Sewage treatment plant I, Gut Großlappen, Munich ... - Koch + Partner
Sewage treatment plant I, Gut Großlappen, Munich ... - Koch + Partner
Sewage treatment plant I, Gut Großlappen, Munich ... - Koch + Partner
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Sewage</strong> <strong>treatment</strong> <strong>plant</strong> I, <strong>Gut</strong> <strong>Großlappen</strong>, <strong>Munich</strong> - Germany<br />
Sand filtration <strong>plant</strong>, new porter´s house, showroom, laboratory<br />
Construction of a new sand<br />
filtration <strong>plant</strong> with electrical<br />
building, sewage water<br />
pumping station, drain-quantity<br />
measurement with visitor´s<br />
room, work yard and adjacent<br />
to existing buildings, porter´s<br />
house and groundfloor parking<br />
Client (public):<br />
Landeshauptstadt München,<br />
Baureferat Stadtentwässerung<br />
Start of planning 2003<br />
Completion approx. 2008<br />
Artistic and architectural<br />
consultancy, planning<br />
K+P<br />
Architekten und Stadtplaner GmbH<br />
<strong>Koch</strong> Voigt Zschornack
<strong>Sewage</strong> <strong>treatment</strong> <strong>plant</strong> I, <strong>Gut</strong> <strong>Großlappen</strong>, <strong>Munich</strong> - Germany<br />
Sand filtration <strong>plant</strong>, new porter´s house, showroom,<br />
laboratory<br />
K+P<br />
Architekten und Stadtplaner GmbH<br />
<strong>Koch</strong> Voigt Zschornack
<strong>Sewage</strong> <strong>treatment</strong> <strong>plant</strong> I, <strong>Gut</strong> <strong>Großlappen</strong>, <strong>Munich</strong> - Germany<br />
Mechanical <strong>plant</strong>, 2. biolog. purification <strong>plant</strong>, administration buildings and<br />
laboratories 1986-1996<br />
K+P<br />
Architekten und Stadtplaner GmbH<br />
<strong>Koch</strong> Voigt Zschornack
<strong>Sewage</strong> <strong>treatment</strong> <strong>plant</strong> I, <strong>Gut</strong> <strong>Großlappen</strong>, <strong>Munich</strong> - Germany<br />
The maintenance and improvement of water quality represent a great<br />
challenge to modern society. The conversion of existing structures<br />
and the construction of new buildings for this purpose are, therefore,<br />
assignments of great responsibility.<br />
<strong>Sewage</strong> <strong>treatment</strong> structures have, first and foremost, to meet<br />
functional needs. Nevertheless, a number of <strong>treatment</strong> <strong>plant</strong>s built<br />
in the recent years for the city of <strong>Munich</strong> demonstrate that design<br />
considerations can also play an important role.<br />
Over a period of 20 years, from 1986-2006, and further on, we have<br />
helped to give the old <strong>Munich</strong> I sewage <strong>treatment</strong> <strong>plant</strong> a new face.<br />
The project comprised the planning and construction management of<br />
the new buildings, as well as the detailed design of the engineering<br />
structures. The work included:<br />
Artistic and architectural consultancy in respect of the new engineering<br />
structures forming the second biological purification <strong>plant</strong><br />
Construction of the new building for mechanical <strong>plant</strong> with a hall for<br />
vehicles and equipment<br />
Construction of administration buildings and laboratories<br />
Construction of a heating <strong>plant</strong><br />
Construction of a workshop for equipment and electrical installations<br />
Artistic and architectural consultancy in respect of the hall for<br />
mechanical <strong>plant</strong> and the new buildings for the northern works yard<br />
Facade refurbishment of the water purification pumping house<br />
Artistic and architectural consultancy in respect of construction of a new<br />
sand filtration <strong>plant</strong> with electrical building. <strong>Sewage</strong> water pumping<br />
station, drain-quantity measurement with visitors´ room, work yard and<br />
adjacent to existing buildings, porters´ house and ground floor parking.<br />
Project figures and facts:<br />
Location: <strong>Sewage</strong> <strong>treatment</strong> <strong>plant</strong> I, <strong>Gut</strong> <strong>Großlappen</strong>, Germany<br />
Client: Landeshauptstadt München, Stadtentwässerung<br />
Phase 2-9: K+P Architekten und Stadtplaner GmbH<br />
<strong>Koch</strong> Drohn Schneider Voigt<br />
Ismaninger Str. 57, D-81675 <strong>Munich</strong>, Germany<br />
Mechanical <strong>plant</strong>, 2. biolog. purification <strong>plant</strong>, administration buildings<br />
and laboratories<br />
Building costs: ca. 31,7 Mio. Euro<br />
Gross volume: 31.500 m³<br />
Gross floor area 5.800 sq m - Net main floor area: 1.290 sq m<br />
Start of planning: 1986 - Completion: 1996<br />
Site area: 15.400 sq m<br />
Sand filtration <strong>plant</strong>, drain-quantity measurement with visitors´ room<br />
Building costs: ca. 42,8 Mio. Euro<br />
Gross volume: 78.420 m³<br />
Start of planning: 2002 - Completion: approx. 2008<br />
K+P<br />
Architekten und Stadtplaner GmbH<br />
<strong>Koch</strong> Voigt Zschornack