319 REPAIR PARTY ELECTRICIAN<br />

Estimated completion time: 4 weeks<br />

319.1 PREREQUISITES<br />

273<br />

WATCHSTATION 319<br />

FOR OPTIMUM TRAINING EFFECTIVENESS, THE FOLLOWING ITEMS SHOULD BE<br />

COMPLETED PRIOR TO STARTING YOUR ASSIGNED TASKS BUT SHALL BE COMPLETED<br />

PRIOR TO FINAL WATCHSTATION QUALIFICATION.<br />

319.1.1 WATCHSTATIONS FROM THIS PQS:<br />

312 Repair Party Investigator (RECOMMENDED)<br />

Completed ___________________________________<br />

(Qualifier and Date)<br />

.2 FUNDAMENTALS FROM NAVEDTRA 43103, ENGINEERING FUNDAMENTALS:<br />

319.2 TASKS<br />

108 Electrical<br />

Completed ___________________________________<br />

(Qualifier and Date)<br />

For the tasks listed below:<br />

A. What are the steps of this procedure?<br />

B. What are the reasons for each step?<br />

C. What control/coordination is required?<br />

D. What means of communications are used?<br />

E. What safety precautions must be observed?<br />

F. What parameters/operating limits must be monitored?<br />

G. Satisfactorily perform this task.<br />

Questions<br />

319.2.1 Inventory and inspect an electrical repair kit G<br />

___________________________________<br />

(Signature and Date)<br />

.2 Don electrical safety equipment and demetalize A B F G<br />

___________________________________<br />

(Signature and Date)