
be included in the road reserve, or located on freehold property.<br />
No padmounted substations are to be located in Trustee Reserves.<br />
Where the developer required the padmount to be included:<br />
a) In the Road Reserve:-<br />
The Developer shall obtain all necessary approvals from the<br />
Department of Transport or the Local Authority.<br />
b) On Freehold property (including residential or parkland):-<br />
The Developer shall provide <strong>Ergon</strong> <strong>Energy</strong> with a registered<br />
easement at no cost to <strong>Ergon</strong> <strong>Energy</strong>.<br />
Acceptable separation of padmount to adjacent dwellings is provided<br />
if the front of dwellings are set back 6.0m from the R.P. Street<br />
Alignment and the padmount is located as shown in drawings No.<br />
5174, 5010 Sheets 1 or 2.<br />
Developments including streets where the allowable dwelling set back<br />
is less than 6.0m will require padmount siting on either an alternative<br />
street, where the dwelling set back is 6.0m, or in Parklands.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
3/2/03<br />
D. M K. c<br />
D. M K.<br />
UNDERGROUND DISTRIBUTION<br />
11kV PADMOUNTED SUBSTATIONS<br />
FRONT ENTRY TYPE<br />
INSTALLATION<br />
FILE: 5<br />
55 5000 1<br />
5000<br />
Dwg Sh<br />
1<br />
C
1 SITE<br />
1.5<br />
(CONT’D)<br />
Commercial and Industrial or Landscaped Areas<br />
Whether the padmounted substation is for the sole use of that<br />
complex, or is required as part of the distribution network, the<br />
owner is required to grant <strong>Ergon</strong> <strong>Energy</strong> an easement for the<br />
padmounted site, access and cabling.<br />
Separation of 5.0m between padmount transformer LV bushings<br />
and the nearest room or habitable area should be provided<br />
where possible.<br />
1.6 Parklands - for other than URD<br />
1.7<br />
Acceptable separation of padmount to adjacent dwellings is<br />
shown in drawings No. 5010 Sheets 1 & 2.<br />
Cabling and Access<br />
Cabling Only<br />
Should the cabling route not be available in conjunction with<br />
access, a 1.0m wide cable easement is required to the front<br />
of the padmount. Additionally 2.0m x 3.0m (padmount site<br />
width) is required immediately in front to allow spreading of<br />
cables for entry to the padmount and also include the buried<br />
earth cable.<br />
A ORIGINAL ISSUE<br />
B<br />
4.3.04<br />
C 3.7.08<br />
Obtain the necessary approval for an easement to accommodate<br />
the padmounted substation, cabling and access to site.<br />
Cabling and Access Requirement<br />
A 3.0m wide easement, or road reserve, from the front of<br />
the site is required for cabling and access.<br />
HARD COPY<br />
UNCONTROLLED<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
2 SITE PREPARATION<br />
Sites shall be prepared in accordance with the included<br />
construction drawings.<br />
3 CONSTRUCTION OF RETAINING WALLS<br />
Retaining walls shall be constructed around the perimeter of a<br />
padmounted substation site where:<br />
A change in ground level of 300mm or more occurs within 2.0m<br />
of the boundary of the padmounted substation site.<br />
4 PADMOUNTED SUBSTATION FOUNDATION<br />
4.1 Uniculvert<br />
4.2<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
Uniculvert foundations shall not be constructed where site and<br />
ground conditions do not provide an even or equal bearing<br />
capacity for the padmounted substation, or where no HV<br />
switchgear is fitted and the cable is connected directly to the<br />
transformer HV terminals.<br />
Uniculvert foundations for both stable and unstable soil conditions<br />
shall be constructed in accordance with Drawing No. 5005.<br />
Concrete Piers<br />
Concrete piers shall be installed where the site ground conditions<br />
do not provide an even or equal bearing capacity for the<br />
padmounted substation foundation, or where no HV switchgear<br />
is fitted and the cable is connected directly to the transformer<br />
HV terminals.<br />
At sites where shallow rock is encountered use the uniculvert<br />
foundation type if applicable.<br />
Concrete piers shall be constructed in accordance with<br />
Drawing No. 5009.<br />
3/2/03<br />
D. M K. c<br />
D. M K.<br />
UNDERGROUND DISTRIBUTION<br />
11kV PADMOUNTED SUBSTATIONS<br />
FRONT ENTRY TYPE<br />
INSTALLATION<br />
FILE: 5<br />
55 5000 2<br />
5000<br />
Dwg Sh<br />
2<br />
C
Plinth over<br />
shown dashed.<br />
For details of<br />
reinforced concrete<br />
surround slab refer<br />
to drawing 5004.<br />
FOOTPATH<br />
A<br />
Truncate foundation<br />
F<br />
250<br />
to allow cable access<br />
into padmount.<br />
Use formwork.<br />
R.P. Street<br />
Alignment<br />
Fence refer<br />
drawing 5011.<br />
Footpath<br />
Ground Line<br />
Backfill<br />
600<br />
Min<br />
A ORIGINAL ISSUE<br />
B 3.12.03<br />
C 11.07.12<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
700<br />
F<br />
F<br />
F F<br />
F<br />
3000<br />
2800<br />
2450<br />
Masonry<br />
block wall<br />
PLAN<br />
SECTION<br />
A<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
100<br />
2800<br />
F<br />
F<br />
F<br />
3000<br />
F<br />
F<br />
3400<br />
Site<br />
Retaining wall<br />
foundation<br />
Boundary<br />
Natural Ground<br />
Line<br />
F<br />
Uniculvert<br />
foundation<br />
Weepholes<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
F<br />
F<br />
For earth rod location<br />
refer EARTHING:<br />
Drawing No. 5013<br />
or 5014.<br />
Filter material<br />
100mm dia conduit through<br />
footing for each spike.<br />
Trim top of conduit as req’d<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
CONCRETE STRENGTHS<br />
23/11/01<br />
Foundation<br />
200 series<br />
blockwork<br />
F’c Slump Aggregate Cement<br />
Concrete infill to<br />
be rounded to form<br />
watershed capping<br />
F<br />
F<br />
850<br />
F<br />
RETAINING WALL DETAIL<br />
NOTE:<br />
25MPa<br />
Blockwork /<br />
17.5MPa<br />
Core Filling<br />
N16 at 400 crs<br />
20 cover to<br />
inside face<br />
N16 at 400 crs<br />
lap 500 at<br />
corners & where<br />
necessary<br />
N12 at 300 crs<br />
lap 400<br />
C.Noel<br />
A.Bletchly<br />
T.Borg<br />
SL62 mesh with<br />
60 cover top<br />
50<br />
75<br />
150<br />
F<br />
F<br />
F<br />
Size (Max) Content (Min)<br />
300<br />
F<br />
20mm<br />
F<br />
-<br />
10mm 300kg/cu. m<br />
Site<br />
Boundary<br />
Backfill<br />
material<br />
Filter<br />
material<br />
75 cover to bottom<br />
Where a retaining wall greater than 1.2 metres<br />
high is required a Pier Foundation must be used.<br />
RETAINING WALL - MAXIMUM HEIGHT 1.2m<br />
5007<br />
500<br />
11kV PADMOUNTED SUBSTATIONS<br />
CUT SLOPING SITE - UNICULVERT FOUNDATION<br />
55 5007 1<br />
F<br />
N16 at 400 crs<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
1<br />
1200 Max.<br />
250<br />
C
Plinth over<br />
shown dashed.<br />
For details of<br />
reinforced concrete<br />
surround slab Refer<br />
Padmounted Subs<br />
drawing 5004.<br />
FOOTPATH<br />
A<br />
Truncate foundation<br />
to allow cable access<br />
into padmount.<br />
Use formwork.<br />
R.P. Street<br />
Alignment<br />
Fence refer<br />
drawing 5011.<br />
Footpath<br />
Ground Line<br />
600<br />
Min<br />
A ORIGINAL ISSUE<br />
B 3.12.03<br />
C 11.07.12<br />
F<br />
F<br />
F<br />
250<br />
Backfill<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
700 for B1<br />
1200 for B2<br />
F<br />
F<br />
3000<br />
2800<br />
2450<br />
Masonry<br />
block wall<br />
SECTION<br />
PLAN<br />
A<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
100<br />
2800<br />
Pier<br />
F F<br />
F<br />
F<br />
3000<br />
3400<br />
foundation<br />
Site<br />
Retaining wall<br />
foundation<br />
(1300 wide<br />
shown)<br />
Boundary<br />
Line<br />
Weepholes<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
F<br />
F<br />
F<br />
F<br />
For earth rod location<br />
refer EARTHING:<br />
Drawing No. 5013<br />
or 5014.<br />
Natural Ground<br />
Filter material<br />
100mm dia conduit<br />
through footing for<br />
earth rod. Trim top<br />
of conduit as req’d.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
23/11/01<br />
CONCRETE STRENGTHS<br />
Foundation<br />
F’c<br />
25MPa<br />
Blockwork /<br />
17.5MPa<br />
Core Filling<br />
F<br />
Concrete infill to<br />
be rounded to form<br />
watershed capping<br />
200 series<br />
blockwork<br />
N16 at 400 crs<br />
lap 500 at corners<br />
& where necessary<br />
N16 at 400 crs<br />
B1=850<br />
B2=1300<br />
50<br />
20 cover to inside face<br />
N12 at 300 crs<br />
lap 400<br />
C.Noel<br />
A.Bletchly<br />
T.Borg<br />
SL62 mesh with<br />
60 cover top<br />
F<br />
F<br />
F<br />
F<br />
Slump Aggregate<br />
F<br />
75<br />
150<br />
F<br />
RETAINING WALL DETAIL<br />
Size (Max) Content (Min)<br />
300<br />
20mm<br />
10mm<br />
CUT SLOPING SITE - PIER FOUNDATION<br />
RETAINING WALL - MAXIMUM HEIGHT 2.0m<br />
5007<br />
Site<br />
Boundary<br />
500<br />
11kV PADMOUNTED SUBSTATIONS<br />
55 5007 2<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
Cement<br />
-<br />
300kg/cu. m<br />
Backfill<br />
material<br />
Filter<br />
material<br />
N16 at 400 crs<br />
75 cover to bottom<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
2<br />
H1=1200 (Use B1 footing width)<br />
250<br />
F<br />
F<br />
F<br />
F<br />
H2=2000 (Use B2 footing width)<br />
C
Plinth over<br />
shown dashed.<br />
For details of<br />
reinforced concrete<br />
surround slab refer<br />
to drawing 5004.<br />
FOOTPATH<br />
A<br />
Truncate foundation<br />
F<br />
250<br />
to allow cable access<br />
into padmount.<br />
Use formwork.<br />
R.P. Street<br />
Alignment<br />
Fence refer<br />
drawing 5011.<br />
Footpath<br />
Ground Line<br />
600<br />
F<br />
Min<br />
F<br />
Backfill<br />
A ORIGINAL ISSUE<br />
B 3.12.03<br />
C 11.07.12<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
700<br />
F<br />
F<br />
3000<br />
2800<br />
2450<br />
Masonry<br />
block wall<br />
SECTION<br />
PLAN<br />
A<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
100<br />
2800<br />
F<br />
F<br />
F<br />
F<br />
3000<br />
Uniculvert<br />
foundation<br />
F<br />
F<br />
F<br />
3400<br />
F<br />
Site<br />
Boundary<br />
Finished<br />
Site Level<br />
Filter material<br />
Weepholes<br />
Natural Ground<br />
Line<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
For earth rod location<br />
refer EARTHING:<br />
Drawing No. 5013<br />
or 5014.<br />
Retaining wall<br />
foundation<br />
100mm dia conduit<br />
through footing for<br />
earth spike. Trim top<br />
of conduit as req’d.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
CONCRETE STRENGTHS<br />
Foundation<br />
F<br />
NOTE:<br />
F<br />
F’c<br />
25MPa<br />
Blockwork /<br />
17.5MPa<br />
Core Filling<br />
Filter<br />
Backfill<br />
material<br />
material<br />
23/11/01<br />
Concrete infill to<br />
F<br />
F<br />
850<br />
Slump<br />
75<br />
be rounded to form<br />
watershed capping<br />
N16 at 400 crs<br />
20 cover to<br />
inside face<br />
SL62 mesh with<br />
60 cover top<br />
N12 at 300 crs<br />
lap 400<br />
C.Noel<br />
A.Bletchly<br />
T.Borg<br />
F<br />
300<br />
150 10mm<br />
F<br />
RETAINING WALL DETAIL<br />
F<br />
Where a retaining wall greater than 1.2 metres<br />
50<br />
Aggregate<br />
20mm<br />
high is required a Pier Foundation must be used.<br />
500<br />
5008<br />
Boundary<br />
11kV PADMOUNTED SUBSTATIONS<br />
F<br />
F<br />
Size (Max) Content (Min)<br />
Site<br />
-<br />
300kg/cu. m<br />
200 series<br />
blockwork<br />
Cement<br />
FILLED SLOPING SITE - UNICULVERT F’DN<br />
RETAINING WALL - MAXIMUM HEIGHT 1.2m<br />
55 5008 1<br />
F<br />
F<br />
F<br />
N16 at 400 crs<br />
lap 500 at<br />
corners & where<br />
necessary<br />
F<br />
F<br />
N16 at 400 crs<br />
75 cover to bottom<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
1<br />
250 1200 Max.<br />
F<br />
F<br />
F<br />
F<br />
C
Plinth over<br />
shown dashed.<br />
For details of<br />
reinforced concrete<br />
surround slab Refer<br />
Padmounted Subs<br />
drawing 5004.<br />
FOOTPATH<br />
A<br />
Truncate foundation<br />
to allow cable access<br />
into padmount.<br />
Use formwork.<br />
R.P. Street<br />
Alignment<br />
Fence refer<br />
250<br />
drawing 5011.<br />
Footpath<br />
Ground Line<br />
600<br />
F<br />
Min<br />
F<br />
Backfill<br />
A ORIGINAL ISSUE<br />
B 3.12.03<br />
C 11.07.12<br />
F<br />
F<br />
F<br />
F<br />
F<br />
700 for B1<br />
1200 for B2<br />
F<br />
3000<br />
2800<br />
2450<br />
F F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
Masonry<br />
block wall<br />
SECTION<br />
PLAN<br />
A<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
Pier<br />
F<br />
100<br />
2800<br />
F<br />
F<br />
F<br />
F<br />
foundation<br />
F<br />
3000<br />
F<br />
3400<br />
Site<br />
F<br />
F<br />
Boundary<br />
Finished<br />
Site Level<br />
Filter material<br />
Weepholes<br />
Natural<br />
shown)<br />
Ground Line<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
For earth rod location<br />
refer EARTHING:<br />
Drawing No. 5013<br />
or 5014.<br />
Retaining wall<br />
foundation<br />
(1300 wide<br />
100mm dia conduit<br />
through footing for<br />
earth spike. Trim top<br />
of conduit as req’d.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
CONCRETE STRENGTHS<br />
Foundation<br />
Blockwork /<br />
17.5MPa<br />
Core Filling<br />
Backfill<br />
Material<br />
Filter material<br />
SL62 mesh with<br />
60 cover top<br />
N12 at 300 crs<br />
lap 400<br />
F<br />
C.Noel<br />
23/11/01<br />
A.Bletchly<br />
T.Borg<br />
F<br />
F<br />
F<br />
F’c Slump Aggregate Cement<br />
25MPa<br />
Concrete infill to<br />
be rounded to form<br />
watershed capping<br />
F<br />
B1=850<br />
B2=1300<br />
300<br />
F<br />
75<br />
150<br />
F<br />
F<br />
50<br />
500<br />
RETAINING WALL DETAIL<br />
11kV PADMOUNTED SUBSTATIONS<br />
F<br />
F<br />
F<br />
F<br />
Size (Max) Content (Min)<br />
20mm<br />
10mm<br />
-<br />
300kg/cu. m<br />
FILLED SLOPING SITE - PIER FOUNDATION<br />
RETAINING WALL - MAXIMUM HEIGHT 2.0m<br />
55 5008 2<br />
F<br />
F<br />
F F<br />
F<br />
Site<br />
F<br />
5008<br />
Boundary<br />
200 series<br />
blockwork<br />
N16 at 400 crs<br />
lap 500 at<br />
corners & where<br />
necessary<br />
N16 at 400 crs<br />
20 cover to<br />
inside face<br />
N16 at 400 crs<br />
75 cover to bottom<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
2<br />
F<br />
H1=1200 (Use B1 footing width)<br />
H2=2000 (Use B2 footing width)<br />
250<br />
F<br />
F F<br />
C
Galvanised<br />
steel posts<br />
Concrete surface<br />
must fall away<br />
from edge of<br />
steel posts<br />
600 MIN. INTO CONCRETE<br />
GALVANISED STEEL<br />
POST CONSTRUCTION IN<br />
MASONRY BLOCK WALL.<br />
A ORIGINAL ISSUE<br />
B 7.3.08<br />
F<br />
F<br />
Not suitable for use at padmounted substations<br />
with separate LV & HV earthing<br />
F<br />
2 x M12 S/Steel<br />
trubolts embedded<br />
110mm minimum.<br />
(Ramset T16175SS or<br />
approved equivalent)<br />
Natural<br />
Ground<br />
Line<br />
F<br />
Earth Face<br />
120 0 +_<br />
200 MIN.<br />
HARD COPY<br />
UNCONTROLLED<br />
F<br />
F<br />
F<br />
Fence inside<br />
boundary<br />
Aluminium<br />
Posts<br />
ALUMINIUM POST<br />
Earth Face<br />
SIDE MOUNTED CONSTRUCTION<br />
TO MASONRY BLOCK WALL<br />
FOR CUT SLOPING SITES<br />
F<br />
Natural<br />
Ground<br />
F<br />
Line<br />
(Use this construction as an alternative)<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
10mm thick aluminium<br />
base plate fully welded<br />
to aluminium post in<br />
accordance with AS 1657<br />
and AS 1665.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
2 x M12 S/Steel<br />
trubolts embedded<br />
110mm minimum.<br />
(Ramset T16100SS or<br />
approved equivalent)<br />
30/5/00<br />
D. M K. c<br />
C.Lindsay<br />
NOTES:<br />
1.<br />
2.<br />
3.<br />
Aluminium<br />
Posts<br />
F<br />
F<br />
200 MIN.<br />
ALUMINIUM POST<br />
DECK MOUNTED CONSTRUCTION<br />
TO MASONRY BLOCK WALL<br />
A safety fence shall be constructed on retaining wall<br />
sloping sites where the difference between ground<br />
level and padmount site is 300mm or greater.<br />
Chain wire infill and the support cables shall be PVC<br />
or baked polyester coated and coloured black or green.<br />
All construction of safety fences to be:<br />
(a)<br />
(b)<br />
In accordance with AS 1657 / AS 1926 including<br />
latest amendments.<br />
Of a type where infill is between top and toe<br />
board / bottom rails.<br />
UNDERGROUND DISTRIBUTION<br />
PADMOUNTED SUBSTATIONS<br />
SITE PREPARATION - SAFETY FENCE<br />
RETAINING WALL MOUNTING DETAILS<br />
FILE: 5<br />
55 5011 1<br />
5011<br />
Dwg Sh<br />
F<br />
Watershed<br />
Capping<br />
B 1/2 DISC<br />
B
PADMOUNT VOLTAGE<br />
PMR = Rectangular Type<br />
EXAMPLE:-<br />
A ORIGINAL ISSUE<br />
B 7.4.08<br />
Padmounted Substation<br />
22kV PADMOUNTED SUBSTATION (INCLUDING LV SWITCHGEAR) CONSTRUCTION CODE<br />
Code shown within dashed box<br />
appears on relevant construction<br />
detail drawings in this manual.<br />
A<br />
22 = 22kV<br />
PMR 22/5/41<br />
CAPACITY (kVA)<br />
PMR22/5/41 = Rectangular type padmounted substation, 22kV, 500kVA, 4.1m long.<br />
HARD COPY<br />
UNCONTROLLED<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
3 = 315<br />
5 = 500<br />
1k = 1000<br />
21/1/03<br />
D. M K. c<br />
C.Lindsay<br />
ENCLOSURE LENGTH<br />
22kV PADMOUNTED SUBSTATIONS<br />
CONSTRUCTION CODE GUIDE<br />
INCLUDING LV SWITCHGEAR<br />
55 5043 1<br />
41 = 4.1m<br />
CONTRACT No. 2006/0061/T<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
5043<br />
Dwg Sh<br />
1<br />
B
B 7.4.08<br />
PADMOUNT<br />
PMR = Rectangular Type<br />
EXAMPLE:-<br />
C 4.7.08<br />
D<br />
02.11.11<br />
22kV PADMOUNTED SUBSTATION WITH LV SWITCHGEAR AND F&G HV RMU CONSTRUCTION CODE<br />
Code shown within dashed box<br />
appears on relevant construction<br />
detail drawings in this manual.<br />
Padmounted Substation<br />
VOLTAGE<br />
22 = 22kV<br />
CAPACITY (kVA)<br />
3 = 315<br />
5 = 500<br />
A<br />
1k = 1000<br />
PMR 22/5/41 FGA 21<br />
ENCLOSURE LENGTH<br />
41 = 4.1m (ONLY)<br />
TYPE<br />
FGA = F&G GA...-C<br />
RM6 = Schneider Electric RM6<br />
20/12/01<br />
22kV PADMOUNTED SUBSTATIONS<br />
CONSTRUCTION CODE GUIDE<br />
55 5043 2<br />
SWITCH ARRANGEMENT<br />
21 = 2 switchable feeder units + 1 fuse protected tee<br />
31 = 3 switchable feeder units + 1 fuse protected tee<br />
22 = 2 switchable feeder units + 2 fuse protected tees<br />
PMR 22/5/41 RM6 21 = Rectangular type padmounted substation, 22kV, 500kVA, 4.1m long, Schneider Electric RM6 RMU,<br />
A ORIGINAL ISSUE<br />
with 2 switchable feeder units and 1 fuse protected tee-off unit<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C.Noel<br />
A.Bletchly<br />
T.Borg<br />
UNDERGROUND DISTRIBUTION<br />
WITH LV SWITCHGEAR AND HV RMU SWITCHGEAR<br />
FILE: 5<br />
5043<br />
Dwg Sh<br />
2<br />
D
PADMOUNT FOUNDATION<br />
PMRF = Rectangular Type<br />
EXAMPLE:-<br />
B 9.4.08<br />
Code shown within dashed box<br />
appears on relevant construction<br />
detail drawings in this manual.<br />
NOTE:-<br />
Padmounted Substation<br />
Foundation<br />
22kV PADMOUNTED SUBSTATION FOUNDATION & SITE FINISH CONSTRUCTION CODE<br />
VOLTAGE<br />
22 = 22kV<br />
1. No materials are included in constructions<br />
A ORIGINAL ISSUE<br />
A<br />
PMRF 22/41/8 HL<br />
ENCLOSURE LENGTH HEIGHT ABOVE SERVICE PLATFORM<br />
21/1/03<br />
D. M K. c<br />
C.Lindsay<br />
Required only where foundation<br />
is not provided by others.<br />
GROUND<br />
8 = 800mm Max.<br />
14 = 1400mm Max.<br />
(Omit where not req"d)<br />
22kV PADMOUNTED SUBSTATIONS<br />
CONSTRUCTION CODE GUIDE<br />
FOUNDATION AND SITE FINISH<br />
55 5043 3<br />
H = High Voltage<br />
L = Low Voltage<br />
HL = High & Low Voltage<br />
PMRF22/41/8HL = Rectangular type padmounted substation foundation, 22kV, 4.1m enclosure, 800mm max. above ground,<br />
high & low voltage service platforms.<br />
HARD COPY<br />
UNCONTROLLED<br />
41 = 4.1m<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
5043<br />
Dwg Sh<br />
3<br />
B
B 12.3.08<br />
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
BLANK<br />
22kV PADMOUNTED SUBSTATION<br />
with F&G GA 1K1T-C RING MAIN UNIT<br />
(1 SWITCHABLE FEEDER UNIT & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
A ORIGINAL ISSUE<br />
C 26.5.11<br />
BLANK<br />
RATING<br />
200kVA<br />
BLANK<br />
BLANK<br />
xxx/400A<br />
xxx/400A<br />
CONTRACT No. 2006/0061/T<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
F<br />
23/5/01<br />
C.Lindsay<br />
BLANK<br />
22kV PADMOUNTED SUBSTATION<br />
with F&G GA 2K1TS-C RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
A. Bletchly<br />
xxx/400A<br />
RATING<br />
500kVA<br />
RECTANGULAR TYPE - SCHEMATIC<br />
xxx/400A<br />
xxx/400A<br />
5082<br />
xxx/400A<br />
22kV PADMOUNTED SUBSTATIONS<br />
F&G HV SWITCHGEAR AND LV SWITCHGEAR<br />
55 5082 1<br />
315kVA<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
xxx/400A<br />
1<br />
C
B 12.3.08<br />
HV SWITCHGEAR SIDE<br />
22kV PADMOUNTED SUBSTATION<br />
with F&G GA 3K1TS-C RING MAIN UNIT<br />
(3 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
BLANK<br />
xxx/400A<br />
xxx/400A<br />
LV SWITCHGEAR SIDE<br />
F F F<br />
A ORIGINAL ISSUE<br />
C 25.5.11<br />
D 20.04.12<br />
RATING<br />
315kVA<br />
500kVA<br />
xxx/400A<br />
xxx/400A<br />
xxx/400A<br />
CONTRACT No. 2006/0061/T<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
22kV PADMOUNTED SUBSTATION<br />
with F&G GA 2K2TS-C RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 2 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
22/1/03<br />
A. Bletchly<br />
C.Lindsay<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR TYPE - SCHEMATIC<br />
F&G HV SWITCHGEAR AND LV SWITCHGEAR<br />
55 5082 2<br />
BLANK<br />
RATING<br />
315kVA<br />
500kVA<br />
xxx/400A<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
xxx/400A<br />
xxx/400A<br />
5082<br />
xxx/400A<br />
Dwg Sh<br />
2<br />
xxx/400A<br />
D
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
22kV PADMOUNTED SUBSTATION<br />
with F&G GA 2K1TS-C RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
B 8.4.08<br />
CONSUMERS MAINS<br />
ISOLATOR<br />
RATING<br />
BLANK<br />
xxx/630A<br />
F F F<br />
A ORIGINAL ISSUE<br />
C 25.5.11<br />
xxx/630A<br />
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
22kV PADMOUNTED SUBSTATION<br />
with F&G GA 3K1TS-C RING MAIN UNIT<br />
(3 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
1000kVA 1000kVA<br />
CONTRACT No. 2006/0061/T<br />
HARD COPY<br />
UNCONTROLLED<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
23/5/01<br />
A. Bletchly<br />
C.Lindsay<br />
CONSUMERS MAINS<br />
ISOLATOR<br />
RATING<br />
UNDERGROUND DISTRIBUTION<br />
BLANK<br />
xxx/630A<br />
xxx/630A<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR TYPE - SCHEMATIC<br />
F&G HV SWITCHGEAR AND LV SWITCHGEAR<br />
FILE: 5<br />
55 5082 3<br />
5082<br />
Dwg Sh<br />
3<br />
C
F<br />
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
22kV PADMOUNTED SUBSTATION<br />
with F&G GA 2K2TS-C RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 2 FUSE PROTECTED TEE<br />
and LV FUSE SWITCH<br />
A ORIGINAL ISSUE<br />
B 8.4.08<br />
C 25.5.11<br />
CONSUMERS MAINS<br />
ISOLATOR<br />
RATING<br />
1000kVA<br />
BLANK<br />
xxx/630A<br />
HARD COPY<br />
UNCONTROLLED<br />
xxx/630A<br />
CONTRACT No. 2006/0061/T<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
22/1/03<br />
A. Bletchly<br />
C.Lindsay<br />
UNDERGROUND DISTRIBUTION<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR TYPE - SCHEMATIC<br />
F&G HV SWITCHGEAR AND LV SWITCHGEAR<br />
FILE: 5<br />
55 5082 4<br />
5082<br />
Dwg Sh<br />
4<br />
C
MATERIAL - PADMOUNTED SUBSTATION INCLUDING LV SWITCHGEAR<br />
ASSY<br />
537-1<br />
537-2<br />
537-3<br />
537-4<br />
537-5<br />
537-6<br />
ASSY<br />
554-3<br />
Padmounted Substation 100kVA with LV Switchgear<br />
Padmounted Substation 200kVA with LV Switchgear<br />
Padmounted Substation 315kVA with LV Switchgear<br />
Padmounted Substation 500kVA with LV Switchgear<br />
Padmounted Substation 750kVA with LV Switchgear<br />
DESCRIPTION<br />
DESCRIPTION<br />
MATERIAL - ABB SD SERIES HV SWITCHGEAR<br />
538-2 Ring Main Unit ABB, 2 Switch 1 Fuse<br />
ASSY<br />
538-1<br />
538-3<br />
538-4<br />
Cartridge fuse link 16A<br />
554-5 Cartridge fuse link 25A<br />
554-6<br />
Cartridge fuse link 31.5A<br />
554-8 Cartridge fuse link 50A<br />
554-9 Cartridge fuse link 63A<br />
554-11 Cartridge fuse link 80A<br />
MATERIAL - MAGNEFIX MD SERIES HV SWITCHGEAR<br />
DESCRIPTION<br />
Ring Main Unit Magnefix, 3 Switch 1 Fuse<br />
Ring Main Unit Magnefix, 2 Switch 1 Fuse<br />
Switch Fuse Unit Magnefix, 1 Switch 1 Fuse<br />
QTY<br />
1<br />
QTY<br />
100kVA 200kVA 315kVA 500kVA 750kVA 1000kVA<br />
1 1 1 1 1 1<br />
100kVA<br />
555-2 Cartridge fuse link 10A 3<br />
555-4 Cartridge fuse link 20A<br />
555-5 Cartridge fuse link 25A<br />
555-7 Cartridge fuse link 40A<br />
555-8 Cartridge fuse link 50A<br />
A ORIGINAL ISSUE<br />
B<br />
6.10.05<br />
C 3.3.11<br />
Padmounted Substation 1000kVA with LV Board<br />
HARD COPY<br />
UNCONTROLLED<br />
3<br />
3<br />
1<br />
3<br />
200kVA<br />
1<br />
3<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
3<br />
QTY<br />
315kVA<br />
1<br />
3<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
3<br />
500kVA<br />
1<br />
3<br />
C. Noel<br />
20/10/00<br />
A. Bletchly<br />
C.Lindsay<br />
3<br />
750kVA<br />
1<br />
3<br />
MATERIAL - LV FUSE<br />
ASSY<br />
529-11<br />
NOTES:<br />
1.<br />
2.<br />
3.<br />
4.<br />
11kV PADMOUNTED SUBSTATIONS<br />
FRONT ENTRY TYPE<br />
MATERIAL<br />
DESCRIPTION QTY<br />
Fuse link 125A din size 2<br />
529-13 Fuse link 200A din size 2<br />
529-14 Fuse link 250A din size 2<br />
529-16 Fuse link 355A din size 2<br />
529-17 Fuse link 400A din size 2<br />
5.<br />
55 5091 1<br />
HV Switchgear is supplied separately<br />
as required.<br />
5091<br />
3<br />
All Padmounted Substations are<br />
supplied with LV Switchgear fitted.<br />
Ensure correct phasing, HV switchgear<br />
to transformer cabling, prior to<br />
installation of switchgear.<br />
Designer to nominate LV fuse link<br />
current rating.<br />
HV fuse links are provided with<br />
switchgear construction.<br />
Assy 537-6 fitted with LV board<br />
transformer disconnector only<br />
CONTRACT No. 2004 / 037 / T<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
1<br />
C
Concrete<br />
Plinth<br />
Assy Selection<br />
538-2 and<br />
554-3 to 11<br />
or<br />
538-1, 3 or 4 and<br />
555-2 to 8<br />
HV SWITCHGEAR<br />
COMPARTMENT<br />
For feeder cable connection,<br />
Refer HV CONSTRUCTION<br />
drawing. No. 5051 (ABB RMU)<br />
or<br />
A ORIGINAL ISSUE<br />
B<br />
6.10.05<br />
C 11.08.10<br />
D 3.3.11<br />
F<br />
F<br />
drawing. No. 5054 (Magnefix<br />
RMU & SFU or Transformer)<br />
HARD COPY<br />
UNCONTROLLED<br />
F<br />
TRANSFORMER<br />
PLAN<br />
LV SWITCHGEAR<br />
COMPARTMENT<br />
F<br />
F<br />
For mains distribution<br />
cable connection, Refer<br />
LV CONSTRUCTION<br />
drawing. No. 5209.<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
Assy Selection<br />
529-11 to 17<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
18/10/00<br />
A. Bletchly<br />
C.Lindsay<br />
SIDE VIEW<br />
FRONT ENTRY TYPE<br />
CONSTRUCTION<br />
F<br />
Assy Selection<br />
537-1 to 6<br />
CONTRACT No. 2004 / 037 / T<br />
Concrete<br />
Plinth<br />
11kV PADMOUNTED SUBSTATIONS<br />
55 5091 2<br />
5091<br />
F<br />
F<br />
<strong>Construction</strong> Type<br />
PM11<br />
PM11SW<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
2<br />
D
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE HV SWITCHGEAR SIDE<br />
LV SWITCHGEAR SIDE<br />
A ORIGINAL ISSUE<br />
B 3.8.05<br />
C 3.3.11<br />
RATING<br />
100kVA<br />
125 / 400A<br />
11kV PADMOUNTED SUBSTATION<br />
with LV FUSE SWITCH ONLY<br />
HARD COPY<br />
UNCONTROLLED<br />
CONTRACT No. 2004 / 037 / T<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
30/1/03<br />
A. Bletchly<br />
C.Lindsay<br />
RATING<br />
200kVA<br />
315kVA<br />
500kVA<br />
750kVA<br />
1000kVA<br />
11kV PADMOUNTED SUBSTATIONS<br />
FRONT ENTRY TYPE - SCHEMATIC<br />
LV SWITCHGEAR ONLY<br />
xxx / 400A<br />
11kV PADMOUNTED SUBSTATION<br />
with LV FUSE SWITCH ONLY<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
55 5094 1<br />
5094<br />
xxx / 400A<br />
Dwg Sh<br />
xxx / 630A<br />
BLANK<br />
C
HV SWITCHGEAR SIDE<br />
TEST<br />
OFF<br />
ON<br />
EARTH<br />
FEEDER<br />
CABLE<br />
11kV PADMOUNTED SUBSTATION<br />
with ABB SDAF3 RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
A ORIGINAL ISSUE<br />
B 29.07.03<br />
C 3.8.05<br />
D 3.3.11<br />
TEST<br />
ON<br />
EARTH<br />
OFF<br />
TEST<br />
ON<br />
EARTH<br />
OFF<br />
FEEDER<br />
CABLE<br />
RATING<br />
100kVA<br />
HARD COPY<br />
UNCONTROLLED<br />
LV SWITCHGEAR SIDE<br />
125 / 400A<br />
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
TEST<br />
ON<br />
EARTH<br />
OFF<br />
FEEDER<br />
CABLE<br />
CONTRACT No. 2004 / 037 / T<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
11kV PADMOUNTED SUBSTATION<br />
with ABB SDAF3 RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
TEST<br />
C. Noel<br />
30/1/03<br />
A. Bletchly<br />
C.Lindsay<br />
ON<br />
EARTH<br />
OFF<br />
TEST<br />
RATING<br />
200kVA<br />
315kVA<br />
500kVA<br />
750kVA<br />
1000kVA<br />
xxx / 400A<br />
1000kVA<br />
FRONT ENTRY TYPE - SCHEMATIC<br />
5095<br />
TRANSFORMER<br />
LV ISOLATOR RATING<br />
200kVA<br />
315kVA<br />
500kVA<br />
750kVA<br />
xxx / 400A<br />
11kV PADMOUNTED SUBSTATIONS<br />
55 5095 1<br />
ON<br />
EARTH<br />
OFF<br />
FEEDER<br />
CABLE<br />
UNDERGROUND DISTRIBUTION<br />
xxx / 630A<br />
1000A<br />
1000A<br />
1000A<br />
2000A<br />
2000A<br />
ABB HV SWITCHGEAR AND LV SWITCHGEAR<br />
FILE: 5<br />
Dwg Sh<br />
BLANK<br />
D
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE HV SWITCHGEAR SIDE<br />
LV SWITCHGEAR SIDE<br />
FEEDER<br />
CABLE<br />
FEEDER<br />
CABLE<br />
11kV PADMOUNTED SUBSTATION<br />
with MAGNEFIX MD451 RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
A ORIGINAL ISSUE<br />
B 3.8.05<br />
C 8.3.11<br />
RATING<br />
100kVA<br />
HARD COPY<br />
UNCONTROLLED<br />
125 / 400A<br />
FEEDER<br />
CABLE<br />
CONTRACT No. 2004 / 037 / T<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
11kV PADMOUNTED SUBSTATION<br />
with MAGNEFIX MD414 SWITCH FUSE UNIT<br />
(1 SWITCHABLE FEEDER UNIT & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
23/5/01<br />
A. Bletchly<br />
C.Lindsay<br />
RATING<br />
100kVA<br />
UNDERGROUND DISTRIBUTION<br />
125 / 400A<br />
11kV PADMOUNTED SUBSTATIONS<br />
FRONT ENTRY TYPE - SCHEMATIC<br />
MAGNEFIX HV SWITCHGEAR & LV SWITCHGEAR<br />
FILE: 5<br />
55 5096 1<br />
5096<br />
Dwg Sh<br />
1<br />
C
HV SWITCHGEAR SIDE<br />
FEEDER<br />
CABLE<br />
FEEDER<br />
CABLE<br />
11kV PADMOUNTED SUBSTATION<br />
with MAGNEFIX MD451 RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
A ORIGINAL ISSUE<br />
B 3.8.05<br />
C 8.3.11<br />
RATING<br />
200kVA<br />
315kVA<br />
FEEDER<br />
CABLE<br />
11kV PADMOUNTED SUBSTATION<br />
with MAGNEFIX MD414 SWITCH FUSE UNIT<br />
(1 SWITCHABLE FEEDER UNIT & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
500kVA 500kVA<br />
CONTRACT No. 2004 / 037 / T<br />
HARD COPY<br />
UNCONTROLLED<br />
LV SWITCHGEAR SIDE<br />
xxx / 400A<br />
TRANSFORMER<br />
LV ISOLATOR RATING<br />
200kVA<br />
315kVA<br />
xxx / 400A<br />
xxx / 630A<br />
1000A<br />
1000A<br />
500kVA 1000A<br />
BLANK<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
HV SWITCHGEAR SIDE<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
30/1/03<br />
A. Bletchly<br />
C.Lindsay<br />
RATING<br />
200kVA<br />
315kVA<br />
200kVA<br />
500kVA<br />
FRONT ENTRY TYPE - SCHEMATIC<br />
LV SWITCHGEAR SIDE<br />
xxx / 400A<br />
TRANSFORMER<br />
LV ISOLATOR RATING<br />
315kVA<br />
UNDERGROUND DISTRIBUTION<br />
5096<br />
xxx / 400A<br />
11kV PADMOUNTED SUBSTATIONS<br />
55 5096 2<br />
2<br />
xxx / 630A<br />
1000A<br />
1000A<br />
1000A<br />
MAGNEFIX HV SWITCHGEAR & LV SWITCHGEAR<br />
FILE: 5<br />
Dwg Sh<br />
BLANK<br />
C
A ORIGINAL ISSUE<br />
B 3.8.05<br />
C 8.3.11<br />
FEEDER FEEDER<br />
CABLE<br />
HARD COPY<br />
UNCONTROLLED<br />
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
CABLE<br />
FEEDER<br />
CABLE<br />
11kV PADMOUNTED SUBSTATION<br />
with MAGNEFIX MD442 RING MAIN UNIT<br />
(3 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
RATING<br />
200kVA<br />
315kVA<br />
500kVA<br />
750kVA<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
30/1/03<br />
A. Bletchly<br />
C.Lindsay<br />
xxx / 400A<br />
xxx / 400A<br />
200kVA<br />
315kVA<br />
500kVA<br />
750kVA<br />
xxx / 630A<br />
TRANSFORMER<br />
BLANK<br />
LV ISOLATOR RATING<br />
1000A<br />
1000A<br />
1000A<br />
2000A<br />
11kV PADMOUNTED SUBSTATIONS<br />
FRONT ENTRY TYPE - SCHEMATIC<br />
MAGNEFIX HV SWITCHGEAR & LV SWITCHGEAR<br />
55 5096 3<br />
CONTRACT No. 2004 / 037 / T<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
5096<br />
Dwg Sh<br />
3<br />
C
EXAMPLE:-<br />
A ORIGINAL ISSUE<br />
B 8.8.05<br />
C 10.01.12<br />
11kV PADMOUNTED SUBSTATION (INCLUDING LV SWITCHGEAR) CONSTRUCTION CODE<br />
Code shown within dashed box<br />
appears on relevant construction<br />
detail drawings in this manual.<br />
PADMOUNT<br />
PM = Front Entry Type<br />
Padmounted Substation<br />
PM11/500 = Padmounted Substation, 11kV, 500kVA<br />
HARD COPY<br />
UNCONTROLLED<br />
A<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
PM 11/500<br />
VOLTAGE CAPACITY (kVA)<br />
11 = 11kV<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
20/12/01<br />
D. M K. c<br />
C.Lindsay<br />
11kV PADMOUNTED SUBSTATIONS<br />
CONSTRUCTION CODE GUIDE<br />
INCLUDING LV SWITCHGEAR<br />
55 5099 1<br />
100<br />
315<br />
500<br />
750<br />
1000<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
5099<br />
Dwg Sh<br />
1<br />
C
EXAMPLE:-<br />
A ORIGINAL ISSUE<br />
B<br />
6.10.05<br />
C 02.11.11<br />
PADMOUNT<br />
PM = Front Entry Type<br />
11kV PADMOUNTED SUBSTATION WITH LV SWITCHGEAR AND HV RMU CONSTRUCTION CODE<br />
Code shown within dashed box<br />
appears on relevant construction<br />
detail drawings in this manual.<br />
Padmounted Substation<br />
VOLTAGE<br />
11 = 11kV<br />
A<br />
PM 11/500/ASL 2S1F<br />
CAPACITY (kVA)<br />
315<br />
500<br />
750<br />
1000<br />
TYPE<br />
ASL = ABB SafeLink<br />
SWITCH ARRANGEMENT<br />
2S1F = 2 Switchable feeder units + 1 Fuse protected Tee<br />
FBX = Schneider Electric FBX<br />
PM11/500/FBX2S1F = 11kV padmounted substation, 500 kVA Capacity, Schneider Electric FBX HV RMU with<br />
HARD COPY<br />
UNCONTROLLED<br />
2 switchable feeder units and 1 fuse protected tee-off unit<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C.Noel<br />
4/3/04<br />
A.Bletchly<br />
T.Borg<br />
UNDERGROUND DISTRIBUTION<br />
11kV PADMOUNTED SUBSTATIONS<br />
CONSTRUCTION CODE GUIDE<br />
WITH LV SW/GEAR AND HV RMU SW/GEAR<br />
FILE: 5<br />
55 5099 2<br />
5099<br />
Dwg Sh<br />
2<br />
C
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
A ORIGINAL ISSUE<br />
B 12.3.08<br />
BLANK<br />
xxx/400A<br />
22kV PADMOUNTED SUBSTATION<br />
with LV FUSE SWITCH ONLY<br />
RATING<br />
315kVA<br />
500kVA<br />
xxx/400A<br />
xxx/400A<br />
HARD COPY<br />
UNCONTROLLED<br />
xxx/400A<br />
xxx/400A<br />
CONTRACT No. 2006/0061/T<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
22/5/01<br />
D. M K. c<br />
C.Lindsay<br />
CONSUMERS MAINS<br />
ISOLATOR<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR TYPE - SCHEMATIC<br />
LV SWITCHGEAR ONLY<br />
55 5104 1<br />
BLANK<br />
xxx/630A<br />
xxx/630A<br />
22kV PADMOUNTED SUBSTATION<br />
with LV FUSE SWITCH ONLY<br />
RATING<br />
1000kVA<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
5104<br />
Dwg Sh<br />
B
MATERIAL - PADMOUNTED SUBSTATION INCLUDING LV SWITCHGEAR<br />
ASSY DESCRIPTION<br />
542-3<br />
542-4<br />
542-5<br />
B 2.4.08<br />
Padmounted Substation 4.1m Long 500kVA with LV Switchgear<br />
Padmounted Substation 4.1m Long 1000kVA with LV Switchgear<br />
Padmounted Substation 4.1m Long 315kVA with LV Switchgear<br />
513-1 Connection earth bar to cover plate 2<br />
QTY<br />
MATERIAL - PADMOUNTED SUBSTATION INCLUDING LV AND HV SWITCHGEAR<br />
ASSY DESCRIPTION<br />
576-1<br />
576-2<br />
576-3<br />
576-4<br />
576-5<br />
576-6<br />
576-7<br />
576-8<br />
576-9<br />
576-10<br />
556-3<br />
556-4<br />
556-7<br />
1<br />
22kV PADMOUNTED SUBSTATIONS<br />
14/2/03<br />
RECTANGULAR TYPE<br />
c MATERIAL<br />
D. M K.<br />
C.Lindsay<br />
MATERIAL - LV FUSE<br />
ASSY DESCRIPTION QTY<br />
529-13 Fuse link 200A din size 2<br />
529-14 Fuse link 250A din size 2<br />
529-15 Fuse link 315A din size 2<br />
529-16<br />
Padmounted Substation 200kVA 4.1m Long with LV Switchgear & RMU F & G 1 Switch 1 Fuse<br />
Padmounted Substation 315kVA 4.1m Long with LV Switchgear & RMU F & G 2 Switch 1 Fuse<br />
Padmounted Substation 315kVA 4.1m Long with LV Switchgear & RMU F & G 3 Switch 1 Fuse<br />
Padmounted Substation 315kVA 4.1m Long with LV Switchgear & RMU F & G 2 Switch 2 Fuse<br />
Padmounted Substation 500kVA 4.1m Long with LV Switchgear & RMU F & G 2 Switch 1 Fuse<br />
Padmounted Substation 500kVA 4.1m Long with LV Switchgear & RMU F & G 3 Switch 1 Fuse<br />
Padmounted Substation 500kVA 4.1m Long with LV Switchgear & RMU F & G 2 Switch 2 Fuse<br />
Padmounted Substation 1000kVA 4.1m Long with LV Switchgear & RMU F & G 2 Switch 1 Fuse<br />
Padmounted Substation 1000kVA 4.1m Long with LV Switchgear & RMU F & G 3 Switch 1 Fuse<br />
Padmounted Substation 1000kVA 4.1m Long with LV Switchgear & RMU F & G 2 Switch 2 Fuse<br />
Cartridge fuse link 16A - 200kVA & 315kVA transformers<br />
Cartridge fuse link 20A - 500kVA transformers<br />
Cartridge fuse link - 40A 1000kVA transformers<br />
529-17 Fuse link 400A din size 2<br />
Refer note 4<br />
513-1 Connection earth bar to cover plate 2<br />
1. All padmount substations are supplied fitted with either LV switchgear or LV and HV switchgear as required<br />
2. Padmount substations for new installations shall be 4.1m long.<br />
3. Designers to nominate LV fuse link current rating<br />
4. HV fuse links provided with the padmounted substation construction.<br />
Those fitted with 2 switch 2 fuse RMU are supplied with 3 fuse links to suit that transformer only.<br />
Designer to nominate required fuse links for the remaining fuse unit<br />
A ORIGINAL ISSUE<br />
HARD COPY<br />
UNCONTROLLED<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
55 5105 1<br />
Fuse link 355A din size 2<br />
QTY<br />
1<br />
3<br />
5105<br />
1<br />
3<br />
CONTRACT No. 2006/0061/T<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
B
B 2.4.08<br />
F<br />
For mains distribution<br />
cable connection, Refer<br />
LV CONSTRUCTION<br />
drawing No. 5087.<br />
For feeder cable connection,<br />
Refer HV CONSTRUCTION<br />
drawing No. 5044 (F & G RMU)<br />
or<br />
A ORIGINAL ISSUE<br />
F<br />
drawing No. 5120 (Transformer)<br />
F<br />
Assy 513-1<br />
Assy Selection<br />
529-13, 14, 15, 16 or 17<br />
HARD COPY<br />
UNCONTROLLED<br />
F<br />
F<br />
Assy Selection<br />
556-3, 4 or 7<br />
HV<br />
Compartment<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
F<br />
22kV PADMOUNTED SUBSTATIONS<br />
29/1/03<br />
RECTANGULAR TYPE<br />
c CONSTRUCTION<br />
D. M K.<br />
C.Lindsay<br />
Assy 513-1<br />
Transformer<br />
Compartment<br />
CONTRACT No. 2006/0061/T<br />
55 5105 2<br />
F<br />
Assy Selection<br />
542-3 to 5 or<br />
576-1 to 10<br />
LV<br />
Compartment<br />
5105<br />
<strong>Construction</strong> Type<br />
PMR22<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
2<br />
B
1 SITE<br />
B<br />
C<br />
1.1<br />
PADMOUNTED SUBSTATION INSTALLATION<br />
General<br />
The site shall be to the satisfaction of <strong>Ergon</strong> <strong>Energy</strong>, including<br />
Stable (soil conditions)<br />
Flood free 1.4<br />
Free from steep batters<br />
1.2 Site Size<br />
4.3.04<br />
3.7.08<br />
Where possible, level or gently sloping ground<br />
Along coastal areas the site must be located as far as possible<br />
from the shoreline and sheltered from salt spray.<br />
A site should not be located where impact by traffic is likely and,<br />
if at a truncated section of the street alignment or other<br />
non regular shaped site, the specified rectangular size<br />
shall not be reduced.<br />
The minimum area required to accommodate a rectangular type<br />
Padmounted substation shall be:<br />
Common earthing sites<br />
Sites without retaining walls - 4000mm width x 6000mm depth.<br />
Sites requiring retaining walls - assessed on an individual basis<br />
and to include sufficient clearance to allow, without adverse<br />
impact on cables, passage of underground cables on site.<br />
Sites requiring retaining walls should be avoided if possible.<br />
Note the site size shall be increased to include retaining walls<br />
& footings<br />
A ORIGINAL ISSUE<br />
Separate Earthing Sites<br />
12000mm width x 10000mm depth.<br />
Sites requiring retaining walls - assessed on an individual basis,<br />
however, these sites should be avoided if possible.<br />
HARD COPY<br />
UNCONTROLLED<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
1.3 Substation Orientation<br />
Except where not practicable, padmounted substations shall<br />
be oriented such that the LV cabinet end is facing the dedicated<br />
footpath.<br />
URD<br />
The developer shall provide a padmounted substation site(s) as<br />
required by <strong>Ergon</strong> <strong>Energy</strong> at no cost to <strong>Ergon</strong> <strong>Energy</strong>. The site shall<br />
be included in the road reserve, or located on freehold property.<br />
No padmounted substations are to be located in Trustee Reserves.<br />
a) In the Road Reserve:-<br />
The Developer shall obtain all necessary approvals from the<br />
Department of Transport or the Local Authority.<br />
b) On Freehold property (including residential or parkland):-<br />
The Developer shall provide <strong>Ergon</strong> <strong>Energy</strong> with a registered<br />
easement at no cost to <strong>Ergon</strong> <strong>Energy</strong>.<br />
Acceptable separation of padmount to adjacent dwellings is provided<br />
if the front of dwellings are set back 6.0m from the R.P. Street<br />
Alignment and the padmount is located as shown in drawings No.<br />
5176, 5116 Sheets 1 or 2.<br />
Developments including streets where the allowable dwelling set<br />
back is less than 6.0m will require padmount siting on either<br />
an alternative street, where the dwelling set back is 6.0m, or in<br />
Parklands.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
3/2/03<br />
D. M K. c<br />
D. M K.<br />
c<br />
UNDERGROUND DISTRIBUTION<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR TYPE<br />
INSTALLATION<br />
FILE: 5<br />
55 5114 1<br />
5114<br />
Dwg Sh<br />
1<br />
C
1 SITE (CONT’D)<br />
B<br />
1.5 Commercial and Industrial or Landscaped Areas<br />
Whether the padmounted substation is for the sole use of that<br />
complex, or is required as part of the distribution network, the<br />
owner is required to grant <strong>Ergon</strong> <strong>Energy</strong> an easement for the<br />
padmounted site, access and cabling.<br />
Separation of 5.0m between padmount transformer LV bushings<br />
and the nearest room or habitable area should be provided<br />
where possible.<br />
1.6 Parklands - for other than URD<br />
1.7<br />
A ORIGINAL ISSUE<br />
16.3.04<br />
C 3.7.08<br />
D 16.04.12<br />
Obtain the necessary approval for an easement to accommodate<br />
the padmounted substation, cabling and access to site.<br />
Acceptable separation of padmount to adjacent dwellings is<br />
shown in drawings No. 5116 Sheets 1 & 2.<br />
Cabling and Access Requirement<br />
Cabling and Access<br />
A 4.0m wide easement, or road reserve, from the front of the<br />
site is required for cabling and access.<br />
Cabling Only<br />
Should the cabling route not be available in conjunction with<br />
access, a 1.0m wide cable easement is required to the front<br />
of the padmount (to align with the front left side where applicable).<br />
Additionally 2.0m x 4.0m (padmount site width) is required<br />
immediately in front to allow spreading of cables for entry to the<br />
padmount and also include the buried earth cable.<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
2 SITE PREPARATION<br />
3<br />
2.1 Generally<br />
Sites shall be prepared in accordance with the included<br />
construction drawings.<br />
2.2 Filled Sites<br />
Sites requiring fill shall be provided with compacted fill<br />
in accordance with the following:<br />
For less than 300mm fill, Rolled or Compacted; or<br />
For greater than 300mm fill, Controlled.<br />
as defined in AS 2870.<br />
SLOPING SITES<br />
3.1 Retaining walls<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
Retaining walls shall be constructed around the perimeter of the<br />
padmounted substation site where the change in round level<br />
within the boundary of the site exceeds:<br />
200mm in site width<br />
400mm in site length or diagonally<br />
Retaining walls shall be:<br />
Constructed in 200 series concrete masonary block<br />
in accordance with AS/NZS 4455<br />
Outside the 4000mm width x 6000mm depth<br />
The site size shall be increased to include retaining walls,<br />
their footings and safety fence<br />
Note the retaining walls & footings must be located such that<br />
the cable routes within the site and in front of the site are not<br />
altered or restricted.<br />
Refer applicable TRENCHING folder drawings<br />
C.Noel<br />
3/2/03<br />
A.Bletchly<br />
T.Borg<br />
UNDERGROUND DISTRIBUTION<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR TYPE<br />
INSTALLATION<br />
FILE: 5<br />
55 5114 2<br />
5114<br />
Dwg Sh<br />
2<br />
D
4 PADMOUNTED SUBSTATION FOUNDATION<br />
B 18.11.03<br />
C<br />
4.1 Generally<br />
A ORIGINAL ISSUE<br />
16.3.04<br />
D 3.7.08<br />
E 16.04.12<br />
A safety fence shall be provided on retaining wall sloping sites<br />
where the difference between ground level and the finished<br />
surface of the padmount site is 300mm or greater.<br />
Refer drawing No. 5011<br />
The developer shall provide a certified design from a<br />
Civil Engineer (RPEQ) for <strong>Ergon</strong> <strong>Energy</strong>’s consideration.<br />
No special designs for wall construction<br />
shall be used without the approval of <strong>Ergon</strong> <strong>Energy</strong>.<br />
3.2 Rural Sites Only<br />
For padmounted substation sites in rural developments or<br />
similar where large allotments are provided and a change<br />
in ground level of 300mm or more occurs within 2m of the<br />
boundary of the site a 1:4 batter slope in lieu of the retaining<br />
wall may be allowed at the sole discretion of <strong>Ergon</strong> <strong>Energy</strong>.<br />
On cut battered sites a concrete barrier kerb and channel shall<br />
be provided outside the 4000mm x 6000mm to ensure this area<br />
remains free of water, silt or similar that could require periodic<br />
removal or maintenances. The site size shall be extended as<br />
necessary to include the kerb and channel.<br />
At stable padmounted substation sites a foundation shall be<br />
constructed in accordance with the following:<br />
4.1m long substation, base 800mm maximum above ground<br />
- refer Drawing No. 5280.<br />
4.1m long substation, base 1400mm maximum above ground<br />
- refer Drawing No. 5276.<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
At coastal locations in FN Region, unless agreed otherwise by<br />
<strong>Ergon</strong> <strong>Energy</strong>, foundations shall be constructed to ensure the<br />
base of a padmounted substation is above storm surge level<br />
for that location. e.g. In Cairns city, minimum level to the base<br />
of a substation shall be AHD 3.6m<br />
(R.L. 103.600 Cairns City Council Datum 1976).<br />
LV and/or HV Service Platforms shall be provided where the<br />
distance above site surface to top of blockwork at access<br />
doors exceeds 400mm.<br />
4.2 Unstable Sites<br />
Where sites are very unstable, and conventional foundation<br />
construction techniques as described in this document cannot<br />
be applied, a special design shall be required.<br />
In such circumstances, the developer shall obtain a certified<br />
design from a Civil Engineer (RPEQ) for <strong>Ergon</strong> <strong>Energy</strong>’s<br />
consideration. No special designs for padmounted substation<br />
foundation construction shall be used without the approval of<br />
<strong>Ergon</strong> <strong>Energy</strong>.<br />
5 BACKFILLING AND FINAL SITE FINISH<br />
Earthing, conduits and cables shall be installed prior to final site finish.<br />
All backfill of the site must be compacted before final site finish in<br />
accordance with the applicable drawing.<br />
5.1 Common Earthing Sites<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
The substation 6.0m x 4.0m site surface is to be finished with<br />
interlocking masonary paving (Besser "Interlock" or equivalent<br />
approved by <strong>Ergon</strong> <strong>Energy</strong>) installed in accordance with the<br />
manufacturer’s installation specification. A concrete slab shall<br />
not be provided.<br />
C.Noel<br />
3/2/03<br />
A.Bletchly<br />
T.Borg<br />
UNDERGROUND DISTRIBUTION<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR TYPE<br />
INSTALLATION<br />
FILE: 5<br />
55 5114 3<br />
5114<br />
Dwg Sh<br />
3<br />
E
6<br />
5.2 Separate Earthing Sites<br />
ADDITIONAL REQUIREMENTS<br />
6.1<br />
A ORIGINAL ISSUE<br />
B 18.6.08<br />
In addition to the requirements of Clause 5.1 the remaining<br />
ground surface between the barrier kerb (around the paving)<br />
and site extremities shall be finished in accordance with<br />
drawing No. 5177.<br />
Commercial and Industrial Installation<br />
The preferred location of padmounted substation sites at<br />
commercial and industrial developments is at the real property<br />
street alignment with the LV cabinet end of the padmounted<br />
substation facing the adjoining footpath.<br />
Should the padmounted substation site be located elsewhere<br />
on the development, clear all weather access to the site shall<br />
be provided for personnel and heavy equipment at all times.<br />
Easy access for a mobile crane must be available for the<br />
purpose of installation or replacement.<br />
<strong>Ergon</strong> <strong>Energy</strong> cable conduits for the development may be<br />
placed in the substation site and shall pass down the sides<br />
of the foundation. No conduits shall pass through or under<br />
the foundation.<br />
Refer Clause 5 for Backfilling and Final Site Finish.<br />
HARD COPY<br />
UNCONTROLLED<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
6.2 Padmounted Substations in Landscaped Areas<br />
When planting vegetation in landscaped areas and gardens,<br />
ensure vegetation does not encroach on the padmounted<br />
substation site. Take into consideration the fully matured size<br />
of vegetation to allow continuing access to the site.<br />
<strong>Ergon</strong> <strong>Energy</strong> cable conduits for the development may be<br />
placed in the substation site and shall pass down the sides<br />
of the foundation. No conduits shall pass through or under<br />
the foundation.<br />
Refer Clause 5 for Backfilling and Final Site Finish.<br />
6.3 Padmounted Substations Installation in Parklands<br />
Where the padmounted substation is located in Council<br />
Parklands, the installation shall be in accordance with the<br />
requirements of drawing No. 5116 Sheets 1 or 2.<br />
7 SPACING BETWEEN PADMOUNTED SUBSTATION AND<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
OTHER METAL OBJECTS - SEPARATE EARTHING SITES<br />
No buildings/residences, fences, including their foundations, LV<br />
switchboard earths, or metalic objects are permitted within the<br />
clearance zone around the padmount.<br />
Clearance to Telstra assets shall be as noted on EARTHING<br />
drawing No. 5125 Sheet 1.<br />
16/3/04<br />
D. M K. c<br />
D. M K.<br />
UNDERGROUND DISTRIBUTION<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR TYPE<br />
INSTALLATION<br />
FILE: 5<br />
55 5114 4<br />
5114<br />
Dwg Sh<br />
4<br />
B
Site<br />
A _<br />
Boundary<br />
Ground<br />
Line<br />
F<br />
F<br />
A ORIGINAL ISSUE<br />
B 4.3.08<br />
F<br />
6000 Min.<br />
PLAN<br />
Cabinet<br />
SECTION A<br />
_<br />
HARD COPY<br />
UNCONTROLLED<br />
F<br />
800<br />
F<br />
F<br />
1150<br />
F<br />
F<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
F<br />
F<br />
FOOTPATH<br />
4000 Min.<br />
F<br />
F<br />
R.P.Street<br />
Alignment<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
29/1/03<br />
D. M K. c<br />
C.Lindsay<br />
NOTES:<br />
1.<br />
2.<br />
Refer drawing No. 5114 Clause 1 for general site<br />
requirements.<br />
Refer drawing No. 5114 clauses for sloping<br />
site requirements<br />
3. No services other than the <strong>Ergon</strong> <strong>Energy</strong>’s<br />
electric cables shall pass through this<br />
padmounted substation site.<br />
4. Clear access to the padmounted substation<br />
shall be maintained for <strong>Ergon</strong> <strong>Energy</strong>’s<br />
personnel and heavy equipment.<br />
5. Mature landscaping (including trees, sprinklers<br />
etc) shall not encroach onto the padmounted<br />
substation site.<br />
FOR SEPARATE HV & LV EARTHING SITES,<br />
SIZE AND OTHER REQUIREMENTS.<br />
REFER DRAWING No. 5177.<br />
UNDERGROUND DISTRIBUTION<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR TYPE - SITE REQUIREMENT<br />
WITHOUT RETAINING WALL<br />
FILE: 5<br />
55 5117 1<br />
5117<br />
Dwg Sh<br />
B
Site<br />
B 4.3.04<br />
C 4.5.08<br />
800<br />
F<br />
F<br />
Finished<br />
Ground<br />
Line<br />
A _<br />
Boundary<br />
F<br />
F<br />
A ORIGINAL ISSUE<br />
F<br />
300 Min<br />
F<br />
F<br />
6000<br />
H.V. L.V.<br />
Paved Area<br />
Refer note 3<br />
PLAN<br />
F<br />
Cabinet<br />
SECTION A<br />
_<br />
HARD COPY<br />
UNCONTROLLED<br />
F<br />
F<br />
Service Platform<br />
Refer note 4<br />
1150<br />
F<br />
F<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
F<br />
F<br />
FOOTPATH<br />
4000<br />
F<br />
F<br />
R.P.Street<br />
Alignment<br />
Base of<br />
substation<br />
Refer note 2<br />
4/2/03<br />
D. M K. c<br />
C.Lindsay<br />
NOTES:<br />
1.<br />
Foundation & Duct Covers<br />
Refer note 1<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
2.<br />
3.<br />
4.<br />
For foundation, earthing, site finish and cover<br />
plate details:<br />
4.1m long substation, base 800mm maximum<br />
above ground. Refer drawing No. 775498.<br />
4.1m long substation, base 1400mm maximum<br />
above ground. Refer drawing No. 775500.<br />
At coastal locations in FN region, unless agreed<br />
otherwise by <strong>Ergon</strong> <strong>Energy</strong>, the base of substation<br />
is to be above storm surge level for that location.<br />
e.g. in Cairns City ONLY = AHD 3.6m<br />
(R.L. 103.600 Cairns City Council Datum 1976)<br />
The padmounted substation site shall be<br />
paved. Refer drawing No. 5114.<br />
Where the distance above paving to the<br />
base of substation at HV and/or LV cabinet<br />
access doors exceeds 400mm, provide<br />
service platform/s and access ladder/s.<br />
Refer drawing No. 775501.<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR TYPE - SITE FINISH<br />
WITHOUT RETAINING WALL<br />
55 5118 1<br />
5118<br />
<strong>Construction</strong> Type<br />
PMRF22<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
C
MATERIAL - PADMOUNTED SUBSTATION<br />
ASSY DESCRIPTION QTY<br />
563-3 Padmounted Substation 315kVA with LV Switchgear & Ring Main Unit ABB, SDAF3, 2 Switch 1 Fuse<br />
563-4 Padmounted Substation 500kVA with LV Switchgear & Ring Main Unit ABB, SDAF3, 2 Switch 1 Fuse<br />
563-5 Padmounted Substation 750kVA with LV Switchgear & Ring Main Unit ABB, SDAF3, 2 Switch 1 Fuse<br />
563-6 Padmounted Substation 1000kVA with LV Switchgear & Ring Main Unit ABB, SDAF3, 2 Switch 1 Fuse<br />
554-6<br />
554-8<br />
554-9<br />
554-11<br />
MATERIAL - LV FUSE<br />
ASSY<br />
529-11<br />
DESCRIPTION QTY<br />
Fuse link 125A din size 2<br />
529-13 Fuse link 200A din size 2<br />
529-14 Fuse link 250A din size 2<br />
529-16 Fuse link 355A din size 2<br />
529-17 Fuse link 400A din size 2<br />
A ORIGINAL ISSUE<br />
Cartridge fuse link 31.5A (to suit 315kVA padmounted substation)<br />
Cartridge fuse link 50A (to suit 500kVA padmounted substation)<br />
Cartridge fuse link 63A (to suit 750kVA padmounted substation)<br />
Cartridge fuse link 80A (to suit 1000kVA padmounted substation)<br />
B 6.10.05 HARD COPY<br />
C 3.3.11<br />
UNCONTROLLED<br />
3<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
NOTES:<br />
1.<br />
2.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
All Padmounted Substations are supplied with LV Switchgear<br />
and Ring Main Unit ABB SDAF3, 2 switch 1 fuse fitted.<br />
Designer to nominate LV fuse link current rating.<br />
HV fuse links are provided with switchgear construction.<br />
C. Noel<br />
15/3/04<br />
A. Bletchly<br />
C.Lindsay<br />
11kV PADMOUNTED SUBSTATIONS<br />
55 5184 1<br />
1<br />
3<br />
CONTRACT No. 2004 / 037 / T<br />
UNDERGROUND DISTRIBUTION<br />
FRONT ENTRY TYPE WITH LV SWITCHGEAR AND<br />
RMU ABB SDAF3 2 SWITCH 1 FUSE - MATERIAL<br />
FILE: 5<br />
5184<br />
Dwg Sh<br />
1<br />
C
Concrete<br />
Plinth<br />
Assy Selection<br />
554-6 to 11<br />
A ORIGINAL ISSUE<br />
B 6.10.05<br />
C 11.08.10<br />
D 3.3.11<br />
F<br />
HV SWITCHGEAR<br />
COMPARTMENT<br />
F<br />
For feeder cable connection,<br />
Refer HV CONSTRUCTION<br />
drawing No. 5051 (ABB RMU)<br />
HARD COPY<br />
UNCONTROLLED<br />
F<br />
TRANSFORMER<br />
PLAN<br />
LV SWITCHGEAR<br />
COMPARTMENT<br />
F<br />
F<br />
Assy Selection<br />
529-11 to 17<br />
For mains distribution cable connection,<br />
Refer LV CONSTRUCTION<br />
drawing No. 5209.<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
9/3/04<br />
A. Bletchly<br />
C.Lindsay<br />
F<br />
Assy Selection<br />
563-3 to 6<br />
SIDE VIEW<br />
CONTRACT No. 2004 / 037 / T<br />
Concrete<br />
Plinth<br />
11kV PADMOUNTED SUBSTATIONS<br />
55 5184 2<br />
5184<br />
F<br />
F<br />
<strong>Construction</strong> Type<br />
UNDERGROUND DISTRIBUTION<br />
PM11xxxASD<br />
FRONT ENTRY TYPE WITH LV SWITCHGEAR AND<br />
RMU ABB SDAF 3, 2 SWITCH 1 FUSE - CONSTRUCTION<br />
FILE: 5<br />
Dwg Sh<br />
2<br />
D
Sub-Station &<br />
Transformer<br />
Lifting Point<br />
A ORIGINAL ISSUE<br />
B 11.08.10<br />
F<br />
Concrete Plinth<br />
F<br />
TRANSFORMER<br />
HV SWITCHGEAR LV SWITCHGEAR<br />
NOT APPLICABLE<br />
PLAN<br />
HARD COPY<br />
UNCONTROLLED<br />
F<br />
F<br />
F<br />
F<br />
COMPARTMENT<br />
Transformer<br />
Lifting Point<br />
Sub-Station<br />
Lifting Point<br />
Assy Selection<br />
529-11 to 17<br />
For mains distribution cable connection,<br />
Refer LV CONSTRUCTION<br />
drawing No. 5209.<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
4/8/05<br />
D. M K. c<br />
C.Lindsay<br />
Transport Tie Down<br />
Point places<br />
F<br />
SIDE VIEW<br />
CONTRACT No. 2004/037/T<br />
11kV PADMOUNTED SUBSTATIONS<br />
F<br />
Concrete<br />
Plinth<br />
<strong>Construction</strong> Type<br />
UNDERGROUND DISTRIBUTION<br />
FRONT ENTRY TYPE WITH LV SWITCHGEAR<br />
CONSTRUCTION<br />
FILE: 5<br />
55 5189 2<br />
F<br />
Assy Selection<br />
565-3 to 6<br />
5189<br />
F<br />
Dwg Sh<br />
PM11<br />
2<br />
F<br />
B
Sub-Station &<br />
Transformer<br />
Lifting Point<br />
Assy Selection<br />
555-5 to 10<br />
A ORIGINAL ISSUE<br />
B 11.08.10<br />
F<br />
Concrete Plinth<br />
HV SWITCHGEAR<br />
COMPARTMENT<br />
F<br />
For feeder cable connection,<br />
Refer HV CONSTRUCTION<br />
drawing No. 5206 or 5207<br />
(ABB SafeLink RMU)<br />
F<br />
F<br />
TRANSFORMER<br />
PLAN<br />
HARD COPY<br />
UNCONTROLLED<br />
LV SWITCHGEAR<br />
COMPARTMENT<br />
F<br />
F<br />
F<br />
F<br />
Transformer<br />
Lifting Point<br />
Sub-Station<br />
Lifting Point<br />
Assy Selection<br />
529-11 to 17<br />
For mains distribution cable connection,<br />
Refer LV CONSTRUCTION<br />
drawing No. 5209.<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
4/8/05<br />
D. M K. c<br />
C.Lindsay<br />
Transport Tie Down<br />
Point places<br />
F<br />
SIDE VIEW<br />
11kV PADMOUNTED SUBSTATIONS<br />
F<br />
Concrete<br />
Plinth<br />
<strong>Construction</strong> Type<br />
UNDERGROUND DISTRIBUTION<br />
PM11xxxASL<br />
FRONT ENTRY TYPE WITH LV SWITCHGEAR AND<br />
ABB SAFELINK RMU, 2 SW. 1 FUSE - CONSTRUCTION<br />
FILE: 5<br />
55 5191 2<br />
F<br />
Assy Selection<br />
566-3 to 6<br />
CONTRACT No. 2004/037/T<br />
5191<br />
F<br />
Dwg Sh<br />
2<br />
F<br />
B
HV SWITCHGEAR SIDE<br />
FEEDER<br />
CABLE<br />
NOTE:<br />
FEEDER<br />
CABLE<br />
Alternator connection point provided on LV Bus Bars.<br />
A ORIGINAL ISSUE<br />
B 8.3.11<br />
C 30.12.11<br />
RATING<br />
315kVA<br />
500kVA<br />
HARD COPY<br />
UNCONTROLLED<br />
LV SWITCHGEAR SIDE<br />
xxx / 630A<br />
xxx / 400A<br />
xxx / 400A<br />
xxx / 400A<br />
HV SWITCHGEAR SIDE<br />
FEEDER<br />
CABLE<br />
NOTE:<br />
C.Lindsay<br />
FEEDER<br />
CABLE<br />
11kV PADMOUNTED SUBSTATION<br />
with ABB SafeLink RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCHES<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
3 x Right angle adaptor brackets with bolts etc.<br />
RATING<br />
LV SWITCHGEAR SIDE<br />
to connect to LV busbars are supplied in plastic bag.<br />
Brackets will accept 3 x 300mm† cables per phase.<br />
Alternator connection point provided on LV Bus Bars.<br />
C. Noel<br />
14/12/05<br />
A. Bletchly<br />
11kV PADMOUNTED SUBSTATIONS<br />
FRONT ENTRY TYPE - SCHEMATIC<br />
ABB SAFELINK HV SWITCHGEAR & LV SWITCHGEAR<br />
55 5192 1<br />
750kVA<br />
xxx / 630A<br />
5192<br />
xxx / 630A<br />
xxx / 630A<br />
1<br />
xxx / 630A<br />
CONTRACT No. 2004/037/T<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
C
HV SWITCHGEAR SIDE<br />
FEEDER<br />
CABLE<br />
NOTE:<br />
FEEDER<br />
CABLE<br />
3 x Right angle adaptor brackets with bolts etc.<br />
RATING<br />
LV SWITCHGEAR SIDE<br />
to connect to LV busbars are supplied in plastic bag.<br />
Brackets will accept 3 x 300mm† cables per phase.<br />
Alternator connection point provided on LV Bus Bars.<br />
A ORIGINAL ISSUE<br />
B 8.3.11<br />
C 30.12.11<br />
1000kVA<br />
HARD COPY<br />
UNCONTROLLED<br />
SPARE<br />
SPARE<br />
SPARE<br />
SPARE<br />
11kV PADMOUNTED SUBSTATION<br />
with ABB SafeLink RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV DISCONNECTOR<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
4/8/05<br />
A. Bletchly<br />
C.Lindsay<br />
11kV PADMOUNTED SUBSTATIONS<br />
FRONT ENTRY TYPE - SCHEMATIC<br />
ABB SAFELINK HV SWITCHGEAR & LV SWITCHGEAR<br />
55 5192 2<br />
CONTRACT No. 2004 / 037 / T<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
5192<br />
Dwg Sh<br />
2<br />
C
MATERIAL - PADMOUNTED SUBSTATION<br />
ASSY DESCRIPTION QTY<br />
587-3<br />
587-4<br />
587-5<br />
587-6<br />
555-5<br />
555-7<br />
555-9<br />
555-10<br />
ASSY<br />
529-11<br />
Cartridge fuse link 25A (to suit 315kVA padmounted substation)<br />
Cartridge fuse link 40A (to suit 500kVA padmounted substation)<br />
Cartridge fuse link 63A (to suit 750kVA padmounted substation)<br />
Cartridge fuse link 80A (to suit 1000kVA padmounted substation)<br />
MATERIAL - LV FUSE - EACH CIRCUIT<br />
DESCRIPTION QTY<br />
Fuse link 125A din size 2<br />
529-13 Fuse link 200A din size 2<br />
529-14 Fuse link 250A din size 2<br />
529-15 Fuse link 315A din size 2<br />
529-16 Fuse link 355A din size 2<br />
529-17 Fuse link 400A din size 2<br />
A ORIGINAL ISSUE<br />
Padmounted Substation 315kVA with LV Switchgear & Schneider Electric FBX, 2 Switch 1 Fuse<br />
Padmounted Substation 500kVA with LV Switchgear & Schneider Electric FBX, 2 Switch 1 Fuse<br />
Padmounted Substation 750kVA with LV Switchgear & Schneider Electric FBX, 2 Switch 1 Fuse<br />
Padmounted Substation 1000kVA with LV Switchgear & Schneider Electric FBX, 2 Switch 1 Fuse<br />
3<br />
HARD COPY<br />
UNCONTROLLED<br />
NOTES:<br />
1.<br />
2.<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
All Padmounted Substations are supplied with LV Switchgear<br />
and Ring Main Unit fitted - Schneider Electric FBX, 2 switch 1 fuse.<br />
Designer to nominate LV fuse link current rating.<br />
HV fuse links are provided in construction.<br />
3. All LV fuse - switch- disconnector bases are 630A rated.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C.Noel<br />
15.11.11<br />
A.Bletchly<br />
T.Borg<br />
11kV PADMOUNTED SUBSTATIONS<br />
55 5264 1<br />
1<br />
3<br />
CONTRACT No. 08088EECL<br />
UNDERGROUND DISTRIBUTION<br />
FRONT ENTRY TYPE WITH LV SWITCHGEAR AND<br />
SCHNEIDER ELECTRIC FBX RMU, 2 SW. 1 FUSE - MATERIAL<br />
FILE: 5<br />
5264<br />
Dwg Sh<br />
1
Sub-Station &<br />
Transformer<br />
Lifting Point<br />
Assy Selection<br />
555-5 to 10<br />
A ORIGINAL ISSUE<br />
F<br />
Concrete Plinth<br />
HV SWITCHGEAR<br />
COMPARTMENT<br />
F<br />
For feeder cable connection,<br />
Refer HV CONSTRUCTION<br />
drawing No. 5270<br />
(FBX RMU)<br />
F<br />
F<br />
TRANSFORMER<br />
PLAN<br />
HARD COPY<br />
UNCONTROLLED<br />
LV SWITCHGEAR<br />
COMPARTMENT<br />
F<br />
F<br />
F<br />
F<br />
Transformer<br />
Lifting Point<br />
Sub-Station<br />
Lifting Point<br />
Assy Selection<br />
529-11 to 17<br />
For mains distribution cable connection,<br />
Refer LV CONSTRUCTION<br />
drawing No. 5209.<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C.Noel<br />
15.11.11<br />
A.Bletchly<br />
T.Borg<br />
Transport Tie Down<br />
Point places<br />
F<br />
SIDE VIEW<br />
CONTRACT No. 08088EECL<br />
11kV PADMOUNTED SUBSTATIONS<br />
Concrete<br />
Plinth<br />
<strong>Construction</strong> Type<br />
UNDERGROUND DISTRIBUTION<br />
PM11xxxFBX<br />
FRONT ENTRY TYPE WITH LV SWITCHGEAR AND<br />
55 5264 2<br />
F<br />
Assy Selection<br />
587-3 to 6<br />
F<br />
SCHNEIDER ELECTRIC FBX, 2 SW. 1 FUSE - CONSTRUCTION<br />
FILE: 5<br />
5264<br />
F<br />
Dwg Sh<br />
2<br />
F
HV SWITCHGEAR SIDE<br />
FEEDER<br />
CABLE<br />
NOTE:<br />
RATING<br />
315kVA<br />
500kVA<br />
LV SWITCHGEAR SIDE<br />
xxx / 400A<br />
HV SWITCHGEAR SIDE<br />
F F<br />
FEEDER<br />
xxx / 400A<br />
xxx / 400A<br />
CABLE<br />
NOTE:<br />
RATING<br />
LV SWITCHGEAR SIDE<br />
Alternator connection point provided on LV Bus Bars. Alternator connection point provided on LV Bus Bars.<br />
A ORIGINAL ISSUE<br />
B<br />
28.06.12<br />
FEEDER<br />
CABLE<br />
xxx / 630A<br />
3 x Right angle adaptor brackets with bolts etc.<br />
to connect to LV busbars are supplied in plastic bag.<br />
Brackets will accept 3 x 300mm† cables per phase.<br />
11kV PADMOUNTED SUBSTATION<br />
750kVA<br />
with SCHNEIDER ELECTRIC FBX RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCHES<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
15.11.11<br />
A. Bletchly<br />
T.Borg<br />
FEEDER<br />
CABLE<br />
11kV PADMOUNTED SUBSTATIONS<br />
FRONT ENTRY TYPE - SCHEMATIC<br />
SCHNEIDER ELECTRIC FBX HV SWITCHGEAR & LV SWITCHGEAR<br />
55 5265 1<br />
xxx / 630A<br />
5265<br />
xxx / 630A<br />
xxx / 630A<br />
1<br />
xxx / 630A<br />
CONTRACT No. 08088EECL<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
B
HV SWITCHGEAR SIDE<br />
FEEDER<br />
CABLE<br />
NOTE:<br />
3 x Right angle adaptor brackets with bolts etc.<br />
RATING<br />
LV SWITCHGEAR SIDE<br />
to connect to LV busbars are supplied in plastic bag.<br />
Brackets will accept 3 x 300mm† cables per phase.<br />
Alternator connection point provided on LV Bus Bars.<br />
A ORIGINAL ISSUE<br />
B<br />
28.06.12<br />
F<br />
FEEDER<br />
CABLE<br />
1000kVA<br />
SPARE<br />
SPARE<br />
SPARE<br />
SPARE<br />
11kV PADMOUNTED SUBSTATION<br />
with SCHNEIDER ELECTRIC FBX RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV DISCONNECTOR<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
16.11.11<br />
A. Bletchly<br />
T.Borg<br />
11kV PADMOUNTED SUBSTATIONS<br />
FRONT ENTRY TYPE - SCHEMATIC<br />
SCHNEIDER ELECTRIC FBX HV SWITCHGEAR & LV SWITCHGEAR<br />
55 5265 2<br />
CONTRACT No. 08088EECL<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
5265<br />
Dwg Sh<br />
2<br />
B
MATERIAL - PADMOUNTED SUBSTATION INCLUDING LV SWITCHGEAR<br />
ASSY DESCRIPTION<br />
542-3<br />
542-4<br />
542-5<br />
Padmounted Substation 4.1m Long 500kVA with LV Switchgear<br />
Padmounted Substation 4.1m Long 1000kVA with LV Switchgear<br />
Padmounted Substation 4.1m Long 315kVA with LV Switchgear<br />
513-1 Connection earth bar to cover plate 2<br />
QTY<br />
MATERIAL - PADMOUNTED SUBSTATION INCLUDING LV AND HV SWITCHGEAR<br />
ASSY DESCRIPTION<br />
590-1<br />
590-2<br />
590-3<br />
590-4<br />
590-5<br />
590-6<br />
590-7<br />
590-8<br />
590-9<br />
590-10<br />
556-3<br />
556-4<br />
556-7<br />
Cartridge fuse link 16A - 200kVA & 315kVA transformers<br />
Cartridge fuse link 20A - 500kVA transformers<br />
Cartridge fuse link - 40A 1000kVA transformers<br />
1<br />
Refer note 4<br />
16.11.11<br />
MATERIAL - LV FUSE<br />
ASSY DESCRIPTION QTY<br />
529-13 Fuse link 200A din size 2<br />
529-14 Fuse link 250A din size 2<br />
529-15 Fuse link 315A din size 2<br />
529-16<br />
513-1 Connection earth bar to cover plate 2<br />
1. All padmount substations are supplied fitted with either LV switchgear or LV and HV switchgear as required<br />
2. Padmount substations for new installations shall be 4.1m long.<br />
3. Designers to nominate LV fuse link current rating<br />
4. HV fuse links provided with the padmounted substation construction.<br />
Those fitted with 2 switch 2 fuse RMU are supplied with 3 fuse links to suit that transformer only.<br />
Designer to nominate required fuse links for the remaining fuse unit<br />
5. All LV fuse - switch - disconnectors bases are 630A rated.<br />
A ORIGINAL ISSUE<br />
Padmounted Substation 200kVA 4.1m Long with LV Switchgear & RM6 1 Switch 1 Fuse<br />
Padmounted Substation 315kVA 4.1m Long with LV Switchgear & RM6 2 Switch 1 Fuse<br />
Padmounted Substation 315kVA 4.1m Long with LV Switchgear & RM6 3 Switch 1 Fuse<br />
Padmounted Substation 315kVA 4.1m Long with LV Switchgear & RM6 2 Switch 2 Fuse<br />
Padmounted Substation 500kVA 4.1m Long with LV Switchgear & RM6 2 Switch 1 Fuse<br />
Padmounted Substation 500kVA 4.1m Long with LV Switchgear & RM6 3 Switch 1 Fuse<br />
Padmounted Substation 500kVA 4.1m Long with LV Switchgear & RM6 2 Switch 2 Fuse<br />
Padmounted Substation 1000kVA 4.1m Long with LV Switchgear & RM6 2 Switch 1 Fuse<br />
Padmounted Substation 1000kVA 4.1m Long with LV Switchgear & RM6 3 Switch 1 Fuse<br />
Padmounted Substation 1000kVA 4.1m Long with LV Switchgear & RM6 2 Switch 2 Fuse<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C.Noel<br />
A.Bletchly<br />
T.Borg<br />
529-17 Fuse link 400A din size 2<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR TYPE<br />
MATERIAL<br />
Fuse link 355A din size 2<br />
QTY<br />
1<br />
3<br />
55 5266 1<br />
5266<br />
1<br />
3<br />
CONTRACT No. 08088EECL<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh
F<br />
For mains distribution<br />
cable connection, Refer<br />
LV CONSTRUCTION<br />
drawing No. 5087.<br />
or<br />
A ORIGINAL ISSUE<br />
F<br />
F<br />
Assy 513-1<br />
For feeder cable connection,<br />
Refer HV CONSTRUCTION<br />
Assy Selection<br />
drawing No. 5279 (RM6 RMU)<br />
drawing No. 5120 (Transformer)<br />
529-13, 14, 15, 16 or 17<br />
F<br />
F<br />
Assy Selection<br />
556-3, 4 or 7<br />
HV<br />
Compartment<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
F<br />
C.Noel<br />
16.11.11<br />
A.Bletchly<br />
T.Borg<br />
Assy 513-1<br />
Transformer<br />
Compartment<br />
CONTRACT No. 08088EECL<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR TYPE<br />
CONSTRUCTION<br />
55 5266 2<br />
F<br />
Assy Selection<br />
542-3 to 5 or<br />
590-1 to 10<br />
LV<br />
Compartment<br />
5266<br />
<strong>Construction</strong> Type<br />
PMR22<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
2
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
BLANK<br />
BLANK<br />
22kV PADMOUNTED SUBSTATION<br />
with SCHNEIDER ELECTRIC RM6 NE-Q1 RING MAIN UNIT<br />
(1 SWITCHABLE FEEDER UNIT & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
A ORIGINAL ISSUE<br />
F<br />
RATING<br />
200kVA<br />
BLANK<br />
xxx/400A<br />
xxx/400A<br />
BLANK<br />
CONTRACT No. 08088EECL<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
02.04.12<br />
F<br />
22kV PADMOUNTED SUBSTATION<br />
with SCHNEIDER ELECTRIC RM6 NE-1Q1 RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
A. Bletchly<br />
T.Borg<br />
xxx/400A<br />
RATING<br />
315kVA<br />
500kVA<br />
RECTANGULAR TYPE - SCHEMATIC<br />
xxx/400A<br />
xxx/400A<br />
22kV PADMOUNTED SUBSTATIONS<br />
SCHNEIDER ELECTRIC HV SWITCHGEAR AND LV SWITCHGEAR<br />
55 5267 1<br />
xxx/400A<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
5267<br />
Dwg Sh<br />
xxx/400A<br />
1<br />
BLANK
HV SWITCHGEAR SIDE<br />
F<br />
xxx/400A<br />
xxx/400A<br />
LV SWITCHGEAR SIDE<br />
22kV PADMOUNTED SUBSTATION<br />
with SCHNEIDER ELECTRIC RM6 NE-1Q1 RING MAIN UNIT<br />
(3 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
A ORIGINAL ISSUE<br />
xxx/400A<br />
RATING<br />
315kVA<br />
500kVA<br />
xxx/400A<br />
xxx/400A<br />
BLANK<br />
CONTRACT No. 08088EECL<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
F<br />
22kV PADMOUNTED SUBSTATION<br />
with SCHNEIDER ELECTRIC RM6 NE-11Q1 RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 2 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
RATING<br />
315kVA<br />
500kVA<br />
22kV PADMOUNTED SUBSTATIONS<br />
02.04.12<br />
RECTANGULAR TYPE - SCHEMATIC<br />
A. Bletchly<br />
T.Borg<br />
55 5267 2<br />
xxx/400A<br />
xxx/400A<br />
UNDERGROUND DISTRIBUTION<br />
xxx/400A<br />
SCHNEIDER ELECTRIC HV SWITCHGEAR AND LV SWITCHGEAR<br />
FILE: 5<br />
5267<br />
xxx/400A<br />
Dwg Sh<br />
2<br />
xxx/400A<br />
BLANK
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
CONSUMERS MAINS<br />
ISOLATOR<br />
RATING<br />
xxx/630A<br />
xxx/630A<br />
BLANK<br />
F F<br />
22kV PADMOUNTED SUBSTATION<br />
with SCHNEIDER ELECTRIC RM6 NE-1Q1 RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
A ORIGINAL ISSUE<br />
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
1000kVA 1000kVA<br />
CONTRACT No. 08088EECL<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
02.04.12<br />
CONSUMERS MAINS<br />
ISOLATOR<br />
22kV PADMOUNTED SUBSTATION<br />
with SCHNEIDER ELECTRIC RM6 NE-11Q1 RING MAIN UNIT<br />
(3 SWITCHABLE FEEDER UNITS & 1 FUSE PROTECTED TEE)<br />
and LV FUSE SWITCH<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
A. Bletchly<br />
T.Borg<br />
RATING<br />
UNDERGROUND DISTRIBUTION<br />
RECTANGULAR TYPE - SCHEMATIC<br />
xxx/630A<br />
xxx/630A<br />
22kV PADMOUNTED SUBSTATIONS<br />
SCHNEIDER ELECTRIC HV SWITCHGEAR AND LV SWITCHGEAR<br />
FILE: 5<br />
55 5267 3<br />
5267<br />
BLANK<br />
Dwg Sh<br />
3
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
F<br />
CONSUMERS MAINS<br />
ISOLATOR<br />
22kV PADMOUNTED SUBSTATION<br />
with SCHNEIDER ELECTRIC RM6 NE-Q1Q1 RING MAIN UNIT<br />
(2 SWITCHABLE FEEDER UNITS & 2 FUSE PROTECTED TEE<br />
and LV FUSE SWITCH<br />
A ORIGINAL ISSUE<br />
RATING<br />
1000kVA<br />
xxx/630A<br />
xxx/630A<br />
BLANK<br />
CONTRACT No. 08088EECL<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
02.04.12<br />
A. Bletchly<br />
T.Borg<br />
UNDERGROUND DISTRIBUTION<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR TYPE - SCHEMATIC<br />
SCHNEIDER ELECTRIC HV SWITCHGEAR AND LV SWITCHGEAR<br />
FILE: 5<br />
55 5267 4<br />
5267<br />
Dwg Sh<br />
4
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
A ORIGINAL ISSUE<br />
xxx/400A<br />
xxx/400A<br />
22kV PADMOUNTED SUBSTATION<br />
Schneider Electric with LV FUSE SWITCH ONLY<br />
RATING<br />
315kVA<br />
500kVA<br />
xxx/400A<br />
xxx/400A<br />
xxx/400A<br />
BLANK<br />
CONTRACT No. 08088EECL<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
HV SWITCHGEAR SIDE LV SWITCHGEAR SIDE<br />
C.Noel<br />
CONSUMERS MAINS<br />
ISOLATOR<br />
22kV PADMOUNTED SUBSTATION<br />
Schneider Electric with LV FUSE SWITCH ONLY<br />
RATING<br />
1000kVA<br />
22kV PADMOUNTED SUBSTATIONS<br />
02.04.12<br />
RECTANGULAR TYPE - SCHEMATIC<br />
A.Bletchly<br />
T.Borg<br />
55 5272 1<br />
xxx/630A<br />
UNDERGROUND DISTRIBUTION<br />
xxx/630A<br />
SCHNEIDER ELECTRIC LV SWITCHGEAR ONLY<br />
FILE: 5<br />
BLANK<br />
5272<br />
Dwg Sh
1 CONSTRUCTION CO-ORDINATION<br />
Co-ordination is required during foundation construction and finish of the<br />
Padmounted Substation site to ensure installation of conduit, earthing and sand bedding under paving. Terminate top reinforcement bar each side<br />
(where required) service platforms. The Civil Service Provider is<br />
responsible for co-ordination of works, notifying <strong>Ergon</strong> <strong>Energy</strong> or other<br />
Service Provider(s), as required.<br />
2 SERVICE PLATFORMS<br />
Where the distance above paving to the top of blockwork at HV and/or<br />
LV cabinet access doors exceeds 400mm, provide service platform(s)<br />
and access ladder(s).<br />
Refer PADMOUNTED SUBSTATIONS dwg No. 5280 for details.<br />
3 CONCRETE<br />
(a) All concrete work shall be in accordance with AS 3600 & AS 2870.<br />
(b) Concrete for footings and slabs shall be grade N20 to AS 3600.<br />
(c) Minimum cover to reinforcement - 40mm.<br />
4 CABLE CONDUITS<br />
Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong> TRENCHING:<br />
Drawing 5142 for HV and LV conduit locations.<br />
5 EARTHING CABLE PROTECTION CONDUITS<br />
Provide 25 dia UPVC conduit at earth penetrations through<br />
50mm thick unreinforced concrete slab.<br />
A ORIGINAL ISSUE<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
6<br />
7<br />
8<br />
DRAINAGE SLOTS<br />
Provide approx. 5mm wide slots down to finished ground level to drain<br />
of slot. On flat sites provide slots at 2m max. spacing on all sides and on<br />
sloping sites at 2m max. spacing on ’down hill’ sides.<br />
MASONRY BLOCKWORK<br />
(a) Concrete blocks shall be grade 15 in accordance with AS2733<br />
and AS3700.<br />
(b) Mortar shall be class M3 in accordance with AS 3700.<br />
(c) Grout shall be 20MPa at 28 days - 10mm maximum aggregate size.<br />
(d) Concrete masonry material and workmanship shall comply with<br />
AS 3700.<br />
(e) Masonry blocks shall be 200 series and comply with AS/NZS 4455.<br />
(f) All cores containing reinforcement shall be grout filled. Provide an<br />
opening in bottom course to permit clean out of cell space.<br />
(g) Vertical reinforcement to block walls shall be 1/Y12 at corners,<br />
beside openings and at 1200mm max. centres.<br />
(h) Reinforce single course bond beam at top of wall with 2/Y12 bars<br />
horizontally.<br />
ALUMINIUM COVER PLATES & SUPPORT ANGLES<br />
Provide 3mm marine grade Aluminium cover plates fitted to Aluminium<br />
support Lat<br />
(2) openings in blockwork. Obtain final dimensions on site.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
10.04.12<br />
A. Bletchly<br />
T.Borg<br />
UNDERGROUND DISTRIBUTION<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR 3.7m LONG, 800mm MAXIMUM ABOVE<br />
GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />
FILE: 5<br />
Dwg 5273 Sh1<br />
55 5273 1
A ORIGINAL ISSUE<br />
RP Boundary<br />
A<br />
F<br />
4000<br />
F<br />
RP Boundary<br />
F<br />
800<br />
F<br />
F<br />
1390<br />
F<br />
F<br />
1390<br />
F<br />
F<br />
300<br />
F<br />
FF<br />
F 190 1010<br />
F<br />
F<br />
300<br />
F<br />
190 F<br />
RP Boundary<br />
F<br />
F<br />
Barrier Kerb<br />
1060<br />
Besser "Interlock" Pavers<br />
F<br />
F<br />
50<br />
F<br />
F<br />
F 190<br />
F<br />
F<br />
F<br />
F<br />
340 F<br />
1010<br />
Barrier Kerb<br />
F<br />
100<br />
B<br />
C<br />
F<br />
890<br />
F<br />
F<br />
F150<br />
190<br />
F<br />
F<br />
6000<br />
3790<br />
Barrier Kerb<br />
HV Service Platform (if required)<br />
Refer Note 2<br />
Barrier Kerb<br />
PLAN<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
1610<br />
200 Series Masonary Blocks<br />
F<br />
F<br />
190<br />
Drainage SlotF<br />
Refer Note 6<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
F<br />
C. Noel<br />
10.04.12<br />
C<br />
A. Bletchly<br />
T.Borg<br />
F<br />
F<br />
Barrier Kerb<br />
F<br />
600 F<br />
F<br />
250<br />
F<br />
600<br />
50<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F F<br />
50<br />
F<br />
100<br />
F<br />
100<br />
50<br />
F<br />
340<br />
F<br />
340 F<br />
LV Service Platform (if required)<br />
Refer Note 2<br />
F<br />
F<br />
550<br />
F<br />
1800<br />
1150<br />
F<br />
F<br />
F<br />
Barrier Kerb<br />
F<br />
F<br />
300<br />
F<br />
F<br />
FOOTPATH<br />
R.P.Street<br />
Alignment<br />
Earthing<br />
UNDERGROUND DISTRIBUTION<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR 3.7m LONG, 800mm MAXIMUM ABOVE<br />
GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />
FILE: 5<br />
Dwg 5273 Sh2<br />
55 5273 2
150 F<br />
Earthing<br />
A ORIGINAL ISSUE<br />
F<br />
F<br />
300 Min<br />
F<br />
F<br />
F<br />
200 series Bond Beam<br />
2/N12 bars horizontally<br />
F<br />
F<br />
150mm thick concrete slab ( Grade N20 )<br />
placed centrally<br />
Cable Conduits<br />
Refer Note 4<br />
F<br />
F<br />
25<br />
F<br />
F<br />
N12 bars Vertically<br />
reinforced with one layer SL72 mesh<br />
SECTION<br />
A<br />
Cable conduit omitted from view<br />
M10 Galv. Masonary Anchors<br />
@ 400 max crs.<br />
F<br />
75 x 50 x 6 Al.L<br />
Refer Note 8 F 20<br />
F<br />
F<br />
F<br />
20<br />
F<br />
25dia Earthing Protection<br />
Conduit. Refer Note 5.<br />
F<br />
F<br />
F<br />
F<br />
F F<br />
F45<br />
40<br />
F<br />
5<br />
F<br />
F<br />
F<br />
35<br />
F<br />
20<br />
F<br />
F<br />
F<br />
35<br />
F<br />
F<br />
50<br />
F<br />
3mm Alum Cover P L<br />
Refer Note 8<br />
800 Max<br />
200 Min.<br />
Earthing<br />
Barrier Kerb<br />
50mm thick unreinforced concrete<br />
Vapour Barrier<br />
Orange Caution Tape<br />
Earthing. Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong><br />
EARTHING Dwg 5123 Common Earth, 5125 Seperate Earth.<br />
F<br />
F<br />
D<br />
F<br />
F<br />
Cover Plate<br />
SECTION C<br />
VIEW<br />
SCALE 1:10 SCALE 1:10<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
10 thick x 50mm dia Backing Plate<br />
Stitch weld<br />
Drill & tap M12 (2 places) for lifting holes<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
10.04.12<br />
F<br />
F<br />
F<br />
A. Bletchly<br />
T.Borg<br />
F<br />
100<br />
F<br />
F<br />
250<br />
F<br />
F<br />
500<br />
F<br />
F<br />
F<br />
F<br />
14 dia hole for<br />
Earth Connection<br />
F<br />
F<br />
F<br />
D<br />
Compacted, well graded,<br />
course bedding sand.<br />
F<br />
150<br />
F<br />
F<br />
F<br />
Besser "Interlock" Pavers<br />
laid in accordance with<br />
manufacturers specification<br />
F<br />
Min Fal 1 in 50 F<br />
F<br />
40mm Min. levelling layer<br />
of compacted, well graded,<br />
course bedding sand.<br />
25<br />
5<br />
F F<br />
F<br />
SECTION<br />
B<br />
Cable conduit omitted from view<br />
6 Thick x 25mm dia Backing Plate<br />
Stitch weld<br />
Drill & tap for M10 SS ’D’ Head Bolts<br />
200<br />
55 5273 3<br />
F<br />
F<br />
50<br />
F<br />
F<br />
85<br />
F<br />
400 max.crs.<br />
F<br />
5273<br />
F<br />
F<br />
2/N12 Bars<br />
Min 600 Lap, 40 Cover<br />
F<br />
F<br />
F150<br />
22kV PADMOUNTED SUBSTATIONS<br />
F<br />
Barrier Kerb<br />
F<br />
100 200<br />
F<br />
Earthing<br />
F<br />
F<br />
Cable Trench<br />
UNDERGROUND DISTRIBUTION<br />
3<br />
Natural Surface<br />
RECTANGULAR 3.7m LONG, 800mm MAXIMUM ABOVE<br />
GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />
FILE: 5<br />
Dwg Sh
1 CONSTRUCTION CO-ORDINATION<br />
Co-ordination is required during foundation construction and finish of the<br />
2 SERVICE PLATFORMS<br />
3 CONCRETE<br />
(a) All concrete work shall be in accordance with AS 3600 & AS 2870.<br />
(b) Concrete for footings and slabs shall be grade N20 to AS 3600.<br />
(c) Minimum cover to reinforcement - 40mm.<br />
4 CABLE CONDUITS<br />
Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong> TRENCHING:<br />
Drawing 5142 for HV and LV conduit locations.<br />
5 EARTHING CABLE PROTECTION CONDUITS<br />
Provide 25 dia UPVC conduit at earth penetrations through<br />
50mm thick unreinforced concrete slab.<br />
7<br />
8<br />
DRAINAGE SLOTS<br />
Padmounted Substation site to ensure installation of conduit, earthing and sand bedding under paving. Terminate top reinforcement bar each side<br />
(where required) service platforms. The Civil Service Provider is<br />
responsible for co-ordination of works, notifying <strong>Ergon</strong> <strong>Energy</strong> or other<br />
Service Provider(s), as required.<br />
Where the distance above paving to the top of blockwork at HV and/or<br />
LV cabinet access doors exceeds 400mm, provide service platform(s)<br />
and access ladder(s).<br />
Refer PADMOUNTED SUBSTATIONS dwg No. 5280 for details.<br />
A ORIGINAL ISSUE<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
6<br />
Provide approx. 5mm wide slots down to finished ground level to drain<br />
of slot. On flat sites provide slots at 2m max. spacing on all sides and on<br />
sloping sites at 2m max. spacing on ’down hill’ sides.<br />
MASONRY BLOCKWORK<br />
(a) Concrete blocks shall be grade 15 in accordance with AS2733<br />
and AS3700.<br />
(b) Mortar shall be class M3 in accordance with AS 3700.<br />
(c) Grout shall be 20MPa at 28 days - 10mm maximum aggregate size.<br />
(d) Concrete masonry material and workmanship shall comply with<br />
AS 3700.<br />
(e) Masonry blocks shall be 200 series and comply with AS/NZS 4455.<br />
(f) All cores containing reinforcement shall be grout filled. Provide an<br />
opening in bottom course to permit clean out of cell space.<br />
(g) Vertical reinforcement to block walls shall be 1/Y12 at corners,<br />
beside openings and at 1200mm max. centres.<br />
(h) Reinforce single course bond beam at top of wall with 2/Y12<br />
bars horizontally.<br />
ALUMINIUM COVER PLATES & SUPPORT ANGLES<br />
Provide 3mm marine grade Aluminium cover plates fitted to Aluminium<br />
support Lat<br />
(2) openings in blockwork. Obtain final dimensions on site.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
10.04.12<br />
A. Bletchly<br />
T.Borg<br />
UNDERGROUND DISTRIBUTION<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR 4.1m LONG, 800mm MAXIMUM ABOVE<br />
GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />
FILE: 5<br />
Dwg 5274 Sh1<br />
55 5274 1
A ORIGINAL ISSUE<br />
RP Boundary<br />
A<br />
F<br />
4000<br />
F<br />
RP Boundary<br />
F<br />
800<br />
F<br />
F<br />
1390<br />
F<br />
F<br />
300<br />
F<br />
F<br />
F 190 1010<br />
F<br />
F<br />
300<br />
F<br />
190 F<br />
RP Boundary<br />
F<br />
F<br />
Barrier Kerb<br />
660<br />
F<br />
200<br />
F<br />
F<br />
F<br />
F 190<br />
F<br />
F<br />
F<br />
490 F<br />
Besser "Interlock" Pavers<br />
F<br />
F<br />
100<br />
1410<br />
B<br />
C<br />
Barrier Kerb<br />
750 F<br />
F<br />
F<br />
F150<br />
190<br />
HV Service Platform (if required)<br />
Refer Note 2<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
F<br />
ABN 50 087 646 062<br />
F<br />
6000<br />
4190<br />
Barrier Kerb<br />
Barrier Kerb<br />
PLAN<br />
1610<br />
200 Series Masonary Blocks<br />
Drainage Slot<br />
Refer Note 6<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
F<br />
C. Noel<br />
10.04.12<br />
A. Bletchly<br />
F<br />
T.Borg<br />
F<br />
190<br />
C<br />
F<br />
F<br />
F<br />
Barrier Kerb<br />
F<br />
600 F<br />
F<br />
250<br />
F<br />
F<br />
F<br />
F<br />
F<br />
50<br />
F<br />
50<br />
F<br />
F<br />
F<br />
550<br />
F<br />
1800<br />
LV Service Platform (if required)<br />
Refer Note 2<br />
1150<br />
22kV PADMOUNTED SUBSTATIONS<br />
Barrier Kerb<br />
RECTANGULAR 4.1m LONG, 800mm MAXIMUM ABOVE<br />
GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />
FILE: 5<br />
600<br />
50 F<br />
F<br />
F<br />
F<br />
100<br />
F<br />
100<br />
340<br />
F<br />
F<br />
340<br />
Dwg 5274 Sh2<br />
55 5274 2<br />
F<br />
F<br />
F<br />
F<br />
F<br />
300<br />
F<br />
F<br />
FOOTPATH<br />
R.P.Street<br />
Alignment<br />
Earthing<br />
UNDERGROUND DISTRIBUTION
A ORIGINAL ISSUE<br />
F<br />
150 F<br />
F<br />
300 Min<br />
F<br />
Earthing<br />
F<br />
F<br />
F<br />
200 Series Bond Beam<br />
2/N12 bars Horizontally<br />
150mm thick concrete slab ( Grade N20 )<br />
reinforced with one layer SL72 mesh<br />
placed centrally<br />
F<br />
Cable Conduits<br />
Refer Note 4<br />
F<br />
F<br />
SECTION<br />
M10 Galv. Masonary Anchors<br />
@ 400 max crs.<br />
25<br />
F<br />
F<br />
F<br />
75 x 50 x 6 Al.L<br />
Refer Note 8 F 20<br />
F<br />
A<br />
Cable conduit omitted from view<br />
F<br />
F<br />
20<br />
C<br />
F<br />
25dia Earthing Protection<br />
Conduit. Refer Note 5.<br />
SECTION<br />
N12 bars Vertically<br />
F<br />
F<br />
F<br />
F<br />
F F<br />
F45<br />
40<br />
F<br />
5<br />
F<br />
F<br />
F<br />
35<br />
F<br />
20<br />
F<br />
F<br />
F<br />
35<br />
F<br />
F<br />
50<br />
F<br />
3mm Alum Cover P L<br />
Refer Note 8<br />
F<br />
F<br />
F<br />
Earthing<br />
Barrier Kerb<br />
800 Max<br />
200 Min.<br />
50mm thick unreinforced concrete<br />
Vapour Barrier<br />
Orange Caution Tape<br />
Earthing. Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong><br />
EARTHING Dwg 5123 Common Earth, 5125 Seperate Earth.<br />
D<br />
F<br />
Cover Plate<br />
SCALE 1:10 SCALE 1:10<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
10 thick x 50mm dia Backing Plate<br />
Stitch weld<br />
Drill & tap M12 (2 places) for lifting holes<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
F<br />
100<br />
F<br />
C. Noel<br />
10.04.12<br />
A. Bletchly<br />
T.Borg<br />
F<br />
F<br />
F<br />
14 dia Hole for<br />
Earth Connection<br />
VIEW<br />
F<br />
D<br />
F<br />
F<br />
F<br />
F<br />
F<br />
150<br />
F<br />
250<br />
F<br />
F<br />
F<br />
Compacted, well graded,<br />
course bedding sand.<br />
F<br />
500<br />
F<br />
F<br />
F<br />
F<br />
25<br />
F F<br />
5<br />
F<br />
50<br />
F<br />
F<br />
F<br />
85<br />
F<br />
400 max.crs.<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR 4.1m LONG, 800mm MAXIMUM ABOVE<br />
GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />
55 5274 3<br />
Besser "Interlock" Pavers<br />
laid in accordance with<br />
manufacturers specification<br />
Min Fal 1 in 50 F<br />
6 Thick x 25mm dia Backing Plate<br />
Stitch weld<br />
Drill & tap for M10 SS ’D’ Head Bolts<br />
200<br />
F<br />
F<br />
40mm Min. levelling layer<br />
of compacted, well graded,<br />
course bedding sand.<br />
SECTION<br />
B<br />
Cable conduit omitted from view<br />
F<br />
5274<br />
F<br />
F<br />
2/N12 Bars<br />
Min 600 Lap, 40 Cover<br />
F<br />
F<br />
F150<br />
F<br />
3<br />
Barrier Kerb<br />
F<br />
100 200<br />
F<br />
Earthing<br />
F<br />
F<br />
Cable Trench<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
Natural Surface
1 CONSTRUCTION CO-ORDINATION<br />
Co-ordination is required during foundation construction and finish of the<br />
2 SERVICE PLATFORMS<br />
3 CONCRETE<br />
(a) All concrete work shall be in accordance with AS 3600 & AS 2870.<br />
(b) Concrete for footings and slabs shall be grade N20 to AS 3600.<br />
(c) Minimum cover to reinforcement - 40mm.<br />
4 CABLE CONDUITS<br />
Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong> TRENCHING:<br />
Drawing 5142 for HV and LV conduit locations.<br />
5 EARTHING CABLE PROTECTION CONDUITS<br />
Provide 25 dia UPVC conduit at earth penetrations through<br />
50mm thick unreinforced concrete slab.<br />
7<br />
8<br />
DRAINAGE SLOTS<br />
Padmounted Substation site to ensure installation of conduit, earthing and sand bedding under paving. Terminate top reinforcement bar each side<br />
(where required) service platforms. The Civil Service Provider is<br />
responsible for co-ordination of works, notifying <strong>Ergon</strong> <strong>Energy</strong> or other<br />
Service Provider(s), as required.<br />
Where the distance above paving to the top of blockwork at HV and/or<br />
LV cabinet access doors exceeds 400mm, provide service platform(s)<br />
and access ladder(s).<br />
Refer PADMOUNTED SUBSTATIONS dwg No. 5280 for details.<br />
A ORIGINAL ISSUE<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
6<br />
Provide approx. 5mm wide slots down to finished ground level to drain<br />
of slot. On flat sites provide slots at 2m max. spacing on all sides and on<br />
sloping sites at 2m max. spacing on ’down hill’ sides.<br />
MASONRY BLOCKWORK<br />
(a) Concrete blocks shall be grade 15 in accordance with AS2733<br />
and AS3700.<br />
(b) Mortar shall be class M3 in accordance with AS 3700.<br />
(c) Grout shall be 20MPa at 28 days - 10mm maximum aggregate size.<br />
(d) Concrete masonry material and workmanship shall comply with<br />
AS 3700.<br />
(e) Masonry blocks shall be 200 series and comply with AS/NZS 4455.<br />
(f) All cores containing reinforcement shall be grout filled. Provide an<br />
opening in bottom course to permit clean out of cell space.<br />
(g) Vertical reinforcement to block walls shall be 1/Y12 at corners,<br />
beside openings and at 1200mm max. centres.<br />
(h) Reinforce single course bond beam at top of wall with 2/Y12<br />
bars horizontally.<br />
ALUMINIUM COVER PLATES & SUPPORT ANGLES<br />
Provide 3mm marine grade Aluminium cover plates fitted to Aluminium<br />
support Lat<br />
(2) openings in blockwork. Obtain final dimensions on site.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
10.04.12<br />
A. Bletchly<br />
T.Borg<br />
UNDERGROUND DISTRIBUTION<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR 3.7m LONG, 1400mm MAXIMUM ABOVE<br />
GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />
FILE: 5<br />
Dwg 5275 Sh1<br />
55 5275 1
A ORIGINAL ISSUE<br />
RP Boundary<br />
A<br />
F<br />
4000<br />
F<br />
RP Boundary<br />
F<br />
800<br />
F<br />
F<br />
1390<br />
F<br />
F<br />
1390<br />
F<br />
F<br />
300<br />
F<br />
F<br />
F 190 1010<br />
F<br />
F<br />
300<br />
F<br />
190 F<br />
RP Boundary<br />
F<br />
F<br />
Barrier Kerb<br />
1060<br />
Besser "Interlock" Pavers<br />
F<br />
F<br />
50<br />
F<br />
F<br />
F 190<br />
F<br />
F<br />
F<br />
F<br />
340 F<br />
Barrier Kerb<br />
F<br />
100<br />
B<br />
1010<br />
C<br />
F<br />
890<br />
F<br />
F<br />
F150<br />
190<br />
F<br />
F<br />
6000<br />
3790<br />
Barrier Kerb<br />
HV Service Platform (if required)<br />
Refer Note 2<br />
Barrier Kerb<br />
PLAN<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
1610<br />
200 Series Masonary Blocks<br />
Drainage Slot<br />
Refer Note 6<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
F<br />
F<br />
F<br />
C. Noel<br />
10.04.12<br />
A. Bletchly<br />
T.Borg<br />
190<br />
C<br />
F<br />
F<br />
F<br />
Barrier Kerb<br />
F<br />
600 F<br />
F<br />
250<br />
F<br />
600<br />
50 F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
50<br />
F<br />
100<br />
F<br />
100<br />
F<br />
50<br />
F<br />
340<br />
F<br />
340 F<br />
F<br />
F<br />
550<br />
F<br />
1800<br />
LV Service Platform (if required)<br />
Refer Note 2<br />
1150<br />
22kV PADMOUNTED SUBSTATIONS<br />
F<br />
F<br />
F<br />
Barrier Kerb<br />
F<br />
F<br />
300<br />
RECTANGULAR 3.7m LONG, 1400mm MAXIMUM ABOVE<br />
GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />
FILE: 5<br />
Dwg 5275 Sh2<br />
55 5275 2<br />
F<br />
F<br />
FOOTPATH<br />
R.P.Street<br />
Alignment<br />
Earthing<br />
UNDERGROUND DISTRIBUTION
200 series Bond Beam<br />
2/N12 bars horizontally<br />
Earthing<br />
150 F<br />
F<br />
A ORIGINAL ISSUE<br />
F<br />
F<br />
F<br />
F<br />
placed centrally<br />
F<br />
N12 bars Vertically<br />
150mm thick concrete slab ( Grade N20 )<br />
reinforced with one layer SL72 mesh<br />
SECTION<br />
A<br />
Cable conduit omitted from view<br />
F<br />
Cable Conduits<br />
Refer Note 4<br />
M10 Galv. Masonary Anchors<br />
@ 400 max crs.<br />
25<br />
75 x 50 x 6 Al.L<br />
Refer Note 8 F 20<br />
F<br />
F<br />
F<br />
20<br />
C<br />
F<br />
F<br />
40<br />
5<br />
F<br />
F<br />
F<br />
35<br />
20<br />
FF<br />
35<br />
FF<br />
FF<br />
F<br />
SCALE 1:10<br />
F<br />
25dia Earthing Protection<br />
Conduit. Refer Note 5.<br />
SECTION<br />
F<br />
F<br />
200 Min.<br />
F45<br />
FF<br />
F<br />
50<br />
F<br />
3mm Alum L Cover PL<br />
Refer Note 8<br />
F<br />
F<br />
D<br />
Barrier Kerb<br />
Cover Plate<br />
F<br />
F<br />
100<br />
14 dia hole for<br />
Earth Connection<br />
F<br />
10 thick x 50mm dia Backing Plate<br />
Stitch weld<br />
Drill & tap M12 (2 places) for lifting holes<br />
VIEW<br />
F<br />
D<br />
F<br />
SCALE 1:10<br />
F<br />
F<br />
F<br />
6 Thick x 25mm dia Backing Plate<br />
Stitch weld<br />
Drill & tap for M10 SS ’D’ Head Bolts<br />
200<br />
150<br />
F<br />
Min Fal 1 in 50 F<br />
F<br />
F<br />
F<br />
F<br />
25<br />
F F<br />
5<br />
F<br />
50<br />
F<br />
F<br />
F<br />
85<br />
400 max.crs.<br />
(typical)<br />
F<br />
F F<br />
F F<br />
F150<br />
F<br />
Barrier Kerb<br />
100 200<br />
FF<br />
F F<br />
Orange Caution Tape<br />
Earthing. Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong><br />
EARTHING Dwg 5123 Common Earth, 5125 Seperate Earth.<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
1400 Max<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
F<br />
F<br />
F<br />
Earthing<br />
FF 250<br />
500 F<br />
F<br />
F<br />
C. Noel<br />
10.04.12<br />
A. Bletchly<br />
T.Borg<br />
50mm thick<br />
unreinforced concrete<br />
Vapour Barrier<br />
F<br />
F<br />
Compacted, well graded,<br />
course bedding sand.<br />
Besser "Interlock" Pavers<br />
laid in accordance with<br />
manufacturers specification<br />
F<br />
40mm Min. levelling layer<br />
of compacted, well graded,<br />
course bedding sand.<br />
SECTION<br />
B<br />
Cable conduit omitted from view<br />
22kV PADMOUNTED SUBSTATIONS<br />
F<br />
F<br />
F<br />
F<br />
F<br />
Earthing<br />
F<br />
F<br />
Cable Trench<br />
Natural Surface<br />
RECTANGULAR 3.7m LONG, 1400mm MAXIMUM ABOVE<br />
GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />
FILE: 5<br />
Dwg 5275 Sh3<br />
55 5275 3<br />
2/N12 Bars<br />
Min 600 Lap, 40 Cover<br />
UNDERGROUND DISTRIBUTION
1 CONSTRUCTION CO-ORDINATION<br />
Co-ordination is required during foundation construction and finish of the<br />
2 SERVICE PLATFORMS<br />
3 CONCRETE<br />
(a) All concrete work shall be in accordance with AS 3600 & AS 2870.<br />
(b) Concrete for footings and slabs shall be grade N20 to AS 3600.<br />
(c) Minimum cover to reinforcement - 40mm.<br />
4 CABLE CONDUITS<br />
Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong> TRENCHING:<br />
Drawing 5142 for HV and LV conduit locations.<br />
5 EARTHING CABLE PROTECTION CONDUITS<br />
Provide 25 dia UPVC conduit at earth penetrations through<br />
50mm thick unreinforced concrete slab.<br />
7<br />
8<br />
DRAINAGE SLOTS<br />
Padmounted Substation site to ensure installation of conduit, earthing and sand bedding under paving. Terminate top reinforcement bar each side<br />
(where required) service platforms. The Civil Service Provider is<br />
responsible for co-ordination of works, notifying <strong>Ergon</strong> <strong>Energy</strong> or other<br />
Service Provider(s), as required.<br />
Where the distance above paving to the top of blockwork at HV and/or<br />
LV cabinet access doors exceeds 400mm, provide service platform(s)<br />
and access ladder(s).<br />
Refer PADMOUNTED SUBSTATIONS dwg No. 5280 for details.<br />
A ORIGINAL ISSUE<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
6<br />
Provide approx. 5mm wide slots down to finished ground level to drain<br />
of slot. On flat sites provide slots at 2m max. spacing on all sides and on<br />
sloping sites at 2m max. spacing on ’down hill’ sides.<br />
MASONRY BLOCKWORK<br />
(a) Concrete blocks shall be grade 15 in accordance with AS2733<br />
and AS3700.<br />
(b) Mortar shall be class M3 in accordance with AS 3700.<br />
(c) Grout shall be 20MPa at 28 days - 10mm maximum aggregate size.<br />
(d) Concrete masonry material and workmanship shall comply with<br />
AS 3700.<br />
(e) Masonry blocks shall be 200 series and comply with AS/NZS 4455.<br />
(f) All cores containing reinforcement shall be grout filled. Provide an<br />
opening in bottom course to permit clean out of cell space.<br />
(g) Vertical reinforcement to block walls shall be 1/Y12 at corners,<br />
beside openings and at 1200mm max. centres.<br />
(h) Reinforce single course bond beam at top of wall with 2/Y12<br />
bars horizontally.<br />
ALUMINIUM COVER PLATES & SUPPORT ANGLES<br />
Provide 3mm marine grade Aluminium cover plates fitted to Aluminium<br />
support Lat<br />
(2) openings in blockwork. Obtain final dimensions on site.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
10.04.12<br />
A. Bletchly<br />
T.Borg<br />
UNDERGROUND DISTRIBUTION<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR 4.1m LONG, 1400mm MAXIMUM ABOVE<br />
GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />
FILE: 5<br />
Dwg 5276 Sh1<br />
55 5276 1
A ORIGINAL ISSUE<br />
RP Boundary<br />
A<br />
F<br />
4000<br />
F<br />
RP Boundary<br />
F<br />
800<br />
F<br />
F<br />
1390<br />
F<br />
F<br />
1390<br />
F<br />
F<br />
300<br />
F<br />
F<br />
F 190 1010<br />
F<br />
F<br />
300<br />
F<br />
190 F<br />
RP Boundary<br />
F<br />
F<br />
Barrier Kerb<br />
660<br />
F<br />
200<br />
F<br />
F<br />
F<br />
F 190<br />
F<br />
F<br />
F<br />
490 F<br />
Besser "Interlock" Pavers<br />
F<br />
F<br />
100<br />
1410<br />
B<br />
C<br />
Barrier Kerb<br />
750 F<br />
F<br />
F<br />
F150<br />
190<br />
HV Service Platform (if required)<br />
Refer Note 2<br />
F<br />
F<br />
6000<br />
4190<br />
Barrier Kerb<br />
Barrier Kerb<br />
PLAN<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
1610<br />
200 Series Masonary Blocks<br />
Drainage Slot<br />
Refer Note 6<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
F<br />
F<br />
F<br />
C. Noel<br />
10.04.12<br />
A. Bletchly<br />
T.Borg<br />
190<br />
C<br />
F<br />
F<br />
F<br />
Barrier Kerb<br />
F<br />
600 F<br />
F<br />
250<br />
F<br />
600<br />
50 F<br />
F<br />
F<br />
F<br />
F<br />
F<br />
50<br />
F<br />
100<br />
F<br />
F<br />
100<br />
F<br />
50<br />
F<br />
340<br />
F<br />
F<br />
340<br />
F<br />
F<br />
550<br />
F<br />
1800<br />
LV Service Platform (if required)<br />
Refer Note 2<br />
1150<br />
22kV PADMOUNTED SUBSTATIONS<br />
F<br />
F<br />
F<br />
Barrier Kerb<br />
F<br />
F<br />
300<br />
RECTANGULAR 4.1m LONG, 1400mm MAXIMUM ABOVE<br />
GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />
FILE: 5<br />
Dwg 5276 Sh2<br />
55 5276 2<br />
F<br />
F<br />
FOOTPATH<br />
R.P.Street<br />
Alignment<br />
Earthing<br />
UNDERGROUND DISTRIBUTION
200 Series bond Beam<br />
2/N12 bars Horizontally<br />
150 F<br />
F<br />
Earthing<br />
A ORIGINAL ISSUE<br />
F<br />
F<br />
F<br />
F<br />
150mm thick concrete slab (Grade N20)<br />
reinforced with one layer SL72 mesh<br />
placed centrally.<br />
F<br />
N12 bars Vertically<br />
F<br />
SECTION<br />
A<br />
Cable conduit omitted from view<br />
Cable Conduits<br />
Refer Note 4<br />
M10 Galv. Masonary Anchors<br />
@ 400 max crs.<br />
25<br />
F<br />
F<br />
F<br />
20<br />
75 x 50 x 6 Al.L<br />
Refer Note 8<br />
FF<br />
F<br />
F<br />
20<br />
C<br />
F<br />
25dia Earthing Protection<br />
Conduit. Refer Note 5.<br />
SECTION<br />
F<br />
F<br />
40<br />
F<br />
5<br />
F<br />
F<br />
F<br />
35<br />
F<br />
20<br />
F<br />
F<br />
F<br />
35<br />
F<br />
F<br />
50<br />
F<br />
F<br />
F<br />
3mm Alum Cover PL<br />
Refer Note 8<br />
F F<br />
F45<br />
1400 Max<br />
200 Min.<br />
F<br />
F<br />
Orange Caution Tape<br />
Earthing. Refer <strong>Underground</strong> <strong>Construction</strong> <strong>Manual</strong><br />
EARTHING Dwg 5123 Common Earth, 5125 Seperate Earth.<br />
D<br />
F<br />
Earthing<br />
Cover Plate<br />
Barrier Kerb<br />
F<br />
F<br />
F 250<br />
500 F<br />
SCALE 1:10 SCALE 1:10<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
F<br />
F<br />
C. Noel<br />
10.04.12<br />
A. Bletchly<br />
F<br />
T.Borg<br />
F<br />
100<br />
14 dia Hole for<br />
Earth Connection<br />
F<br />
F<br />
F<br />
F<br />
Vapour Barrier<br />
F<br />
D<br />
F<br />
150<br />
F<br />
6 Thick x 25mm dia Backing Plate<br />
Stitch weld<br />
Drill & tap for M10 SS ’D’ Head Bolts<br />
200<br />
10 thick x 50mm dia Backing Plate<br />
Stitch weld<br />
Drill & tap M12 (2 places) for lifting holes<br />
VIEW<br />
50mm thick<br />
unreinforced concrete<br />
F<br />
F<br />
F<br />
FF<br />
F<br />
F<br />
Compacted, well graded,<br />
course bedding sand.<br />
25<br />
F F<br />
5<br />
50<br />
F<br />
F<br />
F<br />
85<br />
400 max.crs.<br />
(typical)<br />
F<br />
F<br />
FF<br />
F F<br />
Besser "Interlock" Pavers<br />
laid in accordance with<br />
manufacturers specification<br />
Min Fal 1 in 50 F<br />
40mm Min. levelling layer<br />
of compacted, well graded,<br />
course bedding sand.<br />
F150<br />
22kV PADMOUNTED SUBSTATIONS<br />
F<br />
SECTION<br />
RECTANGULAR 4.1m LONG, 1400mm MAXIMUM ABOVE<br />
GROUND FOUNDATION, EARTHING & SITE FINISH DETAILS<br />
Dwg 5276 Sh3<br />
55 5276 3<br />
B<br />
Cable conduit omitted from view<br />
F<br />
F<br />
F<br />
2/N12 Bars<br />
Min 600 Lap, 40 Cover<br />
F<br />
F<br />
F<br />
Barrier Kerb<br />
F<br />
100 200<br />
F<br />
Earthing<br />
F<br />
F<br />
Cable Trench<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Natural Surface
A ORIGINAL ISSUE<br />
MATERIAL:<br />
TOLERANCES:<br />
FABRICATION:<br />
PROTECTIVE<br />
COAT:<br />
CONCRETE:<br />
NOTES:<br />
Structural steel bars and sections shall be in accordance with AS/NZS 3679 - 250.<br />
Circular hollow sections shall be in accordance with AS 1163 - C250.<br />
+<br />
-2mm<br />
except where otherwise specified on drawing.<br />
(a) Welds shall be categorg SP in accordance with AS/NZS 1554.1.<br />
All joints shall be full seal welds unless noted otherwise.<br />
Fillet welds shall be 5mm.<br />
(b) Remove sharp edges, burrs and weld spatter prior to galvanizing.<br />
(c) Remove slag after galvanizing.<br />
Hot dip galvanize after fabrication in accordance with AS/NZS 4680.<br />
(a) All concrete work shall be in accordance with AS 3600.<br />
(b) Concrete shall be grade N20 in accordance with AS 3600.<br />
(c) Minimum cover to reinforcement - 65mm.<br />
(a) Fix Gridmesh to support frame using galv. clamps in accordance with manufactures<br />
requirements.<br />
(b) Chain to be hooked on Padmount side of Platform. Chain and hook to be clear of<br />
ladder access when in unhooked position.<br />
(c) Establish height of service platforms and ladders on site.<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C. Noel<br />
04.07.12<br />
A. Bletchly<br />
T.Borg<br />
UNDERGROUND DISTRIBUTION<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR HV AND LV SERVICE PLATFORM<br />
DETAILS<br />
FILE: 5<br />
Dwg 5280 Sh1<br />
55 5280 1
A ORIGINAL ISSUE<br />
95<br />
14 dia holes (4 places) for<br />
12mm Chemset masonary anchors<br />
Back of MS<br />
F<br />
+ 5<br />
850-<br />
0<br />
F<br />
Back of MS<br />
F<br />
+ 5<br />
900-<br />
0<br />
Top Grating<br />
Refer Detail 1<br />
F<br />
F<br />
+ 5<br />
1400-<br />
0<br />
F<br />
F<br />
450<br />
F<br />
F<br />
150<br />
F<br />
F<br />
F<br />
80 F<br />
F<br />
FF F<br />
F<br />
F<br />
F<br />
FF<br />
F<br />
300 dia<br />
F<br />
F<br />
F<br />
F<br />
F<br />
300 Min.<br />
1200<br />
33.7 x 2 CHS top rail<br />
26.9 x 2 CHS Mid.Rail<br />
48.3 x 3.2 CHS posts<br />
60.3 OD x 3.6Tk posts<br />
4/N12 Vertical Bars<br />
W8 Ties @ 600crs Max<br />
F<br />
F<br />
300<br />
F<br />
Refer Detail 4<br />
F<br />
+ 5<br />
2600<br />
-0<br />
+ 5<br />
2440<br />
-0<br />
2440<br />
400 810<br />
F<br />
F F 250<br />
F<br />
F F 250<br />
80<br />
F<br />
F<br />
F 330<br />
F<br />
F 600 F 220<br />
F<br />
F<br />
30<br />
F<br />
1390<br />
F<br />
Back of MS<br />
Edge of Blockwork<br />
Back of MS<br />
C. Noel<br />
22kV PADMOUNTED SUBSTATIONS<br />
04.07.12<br />
RECTANGULAR HV AND LV SERVICE PLATFORM<br />
A. Bletchly<br />
T.Borg<br />
F<br />
FF<br />
FF<br />
FF<br />
300<br />
F<br />
F<br />
Galvanised GR50110<br />
gridmesh floor<br />
75 x 75 x 6 Fl. Base Plates<br />
Refer galvanizing note above<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
F<br />
PLAN<br />
Refer Detail 3<br />
Provide internal holes in handrails and posts<br />
as required by Galvanizer to vent and drain<br />
zinc during galvanizing.<br />
F<br />
14 dia holes (2 places) for<br />
12mm Chemset masonary anchors<br />
ELEVATION<br />
F<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
95<br />
F<br />
F<br />
1200<br />
F<br />
F<br />
F<br />
300<br />
F<br />
F<br />
F<br />
F<br />
300<br />
F<br />
F<br />
F<br />
90<br />
600<br />
F<br />
F<br />
500 Min<br />
F<br />
F<br />
F<br />
F<br />
F<br />
150<br />
F<br />
F<br />
+ 5<br />
850-0<br />
Refer Detail 4<br />
Refer Detail 2<br />
F<br />
F<br />
180<br />
F<br />
65<br />
F<br />
300<br />
F<br />
F<br />
790<br />
Galvanised GR50110<br />
gridmesh floor<br />
600<br />
600<br />
450<br />
F<br />
600<br />
F<br />
300 dia<br />
F<br />
F<br />
F<br />
F<br />
Back of MS<br />
F<br />
F<br />
F<br />
F<br />
F<br />
DETAILS<br />
F<br />
F<br />
F<br />
+ 5<br />
2100-<br />
0<br />
F<br />
F<br />
Back of MS<br />
F<br />
Back of MS<br />
8mm galv. chain<br />
at ladder access.<br />
Refer note.<br />
Rungs to be equaly spaced<br />
200min - 300max<br />
65 x 10 Fl Stiles<br />
Top of top rung level<br />
with top Gridmesh<br />
W8 Ties @ 600crs.<br />
55 5280 2<br />
20mm dia. MS Rungs.<br />
Full seal fillet weld<br />
to Stiles.<br />
<strong>Construction</strong> joint if reqd.<br />
4/N12 Vertical Bars<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
5280<br />
Dwg Sh<br />
2
A ORIGINAL ISSUE<br />
75 F<br />
FF 35<br />
Edge of blockwork<br />
F<br />
F<br />
F<br />
40<br />
F F<br />
12<br />
70<br />
150<br />
F<br />
40 x 40 x 5 L<br />
75 Long<br />
F F<br />
12<br />
100<br />
60 x 8 Plate 150 Long<br />
75 TFC frame<br />
F<br />
40<br />
F<br />
PLAN<br />
SCALE 1:5<br />
Edge of blockwork<br />
F<br />
F<br />
F<br />
ELEVATION<br />
F<br />
DETAIL 2<br />
22 F<br />
F F<br />
10<br />
Gridmesh omitted for clarity<br />
F<br />
F<br />
75 x 75 x 6 L x 150 Long<br />
F<br />
75 TFC<br />
F<br />
60<br />
F<br />
SECTION A<br />
14 dia holes (2 places) for<br />
12mm galv. Chemset masonary anchors<br />
75 x 75 x 6 L x 150 Long<br />
48.3 x 3.2 CHS post<br />
5 FF<br />
5 FF<br />
F<br />
F<br />
20 FF<br />
F<br />
DETAIL 1<br />
SCALE 1:5<br />
12<br />
80<br />
F<br />
75 TFC<br />
150 F<br />
12<br />
40 x 40 x 5 L 75 Long<br />
PLAN<br />
F<br />
Galvanised GR50110<br />
gridmesh floor<br />
F<br />
20<br />
FF<br />
A<br />
M12 galv. bolts<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
33.7 x 2 CHS top rail<br />
Galvanised GR50110<br />
gridmesh floor<br />
75TFC<br />
75 TFC<br />
5 FF<br />
75 TFC<br />
40<br />
C. Noel<br />
04.07.12<br />
A. Bletchly<br />
T.Borg<br />
FFF<br />
38<br />
FF<br />
Fabricate 150 x 75 x 6 L x 600 Long<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
75 TFC<br />
F<br />
12<br />
F<br />
150<br />
5 FF<br />
20 x 6 Fl. 600 Long<br />
Stitch Weld<br />
F<br />
48.3 x 3.2 CHS posts<br />
F<br />
F<br />
F<br />
20 F<br />
F<br />
F<br />
F<br />
F<br />
65 x 6 Fl. 80 Long<br />
65 x 10 Fl.<br />
100r F<br />
195<br />
F<br />
Edge of blockwork<br />
PLAN<br />
SCALE 1:5<br />
F<br />
DETAIL 4<br />
SCALE 1:2.5<br />
188<br />
ELEVATION<br />
M12 bolt<br />
F<br />
F 100<br />
F<br />
F<br />
F<br />
14 dia. hole<br />
32 x 5 Fl. x 60 Long<br />
For earth connection<br />
22kV PADMOUNTED SUBSTATIONS<br />
RECTANGULAR HV AND LV SERVICE PLATFORM<br />
DETAILS<br />
55 5280 3<br />
F<br />
220<br />
F<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
5280<br />
Dwg Sh<br />
3
F<br />
F<br />
4400 Min.<br />
R.P.Street<br />
Alignment<br />
A ORIGINAL ISSUE<br />
FOOTPATH<br />
F<br />
F<br />
F<br />
F<br />
1150<br />
F<br />
F<br />
1000<br />
F<br />
1750<br />
6200 Min.<br />
PLAN<br />
Cabinet<br />
SECTION A<br />
_<br />
F<br />
F<br />
100<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
F<br />
CONCRETE STRENGTHS<br />
Foundation<br />
F’c Slump Aggregate Cement<br />
25MPa<br />
Blockwork /<br />
17.5MPa<br />
Core Filling<br />
N16 at 400 crs<br />
80mm Vertical<br />
20 cover to<br />
Conduit<br />
inside face<br />
A<br />
_<br />
200 series<br />
F<br />
F<br />
F<br />
F<br />
1390<br />
Site<br />
Boundary<br />
200<br />
200<br />
Ground<br />
Line<br />
F<br />
Conduit installed through RETAINING WALL DETAIL<br />
the slab and continue to<br />
C.Noel<br />
10.07.12<br />
A.Bletchly<br />
T.Borg<br />
blockwork<br />
N16 at 400 crs<br />
lap 500 at<br />
corners & where<br />
necessary<br />
SL72 mesh with<br />
60 cover top<br />
N12 at 300 crs<br />
lap 400<br />
250<br />
ground level for ease of<br />
finding. This can be cut<br />
to suit later.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
F<br />
F<br />
75<br />
150<br />
Concrete infill to<br />
be rounded to form<br />
watershed capping<br />
F<br />
F<br />
F<br />
F<br />
Size (Max) Content (Min)<br />
20mm<br />
22kV PADMOUNTED SUBSTATIONS<br />
F<br />
F<br />
-<br />
10mm 300kg/cu. m<br />
75 cover to bottom<br />
RETAINING WALL - MAXIMUM HEIGHT 1.2m<br />
55 5281 1<br />
50<br />
800<br />
F<br />
CUT SLOPING SITE<br />
F<br />
300<br />
5281<br />
Site<br />
Boundary<br />
500<br />
1<br />
Backfill<br />
material<br />
Filter<br />
material<br />
N16 at 400 crs<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
1200 Max.<br />
500
F<br />
F<br />
4400 Min.<br />
Fence refer<br />
FOOTPATH<br />
drawing 5011.<br />
Footpath<br />
Ground Line<br />
600<br />
F<br />
Min<br />
F<br />
Backfill<br />
A ORIGINAL ISSUE<br />
F<br />
F<br />
F<br />
1150<br />
F<br />
F<br />
1000<br />
F<br />
1750<br />
F<br />
F<br />
Cabinet<br />
SECTION<br />
6200 Min.<br />
PLAN<br />
A<br />
F<br />
F<br />
F<br />
F<br />
F<br />
Site<br />
F<br />
Boundary<br />
Finished<br />
Site Level<br />
F<br />
F<br />
F<br />
F<br />
1390<br />
Filter material<br />
Weepholes<br />
F<br />
A _<br />
200<br />
200<br />
Natural Ground<br />
Line<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
100mm dia conduit<br />
through footing for<br />
earth spike. Trim top<br />
of conduit as req’d.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C.Noel<br />
10.07.12<br />
A.Bletchly<br />
T.Borg<br />
CONCRETE STRENGTHS<br />
Foundation<br />
F<br />
F’c<br />
25MPa<br />
Blockwork /<br />
17.5MPa<br />
Core Filling<br />
Filter<br />
20 cover to<br />
inside face<br />
Backfill<br />
material<br />
material<br />
Concrete infill to<br />
RETAINING WALL DETAIL<br />
22kV PADMOUNTED SUBSTATIONS<br />
RETAINING WALL - MAXIMUM HEIGHT 1.2m<br />
55 5281 2<br />
F<br />
Slump<br />
75<br />
be rounded to form<br />
watershed capping<br />
N16 at 400 crs<br />
N12 at 400<br />
with 55 cover<br />
300<br />
150 10mm<br />
F<br />
F<br />
F<br />
300<br />
FILLED SLOPING SITE<br />
Size (Max) Content (Min)<br />
50<br />
F<br />
F<br />
Aggregate<br />
F<br />
F<br />
20mm<br />
F<br />
500<br />
800<br />
5281<br />
Site<br />
Boundary<br />
lap 500 at<br />
necessary<br />
F<br />
F<br />
2<br />
-<br />
300kg/cu. m<br />
N16 at 400 crs<br />
200 series<br />
blockwork<br />
N12 at 400<br />
Cement<br />
corners & where<br />
SL72 mesh<br />
F<br />
F<br />
55 cover<br />
250<br />
UNDERGROUND DISTRIBUTION<br />
FILE: 5<br />
Dwg Sh<br />
F<br />
500<br />
1400 Max.<br />
N16 at 400 crs<br />
F<br />
F
RETAINING WALL CONSTRUCTION<br />
1 SETTING OUT<br />
The Contractor shall be responsible for the correct setting out of<br />
works. The Contractor shall establish the actual position of all<br />
services on site before commencing work on the site.<br />
2 COMPLIANCE<br />
The Contractor shall comply with acts of parliament, statutory,<br />
municipal and other regulations or bylaws, that in any way<br />
affect the works, with particular regard to:<br />
Workplace Health & Safety<br />
Protection of Public Utilities<br />
Traffic Hazards and Public Safety.<br />
3 DAMAGE RESPONSIBILITY<br />
The Contractor shall be responsible for any damage to public<br />
utility service installations such as water, gas and sewer pipes,<br />
electrical, traffic signal or telephone conduits and shall bear the<br />
costs of reinstating any service damaged during consturction of<br />
the works.<br />
4 SPECIAL CONDITIONS<br />
The retaining wall construction drawings provided by <strong>Ergon</strong><br />
<strong>Energy</strong> are to be applied in normal situations.<br />
Where special conditions exist, (in the opinion of a Civil<br />
Engineer RPEQ) such as:<br />
Extra heavy surcharge<br />
Unstable ground conditions<br />
Property boundary limitations<br />
Excavation or backfilling restrictions<br />
A ORIGINAL ISSUE<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
The developer shall provide a certified design from a Civil Engineer<br />
(RPEQ) for <strong>Ergon</strong> <strong>Energy</strong>’s consideration. No special designs for retaining<br />
wall construction shall be used without the approval of <strong>Ergon</strong> <strong>Energy</strong>.<br />
5 ADDITIONAL REQUESTS<br />
Additional requests will be required if the developer, or the developer’s<br />
representative, choose to:<br />
Construct the padmounted substation on a slope where the retaining<br />
wall would be higher than 2.0m, or<br />
Use a different method of construction for the retaining wall.<br />
Requests shall be accompanied by a certified design from a Civil Engineer<br />
(RPEQ) for <strong>Ergon</strong> <strong>Energy</strong>’s consideration. No special designs for retaining<br />
wall construction shall be used without the approval of <strong>Ergon</strong> <strong>Energy</strong>.<br />
6 MASONRY<br />
Concrete masonry materials and workmanship shall comply with AS3700.<br />
Masonry blocks shall be 200 series and shall comply with AS/NZS 4455.<br />
Mortar shall consist of 1 part cement, 1/10 part slaked lime and 3 parts<br />
sand measured by volume complying with the requirements of AS 3700<br />
- masonry structures.<br />
The bottom course blocks shall contain an opening to permit clean out of<br />
the cell space.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C.Noel<br />
12.07.12<br />
A.Bletchly<br />
T.Borg<br />
UNDERGROUND DISTRIBUTION<br />
22kV PADMOUNTED SUBSTATIONS<br />
SITE PREPARATION<br />
RETAINING WALL CONSTRUCTION<br />
FILE: 5<br />
55 5283 1<br />
5283<br />
Dwg Sh<br />
1
7<br />
8<br />
9<br />
FOUNDATIONS<br />
Where the bearing surface under the foundation is silt or clay<br />
soil, a 100mm layer of compacted sand or gravel bedding<br />
material shall be placed under the concrete foundation.<br />
Foundation must be undisturbed material which is firm and dry.<br />
Wall not to be founded on uncompacted fill material.<br />
CONCRETE<br />
Concrete work shall comply with AS3600<br />
Concrete:-<br />
Foundation - F’c = 25MPa; 75mm Slump; 20mm Max Agg.<br />
Core Filling - F’c = 17.5MPa; 150mm Slump; 10mm Max<br />
Agg.<br />
Concrete foundation slab with continuous reinforcement over-<br />
lapped at joints shall be poured MONOLITHICALLY (in one<br />
operation).<br />
REINFORCEMENT<br />
Reinforcement:-<br />
Hot rolled deformed bar - "TEMPCORE" complying with<br />
AS 1302<br />
Hard-drawn steel wire reinforcement fabric complying with<br />
AS 1303 and AS 1304.<br />
A ORIGINAL ISSUE<br />
<strong>Ergon</strong> <strong>Energy</strong> Corporation Ltd<br />
ABN 50 087 646 062<br />
10 DRAINAGE<br />
50mm weepholes at 1200 centres shall be provided through walls.<br />
A porous backfill such as gravel or coarse sand shall be provided directly<br />
behind the wall to allow water to reach the weepholes. It is essential to<br />
have suitable filter material between the wall and the natural ground.<br />
11 BACKFILLING<br />
Clay soils and organic silts shall not be used as backfill as they have poor<br />
drainage characteristics.<br />
Backfill should not be placed or compacted until the wall has cured (14<br />
days minimum for 17.5 MPa concrete) so as to have sufficient strength to<br />
withstand backfilling loads.<br />
Backfill shall be compacted to 95% of the maximum dry density as defined<br />
in the Modified Compaction Test - Test AS 1289 - E2.1.<br />
After installation of the padmounted substation and cables has been<br />
completed, the ground within the enclosure shall be backfilled,<br />
compacted, levelled and finished in accordance with Drawing No. 5004.<br />
APPROVED<br />
DATE<br />
PASSED<br />
DRAWN<br />
C.Noel<br />
12.07.12<br />
A.Bletchly<br />
T.Borg<br />
UNDERGROUND DISTRIBUTION<br />
22kV PADMOUNTED SUBSTATIONS<br />
SITE PREPARATION<br />
RETAINING WALL CONSTRUCTION<br />
FILE: 5<br />
55 5283 2<br />
5283<br />
Dwg Sh<br />
2