22.03.2013 Views

DAMAGE CONTROL (DC) PERSONNEL ... - Dcfpnavymil.org

DAMAGE CONTROL (DC) PERSONNEL ... - Dcfpnavymil.org

DAMAGE CONTROL (DC) PERSONNEL ... - Dcfpnavymil.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

210 AQUEOUS FILM FORMING FOAM SYSTEM (CONT’D)<br />

Questions<br />

210.1.2 Installed FP-180 [ref. a, sec. 3; refs. c, d] A B C D E<br />

a. Manual control valve [ref. a, sec. 2; refs. c, d] A B<br />

.3 HCFF two-speed system:<br />

a. Two-speed pump with motor [ref. a, sec. 3; refs. c, d] A B C D E<br />

b. Sprinkler group control valves/groups [ref. a, sec. 2; refs. c, d] A B C E<br />

.4 Flight deck AFFF injection system:<br />

a. Injection pump/motor [ref. a, sec. 3; refs. c, d] A B<br />

b. Gallery deck injection stations [refs. c, d] B<br />

c. Hydraulically operated 2½-inch check valve [refs. c, d] B<br />

d. Gallery deck bypass cutout valve [refs. c, d] B<br />

e. Flush deck nozzle cutout [ref a sec 2; refs. c, d] A B<br />

f. Deck edge nozzle cutout valve [ref. a, sec. 2; refs. c, d] A B<br />

.5 Balanced pressure proportioner system: [ref. a, sec. 3; refs. c, d]<br />

a. Concentrate pump A B C E<br />

b. AFFF proportioner/venturi A B E<br />

c. Balancing valve A B E<br />

.6 Installed in-line eductor (MCM/MHC class) [ref. b, sec. 4; refs. c, d] A B E<br />

a. Manual control valve [ref. a, sec. 2; refs. c, d] A B E<br />

b. Hose reel activation valve [ref. a, sec. 3; refs. c, d] A B E<br />

c. Sprinkler activation valve [ref. a, sec. 2; refs. c, d] A B E<br />

.7 AFFF transfer main system:<br />

a. AFFF reserve tank [ref. a, sec. 3, par. 3.1.6; refs. c, d] A B<br />

b. AFFF transfer pump/motor [ref. a, sec. 3, par. 3.1.4; refs. c, d] A B C E<br />

c. AFFF remote reserve TLI [ref. a, sec. 3, par. 3.1.6; refs. c, d] A B<br />

d. AFFF transfer main isolation valves<br />

[ref. a, sec. 2, fig. 2.6; refs. c, d] A B E<br />

.8 12-GPM pump/motor [ref. a, sec. 3; refs. c, d] A B C<br />

___________________________________<br />

(Signature and Date)<br />

210.2 PRINCIPLES OF OPERATION<br />

210.2.1 How do the components work together to achieve the system’s function?<br />

[ref. a, sec. 2]<br />

.2 Draw a diagram of this system. [refs. c, d]<br />

.3 Using a diagram of this system, show the path of: [refs. c, d]<br />

a. AFFF concentrate from the tank to the discharge outlet<br />

b. Seawater from the firemain root valve to the discharge outlet<br />

c. AFFF reserve concentrate from the tank to the receiving station<br />

d. AFFF concentrate in recirculation mode<br />

80

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!