28.09.2012 Views

Company Brochure - Jakem AG

Company Brochure - Jakem AG

Company Brochure - Jakem AG

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BRIDGES AND WALKWAYS, STEEL STRUCTURES FOR THE POWER SUPPLY INDUSTRY<br />

CREATING CONNECTIONS: BRIDGES, MASTS AND PYLONS<br />

Walliswil footbridge, Walliswil, Switzerland, 104 m in length<br />

Bridges have been built of steel for over 200<br />

years now. They are well-known for their pa-<br />

tent durability and economic effi ciency, which<br />

results for example from especially fast comple-<br />

tion times. Manufactured and installed in just<br />

4 weeks, the Walliswil footbridge, which cros-<br />

ses the Aare River at Niederbipp in Switzer-<br />

land, is an excellent illustration. Its supporting<br />

structure consists of two connected frameworks<br />

104 meters in length. It carries the footpath<br />

itself, which is a lightweight structure construc-<br />

ted from end plates.<br />

JAKEM <strong>AG</strong> builds bridges for footpaths and<br />

cycle paths, rail infrastructure walkways and<br />

platform roofs, and pipe bridges for chemical<br />

and pharmaceutical companies.<br />

S Bahn rapid transit stop, Bern<br />

Wankdorf, Switzerland. Main<br />

walkways in four sections and canopy,<br />

platform roofs and staircases<br />

Walkway at Sika <strong>AG</strong>, Düdingen,<br />

Switzerland<br />

JAKEM <strong>AG</strong> has several decades of experience<br />

in the high voltage pylon sector and is regarded<br />

as an authority in the subject. For the power<br />

industry, we fabricate equipment stands for high<br />

voltage switching stations, pylons for overhead<br />

lines and high-level mounting frames for outdoor<br />

switching stations. Trial assembly takes place at<br />

our premises prior to installation so that there are<br />

no surprises when the structures are installed in<br />

virtually inaccessible terrain.<br />

Trial installation at JAKEM <strong>AG</strong>’s<br />

premises<br />

Steel lattice pylons for Rätia Energie<br />

<strong>AG</strong>, Robbia – La Punt, Switzerland<br />

Steel lattice pylons for Atel <strong>AG</strong>,<br />

Nufenen – San Giacomo, Switzerland<br />

Panoramica walkway, Cardada (TI),<br />

Switzerland. Titanium-clad steel path.<br />

Helicopter installation<br />

12 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!