Goals and targets<br />

Our <strong>2011</strong> targets<br />

Several targets were set in 2010 for <strong>2011</strong>.<br />

Some of these targets were met and our efforts were particularly rewarded with a<br />

nine per cent reduction in water consumption and a 45 per cent increase in the<br />

amount of wastepaper and cardboard collected for recycling.<br />

However, some of our targets were not met. We set a five per cent reduction target<br />

for our energy consumption in <strong>Etihad</strong> Complex and in our offices at <strong>Etihad</strong> Plaza.<br />

However, the electricity demand in these facilities increased during <strong>2011</strong> by seven<br />

and two per cent respectively. This was primarily due to the more intensive use of<br />

the facilities, particularly our crew training areas. Plans for building improvement<br />

projects in 2012 should allow for efficiency improvements in 2012.<br />

Reduction targets Outcome<br />

Five per cent reduction in potable water consumption<br />

at <strong>Etihad</strong> Complex<br />

Five per cent reduction in energy consumption TARGET NOT MET<br />

<strong>Etihad</strong> Complex<br />

<strong>Etihad</strong> Plaza offices<br />

10 per cent reduction in the volume of waste to landfill<br />

from <strong>Etihad</strong> Complex<br />

10 per cent improvement in waste segregation and<br />

recycling in <strong>Etihad</strong> Complex<br />

TARGET EXCEEDED<br />

Nine per cent reduction in consumption<br />

in <strong>2011</strong> versus 2010<br />

Seven per cent increase in consumption<br />

in <strong>2011</strong> on 2010<br />

Two per cent increase in consumption in<br />

<strong>2011</strong> on 2010<br />

TARGET NOT MET<br />

0.4 per cent reduction in volume of<br />

waste to landfill in <strong>2011</strong> on 2010<br />

TARGET EXCEEDED<br />

45 per cent more material segregated<br />

and sent for recycling in <strong>2011</strong> on 2010<br />

10 per cent reduction in copy paper use in TARGET NOT MET<br />

<strong>Etihad</strong> Headquarter (HQ)<br />

<strong>Etihad</strong> Training Academy (TA)<br />

<strong>Etihad</strong> Plaza offices<br />

four per cent reduction in copy paper<br />

use in <strong>2011</strong> on 2010<br />

Three per cent increase in copy paper<br />

use in <strong>2011</strong> on 2010<br />

Four per cent increase in copy paper use<br />

in <strong>2011</strong> on 2010<br />

District cooling No target set for <strong>2011</strong><br />

<strong>Etihad</strong> Complex<br />

<strong>Etihad</strong> Plaza offices<br />

Three per cent reduction in district cooling<br />

needs in <strong>2011</strong> on 2010<br />

Eight per cent reduction in district cooling<br />

needs in <strong>2011</strong> on 2010<br />

Our 2012 targets<br />

The main focus for 2012 is to drive down electricity consumption in our ground<br />

facilities, identify ways and means to reduce the volume of waste going to landfill<br />

and to use the 2012 water saving campaign to reduce dependence on fresh water<br />

both in our offices and facilities and in the daily lives of our staff.<br />

Unlike last year, we will also set a target for our cooling water consumption.<br />

While we achieved improvement in this area from 2010 to <strong>2011</strong> (three per cent<br />

and eight per cent respectively at <strong>Etihad</strong> Complex and <strong>Etihad</strong> Plaza), the facilities<br />

management team will be looking at the feasibility of further improving the<br />

efficiency of the air cooling units. Signifigant upgrading of the water distribution<br />

systems within <strong>Etihad</strong> <strong>Airways</strong> facilities should result in fewer instances of broken<br />

pipeworks and leaks.<br />

Reduction targets Action plan<br />

Five per cent reduction in potable water consumption at<br />

<strong>Etihad</strong> Complex compared to <strong>2011</strong><br />

Five per cent reduction in energy consumption at <strong>Etihad</strong><br />

Complex and the <strong>Etihad</strong> Plaza offices compared to<br />

<strong>2011</strong><br />

Five per cent reduction in cooling water requirements at<br />

<strong>Etihad</strong> Complex compared to <strong>2011</strong><br />

10 per cent reduction in the volume of waste to landfill<br />

from <strong>Etihad</strong> Complex compared to <strong>2011</strong><br />

10 per cent improvement in waste segregation and<br />

recycling in <strong>Etihad</strong> Complex compared to <strong>2011</strong><br />

10 per cent reduction in copy paper use in both <strong>Etihad</strong><br />

Complex and <strong>Etihad</strong> Plaza offices compared to <strong>2011</strong><br />

The 2012 water saving campaign will<br />

promote water saving among staff.<br />

Feasibility studies on using drainage<br />

water from air handling and fan cool<br />

condensate for irrigation may lead to<br />

implementation of this initiative in 2012.<br />

A switch to energy saving lighting<br />

Improvements in the building management<br />

systems will enable a more effective<br />

and efficient scheduling system for<br />

lighting and air conditioning systems.<br />

More comprehensive cleaning and<br />

maintenance of air conditioning<br />

systems.<br />

Improvements to building management<br />

system.<br />

A waste composition assessment will<br />

allow a comprehensive plan which<br />

reflects reduction opportunities.<br />

Additional materials for recycling will<br />

be identified.<br />

Continued education and awareness<br />

raising for office and cleaning staff<br />

Changing of the printer setting to default<br />

double sided.<br />

Education and awareness raising and<br />

communication to office staff by the<br />

Green Champions.<br />

Summary<br />

Units <strong>2011</strong> 2010<br />

Aircraft Operation Metrics<br />

Total Passenger Kilometers (PK) 40,020,920,494 34,516,523,826<br />

Freight Tonne Kilomters (FTK) 2,245,587,824 2,212,751,786<br />

Total Tonne Kilometer (TK)<br />

Fuel Consumption<br />

7,048,098,283 6,354,734,645<br />

Total Consumption tonnes 1,722,842 1,548,638<br />

Fuel consumption (passenger flights only) tonnes 1,561,426 1,429,848<br />

Fuel consumption (Cargo)<br />

Carbon Dioxide Emissions<br />

tonnes 161,416 118,789<br />

Total CO2 emission (pax & cargo) tonnes of CO2/kg 5,427 4,878<br />

CO2 per RPK (passenger only) gCO2/100 PK 123 130<br />

CO2 per TK gCO2/100 TK 770 768<br />

% of improvement in CO2/RPK (Since 2006) CO2/RPK 17.25% 12.13%<br />

% of improvement in CO2/TK (Since 2008) CO2/TK 3.52% 3.82%<br />

Total NOx emission during LTO kg 974,575 843,569<br />

NOx emission per LTO kg 33 32<br />

CO emission per LTO<br />

Fuel Ground Vehicle<br />

kg 14 13<br />

Petrol Liters 190,340 350,237<br />

Diesel<br />

Energy<br />

Liters 1,932,795 1,774,469<br />

<strong>Etihad</strong> Headquarter & Training Academy<br />

<strong>Etihad</strong> Plaza (Offices and Common Area)<br />

District Cooling<br />

kWh<br />

1,501,981<br />

675,813<br />

1,408,867<br />

660,359<br />

<strong>Etihad</strong> Headquarter & Training Academy<br />

<strong>Etihad</strong> Plaza (Including residential areas)<br />

Water<br />

tonnes/hour<br />

4,239,162<br />

3,009,064<br />

4,358,315<br />

3,274,599<br />

<strong>Etihad</strong> Headquarter & Training Academy<br />

m3 <strong>Etihad</strong> Plaza (Offices and Common Area)<br />

Waste<br />

74,202<br />

2,481<br />

81,560<br />

2,946<br />

Paper and Cardboard recycled kg 24,775 17,300<br />

Printer Cartridges recycled pcs 206 549<br />

Aluminium (cans) recycled kg 0 240<br />

Plastic (bottles) recycled kg 10 90<br />

<strong>Etihad</strong> Complex General Waste kg 728,700 731,850<br />

EN1, EN2, EN3, EN4, EN8, EN16, EN20, EN22<br />

34 <strong>Etihad</strong> <strong>Airways</strong> Corporate Social Responsibility Report <strong>2011</strong> <strong>Etihad</strong> <strong>Airways</strong> Corporate Social Responsibility Report <strong>2011</strong> 35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!