Sample planning - Multibeton

multibeton

Sample planning - Multibeton

Manifold areas

room no.

Project no./designation

Date/page

Manifold group

Tv

Pressure loss

Mass stream

room

storey

1 Manifold room ankl./gard.

36

7920 Pa

868 l/h

register

FL

Valve settings

WZ1

WZ2

WZ3

english/MultiDRAW

13.12.2010 Page 4

To avoid residues please devide the MB pipe in an

efficient and fitting way.

001 wifa GF 1 2,5 59 4,20 A20 3,41 C

003 WC GF 1 1,0 23 2,37 A25 0,60 A20

004 abst GF 1 1,0 26 3,71 A30 1,19 A25

005 bad GF 2 3,0 2,5 51 2,31 C 1,00 C 1,79 C

007 flex-raum GF 1 2,5 90 10,06 A20 4,45 C

008 wohnen / essen GF 2 3,5 179 34,28 A25 6,80 A20

009 küche GF 1 2,5 75 11,91 A30 2,42 C

WZ4

pipe m

9 504 68,84 19,87 1,79

MULTIBETON GmbH · Heuserweg 23 · 53842 Troisdorf · Phone 0 22 41 - 25 20 00 · Fax 0 22 41 - 25 20 099

E-mail technik@multibeton.de · Internet www.multibeton.de

int. zone m²

fringe zone m²

wall zone m²

More magazines by this user
Similar magazines