04.03.2013 Views

Project Deliverable D50 Report on Best Practices Workshop - Ifremer

Project Deliverable D50 Report on Best Practices Workshop - Ifremer

Project Deliverable D50 Report on Best Practices Workshop - Ifremer

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Names Surnames Instituti<strong>on</strong>s Emails<br />

Di<strong>on</strong>ysios Ballas HCMR dballas@ath.hcmr.gr<br />

Jérôme Blandin IFREMER jerome.blandin@ifremer.fr<br />

J<strong>on</strong> Campbell NOCS joc@noc.sot<strong>on</strong>.ac.uk<br />

Johannes Karstensen KDM-IFM-GEOMAR jkarstensen@ifm-geomar.de<br />

Christophe Laot Telecom Bretagne Christophe.laot@telecom-bretagne.eu<br />

Benoît Lecomte IPGP blecomte@ipgp.jussieu.fr<br />

Presentati<strong>on</strong> of experiences were open for discussi<strong>on</strong>:<br />

J<strong>on</strong> Campbell (NOCS): PAP site deployment / telemetry issues<br />

Di<strong>on</strong>ysis Ballas (HCMR): Tsunami detecti<strong>on</strong> platform<br />

Johannes Karstensen (IFM-Geomar): Overview of Eurosite moorings<br />

Jérôme Blandin –Julien Legrand (IFREMER): COMMODAC - a comparis<strong>on</strong> of<br />

acoustic modems.<br />

On day two, discussi<strong>on</strong>s were held <strong>on</strong> several design issues, including energy<br />

management, <strong>on</strong>-shore organizati<strong>on</strong>, deployment procedures and extensi<strong>on</strong> of<br />

deployment durati<strong>on</strong>s.<br />

4.3.2.3 Debriefing<br />

Several design issues, including energy management, <strong>on</strong>-shore organizati<strong>on</strong>, deployment<br />

procedures and extensi<strong>on</strong> of deployment durati<strong>on</strong>s have already been addressed by members<br />

of the ESONET community in the framework of time series stati<strong>on</strong>s (PAP, ESTOC etc.).<br />

A number of comm<strong>on</strong> c<strong>on</strong>cerns were indentified and the group agreed to keep updated <strong>on</strong> the<br />

progress of the next or <strong>on</strong>-going experiments, in particular the ESONET demo missi<strong>on</strong>s.<br />

(see appendix E)<br />

4.4 Standardisati<strong>on</strong> and Interoperability<br />

4.4.1 Time series and images: treatment and qualificati<strong>on</strong><br />

4.4.1.1 Introductory text<br />

The purpose of this sub-sessi<strong>on</strong> is to give an overview <strong>on</strong> most comm<strong>on</strong>ly used<br />

methods for l<strong>on</strong>g time-series analysis of data acquired in the framework of deep-sea<br />

observatories.<br />

The sequence of topics discussi<strong>on</strong>s will start with data qualificati<strong>on</strong>, after the<br />

systematic quality assurance, when the expertise of the specialists is needed to<br />

definitively qualify the data, for instance:<br />

How to detect a slow and low trend <strong>on</strong> a l<strong>on</strong>g time series?<br />

How to c<strong>on</strong>duct pre and post-deployment calibrati<strong>on</strong>s and apply post-deployment<br />

correcti<strong>on</strong>s?<br />

How to apply various signal-processing methods to different kinds of data and<br />

objectives?<br />

How to address gap in time series for signal processing methods?<br />

We will discuss examples from parameters to be collected by the generic sensor module, as<br />

<str<strong>on</strong>g>Deliverable</str<strong>on</strong>g> #50 - update October 2010 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!