22.03.2013 Views

MODULAR COURSES OFFERED AT ILP KUALA LUMPUR

MODULAR COURSES OFFERED AT ILP KUALA LUMPUR

MODULAR COURSES OFFERED AT ILP KUALA LUMPUR

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BIL KOD<br />

1 A02-01-05<br />

2 A02-01-06<br />

3 A02-01-07<br />

4 A02-04-04<br />

5<br />

A02-04-05<br />

6 A03-4<br />

7 A03-5<br />

8 A03-6<br />

COURSE<br />

TITLE<br />

Basic Lathe<br />

Machine<br />

Operation<br />

Basic Milling<br />

Machine<br />

Operation<br />

Basic Grinding<br />

Machine<br />

Operation<br />

Basic CNC Lathe<br />

Machine<br />

Operation<br />

Basic CNC<br />

Milling Machine<br />

Operation<br />

CNC Milling<br />

Operations<br />

CNC Turning<br />

Operations<br />

CNC EDM Wire-<br />

Cut Machining<br />

Operations<br />

<strong>MODULAR</strong> <strong>COURSES</strong> <strong>OFFERED</strong> <strong>AT</strong> <strong>ILP</strong> <strong>KUALA</strong> <strong>LUMPUR</strong><br />

DUR<strong>AT</strong>ION<br />

(HOUR)<br />

30 JAM<br />

30 JAM<br />

30 JAM<br />

30 JAM<br />

30 JAM<br />

D<strong>AT</strong>E<br />

Jun 10<br />

Jun 10<br />

Jun 10<br />

Jun 5<br />

Jun 5<br />

40 Jan - Disember 10<br />

40 Jan - Disember 10<br />

40 Jan - Disember 10<br />

CAPACITY CONTENT<br />

1. Prepare process planning for turning operation<br />

2. Prepare materials for machining operation<br />

3. Select lathe machine accessories & attachment<br />

4. Set up workpiece on machine lathe<br />

5. Prepare lathe cutting tools holder<br />

6. Set up cutting tool to workpiece<br />

7. Carry out basic turning operation (step, plain<br />

facing etc)<br />

8. Carry out taper turning (compound slide &<br />

offsetting tailstock)<br />

9. Carry out boring operation on lathe<br />

10. Carry out drilling & reaming operation on lathe<br />

11. Carry out thread cutting (V-thread external &<br />

internal)<br />

12. Carry out knurling operation on lathe<br />

13. Carry out profile turning<br />

1. Prepare process planning for milling operation<br />

2. Prepare materials for machining operation<br />

3. Select milling machine accessories & attachment<br />

4. Set up workpiece on machine<br />

5. Prepare milling cutting tool<br />

6. Carry out vertical milling operation (boring,<br />

pocket, slotting, taper boring)<br />

7. Carry out horizontal milling operation (slotting,<br />

squaring etc)<br />

1. Prepare process planning for grinding operation<br />

(determine grinding process)<br />

2. Select grinding machine<br />

3. Determine type of workpiece /material to be<br />

ground<br />

4. Prepare wheel for grinding<br />

5. Set up workpiece on machine aligment<br />

6. Carry out surface grinding process<br />

7. Carry out internal & external cylindrical grinding<br />

8. Carry out centerless grinding operation<br />

1. Conduct daily inspection on CNC Turning Machine<br />

2. Prepare program for CNC Turning Machine<br />

3.Set up workpiece on CNC Turning Machine<br />

4. Set up cutting tool on CNC Turning Machine<br />

5. Carry out CNC Turning Machine operation and<br />

Product inspection<br />

1. Conduct daily inspection on CNC Milling Machine<br />

2. Prepare program for CNC Milling Machine<br />

3. Set up workpiece on CNC Milling Machine<br />

4. Set up cutting tool on CNC Milling Machine<br />

5. Carry out CNC Milling Machine operation and<br />

Product inspection<br />

Introduction to CNC milling machine, NC program<br />

structure and the general flow of NC operation, CNC<br />

function codes, perform "dry run".<br />

Introduction to lathe machine, NC program structure<br />

and the general flow of NC operation, Perform "dry<br />

run".<br />

Introduction to EDM Wirecut machine, NC program<br />

structure and the general flow of NC operation,<br />

graphical simulation and tool path analysis<br />

COURSE<br />

MANAGER<br />

Mr. Muhammad<br />

Yazli<br />

Bin Yaakub<br />

Mr. Muhammad<br />

Yazli<br />

Bin Yaakub<br />

Mr. Muhammad<br />

Yazli<br />

Bin Yaakub<br />

Mr. Muhammad<br />

Yazli<br />

Bin Yaakub<br />

Mr. Muhammad<br />

Yazli<br />

Bin Yaakub<br />

Mr. Yap<br />

Mr. Yap<br />

Mr. Yap


BIL KOD<br />

9 SEM<br />

10 JM<br />

11<br />

IMAW<br />

12 IPLC<br />

13 B01-PW2<br />

14 B01-PW4<br />

COURSE<br />

TITLE<br />

Wireman Single<br />

Phase (PW2)<br />

Wireman Three<br />

Phase (PW4)<br />

DUR<strong>AT</strong>ION<br />

(HOUR)<br />

D<strong>AT</strong>E<br />

2 wk Jan<br />

2 wk Mac<br />

2 wk May<br />

32 2 wk July<br />

15<br />

2 WK Sept<br />

2 wk Nov<br />

2 wk Feb<br />

2 wk Apr<br />

2 wk Jun<br />

16 15<br />

2 wk Aug<br />

2 wk Oct<br />

2 wk Dis<br />

3 wk Jan<br />

3 wk Mac<br />

3 wk May<br />

16 3 wk July<br />

15<br />

3 wk Sept<br />

3 wk Nov<br />

3 wk Feb<br />

3 wk Apr<br />

3 wk Jun<br />

40 15<br />

3 wk Aug<br />

248<br />

248<br />

15 B01-1 Domestic Wiring 40<br />

16 B01-2<br />

17 B01-2<br />

18 B01-3<br />

19 B05-1<br />

20 B05-2<br />

21 B05-3<br />

Service<br />

Equipment and<br />

Machinery<br />

Basic Join<br />

Material<br />

Introduction To<br />

Manual Arc<br />

Welding<br />

Introduction To<br />

Programmable<br />

Logic Controller<br />

(PLC)<br />

Industrial<br />

Wiring<br />

Industrial<br />

Wiring (Plus Air-<br />

Conditioning<br />

Installation &<br />

Servicing )<br />

Electrical Motor<br />

Control<br />

Programmable<br />

Logic Control<br />

(PLC)<br />

Application of<br />

power<br />

electronics<br />

Basic pneumatic<br />

system<br />

40<br />

40<br />

40<br />

3 wk Oct<br />

3 wk Dis<br />

16 Week<br />

Mac - Nov<br />

16 Week<br />

Mac - Nov<br />

1 Week<br />

Jan - Dis<br />

1 Week<br />

Jan - Dis<br />

1 Week<br />

Jan - Dis<br />

1 Week<br />

Jan - Dis<br />

CAPACITY CONTENT<br />

8 - 10<br />

8 - 10<br />

8 - 10<br />

8 - 10<br />

8 - 10<br />

8 - 10<br />

24 Jan - Disember 10<br />

24 Jan - Disember 10<br />

40 Jan - Disember 10<br />

Overview on performing lubrication, Checking<br />

leakage, Checking temperature and pressure,<br />

Assess/check parts wear and tear (tribology analysis)<br />

, Checking equipment vibration, Checking parts for<br />

corrosion, Checking shaft alignment, distortion and<br />

bending, Propose maintenance schedule and<br />

checklist, Propose modification for maintenance and<br />

service and identify spares.<br />

Introduction to various material joining techniques<br />

including Join Belt, Performing hook and hinge joint,<br />

stitch material, performing riveting, seaming,<br />

brazing, soldering, bonding, bolting, shafting and<br />

join chain / links.<br />

Introduction to arc welding machines, welding<br />

equipment’s and accessories, type of electrodes,<br />

diameters and current setting, starting of arc and<br />

typoes of weaving, arc exercises, making straight<br />

bead and padding, fillet joint, penetration practice<br />

and open corner joints.<br />

Overview on PLC, hardware components, advantages<br />

of using PLC, programming methods, circuits design<br />

and development, installation and commission,<br />

trouble-shooting and debugging, and software<br />

management.<br />

This course make the participant take a test for PW2<br />

category and certificate will given by Suruhanjaya<br />

Tenaga.<br />

This course make the participant take a test for PW2<br />

category and certificate will given by Suruhanjaya<br />

Tenaga.<br />

Introduction to domestic wiring sys. In malaysia,<br />

symbols,install lights,inlet/outlet socket,cooking<br />

control unit,connect and testing.<br />

Tools and equipment,cutting,bending conduit and<br />

trunking,single phase and three phase wiring.<br />

Tools and equipment,cutting,bending conduit and<br />

trunking,single phase and three phase wiring. (Plus<br />

Air-Conditioning Installation & Servicing )<br />

Introduction to A.C motor,type of starter motor and<br />

accessories,D.O.L starter wiring,star-delta starter.<br />

Introduction to PLC,block diagram,structure and<br />

configuration,writing program for PLC,project.<br />

Introduction,identify and use switching device,<br />

symbols,characteristic and rating,data sheet,built<br />

one mini project based.<br />

Basic pneumatic system,pneumatic symbols and<br />

standard,function of pneumatic working elements<br />

and valve,basic pneumatic circuit<br />

COURSE<br />

MANAGER<br />

Mr. Rosli B. Yunos<br />

Mr. Hassan B. A<br />

Majid<br />

Mr. Hassan B. A<br />

Majid<br />

Mr. Mazwar B.<br />

Mahmood<br />

Mr. Nazarudin Md<br />

Bahar<br />

Mr. Nazarudin Md<br />

Bahar<br />

Mr. Nazarudin Md<br />

Bahar<br />

Mr. Nazarudin Md<br />

Bahar<br />

Mr. Nazarudin Md<br />

Bahar<br />

Mr. Nazarudin Md<br />

Bahar<br />

Mr. Sharudin<br />

Mr. Sharudin<br />

Mr. Sharudin


BIL KOD<br />

22 B05-4<br />

23 C01-1<br />

24 C01-2<br />

25 C01-3<br />

26 C01-4<br />

27 C01-5<br />

28 F01 - 1<br />

29 F01 - 2<br />

30 F01 - 3<br />

31 F01 - 4<br />

32 F01 -4<br />

33 D03-01-CETAK<br />

34<br />

D03-01-CETAK<br />

35 B02-1<br />

36 B02-2<br />

COURSE<br />

TITLE<br />

PIC Circuit<br />

Development<br />

And<br />

Programming<br />

Autocad Basic<br />

2D<br />

Autocad<br />

Intermediate 2D<br />

Autocad<br />

Advance 2D<br />

Autocad Basic<br />

3D<br />

Autocad<br />

Advanced 3D<br />

Computer<br />

system<br />

Computer<br />

Networking<br />

Web<br />

Appilication<br />

Computer<br />

Maintenance<br />

Adobe<br />

Photoshop<br />

Introduction to<br />

basic printing<br />

offset<br />

Multi colour<br />

offset printing<br />

Air-condition<br />

system<br />

Install air<br />

conditioning<br />

(Split Unit)<br />

DUR<strong>AT</strong>ION<br />

(HOUR)<br />

D<strong>AT</strong>E<br />

20 Jan - Disember 10<br />

32 Jan - Disember 10<br />

40 Jan - Disember 10<br />

32 Jan - Disember 10<br />

32 Jan - Disember 10<br />

32 Jan - Disember 6<br />

16 Jan - Disember 10<br />

16 Jan - Disember 10<br />

16 Jan - Disember 10<br />

16 Jan - Disember 10<br />

16 Jan - Disember 10<br />

2 wk Apr<br />

2 wk May<br />

2 wk Jun<br />

2 wk Aug<br />

80<br />

2 wk Sept<br />

6<br />

2 wk Okt<br />

2 wk Nov<br />

2 wk Dis<br />

2 wk Apr<br />

2 wk May<br />

2 wk Jun<br />

2 wk Aug<br />

56<br />

2 wk Sept<br />

6<br />

2 wk Okt<br />

2 wk Nov<br />

2 wk Dis<br />

32 Jan - Disember 10<br />

8 Jan - Disember 10<br />

CAPACITY CONTENT<br />

Introduction of PIC1684A,pin out<br />

description,memory organization,I/O port.Circuit<br />

construction such as power supply circuit, oscillator<br />

circuit,output circuit,input circuit, programming and<br />

self building circuit and programming.<br />

Introduction,creating drawing,displayed command,<br />

creating a 2D drawing,extracting and editing<br />

Refresh 2D drawing,editing, layer management<br />

annotating drawing,plotting.<br />

Isometric drawing,displayed commands,layer<br />

management,multilines,managing contents,<br />

editing,paper space and model space.<br />

Intro to 3D,3D user interface,basic 3D object,<br />

surfaces,create 3D object,3D editing.<br />

Advanced 3D user interface,advance 3D editing and<br />

boolean operation,visualizing and rendering the<br />

finished product.<br />

Introduction to comp.,PC hardware,PC assembly,<br />

installation OS and application,troubleshooting.<br />

Network fundamental and device,set up network,<br />

basic troubleshooting and maintenance network.<br />

Introduction web pages,web pages design, advanced<br />

web design and web publishing<br />

Assemble and configure computer system unit,<br />

Partition and format hard disk, Configure operating<br />

system, Basic troubleshooting computer system unit<br />

& Upgrading system unit<br />

Working with selection tools, Layer basics, Mask and<br />

channel, Photo retouching<br />

Introduction to the principle of offset printing &<br />

Printing Fundamental<br />

How to operate multicolour printing machine. To<br />

handle variuos of colour printing, trouble shooting<br />

and material.<br />

Air cooled principal,vacum,test,trace leaking, pump<br />

down, aircond wiring system, installation and<br />

service.<br />

Introduction to aircond component sys, components<br />

function,install interior and exterior unit,install gas<br />

pipe,install drain pipe,testing.<br />

COURSE<br />

MANAGER<br />

Mr. Sharudin<br />

Mrs. Roasnani<br />

Mrs. Roasnani<br />

Mrs. Roasnani<br />

Mrs. Roasnani<br />

Mrs. Roasnani<br />

Mrs.Wan Abqariah<br />

Mrs.Wan Abqariah<br />

Mrs.Wan Abqariah<br />

Mrs.Wan Abqariah<br />

Mrs.Wan Abqariah<br />

Mr. Zulfadhli<br />

Mr. Zulfadhli<br />

Mr. Mazhar<br />

Mr. Mazhar


BIL KOD<br />

37 B02-3<br />

38 B03-1<br />

39 B03-2<br />

40 P-115-2-06<br />

41 P-115-3-03<br />

42 P-115-2-09<br />

43 P-115-3-14<br />

44 P-115-3-08<br />

45 P-115-2-08<br />

46 P-115-3-04<br />

47<br />

P-115-2-13<br />

48 P-115-1-05<br />

COURSE<br />

TITLE<br />

Automotive<br />

Aircond<br />

Chargeman(The<br />

ory & Practical<br />

A0 Category)<br />

Chargemen<br />

Modular (Main<br />

Switch board &<br />

LV Motor<br />

Control<br />

EngineManagem<br />

ent System 2<br />

(EFI)<br />

Diesel Fuel<br />

System 3 (F.I.P)<br />

Automatic<br />

Transmission<br />

System 3<br />

Service<br />

Turbocharger<br />

Repair Manual<br />

Drive Train<br />

Repair Manual<br />

Drive Train<br />

Service<br />

Electrical<br />

System<br />

Service Air<br />

Conditioning<br />

System<br />

Perform Engine<br />

Repair<br />

DUR<strong>AT</strong>ION<br />

(HOUR)<br />

D<strong>AT</strong>E<br />

8 Jan - Disember 10<br />

440 Jan. & July only 15<br />

80 Jan - Disember 10<br />

40 Jan - Disember 10<br />

CAPACITY CONTENT<br />

Car aircond component system, service, car aircond<br />

compressor, wiring and troubleshooting<br />

1. Electrical service act, cable, fire fighting system,<br />

aircond sys, underground cable, 3 phase motor,<br />

power factor, transformer, street lighting.<br />

1. Check EFI system pressure<br />

2. Replace electrical fuel pump<br />

3. Replace Fuel injectors<br />

4. Replace air flow meter<br />

5. Replace EFI sensors<br />

6. Replace EFI relay<br />

7. Check EFI wiring system<br />

COURSE<br />

MANAGER<br />

40 Jan - Disember 10 Overhaul diesel injection pump Mr. Omar<br />

1. Service automatic transmission<br />

40 Jan - Disember 10 Mr. Nizom Shah<br />

40 Jan - Disember 10<br />

2. Motor control sys., low voltage switchboard,<br />

maintenance of ACB, commisioning of low voltage<br />

switchboard<br />

1. Motor control sys.,low voltage switchboard,<br />

maintenance of ACB,commisioning of low voltage<br />

switchboard<br />

2. Replace torque converter<br />

1. Carry out check on turbocharger<br />

2. Test turbocharger boost pressure<br />

3. Check turbocharger lubrication pressure<br />

4. Replace turbocharger<br />

5. Overhaul turbocharger<br />

40 Jan - Disember 10 Overhaul transfer box Mr. Hasnul Azrain<br />

40 Jan - Disember 10<br />

1. Overhaul transmission<br />

2. Overhaul rear axle<br />

3. Overhaul transaxle<br />

32 Jan - Disember 10 Check power windows Mr. Hasnul Azrain<br />

40 Jan - Disember 10<br />

1. Check air conditioning belt & tensions<br />

2.Check air cond system cooling capacity<br />

3. Check air cond system for gas leak<br />

4. Service air cond gas system<br />

5 . Install air cond hoses,receiver drier,compressor &<br />

condenser<br />

6. Install evaporator coil & blower<br />

1. Service cooling system<br />

40 Jan - Disember 10<br />

2. Servive lubrication system<br />

3. Determine engine condition<br />

Mr. Raja Zaidi<br />

4. Carry out top overhaul<br />

Mr. Mazhar<br />

Mr. Syaharuddin<br />

Mr. Syaharuddin<br />

Mr. Nur<br />

Syahiruniza<br />

Mr. Mohd Sufian<br />

Mr. Hasnul Azrain<br />

Mr. Noor Adham

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!