January 2013 Monthly Performance Report - Amtrak
January 2013 Monthly Performance Report - Amtrak
January 2013 Monthly Performance Report - Amtrak
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Monthly</strong> <strong>Monthly</strong><br />
<strong>Performance</strong> PP<strong>Performance</strong> ff RR<strong>Report</strong> <strong>Report</strong> tt<br />
For For<br />
<strong>January</strong> <strong>January</strong> <strong>2013</strong> <strong>2013</strong><br />
March 1, <strong>2013</strong>
Table of Contents<br />
Page #<br />
A. Financial Results<br />
1. Summary <strong>Performance</strong> <strong>Report</strong> versus Budget<br />
Operating Results - Month A-1.1<br />
Operating Results - Year to Date A-1.2<br />
Operating Results - Year end Forecast A-1.3<br />
Capital Spend Summary - Month A-1.4<br />
Capital Spend Summary - Year to Date A-1.5<br />
Capital Spend Summary - Year end Forecast A-1.6<br />
2. Metrics<br />
Metrics A-2.1<br />
3. Ridership and Revenue<br />
Ticket Revenue and Ridership Summary A-3.1<br />
Ridership and Ticket Revenue by Route<br />
Current Month A-3.4<br />
Year to Date A-3.5<br />
Ridership and Revenue - Sleeper Class A-3.6<br />
4. Actual and Forecast Results<br />
Income Statement by Business Lines<br />
Month, YTD & Forecast vs. Budget and Prior Year A-4.1<br />
Capital Project Overview<br />
Regular Projects A-4.6<br />
Mechanical Production <strong>Report</strong> A-4.8<br />
Engineering Production <strong>Report</strong> A-4.10<br />
5. Actual Analysis to Prior Year<br />
Consolidated Income Statement A-5.1<br />
Consolidated Statements of Cash Flows A-5.4<br />
Balance Sheet A-5.5<br />
B. Legislative <strong>Report</strong><br />
Legislative Updates B-1<br />
C. Route <strong>Performance</strong> <strong>Report</strong> – Fully Allocated<br />
Summary YTD Route Results C-1<br />
D. Workforce Statistics<br />
Headcount Data D-1<br />
Other Employee Costs D-3<br />
E. <strong>Performance</strong> Indicators<br />
Delay Minutes Summary <strong>Report</strong> E-1<br />
Host Railroad Delay Minutes <strong>Report</strong> E-2<br />
On-Time <strong>Performance</strong> E-7<br />
i
INANCIAL ESULTS
This report is being redesigned and should be<br />
approved in time for the February <strong>Monthly</strong><br />
<strong>Performance</strong> <strong>Report</strong><br />
A - 1.1
METRICS
Key <strong>Performance</strong> Indicators<br />
Results For the Month Ended <strong>January</strong> 31, <strong>2013</strong><br />
Actual Budget/Goal Prior Year (1)<br />
Budget Prior Year<br />
Fav / (Unfav) (2)<br />
Fav / (Unfav) (2)<br />
KPIs<br />
RASM - Revenue per Seat Mile (a) $0.159 $0.158 $0.149 $0.000 $0.009<br />
CASM - Expenses per Seat Mile (b) $0.207 $0.217 $0.228 $0.010 $0.021<br />
(NTS) Cost Recovery Ratio (c) 77% 73% 66% 4% 11%<br />
Ridership (000's) 2,298<br />
2,287<br />
2,229<br />
11<br />
69<br />
Passenger Miles per total core employee (000's) 27<br />
27<br />
26<br />
-0.6 0.6<br />
On-Time <strong>Performance</strong> (Endpoint) 85.7% 85.0% 85.5% 0.7% 0.2%<br />
Customer Satisfaction Index (d) 83<br />
86 82 (3) 1<br />
Host Railroad <strong>Performance</strong> (e) 884<br />
n/a 943<br />
n/a 59<br />
Other Indicators<br />
Seat Miles (000's) 1,075,168 1,061,077 1,052,458<br />
14,092 22,711<br />
Passenger Miles (000's) 477,941<br />
479,538 463,595<br />
(1,597) 14,346<br />
Train Miles (000's) 3,219<br />
3,176<br />
3,165<br />
43<br />
54<br />
Average Load Factor 44.5% 45.2% 44.0% -0.7% 0.4%<br />
Core diesel gallons per train mile (f) 2.2 2.2 1.3 0.0 0.9<br />
Seat Miles per total core employee (000's) 60<br />
61<br />
59<br />
-0.3 0.8<br />
Customer Injuries<br />
Equipment - % of Units in Service: (g)<br />
159<br />
n/a 182 n/a 23<br />
Locomotive Fleet 83.3% n/a 84.1% n/a 0.8%<br />
Passenger Fleet 88.7% n/a 87.9% n/a -0.8%<br />
Unadjusted Ticket Revenue ($000's) $147,892 $143,528 $134,559 $4,364 $13,333<br />
Average Ticket Yield $0.3094 $0.2993 $0.2903 $0.0101 $0.0091<br />
Average Ticket Price $64.36 $62.75 $60.38 $1.61 $3.98<br />
Core Revenue per Train Mile (h) $57.24 $59.84 $53.55 ($2.59) $3.69<br />
Core Expenses per Train Mile (i) $79.67 $81.54 $82.10 ($1.87) $2.43<br />
Total Operating Ratio (j) 1.61<br />
1.64<br />
1.73<br />
0.04<br />
0.13<br />
Total Cost Recovery Ratio (k) 62.3% 60.9% 57.8% 1.4% 4.5%<br />
Average cost per gallon of diesel (l) $2.95 $3.24 $4.18 $0.29 $1.23<br />
Notes:<br />
(a) This is calculated as NTS Total Operating Revenue divided by Available Seat Miles to be consistent with the KPI's.<br />
(b) This is calculated as NTS Total Operating Expense less Depreciation and non-cash OPEB's divided by Available Seat Miles.<br />
(c) This is calculated as RASM divided by CASM.<br />
(d) CSI score has a one month lag.<br />
(e) Minutes of delay per ten thousand Train Miles.<br />
(f) Beginning in February FY11, train gallons include only fuel used on operating routes.<br />
(g) As of April FY11, In Service statistics are obtained from the WMS system, which may not match prior <strong>Monthly</strong> <strong>Performance</strong> <strong>Report</strong>s.<br />
(h) This is calculated as Total Core Operating Revenue divided by Total Train Miles.<br />
(i) This is calculated as Total Core Operating Expense less Depreciation and non-cash OPEB's divided by Total Train Miles.<br />
(j) This is calculated as Total Operating Expenses by Total Operating Revenue (excludes Interest and includes state capital payments).<br />
(k) This is calculated as Total Operating Revenue divided by Total Operating Expenses.<br />
(l) This includes net Fuel Hedge.<br />
(1) Beginning in FY11, statistics are from the <strong>Amtrak</strong> <strong>Performance</strong> Tracking (SAM_APT) System, which may not match prior <strong>Monthly</strong> <strong>Performance</strong> <strong>Report</strong>s.<br />
(2) Variances may not foot due to rounding.<br />
A - 2.1
Key <strong>Performance</strong> Indicators<br />
Results for Fiscal YTD <strong>January</strong> 31, <strong>2013</strong><br />
Actual / Prior Year / Budget Prior Year<br />
Average *<br />
Budget/Goal Average (1)*<br />
Fav / (Unfav) (2)<br />
Fav / (Unfav) (2)<br />
KPIs<br />
RASM - Revenue per Seat Mile (a) $0.180 $0.177 $0.166 $0.002 $0.013<br />
CASM - Expenses per Seat Mile (b) $0.205 $0.207 $0.203 $0.002 ($0.002)<br />
(NTS) Cost Recovery Ratio (c) 88% 86% 82% 2% 6%<br />
Ridership (000's) 10,059<br />
10,212<br />
9,956<br />
(154) 102<br />
Passenger Miles per total core employee (000's) * 30<br />
31<br />
30<br />
-1.3 -1.3<br />
On-Time <strong>Performance</strong> (Endpoint) 85.0% 85.0% 83.5% 0.0% 1.5%<br />
Customer Satisfaction Index (d) 84<br />
84<br />
81<br />
0 3<br />
Host Railroad <strong>Performance</strong> (e) 3,604<br />
n/a 3,958<br />
n/a 354<br />
Other Indicators<br />
Seat Miles (000's) 4,278,303 4,362,350 4,340,587<br />
(84,047) (62,284)<br />
Passenger Miles (000's) 2,128,828 2,174,951 2,116,412<br />
(46,122) 12,416<br />
Train Miles (000's) 12,567<br />
12,747 12,724<br />
(180)<br />
(156)<br />
Average Load Factor 49.8% 49.9% 48.8% -0.1% 1.0%<br />
Core diesel gallons per train mile (f) * 2.3<br />
2.2 2.2 0.1 0.1<br />
Seat Miles per total core employee (000's) * 60<br />
62<br />
62<br />
-2.6 -1.9<br />
Customer Injuries<br />
Equipment - % of Units in Service: (g)<br />
715<br />
n/a 708<br />
n/a (7)<br />
Locomotive Fleet * 83.6% n/a 84.9% n/a 1.3%<br />
Passenger Fleet * 89.7% n/a 88.8% n/a -1.0%<br />
Unadjusted Ticket Revenue ($000's) $671,142 $674,082 $639,361 ($2,940) $31,727<br />
Average Ticket Yield $0.3153 $0.3099 $0.3021 $0.0053 $0.0078<br />
Average Ticket Price $66.72 $66.01 $64.22 $0.72 $2.50<br />
Core Revenue per Train Mile (h) $65.84 $67.65 $60.81 ($1.82) $5.03<br />
Core Expenses per Train Mile (i) $79.51 $77.64 $74.55 $1.87 ($4.96)<br />
Total Operating Ratio (j) 1.43<br />
1.41<br />
1.42<br />
(0.03)<br />
(0.02)<br />
Total Cost Recovery Ratio (k) 69.7% 71.1% 70.6% -1.5% -0.9%<br />
Average cost per gallon of diesel (l) $3.34 $3.18 $3.13 ($0.16) ($0.21)<br />
Notes:<br />
(a) This is calculated as NTS Total Operating Revenue divided by Available Seat Miles to be consistent with the KPI's.<br />
(b) This is calculated as NTS Total Operating Expense less Depreciation and non-cash OPEB's divided by Available Seat Miles.<br />
(c) This is calculated as RASM divided by CASM.<br />
(d) CSI score has a one month lag.<br />
(e) Minutes of delay per ten thousand Train Miles.<br />
(f) Beginning in February FY11, train gallons include only fuel used on operating routes.<br />
(g) As of April FY11, In Service statistics are obtained from the WMS system, which may not match prior <strong>Monthly</strong> <strong>Performance</strong> <strong>Report</strong>s.<br />
(h) This is calculated as Total Core Operating Revenue divided by Total Train Miles.<br />
(i) This is calculated as Total Core Operating Expense less Depreciation and non-cash OPEB's divided by Total Train Miles.<br />
(j) This is calculated as Total Operating Expenses by Total Operating Revenue (excludes Interest and includes state capital payments).<br />
(k) This is calculated as Total Operating Revenue divided by Total Operating Expenses.<br />
(l) This includes net Fuel Hedge.<br />
(1) Beginning in FY11, statistics are from the <strong>Amtrak</strong> <strong>Performance</strong> Tracking (SAM_APT) System, which may not match prior <strong>Monthly</strong> <strong>Performance</strong> <strong>Report</strong>s.<br />
(2) Variances may not foot due to rounding.<br />
* Note: These metrics are reported as the YTD average.<br />
A - 2.2
% out of service<br />
Revenue per Seat Mile<br />
CASM - Expenses per Seat Mile<br />
28%<br />
26%<br />
24%<br />
22%<br />
20%<br />
18%<br />
16%<br />
14%<br />
12%<br />
$0.22<br />
$0.20<br />
$0.18<br />
$0.16<br />
$0.14<br />
$0.12<br />
Locomotives- RASM - Revenue % of per Units Seat out Mile of Service<br />
SUMMARY METRICS<br />
Results as of <strong>January</strong>, <strong>2013</strong><br />
Worse<br />
Actual - FY13 Oct $0.180 Nov $0.187 Dec $0.193 Jan $0.159Feb<br />
Mar Apr May Jun Jul Aug Sep<br />
FY13 - LocoBudget/Goal 81.8% $0.184 83.5% $0.191 85.7% $0.176 83.3% $0.158 $0.164 $0.187 $0.205 $0.203 $0.217 $0.203 $0.203 $0.189<br />
FY12 - LocoPrior Year 85.2% - FY12 $0.168 85.0% $0.184 85.2% $0.163 84.1% $0.149 83.6% $0.150 83.6% $0.173 84.8% $0.210 83.4% $0.193 81.9% $0.200 81.4% $0.189 82.7% $0.177 83.1% $0.179<br />
$0.30<br />
$0.28<br />
$0.26<br />
$0.24<br />
$0.22<br />
$0.20<br />
$0.18<br />
$0.16<br />
Actual - FY13 Budget/Goal Prior Year - FY12<br />
Better<br />
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep<br />
RASM<br />
$0.20<br />
$0.19<br />
$0.18<br />
$0.17<br />
$0.16<br />
$0.15<br />
$0.14<br />
$0.13<br />
$0.12<br />
<strong>January</strong>-13<br />
YTD - ACTUAL $0.180<br />
YTD -<br />
BUDGET/GOAL<br />
RASM YTD<br />
YTD - ACTUAL YTD - BUDGET/GOAL YTD - PRIOR YEAR<br />
$0.177<br />
YTD - PRIOR YEAR $0.166<br />
CASM - Expenses per Seat Mile CASM YTD<br />
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep<br />
Actual - FY13 $0.209 $0.207 $0.197 $0.207<br />
Actual - FY13 Budget/Goal Prior Year - FY12<br />
Better<br />
Budget/Goal $0.203 $0.206 $0.203 $0.217 $0.224 $0.213 $0.222 $0.233 $0.235 $0.213 $0.223 $0.222<br />
Prior Year - FY12 $0.193 $0.195 $0.197 $0.228 $0.218 $0.212 $0.188 $0.248 $0.243 $0.198 $0.198 $0.214<br />
A - 2.3<br />
CASM<br />
YTD - ACTUAL YTD - BUDGET/GOAL YTD - PRIOR YEAR<br />
$0.24<br />
$0.23<br />
$0.22<br />
$0.21<br />
$0.20<br />
$0.19<br />
$0.18<br />
$0.17<br />
$0.16<br />
$0.15<br />
$0.14<br />
<strong>January</strong>-13<br />
YTD - ACTUAL $0.205<br />
YTD - BUDGET/GOAL $0.207<br />
YTD - PRIOR YEAR $0.203
RASM/CASM<br />
# of Riders<br />
120.0%<br />
110.0%<br />
100.0%<br />
90.0%<br />
80.0%<br />
70.0%<br />
60.0%<br />
50.0%<br />
SUMMARY METRICS<br />
Results as of <strong>January</strong>, <strong>2013</strong><br />
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep<br />
Actual - FY13 86.0% 90.2% 97.8% 76.6%<br />
(NTS) Cost Recovery Ratio<br />
Actual - FY13 Budget/Goal Prior Year - FY12<br />
Better<br />
Budget/Goal 90.5% 92.6% 86.5% 73.0% 73.1% 87.9% 92.5% 87.0% 92.5% 95.1% 91.1% 85.0%<br />
Prior Year - FY12 87.3% 94.7% 82.4% 65.7% 68.9% 81.7% 111.6% 78.1% 82.5% 95.4% 89.4% 83.9%<br />
3,000<br />
2,800<br />
2,600<br />
2,400<br />
2,200<br />
2,000<br />
1,800<br />
100.0%<br />
90.0%<br />
80.0%<br />
70.0%<br />
60.0%<br />
50.0%<br />
RIDERSHIP (000's) YTD (000's)<br />
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep<br />
Actual - FY13 2,596 2,560 2,605 2,298<br />
Actual - FY13 Budget/Goal Prior Year - FY12<br />
Better<br />
Budget/Goal 2,666 2,690 2,568 2,287 2,255 2,808 2,845 2,820 2,858 2,878 2,814 2,503<br />
Prior Year - FY12 2,586 2,631 2,511 2,229 2,232 2,763 2,764 2,735 2,672 2,752 2,570 2,389<br />
A - 2.4<br />
Core (NTS) Recovery Ratio<br />
# of Riders<br />
CRR YTD<br />
Actual - FY13 Budget/Goal Prior Year - FY12<br />
<strong>January</strong>-13<br />
Actual - FY13 88%<br />
Budget/Goal 86%<br />
Prior Year - FY12 82%<br />
Actual - FY13 Budget/Goal Prior Year - FY12<br />
12,000<br />
11,000<br />
10,000<br />
9,000<br />
8,000<br />
7,000<br />
6,000<br />
<strong>January</strong>-13<br />
Actual - FY13 10,059<br />
Budget/Goal 10,212<br />
Prior Year - FY12 9,956
Passenger Miles/Core Employee<br />
Seat Miles/Core Employee<br />
45<br />
40<br />
35<br />
30<br />
25<br />
20<br />
SUMMARY METRICS<br />
Results as of <strong>January</strong>, <strong>2013</strong><br />
Avg Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep<br />
Actual - FY13 30 30 32 27<br />
Budget/Goal 32 32 32 27 27 34 34 35 37 39 36 31<br />
Prior Year - FY12 31 31 31 26 26 34 33 33 36 37 35 30<br />
FY11 Avg 32<br />
FY10 Avg 31<br />
70<br />
65<br />
60<br />
55<br />
50<br />
45<br />
Passenger Miles per Core employee (000's)<br />
Actual - FY13 Budget/Goal Prior Year - FY12 FY11 Avg FY10 Avg<br />
Better<br />
Seat Miles per Core employee (000's)<br />
Avg Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep<br />
Actual - FY13 58 59 62 60<br />
Budget - FY12 62 63 64 61 57 62 60 61 59 62 59 59<br />
Prior Year - FY12 63 62 63 59 56 61 59 61 60 62 62 59<br />
FY11 Avg 61<br />
FY10 Avg 61<br />
Actual - FY13 Budget - FY12 Prior Year - FY12 FY11 Avg FY10 Avg<br />
Better<br />
A - 2.5<br />
Passenger Miles/Core Employee<br />
Seat Miles/Core Employee<br />
40<br />
35<br />
30<br />
25<br />
20<br />
YTD Average (000's)<br />
Actual - FY13 Budget/Goal FY10 Avg FY09 Avg<br />
<strong>January</strong>-13<br />
Actual - FY13 30<br />
Budget/Goal 31<br />
FY10 Avg 32<br />
FY09 Avg 31<br />
YTD Average (000's)<br />
Actual - FY13 Budget/Goal FY11 Avg FY10 Avg<br />
65<br />
60<br />
55<br />
50<br />
<strong>January</strong>-13<br />
Actual - FY13 60<br />
Budget/Goal 62<br />
FY11 Avg 61<br />
FY10 Avg 61
% Trains on Time<br />
Passenger Miles/Seat Miles<br />
90%<br />
85%<br />
80%<br />
75%<br />
70%<br />
70%<br />
60%<br />
50%<br />
40%<br />
30%<br />
ON TIME PERFORMANCE<br />
Actual - FY13 Prior Year - FY12<br />
SUMMARY METRICS<br />
Results as of <strong>January</strong>, <strong>2013</strong><br />
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep<br />
Actual - FY13 52.1% 50.4% 52.1% 44.5%<br />
Average Load Factor<br />
Actual - FY13 Budget/Goal Prior Year - FY12<br />
Better<br />
Budget/Goal 51.5% 51.7% 50.9% 45.2% 46.8% 55.4% 57.5% 56.5% 63.3% 62.2% 60.6% 52.2%<br />
Prior Year - FY12 50.0% 50.7% 50.1% 44.0% 46.7% 54.9% 55.1% 53.9% 59.4% 59.3% 56.9% 51.2%<br />
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep<br />
Actual - FY13 82.6% 85.8% 86.0% 85.7%<br />
Prior Year - FY12 80.8% 81.9% 85.9% 85.5% 88.7% 85.8% 86.1% 84.0% 79.2% 74.5% 78.8% 85.2%<br />
A - 2.6<br />
Better<br />
Passenger Miles/Seat Miles<br />
55%<br />
50%<br />
45%<br />
40%<br />
35%<br />
YTD<br />
Actual - FY13 Budget/Goal Prior Year - FY12<br />
YTD<br />
<strong>January</strong>-13<br />
Actual - FY13 49.8%<br />
Budget/Goal 49.9%<br />
Prior Year - FY12 48.8%<br />
% Trains on Time<br />
100%<br />
80%<br />
60%<br />
40%<br />
20%<br />
Actual - FY13 Prior Year - FY12<br />
<strong>January</strong>-13<br />
Actual - FY13 85.0%<br />
Prior Year - FY12 83.5%
Ticket Revenue<br />
Ticket Rev/Psgr Mile<br />
$200,000<br />
$180,000<br />
$160,000<br />
$140,000<br />
$120,000<br />
SUMMARY METRICS<br />
Results as of <strong>January</strong>, <strong>2013</strong><br />
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep<br />
Actual - FY13 170,944 174,314 177,992 147,892<br />
TICKET REVENUE ($000's)<br />
Actual - FY13 Budget/Goal Prior Year - FY12<br />
Better<br />
Budget/Goal 174,710 183,750 172,094 143,528 139,138 178,785 189,816 193,280 200,621 195,992 184,245 171,511<br />
Prior Year - FY12 165,274 175,031 164,497 134,559 133,268 171,186 179,241 182,749 189,120 184,447 177,615 163,274<br />
$0.3500<br />
$0.3400<br />
$0.3300<br />
$0.3200<br />
$0.3100<br />
$0.3000<br />
$0.2900<br />
$0.2800<br />
$0.2700<br />
TICKET YIELD<br />
Actual - FY13 Budget/Goal Prior Year - FY12<br />
Better<br />
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep<br />
Actual - FY13 $0.3170 $0.3260 $0.3085 $0.3094<br />
Budget/Goal $0.3121 $0.3250 $0.3018 $0.2993 $0.2986 $0.2955 $0.3148 $0.3166 $0.3043 $0.2879 $0.2936 $0.3162<br />
Prior Year - FY12 $0.3042 $0.3170 $0.2952 $0.2903 $0.2891 $0.2882 $0.3062 $0.3084 $0.2971 $0.2808 $0.2806 $0.3081<br />
A - 2.7<br />
Ticket Rev/Psgr Mile<br />
Ticket Revenue<br />
$700,000<br />
$650,000<br />
$600,000<br />
$550,000<br />
$500,000<br />
$450,000<br />
$400,000<br />
$350,000<br />
$300,000<br />
YTD ($000's)<br />
Actual - FY13 Budget/Goal Prior Year - FY12<br />
<strong>January</strong>-13<br />
Actual - FY13 $671,142<br />
Budget/Goal $674,082<br />
Prior Year - FY12 $639,415<br />
YTD<br />
Actual - FY13 Budget/Goal Prior Year - FY12<br />
$0.3400<br />
$0.3300<br />
$0.3200<br />
$0.3100<br />
$0.3000<br />
$0.2900<br />
$0.2800<br />
$0.2700<br />
$0.2600<br />
$0.2500<br />
$0.2400<br />
<strong>January</strong>-13<br />
Actual - FY13 $0.3153<br />
Budget/Goal $0.3099<br />
Prior Year - FY12 $0.3021
Fuel Gallons/Train Mile<br />
Fuel Cost/Fuel Gallons<br />
3.2<br />
2.8<br />
2.4<br />
2.0<br />
1.6<br />
1.2<br />
SUMMARY METRICS<br />
Results as of <strong>January</strong>, <strong>2013</strong><br />
Avg Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep<br />
Actual - FY13 2.3 2.3 2.4 2.2<br />
Budget/Goal 2.2 2.2 2.2 2.2 2.1 2.2 2.2 2.3 2.4 2.3 2.4 2.4<br />
Prior Year - FY12 2.3 2.4 2.7 1.3 2.7 2.4 2.5 2.2 2.4 2.5 2.2 2.3<br />
FY10 Avg 2.3<br />
FY09 Avg 2.3<br />
$5.00<br />
$4.50<br />
$4.00<br />
$3.50<br />
$3.00<br />
$2.50<br />
$2.00<br />
$1.50<br />
$1.00<br />
Gallons per train mile<br />
Actual - FY13 Budget/Goal Prior Year - FY12 FY10 Avg FY09 Avg<br />
Average Cost per diesel gallon<br />
Worse<br />
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep<br />
Actual - FY13 $3.66 $3.41 $3.34 $2.95<br />
Actual - FY13 Budget/Goal Prior Year - FY12<br />
Better<br />
Budget/Goal $3.13 $3.16 $3.20 $3.24 $3.24 $3.28 $3.27 $3.31 $3.31 $3.34 $3.34 $3.34<br />
Prior Year - FY12 $2.58 $3.08 $3.06 $4.18 $2.09 $3.38 $3.20 $4.64 $3.08 $2.44 $2.48 $3.63<br />
A - 2.8<br />
Fuel Gallons/Train Mile<br />
Fuel Cost/Fuel Gallons<br />
2.5<br />
2.3<br />
2.0<br />
1.8<br />
1.5<br />
YTD<br />
Actual - FY13 Budget/Goal Prior Year - FY12 FY11 FY10 Avg<br />
<strong>January</strong>-13<br />
Actual - FY13 2.3<br />
Budget/Goal 2.2<br />
Prior Year - FY12 2.2<br />
FY11 2.3<br />
FY10 Avg 2.2<br />
YTD<br />
Actual - FY13 Budget/Goal Prior Year - FY12<br />
$3.80<br />
$3.60<br />
$3.40<br />
$3.20<br />
$3.00<br />
$2.80<br />
$2.60<br />
$2.40<br />
$2.20<br />
$2.00<br />
<strong>January</strong>-13<br />
Actual - FY13 $3.34<br />
Budget/Goal $3.18<br />
Prior Year - FY12 $3.13
RIDERSHIP<br />
AND<br />
REVENUE
Ticket Revenue and Ridership Summary – <strong>January</strong> <strong>2013</strong><br />
<strong>January</strong> FY13 ridership of 2.30 million trips and ticket revenues of $147.7 million were +3%<br />
and +10% respectively vs <strong>January</strong> FY12. <strong>January</strong> ridership was slightly ahead (+½%) vs<br />
Budget while ticket revenues were +3% vs Budget. <strong>January</strong>’s performance benefitted from<br />
travel for the Presidential Inauguration which generated an estimated 18,500 trips worth about<br />
$1.7 million in ticket revenues…<br />
<strong>January</strong> FY13<br />
Ridership (millions) Ticket Revenue ($ millions)<br />
% change vs. % change vs.<br />
Service FY13 FY12 Budget FY12 Budget FY13 FY12 Budget FY12 Budget<br />
<strong>Amtrak</strong> Total 2.30 2.23 2.29 +3.1 +0.5 $147.7 $134.8 $143.5 +9.5 +2.9<br />
NEC Spine 0.85 0.81 0.84 +4.5 +0.6 $79.8 $70.9 $75.9 +12.5 +5.0<br />
Acela 0.26 0.25 0.26 +5.4 -0.6 $39.9 $35.0 $38.2 +14.0 +4.5<br />
Northeast Regional 0.59 0.56 0.58 +4.9 +2.0 $39.6 $34.9 $36.8 +13.3 +7.5<br />
Other Short Distance 1.11 1.09 1.11 +2.5 +0.0 $32.9 $31.4 $33.2 +4.7 -1.0<br />
Long Distance 0.34 0.33 0.33 +1.6 +1.5 $35.1 $32.6 $34.4 +7.7 +1.9<br />
<strong>January</strong> FY13 <strong>Amtrak</strong> on-time performance was 86%, +1 point vs. last <strong>January</strong>. Acela OTP<br />
was 85% which was -7 points compared to last <strong>January</strong>. Northeast Regional OTP was 87%, -2<br />
points vs last year. OTP on other short distance trains was up 2 points from last year at 87%.<br />
Long Distance OTP in <strong>January</strong> was 79%, equal to last year. <strong>January</strong> FY13 gasoline prices<br />
averaged $3.39/gallon nationwide, about equal to last month, and slightly below <strong>January</strong> FY13.<br />
Fiscal year-to-date through <strong>January</strong> FY13, <strong>Amtrak</strong> ridership of 10.1 million trips was +1% vs<br />
same period FY12 but -2% vs Budget. Ticket revenues of $671 million were +5% vs FY12 but<br />
slightly below (-½%) Budget…<br />
October-<strong>January</strong> FY13<br />
Ridership (millions) Ticket Revenue ($ millions)<br />
% change vs. % change vs.<br />
Service FY13 FY12 Budget FY12 Budget FY13 FY12 Budget FY12 Budget<br />
<strong>Amtrak</strong> Total 10.06 9.96 10.21 +1.0 -1.5 $670.9 $638.9 $674.1 +5.0 -0.5<br />
NEC Spine 3.63 3.69 3.79 -1.8 -4.3 $354.1 $337.3 $356.9 +5.0 -0.8<br />
Acela 1.05 1.10 1.13 -4.3 -6.7 $168.7 $164.3 $174.8 +2.7 -3.5<br />
Northeast Regional 2.57 2.59 2.66 -0.6 -3.2 $184.7 $171.8 $180.9 +7.5 +2.1<br />
Other Short Distance 4.92 4.77 4.91 +3.0 +0.1 $154.6 $146.7 $155.4 +5.4 -0.5<br />
Long Distance 1.51 1.49 1.51 +1.5 +0.2 $162.2 $154.8 $161.9 +4.8 +0.2<br />
Acela<br />
Acela ridership in <strong>January</strong> was 5% ahead of last year but slightly below (-1%) Budget. Acela<br />
ticket revenues were up 14% vs last <strong>January</strong> and were +5% vs Budget. Acela’s performance vs<br />
last year was positively impacted by the month ending on three peak travel days (Tue-Wed-<br />
Thu) vs Sun-Mon-Tue last year. First class ridership in <strong>January</strong> was -1% vs last year. Business<br />
class ridership was +6% vs last <strong>January</strong>. By market segment, <strong>January</strong> FY13 ridership was +7%<br />
in south of New York markets, +1% in north of New York markets, and +7% in through New<br />
York markets. This route’s performance in the through New York segment continues to be<br />
positively impacted by the pull-out of Southwest Airlines in the Boston-Philadelphia market last<br />
year. <strong>January</strong> year-over-year ridership was strong (+10%) in the NY-DC endpoint market. The<br />
other endpoint market (NY-Boston) was +4% vs last <strong>January</strong>…<br />
A - 3.1
Acela Year-over-Year % Change<br />
Ridership Ticket Revenues<br />
Year Ago Budget Year Ago Budget<br />
FY12 +1% -3% +3% -2%<br />
October FY13 -4% -5% +2% -4%<br />
November FY13 -15% -16% -8% -13%<br />
December FY13 -2% -3% +7% +1%<br />
<strong>January</strong> FY13 +5% -1% +14% +5%<br />
Northeast Regional<br />
Northeast Regional <strong>January</strong> FY13 ridership was +5% vs last year and +2% vs Budget. Ticket<br />
revenues were +13% vs last year and +8% vs Budget. This route’s good performance during<br />
the month was driven in part by travel to/from Washington, DC for the Presidential<br />
Inauguration. Business class ridership was +5% vs last <strong>January</strong> while coach class ridership was<br />
up 5%. By market segment, <strong>January</strong> FY13 ridership vs FY12 was +5% in south of New York<br />
markets, +8% in through New York markets, and +8% in through New York markets due to the<br />
continued strong performance of the Boston-Philadelphia market resulting from the exit of<br />
Southwest Airlines in early 2012…<br />
Northeast Regional Year-over-Year % Change<br />
Ridership Ticket Revenues<br />
Year Ago Budget Year Ago Budget<br />
FY12 +7% +4% +9% +4%<br />
October FY13 -3% -7% +5% -2%<br />
November FY13 -7% -9% +1% -3%<br />
December FY13 +4% +2% +13% +8%<br />
<strong>January</strong> FY13 +5% +2% +13% +8%<br />
State Supported & Other Short Distance Corridors<br />
<strong>January</strong> FY13 ridership on state supported and other short distance trains was +3% vs <strong>January</strong><br />
FY12 and on par with Budget. Ticket revenues were +5% vs last year but -1% vs Budget. This<br />
business line continues to benefit from both the Downeaster’s expansion to Brunswick, ME and<br />
the extended NE Regional service to Norfolk, VA. Several other short distance routes had<br />
strong year-over-year growth including Keystone (+11%), Vermonter (+9%), Chicago-<br />
Carbondale (+7%), and Washington-Lynchburg (+7%). Ridership declines on other routes<br />
including Hiawathas (-8%), Blue Water (-6%), and Cascades (-2%) are being impacted by low<br />
cost bus service…<br />
Short Distance Corridor Year-over-Year % Change<br />
Ridership Ticket Revenues<br />
Year Ago Budget Year Ago Budget<br />
FY12 +2% -2% +7% +1%<br />
October FY13 +4% 0% +5% -1%<br />
November FY13 +2% -1% +3% -2%<br />
December FY13 +4% +2% +9% +3%<br />
<strong>January</strong> FY13 +3% 0% +5% -1%<br />
A - 3.2
Long Distance<br />
<strong>January</strong> FY13 long distance train ridership was +2% vs last year and +2% vs Budget. Ticket<br />
revenues were +8% vs last year and +2% vs Budget. Sleeper ridership was +7% vs last year.<br />
Coach ridership was +1% vs last <strong>January</strong>. The performance of several long distance trains in<br />
<strong>January</strong> was below last year and Budget including the Silver Star (-4%), Silver Meteor (-9%),<br />
and Crescent (-4%) which were all impacted by trackwork. The Texas Eagle’s ridership was -<br />
14% vs last year which was due to last year’s trackwork that double-counted some trips due a<br />
bus bridge. Year-over-year ridership on the Capitol Ltd. (+7%) and Cardinal (+5%) were up<br />
due in part to travel for the Presidential Inauguration. Ridership in <strong>January</strong> was especially<br />
strong on the Coast Starlight (+19%) and Auto Train (+20%)…<br />
Long Distance Year-over-Year % Change<br />
Ridership Ticket Revenues<br />
Year Ago Budget Year Ago Budget<br />
FY12 +5% 0% +7% -½%<br />
October FY13 -½% -2% +3% -2%<br />
November FY13 0% -1% +3% -1%<br />
December FY13 +4% +3% +6% +2%<br />
<strong>January</strong> FY13 +2% +2% +8% +2%<br />
A - 3.3
Confidential/Proprietary/Deliberative Process Materials<br />
<strong>January</strong> FY13<br />
Ridership Ticket Revenue<br />
% change vs. % change vs.<br />
NEC Spine FY13 FY12 Budget FY12 Budget FY13 FY12 Budget FY12 Budget<br />
1 - Acela 258,289 245,042 259,942 +5.4 -0.6 $39,903,769 $35,012,782 $38,172,540 +14.0 +4.5<br />
5 - Northeast Regional 586,942 559,307 575,609 +4.9 +2.0 $39,579,756 $34,938,690 $36,829,485 +13.3 +7.5<br />
99 - Special Trains 1,450 5,920 5,920 -75.5 -75.5 $270,250 $947,100 $947,100 -71.5 -71.5<br />
Subtotal 846,681 810,269 841,471 +4.5 +0.6 $79,753,775 $70,898,573 $75,949,125 +12.5 +5.0<br />
State Supported and Other Short Distance Corridors<br />
3 - Ethan Allen 3,617 3,730 3,774 -3.0 -4.2 $198,641 $203,291 $209,817 -2.3 -5.3<br />
4 - Vermonter 6,122 5,630 5,698 +8.7 +7.4 $371,474 $333,924 $347,359 +11.2 +6.9<br />
7 - Albany-Niagara Falls-Toronto 28,481 27,402 27,629 +3.9 +3.1 $1,623,291 $1,686,907 $1,744,982 -3.8 -7.0<br />
9 - Downeaster 38,946 37,851 39,766 +2.9 -2.1 $557,145 $518,934 $555,958 +7.4 +0.2<br />
12 - New Haven-Springfield 29,137 27,563 27,811 +5.7 +4.8 $822,965 $790,778 $819,348 +4.1 +0.4<br />
14 - Keystone 114,367 103,138 104,109 +10.9 +9.9 $2,568,351 $2,310,381 $2,404,858 +11.2 +6.8<br />
15 - Empire (NYP-ALB) 80,402 77,376 78,066 +3.9 +3.0 $3,226,212 $3,146,857 $3,260,435 +2.5 -1.0<br />
20 - Chicago-St. Louis (Lincoln Service) 46,380 46,920 50,283 -1.2 -7.8 $1,072,538 $1,023,046 $1,160,886 +4.8 -7.6<br />
21 - Hiawatha 57,988 62,997 63,753 -8.0 -9.0 $1,132,345 $1,169,404 $1,221,916 -3.2 -7.3<br />
22 - Wolverine 35,003 34,149 36,343 +2.5 -3.7 $1,278,985 $1,209,313 $1,331,024 +5.8 -3.9<br />
23 - Chicago-Carbondale (Illini/Saluki) 25,555 23,936 23,985 +6.8 +6.5 $666,984 $618,229 $663,792 +7.9 +0.5<br />
24 - Chicago-Quincy (IL Zephyr/Carl Sandburg) 15,752 15,834 15,870 -0.5 -0.7 $373,556 $350,273 $377,044 +6.6 -0.9<br />
29 - Heartland Flyer 4,614 5,142 5,202 -10.3 -11.3 $117,547 $125,101 $127,828 -6.0 -8.0<br />
35 - Pacific Surfliner 197,077 188,903 192,390 +4.3 +2.4 $4,311,713 $3,933,497 $4,090,040 +9.6 +5.4<br />
36 - Cascades 51,572 52,424 57,212 -1.6 -9.9 $1,711,638 $1,758,521 $2,015,560 -2.7 -15.1<br />
37 - Capitol Corridor 136,201 139,768 140,819 -2.6 -3.3 $2,161,406 $2,161,637 $2,269,262 -0.0 -4.8<br />
39 - San Joaquin 89,097 83,053 85,413 +7.3 +4.3 $2,866,635 $2,791,627 $2,919,463 +2.7 -1.8<br />
40 - Adirondack 9,013 9,445 9,556 -4.6 -5.7 $493,529 $493,871 $510,844 -0.1 -3.4<br />
41 - Blue Water 12,513 13,249 13,395 -5.6 -6.6 $363,023 $389,511 $410,981 -6.8 -11.7<br />
46 - Washington-Lynchburg 12,851 12,071 12,267 +6.5 +4.8 $770,634 $724,086 $747,769 +6.4 +3.1<br />
47 - Washington-Newport News 39,248 39,414 34,140 -0.4 +15.0 $2,063,768 $1,996,359 $1,811,724 +3.4 +13.9<br />
50 - Washington-Norfolk 10,107 - 8,827 - +14.5 $476,086 - $417,808 - +13.9<br />
54 - Hoosier State 2,384 2,510 2,544 -5.0 -6.3 $58,379 $58,413 $61,253 -0.1 -4.7<br />
56 - Kansas City-St. Louis (MO River Runner) 12,125 12,313 12,361 -1.5 -1.9 $322,955 $309,435 $324,435 +4.4 -0.5<br />
57 - Pennsylvanian 14,958 16,735 16,890 -10.6 -11.4 $674,488 $651,644 $675,214 +3.5 -0.1<br />
65 - Pere Marquette 7,376 7,414 7,495 -0.5 -1.6 $215,540 $208,196 $219,819 +3.5 -1.9<br />
66 - Carolinian 22,062 21,985 22,329 +0.4 -1.2 $1,290,352 $1,274,481 $1,318,799 +1.2 -2.2<br />
67 - Piedmont 11,449 11,272 11,573 +1.6 -1.1 $229,603 $213,031 $221,856 +7.8 +3.5<br />
74-81, 85 - Buses - - - - - $830,478 $742,710 $745,496 +11.8 +11.4<br />
96 - Special Trains 0 4,515 4,515 -100.0 -100.0 $0 $187,888 $187,888 -100.0 -100.0<br />
Subtotal 1,114,397 1,086,739 1,114,015 +2.5 +0.0 $32,850,263 $31,381,345 $33,173,458 +4.7 -1.0<br />
Long Distance<br />
16 - Silver Star 30,890 32,091 32,344 -3.7 -4.5 $2,451,485 $2,482,410 $2,572,990 -1.2 -4.7<br />
18 - Cardinal 7,856 7,497 7,512 +4.8 +4.6 $555,472 $467,458 $482,437 +18.8 +15.1<br />
19 - Silver Meteor 24,781 27,166 27,446 -8.8 -9.7 $2,655,501 $2,969,300 $3,076,784 -10.6 -13.7<br />
25 - Empire Builder 39,784 39,109 39,703 +1.7 +0.2 $3,851,305 $3,553,243 $3,669,167 +8.4 +5.0<br />
26 - Capitol Ltd. 15,708 14,697 14,828 +6.9 +5.9 $1,378,198 $1,164,052 $1,205,470 +18.4 +14.3<br />
27 - California Zephyr 27,210 26,346 28,094 +3.3 -3.1 $2,824,915 $2,584,691 $2,807,610 +9.3 +0.6<br />
28 - Southwest Chief 24,341 23,278 23,539 +4.6 +3.4 $2,753,416 $2,513,248 $2,576,660 +9.6 +6.9<br />
30 - City of New Orleans 18,021 17,544 17,690 +2.7 +1.9 $1,438,187 $1,332,841 $1,362,175 +7.9 +5.6<br />
32 - Texas Eagle 23,559 27,292 22,542 -13.7 +4.5 $1,885,477 $1,390,708 $1,846,398 +35.6 +2.1<br />
33 - Sunset Ltd. 7,399 7,756 8,095 -4.6 -8.6 $831,578 $752,276 $784,701 +10.5 +6.0<br />
34 - Coast Starlight 35,303 29,588 30,174 +19.3 +17.0 $2,604,632 $2,168,136 $2,261,793 +20.1 +15.2<br />
45 - Lake Shore Ltd. 27,022 27,678 27,940 -2.4 -3.3 $2,019,630 $1,958,458 $2,028,976 +3.1 -0.5<br />
48 - Palmetto 14,940 14,207 14,342 +5.2 +4.2 $1,218,769 $1,135,480 $1,170,741 +7.3 +4.1<br />
52 - Crescent 18,382 19,222 19,341 -4.4 -5.0 $1,932,231 $2,021,714 $2,092,178 -4.4 -7.6<br />
63 - Auto Train 21,773 18,135 18,327 +20.1 +18.8 $6,673,134 $6,067,478 $6,467,428 +10.0 +3.2<br />
Subtotal 336,969 331,606 331,917 +1.6 +1.5 $35,073,931 $32,561,493 $34,405,508 +7.7 +1.9<br />
<strong>Amtrak</strong> Total 2,298,047 2,228,614 2,287,403 +3.1 +0.5 $147,677,968 $134,841,410 $143,528,091 +9.5 +2.9<br />
A - 3.4
Confidential/Proprietary/Deliberative Process Materials<br />
October-<strong>January</strong> FY13<br />
Ridership Ticket Revenue<br />
% change vs. % change vs.<br />
NEC Spine FY13 FY12 Budget FY12 Budget FY13 FY12 Budget FY12 Budget<br />
1 - Acela 1,052,916 1,100,769 1,128,345 -4.3 -6.7 $168,695,960 $164,335,662 $174,801,754 +2.7 -3.5<br />
5 - Northeast Regional 2,569,990 2,586,148 2,655,850 -0.6 -3.2 $184,669,483 $171,825,694 $180,868,207 +7.5 +2.1<br />
99 - Special Trains 5,287 7,502 7,502 -29.5 -29.5 $716,280 $1,185,693 $1,185,693 -39.6 -39.6<br />
Subtotal 3,628,193 3,694,419 3,791,697 -1.8 -4.3 $354,081,724 $337,347,049 $356,855,654 +5.0 -0.8<br />
State Supported and Other Short Distance Corridors<br />
3 - Ethan Allen 16,664 16,877 17,173 -1.3 -3.0 $907,375 $896,929 $928,254 +1.2 -2.2<br />
4 - Vermonter 28,680 26,917 28,150 +6.5 +1.9 $1,781,162 $1,601,864 $1,712,071 +11.2 +4.0<br />
7 - Albany-Niagara Falls-Toronto 128,418 126,748 127,804 +1.3 +0.5 $7,653,721 $7,883,659 $8,154,147 -2.9 -6.1<br />
9 - Downeaster 174,431 159,897 167,702 +9.1 +4.0 $2,519,665 $2,188,091 $2,366,358 +15.2 +6.5<br />
12 - New Haven-Springfield 130,027 123,997 127,631 +4.9 +1.9 $4,056,077 $3,812,976 $4,030,988 +6.4 +0.6<br />
14 - Keystone 481,813 459,278 466,213 +4.9 +3.3 $11,757,409 $11,039,109 $11,585,637 +6.5 +1.5<br />
15 - Empire (NYP-ALB) 339,888 348,067 352,953 -2.3 -3.7 $14,020,425 $14,539,486 $15,098,487 -3.6 -7.1<br />
20 - Chicago-St. Louis (Lincoln Service) 212,256 206,927 223,750 +2.6 -5.1 $5,260,117 $4,961,201 $5,611,217 +6.0 -6.3<br />
21 - Hiawatha 262,355 273,217 276,307 -4.0 -5.0 $5,213,566 $5,170,390 $5,411,313 +0.8 -3.7<br />
22 - Wolverine 161,340 148,981 159,196 +8.3 +1.3 $6,319,440 $5,584,532 $6,165,889 +13.2 +2.5<br />
23 - Chicago-Carbondale (Illini/Saluki) 113,803 105,192 105,887 +8.2 +7.5 $3,370,415 $3,116,772 $3,306,283 +8.1 +1.9<br />
24 - Chicago-Quincy (IL Zephyr/Carl Sandburg) 76,531 74,802 75,317 +2.3 +1.6 $1,978,221 $1,876,878 $1,993,438 +5.4 -0.8<br />
29 - Heartland Flyer 24,846 26,361 26,670 -5.7 -6.8 $607,403 $624,992 $638,458 -2.8 -4.9<br />
35 - Pacific Surfliner 840,276 787,582 819,505 +6.7 +2.5 $19,765,330 $17,397,836 $18,649,587 +13.6 +6.0<br />
36 - Cascades 240,878 250,594 258,126 -3.9 -6.7 $8,651,146 $9,216,229 $9,765,633 -6.1 -11.4<br />
37 - Capitol Corridor 566,305 581,558 591,507 -2.6 -4.3 $9,488,281 $9,179,163 $9,853,644 +3.4 -3.7<br />
39 - San Joaquin 393,247 354,708 368,953 +10.9 +6.6 $13,544,577 $12,661,978 $13,429,071 +7.0 +0.9<br />
40 - Adirondack 38,232 38,001 38,446 +0.6 -0.6 $2,059,105 $1,983,007 $2,055,643 +3.8 +0.2<br />
41 - Blue Water 56,612 58,550 59,206 -3.3 -4.4 $1,884,667 $1,856,053 $1,951,233 +1.5 -3.4<br />
46 - Washington-Lynchburg 59,783 59,866 60,830 -0.1 -1.7 $4,007,751 $3,878,526 $3,995,806 +3.3 +0.3<br />
47 - Washington-Newport News 192,113 191,576 178,866 +0.3 +7.4 $11,244,370 $10,514,477 $10,222,740 +6.9 +10.0<br />
50 - Washington-Norfolk 25,007 - 22,619 - +10.6 $1,242,947 - $1,111,558 - +11.8<br />
54 - Hoosier State 12,518 12,012 12,188 +4.2 +2.7 $316,834 $301,655 $315,542 +5.0 +0.4<br />
56 - Kansas City-St. Louis (MO River Runner) 61,123 59,280 59,456 +3.1 +2.8 $1,768,579 $1,585,418 $1,665,212 +11.6 +6.2<br />
57 - Pennsylvanian 71,488 70,512 71,757 +1.4 -0.4 $3,522,302 $3,165,629 $3,306,801 +11.3 +6.5<br />
65 - Pere Marquette 33,932 33,790 34,164 +0.4 -0.7 $1,053,149 $1,021,809 $1,074,136 +3.1 -2.0<br />
66 - Carolinian 101,221 104,291 106,480 -2.9 -4.9 $6,052,389 $6,120,390 $6,363,489 -1.1 -4.9<br />
67 - Piedmont 59,238 53,878 55,317 +9.9 +7.1 $1,175,018 $1,037,691 $1,083,685 +13.2 +8.4<br />
74-81, 85 - Buses - - - - - $2,758,568 $2,519,601 $2,529,050 +9.5 +9.1<br />
96 - Special Trains 12,850 17,115 17,115 -24.9 -24.9 $658,011 $977,168 $977,168 -32.7 -32.7<br />
Subtotal 4,915,875 4,770,574 4,909,288 +3.0 +0.1 $154,638,021 $146,713,508 $155,352,535 +5.4 -0.5<br />
Long Distance<br />
16 - Silver Star 139,752 143,975 145,357 -2.9 -3.9 $11,383,882 $11,375,825 $11,750,962 +0.1 -3.1<br />
18 - Cardinal 35,942 35,831 36,157 +0.3 -0.6 $2,486,531 $2,292,675 $2,365,917 +8.5 +5.1<br />
19 - Silver Meteor 117,496 119,323 120,652 -1.5 -2.6 $12,437,142 $12,574,470 $13,008,756 -1.1 -4.4<br />
25 - Empire Builder 170,958 166,324 168,857 +2.8 +1.2 $18,834,330 $17,776,872 $18,403,133 +5.9 +2.3<br />
26 - Capitol Ltd. 71,402 70,076 70,422 +1.9 +1.4 $6,472,177 $5,990,357 $6,231,927 +8.0 +3.9<br />
27 - California Zephyr 118,809 113,895 121,484 +4.3 -2.2 $14,317,374 $13,114,207 $14,331,129 +9.2 -0.1<br />
28 - Southwest Chief 114,280 113,197 114,259 +1.0 +0.0 $13,703,297 $13,076,225 $13,478,186 +4.8 +1.7<br />
30 - City of New Orleans 81,203 80,646 81,252 +0.7 -0.1 $6,732,335 $6,206,239 $6,364,342 +8.5 +5.8<br />
32 - Texas Eagle 108,820 105,766 102,421 +2.9 +6.2 $8,592,997 $7,624,755 $8,385,270 +12.7 +2.5<br />
33 - Sunset Ltd. 32,960 32,113 33,692 +2.6 -2.2 $3,834,052 $3,524,549 $3,696,759 +8.8 +3.7<br />
34 - Coast Starlight 153,743 138,499 141,109 +11.0 +9.0 $13,152,507 $11,934,169 $12,435,985 +10.2 +5.8<br />
45 - Lake Shore Ltd. 125,317 124,304 125,767 +0.8 -0.4 $10,307,404 $9,889,799 $10,239,173 +4.2 +0.7<br />
48 - Palmetto 66,906 65,114 65,747 +2.8 +1.8 $5,754,455 $5,451,570 $5,619,406 +5.6 +2.4<br />
52 - Crescent 92,419 100,648 101,584 -8.2 -9.0 $9,911,617 $10,413,510 $10,730,133 -4.8 -7.6<br />
63 - Auto Train 84,456 81,712 82,606 +3.4 +2.2 $24,287,988 $23,574,338 $24,832,898 +3.0 -2.2<br />
Subtotal 1,514,463 1,491,423 1,511,366 +1.5 +0.2 $162,208,090 $154,819,559 $161,873,976 +4.8 +0.2<br />
<strong>Amtrak</strong> Total 10,058,531 9,956,416 10,212,351 +1.0 -1.5 $670,927,834 $638,880,116 $674,082,164 +5.0 -0.5<br />
A - 3.5
Confidential/Proprietary/Deliberative Process Materials<br />
<strong>Amtrak</strong> Long Distance Ridership & Ticket Revenues, FY13 vs FY12<br />
(Sleeper Class Only)<br />
<strong>January</strong> . . . Ridership Ticket Revenue<br />
FY13 FY12 % Chg. FY13 FY12 % Chg.<br />
16 - Silver Star 2,316 2,327 -0.5 $589,754 $559,739 +5.4<br />
18 - Cardinal 457 455 +0.4 $97,558 $97,799 -0.2<br />
19 - Silver Meteor 2,931 3,603 -18.7 $815,116 $996,763 -18.2<br />
25 - Empire Builder 4,937 4,818 +2.5 $1,267,050 $1,167,051 +8.6<br />
26 - Capitol Ltd. 3,052 2,853 +7.0 $551,651 $469,125 +17.6<br />
27 - California Zephyr 4,198 3,950 +6.3 $1,142,339 $1,055,409 +8.2<br />
28 - Southwest Chief 3,706 3,443 +7.6 $1,046,150 $972,503 +7.6<br />
30 - City of New Orleans 2,586 2,288 +13.0 $400,733 $348,708 +14.9<br />
32 - Texas Eagle 2,636 2,328 +13.2 $601,786 $367,359 +63.8<br />
33 - Sunset Ltd. 1,315 1,209 +8.8 $355,901 $313,175 +13.6<br />
34 - Coast Starlight 4,511 3,673 +22.8 $949,260 $777,938 +22.0<br />
45 - Lake Shore Ltd. 2,137 2,228 -4.1 $503,575 $498,396 +1.0<br />
52 - Crescent 1,733 2,020 -14.2 $422,162 $442,897 -4.7<br />
63 - Auto Train 9,266 7,747 +19.6 $2,717,756 $2,342,729 +16.0<br />
Total 45,781 42,942 +6.6 $11,460,791 $10,409,592 +10.1<br />
October-<strong>January</strong> . . . Ridership Ticket Revenue<br />
FY13 FY12 % Chg. FY13 FY12 % Chg.<br />
16 - Silver Star 10,597 10,187 +4.0 $2,597,928 $2,519,230 +3.1<br />
18 - Cardinal 2,073 1,978 +4.8 $476,209 $445,327 +6.9<br />
19 - Silver Meteor 13,402 13,911 -3.7 $3,702,241 $3,834,511 -3.4<br />
25 - Empire Builder 23,921 23,964 -0.2 $7,070,661 $6,768,576 +4.5<br />
26 - Capitol Ltd. 13,696 13,497 +1.5 $2,827,127 $2,620,790 +7.9<br />
27 - California Zephyr 20,548 18,680 +10.0 $6,688,722 $6,060,895 +10.4<br />
28 - Southwest Chief 18,718 18,010 +3.9 $5,719,738 $5,541,186 +3.2<br />
30 - City of New Orleans 11,771 10,815 +8.8 $1,917,598 $1,671,671 +14.7<br />
32 - Texas Eagle 12,541 11,184 +12.1 $2,785,236 $2,411,079 +15.5<br />
33 - Sunset Ltd. 5,905 5,605 +5.4 $1,674,862 $1,585,151 +5.7<br />
34 - Coast Starlight 22,711 20,696 +9.7 $5,316,808 $4,825,531 +10.2<br />
45 - Lake Shore Ltd. 10,779 10,795 -0.1 $2,907,423 $2,824,590 +2.9<br />
52 - Crescent 9,274 10,560 -12.2 $2,392,740 $2,390,935 +0.1<br />
63 - Auto Train 35,403 34,348 +3.1 $10,053,037 $9,365,520 +7.3<br />
Total 211,339 204,230 +3.5 $56,130,331 $52,864,993 +6.2<br />
A - 3.6
ACTUAL ANALYSIS<br />
TO<br />
BUDGET
NATIONAL RAILROAD PASSENGER CORPORATION<br />
Consolidated Income Statement - Fiscal Year <strong>2013</strong><br />
For the Month of JAN, <strong>2013</strong><br />
Operating Business View<br />
For the Month For the Year to Date Forecast Year End<br />
($ thousands)<br />
REVENUES:<br />
Passenger Related:<br />
<strong>2013</strong> JAN<br />
Actual<br />
<strong>2013</strong> JAN<br />
Budget<br />
2012 JAN<br />
Actual<br />
Variance Fav / (Unfav)<br />
Budget Prior Year<br />
<strong>2013</strong> YTD<br />
Actual<br />
<strong>2013</strong> YTD<br />
Budget<br />
2012 YTD<br />
Actual<br />
Variance Fav / (Unfav)<br />
Budget Prior Year<br />
FY <strong>2013</strong><br />
Forecast<br />
FY <strong>2013</strong><br />
Budget<br />
FY 2012<br />
Last Year<br />
Variance Fav / (Unfav)<br />
Budget Prior Year<br />
Ticket Revenue $143,949 $139,850 $130,661 $4,099 $13,288 $654,576 $657,731 $623,331 ($3,155) $31,245 $2,072,584 $2,075,739 $1,968,172 ($3,155) $104,412<br />
Food & Beverage 9,394 9,196 9,272 198 122 40,050 40,595 37,599 (545) 2,451 127,712 128,257 121,987 (545) 5,725<br />
State Supported Train Revenue 15,771 16,081 13,198 (310) 2,573 66,743 64,326 49,451 2,417 17,292 199,124 192,978 179,008 6,146 20,116<br />
Total Passenger Related Revenue 169,114 165,127 153,131 3,987 15,983 761,369 762,652 710,381 (1,283) 50,988 2,399,420 2,396,974 2,269,167 2,446 130,253<br />
Commuter Revenue<br />
Other:<br />
10,151 9,916 17,721 235 (7,570) 36,199 39,262 62,317 (3,063) (26,118) 113,147 116,209 140,389 (3,062) (27,242)<br />
Reimbursable Revenue 12,302 11,765 9,828 537 2,474 39,279 48,291 31,584 (9,012) 7,695 133,984 142,996 121,387 (9,012) 12,597<br />
Commercial Development 9,400 6,463 6,478 2,937 2,922 29,166 25,571 42,852 3,595 (13,686) 79,634 76,039 93,861 3,595 (14,227)<br />
Other Transportation 10,416 11,777 6,579 (1,361) 3,837 46,522 46,989 42,106 (467) 4,416 141,025 141,492 147,180 (467) (6,155)<br />
Freight Access Fees & Other 4,591 4,256 12,187 335 (7,596) 23,705 17,721 28,871 5,984 (5,166) 59,967 53,983 72,109 5,984 (12,142)<br />
Total Other Revenue 36,709 34,261 35,072 2,448 1,637 138,672 138,572 145,413 100 (6,741) 414,610 414,510 434,537 100 (19,927)<br />
Total Operating Revenue 215,974 209,304 205,924 6,670 10,050 936,240 940,486 918,111 (4,246) 18,129 2,927,177 2,927,693 2,844,093 (516) 83,084<br />
EXPENSES:<br />
Salaries, Wages and Benefits:<br />
Salaries 25,088 24,216 22,699 (872) (2,389) 91,736 94,755 103,496 3,019 11,760 283,875 288,072 279,950 4,197 (3,925)<br />
Wages & Overtime 92,698 90,998 87,756 (1,700) (4,942) 362,980 359,798 348,045 (3,182) (14,935) 1,067,486 1,067,436 1,039,909 (50) (27,577)<br />
Employee Benefits Expenses 54,988 55,581 65,186 593 10,198 210,176 198,651 191,872 (11,525) (18,304) 732,326 692,000 683,022 (40,326) (49,304)<br />
Employee Related 2,143 2,630 2,536 487 393 8,937 10,615 10,530 1,678 1,593 29,431 30,444 30,466 1,013 1,035<br />
Total Salaries, Wages and Benefits 174,917 173,425 178,177 (1,492) 3,260 673,829 663,819 653,943 (10,010) (19,886) 2,113,118 2,077,952 2,033,347 (35,166) (79,771)<br />
Train Operations 24,783 22,200 26,744 (2,583) 1,961 95,193 92,080 86,930 (3,113) (8,263) 277,899 274,234 245,168 (3,665) (32,731)<br />
Fuel, Power, & Utilities 30,552 30,810 27,255 258 (3,297) 124,945 118,569 114,674 (6,376) (10,271) 369,371 358,642 355,288 (10,729) (14,083)<br />
Materials 14,830 17,392 21,257 2,562 6,427 67,620 68,051 73,751 431 6,131 208,574 204,062 205,226 (4,512) (3,348)<br />
Facility, Communication, & Office 17,295 15,004 16,685 (2,291) (610) 57,199 58,159 56,705 960 (494) 168,734 172,736 175,059 4,002 6,325<br />
Advertising & Sales 8,104 8,467 4,938 363 (3,166) 28,793 30,673 21,577 1,880 (7,216) 98,700 98,584 78,476 (116) (20,224)<br />
Casualty & Other Claims 3,603 4,668 6,768 1,065 3,165 22,246 18,671 25,909 (3,575) 3,663 56,692 56,012 50,689 (680) (6,003)<br />
Depreciation 58,445 57,725 55,310 (720) (3,135) 225,720 230,900 220,129 5,180 (5,591) 687,521 692,701 667,824 5,180 (19,697)<br />
Amort of Gain on Sale/Leaseback (82) (340) (340) (258) (258) (1,102) (1,360) (1,360) (258) (258) (3,823) (4,081) (4,081) (258) (258)<br />
Depreciation, net of amortization 58,363 57,385 54,970 (978) (3,393) 224,618 229,540 218,769 4,922 (5,849) 683,698 688,620 663,743 4,922 (19,955)<br />
Other Expenses 28,585 28,221 29,802 (364) 1,217 99,766 110,513 100,445 10,747 679 346,186 335,277 345,802 (10,909) (384)<br />
Indirect Costs Capitalized to P&E (8,734) (9,356) (5,714) (622) 3,020 (31,961) (43,502) (38,167) (11,541) (6,206) (128,650) (132,917) (116,977) (4,267) 11,673<br />
Total Expense 352,298 348,216 360,882 (4,082) 8,584 1,362,248 1,346,573 1,314,536 (15,675) (47,712) 4,194,322 4,133,202 4,035,821 (61,120) (158,501)<br />
Operating Income (Loss) (136,324) (138,912) (154,958) 2,588 18,634 (426,008) (406,087) (396,425) (19,921) (29,583) (1,267,145) (1,205,509) (1,191,728) (61,636) (75,417)<br />
Other (Income) and Expense<br />
Interest Income (329) (189) (538) 140 (209) (20,604) (754) (2,116) 19,850 18,488 (22,110) (2,260) (6,514) 19,850 15,596<br />
Interest Expense 4,737 6,914 7,448 2,177 2,711 21,659 28,638 31,166 6,979 9,507 75,140 82,118 83,187 6,978 8,047<br />
Loss of Extinguishment of Debt 0 0 0 0 0 0 0 0 0 0 0 0 3,771 0 3,771<br />
Other Expense - Net 4,408 6,725 6,910 2,317 2,502 1,055 27,884 29,050 26,829 27,995 53,030 79,858 80,444 26,828 27,414<br />
Loss from Continuing Operations (140,732) (145,637) (161,868) 4,905 21,136 (427,063) (433,971) (425,475) 6,908 (1,588) (1,320,175) (1,285,367) (1,272,172) (34,808) (48,003)<br />
Discontinued Operations 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Net Loss (140,732) (145,637) (161,868) 4,905 21,136 (427,063) (433,971) (425,475) 6,908 (1,588) (1,320,175) (1,285,367) (1,272,172) (34,808) (48,003)<br />
Adjustments (1) 77,092 74,255 80,773 2,837 (3,681) 280,912 298,769 295,975 (17,857) (15,063) 899,719 889,134 910,377 10,585 (10,658)<br />
Adjusted Income or (Loss) ($63,640) ($71,382) ($81,095) $7,742 $17,455 ($146,151) ($135,202) ($129,500) ($10,949) ($16,651) ($420,456) ($396,233) ($361,795) ($24,223) ($58,661)<br />
RECONCILIATION TO CONSOLIDATED STATEMENT OF OPERATIONS:<br />
Total Operating Revenue $215,974 $209,304 $205,924 $6,670 $10,050 $936,240 $940,486 $918,111 ($4,246) $18,129 $2,927,177 $2,927,693 $2,844,093 ($516) $83,084<br />
Federal and State Capital Payments 3,426 2,712 2,561 714 865 13,156 10,846 10,046 2,310 3,110 34,848 32,539 32,737 2,309 2,111<br />
Total Revenue 219,400 212,016 208,485 7,384 10,915 949,396 951,332 928,157 (1,936) 21,239 2,962,025 2,960,232 2,876,830 1,793 85,195<br />
Total Expenses 352,298 348,216 360,882 (4,082) 8,584 1,362,248 1,346,573 1,314,536 (15,675) (47,712) 4,194,322 4,133,202 4,035,821 (61,120) (158,501)<br />
Income or (Loss) from Operations (132,898) (136,200) (152,397) 3,302 19,499 (412,852) (395,241) (386,379) (17,611) (26,473) (1,232,297) (1,172,970) (1,158,991) (59,327) (73,306)<br />
Interest, net 4,408 6,725 6,910 2,317 2,502 1,055 27,884 29,050 26,829 27,995 53,030 79,858 80,444 26,828 27,414<br />
Loss from Continuing Operations (137,306) (142,925) (159,307) 5,619 22,001 (413,907) (423,125) (415,429) 9,218 1,522 (1,285,327) (1,252,828) (1,239,435) (32,499) (45,892)<br />
Discontinued Operations 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Net Income or (Loss) ($137,306) ($142,925) ($159,307) $5,619 $22,001 ($413,907) ($423,125) ($415,429) $9,218 $1,522 ($1,285,327) ($1,252,828) ($1,239,435) ($32,499) ($45,892)<br />
(1) Adjustments exclude Depreciation, Project Related costs (PRJ), non-cash portion of OPEBs and Inspector General's office.<br />
A - 4.1
NATIONAL RAILROAD PASSENGER CORPORATION<br />
Consolidated Income Statement - Fiscal Year <strong>2013</strong><br />
For the Month of JAN, <strong>2013</strong><br />
Operating excluding Project<br />
For the Month For the Year to Date Forecast Year End<br />
($ thousands)<br />
REVENUES:<br />
Passenger Related:<br />
<strong>2013</strong> JAN<br />
Actual<br />
<strong>2013</strong> JAN<br />
Budget<br />
2012 JAN<br />
Actual<br />
Variance Fav / (Unfav)<br />
Budget Prior Year<br />
<strong>2013</strong> YTD<br />
Actual<br />
<strong>2013</strong> YTD<br />
Budget<br />
2012 YTD<br />
Actual<br />
Variance Fav / (Unfav)<br />
Budget Prior Year<br />
FY <strong>2013</strong><br />
Forecast<br />
FY <strong>2013</strong><br />
Budget<br />
FY 2012<br />
Last Year<br />
Variance Fav / (Unfav)<br />
Budget Prior Year<br />
Ticket Revenue $143,949 $139,850 $130,661 $4,099 $13,288 $654,576 $657,731 $623,331 ($3,155) $31,245 $2,072,584 $2,075,739 $1,968,173 ($3,155) $104,411<br />
Food & Beverage 9,394 9,196 9,272 198 122 40,050 40,595 37,599 (545) 2,451 127,712 128,257 121,987 (545) 5,725<br />
State Supported Train Revenue 15,771 16,081 13,198 (310) 2,573 66,743 64,326 49,451 2,417 17,292 199,124 192,978 179,008 6,146 20,116<br />
Total Passenger Related Revenue 169,114 165,127 153,131 3,987 15,983 761,369 762,652 710,381 (1,283) 50,988 2,399,420 2,396,974 2,269,168 2,446 130,252<br />
Commuter Revenue<br />
Other:<br />
10,151 9,916 17,721 235 (7,570) 36,199 39,262 62,317 (3,063) (26,118) 113,147 116,209 140,390 (3,062) (27,243)<br />
Reimbursable Revenue 12,302 11,765 9,828 537 2,474 39,279 48,291 31,584 (9,012) 7,695 133,984 142,996 121,387 (9,012) 12,597<br />
Commercial Development 9,400 6,463 6,478 2,937 2,922 29,166 25,571 42,852 3,595 (13,686) 79,634 76,039 93,861 3,595 (14,227)<br />
Other Transportation 10,416 11,777 6,579 (1,361) 3,837 46,522 46,989 42,106 (467) 4,416 141,025 141,492 147,177 (467) (6,152)<br />
Freight Access Fees & Other 4,591 4,256 12,187 335 (7,596) 23,705 17,721 28,871 5,984 (5,166) 59,967 53,983 72,109 5,984 (12,142)<br />
Total Other Revenue 36,709 34,261 35,072 2,448 1,637 138,672 138,572 145,413 100 (6,741) 414,610 414,510 434,534 100 (19,924)<br />
Total Operating Revenue 215,974 209,304 205,924 6,670 10,050 936,240 940,486 918,111 (4,246) 18,129 2,927,177 2,927,693 2,844,092 (516) 83,085<br />
EXPENSES:<br />
Salaries, Wages and Benefits:<br />
Salaries 24,935 24,125 22,486 (810) (2,449) 91,510 94,396 102,194 2,886 10,684 282,746 286,993 277,504 4,247 (5,242)<br />
Wages & Overtime 92,199 90,793 87,116 (1,406) (5,083) 361,141 358,864 345,929 (2,277) (15,212) 1,064,429 1,065,283 1,033,331 854 (31,098)<br />
Employee Benefits Expenses 54,852 55,433 64,722 581 9,870 209,423 198,018 190,204 (11,405) (19,219) 730,422 690,349 678,816 (40,073) (51,606)<br />
Employee Related 2,107 2,630 2,488 523 381 8,793 10,615 10,430 1,822 1,637 29,287 30,444 30,003 1,157 716<br />
Total Salaries, Wages and Benefits 174,093 172,981 176,812 (1,112) 2,719 670,867 661,893 648,757 (8,974) (22,110) 2,106,884 2,073,069 2,019,654 (33,815) (87,230)<br />
Train Operations 24,783 22,200 26,744 (2,583) 1,961 95,193 92,080 86,930 (3,113) (8,263) 277,899 274,234 245,168 (3,665) (32,731)<br />
Fuel, Power, & Utilities 30,552 30,810 27,255 258 (3,297) 124,946 118,569 114,670 (6,377) (10,276) 369,371 358,642 355,284 (10,729) (14,087)<br />
Materials 13,580 16,048 16,048 19,807 2,468 6,227 63,774 62,675 67,699 (1,099) 3,925 193,976 187,934 184,839 (6,042) (9,137)<br />
Facility, Communication, & Office 16,826 15,004 15,761 (1,822) (1,065) 55,951 58,159 54,743 2,208 (1,208) 167,486 172,736 167,617 5,250 131<br />
Advertising & Sales 8,104 8,467 4,938 363 (3,166) 28,793 30,673 21,577 1,880 (7,216) 98,700 98,584 78,476 (116) (20,224)<br />
Casualty & Other Claims 3,603 4,668 6,768 1,065 3,165 22,246 18,671 25,879 (3,575) 3,633 56,692 56,012 50,689 (680) (6,003)<br />
Depreciation 58,444 57,725 55,310 (719) (3,134) 225,720 230,900 220,130 5,180 (5,590) 687,521 692,701 667,824 5,180 (19,697)<br />
Amort of Gain on Sale/Leaseback (82) (340) (340) (258) (258) (1,102) (1,360) (1,360) (258) (258) (3,823) (4,081) (4,081) (258) (258)<br />
Depreciation, net of amortization 58,362 57,385 54,970 (977) (3,392) 224,618 229,540 218,770 4,922 (5,848) 683,698 688,620 663,743 4,922 (19,955)<br />
Other Expenses 28,105 27,797 27,468 (308) (637) 97,723 108,912 97,366 11,189 (357) 340,950 329,984 323,355 (10,966) (17,595)<br />
Indirect Costs Capitalized to P&E (9,555) (9,793) (6,626) (238) 2,929 (34,863) (45,362) (41,881) (10,499) (7,018) (134,656) (137,881) (128,747) (3,225) 5,909<br />
Total Expense 348,453 345,567 353,897 (2,886) 5,444 1,349,248 1,335,810 1,294,510 (13,438) (54,738) 4,161,000 4,101,934 3,960,078 (59,066) (200,922)<br />
Operating Income (Loss) (132,479) (136,263) (147,973) 3,784 15,494 (413,008) (395,324) (376,399) (17,684) (36,609) (1,233,823) (1,174,241) (1,115,986) (59,582) (117,837)<br />
Other (Income) and Expense<br />
Interest Income 330 189 538 (141) 208 20,604 754 2,116 (19,850) (18,488) 22,110 2,260 6,514 (19,850) (15,596)<br />
Interest Expense 4,737 6,914 7,449 2,177 2,712 21,659 28,638 31,166 6,979 9,507 75,140 82,118 83,187 6,978 8,047<br />
Other Expense - Net 5,067 7,103 7,987 2,036 2,920 42,263 29,392 33,282 (12,871) (8,981) 97,250 84,378 89,701 (12,872) (7,549)<br />
Loss from Continuing Operations (137,546) (143,366) (155,960) 5,820 18,414 (455,271) (424,716) (409,681) (30,555) (45,590) (1,331,073) (1,258,619) (1,205,687) (72,454) (125,386)<br />
Discontinued Operations 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Net Loss (137,546) (143,366) (155,960) 5,820 18,414 (455,271) (424,716) (409,681) (30,555) (45,590) (1,331,073) (1,258,619) (1,205,687) (72,454) (125,386)<br />
A - 4.2
NATIONAL RAILROAD PASSENGER CORPORATION<br />
Consolidated Income Statement - Fiscal Year <strong>2013</strong><br />
For the Month of JAN, <strong>2013</strong><br />
Core<br />
For the Month For the Year to Date Forecast Year End<br />
($ thousands)<br />
REVENUES:<br />
Passenger Related:<br />
<strong>2013</strong> JAN<br />
Actual<br />
<strong>2013</strong> JAN<br />
Budget<br />
2012 JAN<br />
Actual<br />
Variance Fav / (Unfav)<br />
Budget Prior Year<br />
<strong>2013</strong> YTD<br />
Actual<br />
<strong>2013</strong> YTD<br />
Budget<br />
2012 YTD<br />
Actual<br />
Variance Fav / (Unfav)<br />
Budget Prior Year<br />
FY <strong>2013</strong><br />
Forecast<br />
FY <strong>2013</strong><br />
Budget<br />
FY 2012<br />
Last Year<br />
Variance Fav / (Unfav)<br />
Budget Prior Year<br />
Ticket Revenue $143,943 $139,851 $130,592 $4,092 $13,351 $654,568 $657,731 $622,447 ($3,163) $32,121 $2,072,575 $2,075,739 $1,968,112 ($3,164) $104,463<br />
Food & Beverage 9,394 9,196 9,272 198 122 40,050 40,595 37,599 (545) 2,451 127,712 128,257 121,987 (545) 5,725<br />
State Supported Train Revenue 15,771 16,081 13,198 (310) 2,573 66,743 64,326 49,451 2,417 17,292 199,124 192,978 179,008 6,146 20,116<br />
Total Passenger Related Revenue 169,108 165,128 153,062 3,980 16,046 761,361 762,652 709,497 (1,291) 51,864 2,399,411 2,396,974 2,269,107 2,437 130,304<br />
Commuter Revenue<br />
Other:<br />
0 2,561 0 (2,561) 0 0 10,151 (4,500) (10,151) 4,500 113,147 29,636 (4,500) 83,511 117,647<br />
Reimbursable Revenue 285 777 2,481 (492) (2,196) (3,768) 3,100 6,228 (6,868) (9,996) 2,756 9,623 633 (6,867) 2,123<br />
Commercial Development 0 5,922 0 (5,922) 0 0 23,379 0 (23,379) 0 46,082 69,461 0 (23,379) 46,082<br />
Other Transportation 10,339 11,388 6,550 (1,049) 3,789 46,245 45,383 42,058 862 4,187 137,502 136,637 146,122 865 (8,620)<br />
Freight Access Fees & Other 4,512 4,256 7,385 256 (2,873) 23,560 17,721 20,470 5,839 3,090 59,822 53,983 69,395 5,839 (9,573)<br />
Total Other Revenue 15,136 22,343 16,416 (7,207) (1,280) 66,037 89,583 68,756 (23,546) (2,719) 246,162 269,704 216,150 (23,542) 30,012<br />
Total Operating Revenue 184,244 190,032 169,478 (5,788) 14,766 827,398 862,386 773,753 (34,988) 53,645 2,758,720 2,696,314 2,480,757 62,406 277,963<br />
EXPENSES:<br />
Salaries, Wages and Benefits:<br />
Salaries 24,056 23,181 21,287 (875) (2,769) 87,968 90,644 97,162 2,676 9,194 271,690 275,723 264,300 4,033 (7,390)<br />
Wages & Overtime 84,929 83,318 77,154 (1,611) (7,775) 334,527 329,327 310,225 (5,200) (24,302) 980,234 977,586 927,777 (2,648) (52,457)<br />
Employee Benefits Expenses 49,487 50,584 57,598 1,097 8,111 191,899 179,013 166,075 (12,886) (25,824) 672,034 633,441 606,947 (38,593) (65,087)<br />
Employee Related 2,011 2,574 2,303 563 292 8,467 10,388 9,628 1,921 1,161 28,461 29,740 27,651 1,279 (810)<br />
Total Salaries, Wages and Benefits 160,483 159,657 158,342 (826) (2,141) 622,861 609,372 583,090 (13,489) (39,771) 1,952,419 1,916,490 1,826,675 (35,929) (125,744)<br />
Train Operations 24,733 22,200 26,684 (2,533) 1,951 95,004 92,078 86,706 (2,926) (8,298) 277,334 274,228 244,483 (3,106) (32,851)<br />
Fuel, Power, & Utilities 29,540 29,477 26,519 (63) (3,021) 121,382 113,977 111,721 (7,405) (9,661) 357,121 345,363 345,074 (11,758) (12,047)<br />
Materials 12,172 14,464 14,464 18,229 2,292 6,057 55,564 56,315 61,332 751 5,768 173,109 168,917 164,415 (4,192) (8,694)<br />
Facility, Communication, & Office 15,208 14,445 14,222 (763) (986) 50,223 55,863 49,301 5,640 (922) 157,202 165,948 151,376 8,746 (5,826)<br />
Advertising & Sales 8,104 8,467 4,938 363 (3,166) 28,785 30,672 21,577 1,887 (7,208) 98,691 98,583 78,458 (108) (20,233)<br />
Casualty & Other Claims 3,603 4,668 6,768 1,065 3,165 22,246 18,671 25,879 (3,575) 3,633 56,692 56,012 50,689 (680) (6,003)<br />
Depreciation 58,141 57,725 55,007 (416) (3,134) 224,511 230,900 218,918 6,389 (5,593) 686,312 692,701 664,193 6,389 (22,119)<br />
Amort of Gain on Sale/Leaseback (82) (340) (340) (258) (258) (1,102) (1,360) (1,360) (258) (258) (3,823) (4,081) (4,081) (258) (258)<br />
Depreciation, net of amortization 58,059 57,385 54,667 (674) (3,392) 223,409 229,540 217,558 6,131 (5,851) 682,489 688,620 660,112 6,131 (22,377)<br />
Other Expenses 25,851 27,052 25,476 1,201 (375) 91,522 106,023 89,233 14,501 (2,289) 328,344 320,700 294,184 (7,644) (34,160)<br />
Indirect Costs Capitalized to P&E (14,789) (15,902) (10,916) (1,113) 3,873 (53,650) (70,286) (58,847) (16,636) (5,197) (201,920) (211,283) (182,447) (9,363) 19,473<br />
Total Expense 322,964 321,913 324,929 (1,051) 1,965 1,257,346 1,242,225 1,187,550 (15,121) (69,796) 3,881,481 3,823,578 3,633,019 (57,903) (248,462)<br />
Operating Income (Loss) (138,720) (131,881) (155,451) (6,839) 16,731 (429,948) (379,839) (413,797) (50,109) (16,151) (1,122,761) (1,127,264) (1,152,262) 4,503 29,501<br />
Other (Income) and Expense<br />
Interest Income 330 189 523 (141) 193 20,589 754 2,071 (19,835) (18,518) 22,095 2,260 6,332 (19,835) (15,763)<br />
Interest Expense 4,737 6,914 7,429 2,177 2,692 21,640 28,638 31,087 6,998 9,447 75,120 82,118 82,918 6,998 7,798<br />
Other Expense - Net 5,067 7,103 7,952 2,036 2,885 42,229 29,392 33,158 (12,837) (9,071) 97,215 84,378 89,250 (12,837) (7,965)<br />
Loss from Continuing Operations (143,787) (138,984) (163,403) (4,803) 19,616 (472,177) (409,231) (446,955) (62,946) (25,222) (1,219,976) (1,211,642) (1,241,512) (8,334) 21,536<br />
Discontinued Operations 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Net Loss (143,787) (138,984) (163,403) (4,803) 19,616 (472,177) (409,231) (446,955) (62,946) (25,222) (1,219,976) (1,211,642) (1,241,512) (8,334) 21,536<br />
A - 4.3
NATIONAL RAILROAD PASSENGER CORPORATION<br />
Consolidated Income Statement - Fiscal Year <strong>2013</strong><br />
For the Month of JAN, <strong>2013</strong><br />
Ancillary<br />
For the Month For the Year to Date Forecast Year End<br />
($ thousands)<br />
REVENUES:<br />
Passenger Related:<br />
<strong>2013</strong> JAN<br />
Actual<br />
<strong>2013</strong> JAN<br />
Budget<br />
2012 JAN<br />
Actual<br />
Variance Fav / (Unfav)<br />
Budget Prior Year<br />
<strong>2013</strong> YTD<br />
Actual<br />
<strong>2013</strong> YTD<br />
Budget<br />
2012 YTD<br />
Actual<br />
Variance Fav / (Unfav)<br />
Budget Prior Year<br />
FY <strong>2013</strong><br />
Forecast<br />
FY <strong>2013</strong><br />
Budget<br />
FY 2012<br />
Last Year<br />
Variance Fav / (Unfav)<br />
Budget Prior Year<br />
Ticket Revenue $5 $1 $0 $4 $5 $9 $0 $1 $9 $8 $9 $0 $63 $9 ($54)<br />
Food & Beverage 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
State Supported Train Revenue 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Total Passenger Related Revenue 5 1 0 4 5 9 0 1 9 8 9 0 63 9 (54)<br />
Commuter Revenue<br />
Other:<br />
10,151 7,355 22,472 2,796 (12,321) 36,199 29,111 75,511 7,088 (39,312) 113,147 86,574 144,890 26,573 (31,743)<br />
Reimbursable Revenue 12,017 10,988 7,347 1,029 4,670 43,047 45,191 25,356 (2,144) 17,691 131,228 133,373 120,753 (2,145) 10,475<br />
Commercial Development 9,400 541 6,478 8,859 2,922 29,166 2,192 42,852 26,974 (13,686) 33,552 6,578 93,861 26,974 (60,309)<br />
Other Transportation 77 389 29 (312) 48 274 1,608 48 (1,334) 226 3,521 4,853 1,057 (1,332) 2,464<br />
Freight Access Fees & Other 80 0 130 80 (50) 146 0 593 146 (447) 146 0 2,714 146 (2,568)<br />
Total Other Revenue 21,574 11,918 13,984 9,656 7,590 72,633 48,991 68,849 23,642 3,784 168,447 144,804 218,385 23,643 (49,938)<br />
Total Operating Revenue 31,730 19,274 36,456 12,456 (4,726) 108,841 78,102 144,361 30,739 (35,520) 281,603 231,378 363,338 50,225 (81,735)<br />
EXPENSES:<br />
Salaries, Wages and Benefits:<br />
Salaries 879 944 1,199 65 320 3,542 3,752 5,031 210 1,489 11,056 11,270 13,204 214 2,148<br />
Wages & Overtime 7,270 7,475 9,961 205 2,691 26,614 29,535 35,703 2,921 9,089 84,195 87,697 105,556 3,502 21,361<br />
Employee Benefits Expenses 5,365 4,849 7,123 (516) 1,758 17,523 19,005 24,128 1,482 6,605 58,388 56,908 71,871 (1,480) 13,483<br />
Employee Related 96 57 185 (39) 89 326 227 802 (99) 476 826 704 2,352 (122) 1,526<br />
Total Salaries, Wages and Benefits 13,610 13,325 18,468 (285) 4,858 48,005 52,519 65,664 4,514 17,659 154,465 156,579 192,983 2,114 38,518<br />
Train Operations 50 1 60 (49) 10 189 2 224 (187) 35 565 6 687 (559) 122<br />
Fuel, Power, & Utilities 1,012 1,333 736 321 (276) 3,564 4,593 2,950 1,029 (614) 12,250 13,279 10,208 1,029 (2,042)<br />
Materials 1,408 1,584 1,578 176 170 8,211 6,360 6,367 (1,851) (1,844) 20,867 19,017 20,422 (1,850) (445)<br />
Facility, Communication, & Office 1,618 559 1,539 (1,059) (79) 5,728 2,296 5,441 (3,432) (287) 10,284 6,788 16,243 (3,496) 5,959<br />
Advertising & Sales 0 0 0 0 0 8 1 0 (7) (8) 9 2 17 (7) 8<br />
Casualty & Other Claims 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Depreciation 301 0 303 (301) 2 1,209 0 1,212 (1,209) 3 1,209 0 3,631 (1,209) 2,422<br />
Amort of Gain on Sale/Leaseback 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Depreciation, net of amortization 301 0 303 (301) 2 1,209 0 1,212 (1,209) 3 1,209 0 3,631 (1,209) 2,422<br />
Other Expenses 2,254 745 1,993 (1,509) (261) 6,201 2,886 8,134 (3,315) 1,933 12,606 9,284 29,171 (3,322) 16,565<br />
Indirect Costs Capitalized to P&E 5,234 6,108 4,290 874 (944) 18,787 24,923 16,966 6,136 (1,821) 67,266 73,402 53,702 6,136 (13,564)<br />
Total Expense 25,487 23,655 28,967 (1,832) 3,480 91,902 93,580 106,958 1,678 15,056 279,521 278,357 327,064 (1,164) 47,543<br />
Operating Income (Loss) 6,243 (4,381) 7,489 10,624 (1,246) 16,939 (15,478) 37,403 32,417 (20,464) 2,082 (46,979) 36,274 49,061 (34,192)<br />
Other (Income) and Expense<br />
Interest Income 0 0 15 0 15 15 0 46 (15) 31 15 0 182 (15) 167<br />
Interest Expense 0 0 20 0 20 20 0 79 (20) 59 20 0 271 (20) 251<br />
Other Expense - Net 0 0 35 0 35 35 0 125 (35) 90 35 0 453 (35) 418<br />
Loss from Continuing Operations 6,243 (4,381) 7,454 10,624 (1,211) 16,904 (15,478) 37,278 32,382 (20,374) 2,047 (46,979) 35,821 49,026 (33,774)<br />
Discontinued Operations 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Net Loss 6,243 (4,381) 7,454 10,624 (1,211) 16,904 (15,478) 37,278 32,382 (20,374) 2,047 (46,979) 35,821 49,026 (33,774)<br />
A - 4.4
NATIONAL RAILROAD PASSENGER CORPORATION<br />
Consolidated Income Statement - Fiscal Year <strong>2013</strong><br />
For the Month of JAN, <strong>2013</strong><br />
Projects<br />
For the Month For the Year to Date Forecast Year End<br />
($ thousands)<br />
REVENUES:<br />
Passenger Related:<br />
<strong>2013</strong> JAN<br />
Actual<br />
<strong>2013</strong> JAN<br />
Budget<br />
2012 JAN<br />
Actual<br />
Variance Fav / (Unfav)<br />
Budget Prior Year<br />
<strong>2013</strong> YTD<br />
Actual<br />
<strong>2013</strong> YTD<br />
Budget<br />
2012 YTD<br />
Actual<br />
Variance Fav / (Unfav)<br />
Budget Prior Year<br />
FY <strong>2013</strong><br />
Forecast<br />
FY <strong>2013</strong><br />
Budget<br />
FY 2012<br />
Last Year<br />
Variance Fav / (Unfav)<br />
Budget Prior Year<br />
Ticket Revenue $0 $1 $0 ($1) $0 $0 $0 $1 $0 ($1) $0 $0 $1 $0 ($1)<br />
Food & Beverage 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
State Supported Train Revenue 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Total Passenger Related Revenue 0 1 0 (1) 0 0 0 1 0 (1) 0 0 1 0 (1)<br />
Commuter Revenue<br />
Other:<br />
0 0 0 0 0 0 0 0 0 0 113,147 0 0 113,147 113,147<br />
Reimbursable Revenue 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Commercial Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Other Transportation 0 0 0 0 0 (1) 1 0 (2) (1) (1) (1) 1 0 (2)<br />
Freight Access Fees & Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Total Other Revenue 0 0 0 0 0 (1) 1 0 (2) (1) (1) (1) 1 0 (2)<br />
Total Operating Revenue 0 1 0 (1) 0 (1) 1 1 (2) (2) 113,146 (1) 2 113,147 113,144<br />
EXPENSES:<br />
Salaries, Wages and Benefits:<br />
Salaries 153 90 213 (63) 60 226 359 1,302 133 1,076 1,129 1,079 2,445 (50) 1,316<br />
Wages & Overtime 499 205 640 (294) 141 1,838 934 2,116 (904) 278 3,057 2,153 6,579 (904) 3,522<br />
Employee Benefits Expenses 136 148 464 12 328 753 633 1,669 (120) 916 1,904 1,652 4,207 (252) 2,303<br />
Employee Related 35 0 48 (35) 13 145 0 99 (145) (46) 145 0 464 (145) 319<br />
Total Salaries, Wages and Benefits 823 443 1,365 (380) 542 2,962 1,926 5,186 (1,036) 2,224 6,235 4,884 13,695 (1,351) 7,460<br />
Train Operations 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1<br />
Fuel, Power, & Utilities 0 0 0 0 0 0 0 3 0 3 0 0 2 0 2<br />
Materials 1,251 1,344 1,450 93 199 3,846 5,376 6,052 1,530 2,206 14,598 16,129 20,386 1,531 5,788<br />
Facility, Communication, & Office 469 0 936 (469) 467 1,247 0 1,974 (1,247) 727 1,247 0 7,455 (1,247) 6,208<br />
Advertising & Sales 0 0 0 0 0 0 0 0 0 0 0 0 (1) 0 (1)<br />
Casualty & Other Claims 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Depreciation (1) 0 0 1 1 0 0 0 0 0 0 0 0 0 0<br />
Amort of Gain on Sale/Leaseback 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Depreciation, net of amortization (1) 0 0 1 1 0 0 0 0 0 0 0 0 0 0<br />
Other Expenses 480 424 2,333 (56) 1,853 2,043 1,600 3,109 (443) 1,066 5,236 5,293 22,435 57 17,199<br />
Indirect Costs Capitalized to P&E 821 437 913 (384) 92 2,902 1,860 3,715 (1,042) 813 6,007 4,964 11,772 (1,043) 5,765<br />
Total Expense 3,843 2,648 6,997 (1,195) 3,154 13,000 10,762 20,039 (2,238) 7,039 33,323 31,270 75,745 (2,053) 42,422<br />
Operating Income (Loss) (3,843) (2,647) (6,997) (1,196) 3,154 (13,001) (10,761) (20,038) (2,240) 7,037 79,823 (31,271) (75,743) 111,094 155,566<br />
Other (Income) and Expense<br />
Interest Income 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Interest Expense 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1<br />
Other Expense - Net 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1<br />
Loss from Continuing Operations (3,843) (2,647) (6,997) (1,196) 3,154 (13,001) (10,761) (20,038) (2,240) 7,037 79,823 (31,271) (75,744) 111,094 155,567<br />
Discontinued Operations 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Net Loss (3,843) (2,647) (6,997) (1,196) 3,154 (13,001) (10,761) (20,038) (2,240) 7,037 79,823 (31,271) (75,744) 111,094 155,567<br />
A - 4.5
Department & Program<br />
Engineering<br />
YTD<br />
Actual<br />
Structures – Movable Bridge-Movable Span 2,275<br />
Structures – Bridge Ties 72<br />
Structures – Undergrade–Fixed Bridge 5,357<br />
Structures - Culvert 213<br />
Structures - Fence 74<br />
Structures – Interlocking Structures 42<br />
Structures - Tunnel 106<br />
Structures – Retaining Wall 140<br />
Structures - Major Bridge Special Projects 10,086<br />
Structures – M/E Facility 1,303<br />
Structures – M/W Base 4,527<br />
Structures - Station 35,237<br />
Structures – Trans Department Facility 78<br />
Structures – Sunnyside Yard New Mechanical Facilit 164<br />
Communications & Signals- Abs Locations 259<br />
Communications & Signals- Adv Civil Spd Enforc Sys 3,661<br />
Communications & Signals – Cable Fiber (1)<br />
Communications & Signal – Interlocking-C&S 1,458<br />
Communications & Signals - Crossings 186<br />
Communications & Signals - Cetc 1,363<br />
Communications & Signals - Radio 15<br />
Electric Traction - Catenary 1,114<br />
Electric Traction - Catenary Pole 525<br />
Electric Traction - Transmission 148<br />
Electric Traction - Frequency Converters 1,699<br />
Electric Traction - Signal Power 185<br />
Electric Traction - Substations 2,361<br />
Track - Ballast 677<br />
Track - Drainage 636<br />
Track – Fasteners (0)<br />
Safety & Security -<br />
Track - Rail 4,494<br />
Track – Wood/Concrete Crosstie/Timber 5,931<br />
Track – Total Track Renewal/Construction 12,622<br />
Track – Track Laying System 1,500<br />
Track - Turnouts 2,050<br />
Track – Crossings-Road 83<br />
Track - Geometry 4,157<br />
Deputy Chief Engineer Construction - Applications 2,494<br />
Track – Interlocking Renewal 3,233<br />
Track – Equipment-Roadway 1,203<br />
Structures – Special Project 2 157<br />
Life Safety – Lic Ventilation Construction (0)<br />
Life Safety – 1St Avenue Construction 1,753<br />
Life Safety – Nrt Ventilation Construction 87<br />
Life Safety – Standpipe Installation 298<br />
Life Safety – Misc Design & Construction Project 300<br />
NJ HSR Improvements - Interlocking -<br />
NJ HSR Improvements - Track Upgrades 4,890<br />
Other 503<br />
Engineering Total 119,717<br />
Mechanical<br />
Amfleet Programs 21,567<br />
Locomotives 22,033<br />
Acquisitions 31,060<br />
Superliners 17,413<br />
Facility Improvements 804<br />
Horizon/Surfliner Programs 3,865<br />
Non Passenger Equipment 566<br />
Viewliner Programs 2,102<br />
Talgo Programs 190<br />
Acela Programs 6,100<br />
Heritage Programs 1,563<br />
Mandatory Projects 149<br />
General Safety & Reliability 2,554<br />
Mechanical IT Projects 331<br />
Other (143)<br />
Mechanical Total 110,155<br />
Environmental<br />
Environmental Risk Reduction 2<br />
Environmental Remediation Program 618<br />
Other 65<br />
Environmental Total 685<br />
Emergency Management<br />
Safety & Security Program 8,210<br />
Emergency Management 8,210<br />
National Railroad Passenger Corporation (<strong>Amtrak</strong>)<br />
Capital Program Expenditures Excluding Debt Service<br />
<strong>January</strong> <strong>2013</strong> YTD<br />
($ thousands)<br />
YTD<br />
Budgeted<br />
Funding 1<br />
2,380<br />
964<br />
3,193<br />
292<br />
502<br />
117<br />
4,616<br />
1,207<br />
5,493<br />
5,149<br />
3,223<br />
33,939<br />
75<br />
1,673<br />
831<br />
9,784<br />
-<br />
3,825<br />
584<br />
3,812<br />
356<br />
1,802<br />
1,912<br />
607<br />
821<br />
454<br />
4,062<br />
2,587<br />
398<br />
-<br />
804<br />
5,869<br />
4,754<br />
22,651<br />
13,012<br />
2,915<br />
376<br />
5,370<br />
1,804<br />
8,658<br />
3,728<br />
-<br />
-<br />
4,394<br />
-<br />
323<br />
475<br />
107<br />
16,971<br />
(100)<br />
186,770<br />
18,022<br />
51,172<br />
40,752<br />
18,111<br />
1,238<br />
4,444<br />
131<br />
2,514<br />
261<br />
9,300<br />
966<br />
588<br />
915<br />
458<br />
-<br />
148,872<br />
125<br />
1,065<br />
140<br />
1,330<br />
22,585<br />
22,585<br />
A - 4.6<br />
Variance<br />
105<br />
891<br />
(2,164)<br />
79<br />
428<br />
75<br />
4,510<br />
1,067<br />
(4,593)<br />
3,846<br />
(1,304)<br />
(1,298)<br />
(3)<br />
1,509<br />
572<br />
6,123<br />
1<br />
2,367<br />
399<br />
2,449<br />
341<br />
688<br />
1,387<br />
458<br />
(878)<br />
269<br />
1,701<br />
1,910<br />
(238)<br />
0<br />
804<br />
1,376<br />
(1,177)<br />
10,028<br />
11,512<br />
866<br />
293<br />
1,214<br />
(691)<br />
5,425<br />
2,525<br />
(157)<br />
0<br />
2,641<br />
(87)<br />
25<br />
175<br />
107<br />
12,081<br />
(603)<br />
67,053<br />
(3,545)<br />
29,139<br />
9,692<br />
698<br />
434<br />
580<br />
(435)<br />
411<br />
72<br />
3,200<br />
(597)<br />
439<br />
(1,639)<br />
127<br />
143<br />
38,718<br />
123<br />
447<br />
75<br />
645<br />
14,375<br />
14,375<br />
FY13<br />
Remaining<br />
Spend Plan<br />
11,950<br />
2,675<br />
13,795<br />
743<br />
2,288<br />
350<br />
13,315<br />
1,482<br />
1,680<br />
8,356<br />
2,594<br />
60,472<br />
496<br />
3,500<br />
1,753<br />
18,695<br />
(0)<br />
7,687<br />
1,600<br />
10,362<br />
1,429<br />
5,150<br />
4,577<br />
1,382<br />
3,453<br />
1,348<br />
13,441<br />
3,591<br />
679<br />
(0)<br />
2,450<br />
14,628<br />
15,054<br />
52,674<br />
37,851<br />
9,592<br />
1,336<br />
13,742<br />
4,227<br />
21,043<br />
13,555<br />
(0)<br />
0<br />
8,221<br />
637<br />
1,187<br />
523<br />
320<br />
43,844<br />
11,174<br />
450,904<br />
48,659<br />
143,912<br />
37,104<br />
41,456<br />
3,075<br />
9,022<br />
312<br />
5,953<br />
810<br />
37,408<br />
1,435<br />
2,101<br />
947<br />
1,419<br />
0<br />
333,613<br />
898<br />
2,131<br />
551<br />
3,580<br />
43,380<br />
43,380<br />
Spend Plan +<br />
YTD Actual<br />
14,226<br />
2,748<br />
19,152<br />
956<br />
2,363<br />
392<br />
13,421<br />
1,623<br />
11,766<br />
9,659<br />
7,121<br />
95,710<br />
574<br />
3,664<br />
2,012<br />
22,356<br />
(1)<br />
9,145<br />
1,786<br />
11,725<br />
1,444<br />
6,265<br />
5,102<br />
1,530<br />
5,152<br />
1,533<br />
15,802<br />
4,267<br />
1,314<br />
(0)<br />
2,450<br />
19,122<br />
20,985<br />
65,296<br />
39,351<br />
11,642<br />
1,419<br />
17,899<br />
6,722<br />
24,276<br />
14,758<br />
157<br />
-<br />
9,975<br />
725<br />
1,485<br />
823<br />
320<br />
48,734<br />
11,677<br />
570,621<br />
70,226<br />
165,945<br />
68,163<br />
58,869<br />
3,879<br />
12,886<br />
878<br />
8,055<br />
1,000<br />
43,508<br />
2,999<br />
2,250<br />
3,501<br />
1,750<br />
(143)<br />
443,768<br />
900<br />
2,749<br />
616<br />
4,265<br />
51,590<br />
51,590<br />
FY13<br />
Budgeted<br />
Funding Variance<br />
17,300<br />
2,720<br />
16,073<br />
950<br />
2,550<br />
350<br />
26,765<br />
2,605<br />
9,500<br />
11,875<br />
7,130<br />
94,824<br />
500<br />
5,000<br />
3,400<br />
23,888<br />
-<br />
10,950<br />
1,650<br />
11,725<br />
1,230<br />
5,740<br />
5,192<br />
1,415<br />
5,000<br />
1,522<br />
15,269<br />
4,350<br />
1,300<br />
-<br />
2,700<br />
18,851<br />
20,125<br />
74,028<br />
39,931<br />
12,000<br />
1,400<br />
17,900<br />
6,825<br />
25,337<br />
14,700<br />
-<br />
-<br />
12,544<br />
-<br />
1,300<br />
2,407<br />
320<br />
51,100<br />
8,522<br />
600,762<br />
66,711<br />
196,563<br />
76,817<br />
54,417<br />
3,750<br />
12,351<br />
500<br />
7,595<br />
1,000<br />
43,604<br />
2,898<br />
2,250<br />
3,500<br />
1,750<br />
-<br />
473,705<br />
900<br />
3,400<br />
700<br />
5,000<br />
65,965<br />
65,965<br />
3,074<br />
(28)<br />
(3,079)<br />
(6)<br />
187<br />
(42)<br />
13,344<br />
982<br />
(2,266)<br />
2,216<br />
9<br />
(886)<br />
(74)<br />
1,336<br />
1,388<br />
1,532<br />
1<br />
1,805<br />
(136)<br />
0<br />
(214)<br />
(525)<br />
89<br />
(115)<br />
(152)<br />
(11)<br />
(533)<br />
83<br />
(14)<br />
0<br />
250<br />
(271)<br />
(860)<br />
8,732<br />
580<br />
358<br />
(19)<br />
1<br />
103<br />
1,060<br />
(58)<br />
(157)<br />
-<br />
2,569<br />
(725)<br />
(185)<br />
1,584<br />
(0)<br />
2,366<br />
(3,155)<br />
30,141<br />
(3,515)<br />
30,617<br />
8,653<br />
(4,452)<br />
(129)<br />
(535)<br />
(378)<br />
(460)<br />
0<br />
96<br />
(101)<br />
0<br />
(1)<br />
(0)<br />
143<br />
29,937<br />
(0)<br />
651<br />
84<br />
735<br />
14,375<br />
14,375
Department & Program<br />
Transportation / Operations<br />
YTD<br />
Actual<br />
System/Business Application Improvement 1,095<br />
Training and <strong>Performance</strong> Tracking -<br />
Station and Facility Improvements 55<br />
Other -<br />
Transportation Total 1,150<br />
Finance & Treasury<br />
Technology/ System Upgrades & Facility Imrpovement 745<br />
Finance & Treasury Total 745<br />
<strong>Amtrak</strong> Technologies Total<br />
Technology/ System Upgrades 7,587<br />
<strong>Amtrak</strong> Technologies Total 7,587<br />
Procurement<br />
Vehicle Replacement -<br />
Procurement Facility Improvement Program 1<br />
Other -<br />
Procurement Total 1<br />
Real Estate Total<br />
Station / Facility Development 2,884<br />
Real Estate Total 2,884<br />
NEC IID<br />
Existing Partnership Agreements 788<br />
NEC IID Total 788<br />
Marketing & Sales<br />
Technology / System Upgrade 3,881<br />
Infrastructure 118<br />
Other -<br />
Marketing & Sales Total 3,999<br />
Departmental Total 255,920<br />
MANUAL ADJUSTMENTS<br />
Engineering CUS Adjustment 2<br />
National Railroad Passenger Corporation (<strong>Amtrak</strong>)<br />
Capital Program Expenditures Excluding Debt Service<br />
<strong>January</strong> <strong>2013</strong> YTD<br />
(270)<br />
Totals with All Adjustments 255,650<br />
All Capital Projects (PRJ) 12,994<br />
Totals Excluding PRJ 242,656<br />
($ thousands)<br />
YTD<br />
Budgeted<br />
Funding 1<br />
2,586<br />
-<br />
280<br />
83<br />
2,949<br />
1,044<br />
1,044<br />
8,772<br />
8,772<br />
-<br />
-<br />
-<br />
-<br />
3,803<br />
3,803<br />
3,746<br />
3,746<br />
4,415<br />
-<br />
-<br />
4,415<br />
384,287<br />
(333)<br />
383,953<br />
10,765<br />
373,189<br />
Variance<br />
1,491<br />
-<br />
225<br />
83<br />
1,799<br />
299<br />
299<br />
1,185<br />
1,185<br />
-<br />
(1)<br />
-<br />
(1)<br />
920<br />
920<br />
2,958<br />
2,958<br />
534<br />
(118)<br />
-<br />
416<br />
128,367<br />
(63)<br />
128,304<br />
(2,229)<br />
130,533<br />
FY13<br />
Remaining<br />
Spend Plan<br />
1) Authorized amounts were reset following Board approval and do not reflect earlier published amounts.<br />
2) Expenditures include the reimbursable portion of Chicago Union Station projects that are primarily funded by METRA.<br />
3) Excludes early lease buyouts, Inspector General activity and non-capitalizable assessments.<br />
BOLD Numbers are subtotals<br />
A - 4.7<br />
6,905<br />
-<br />
926<br />
4,301<br />
12,131<br />
2,861<br />
2,861<br />
30,275<br />
30,275<br />
-<br />
710<br />
-<br />
710<br />
12,116<br />
12,116<br />
9,440<br />
9,440<br />
14,161<br />
-<br />
-<br />
14,161<br />
913,172<br />
-<br />
913,172<br />
35,669<br />
877,503<br />
Spend Plan +<br />
YTD Actual<br />
8,000<br />
-<br />
981<br />
4,301<br />
13,281<br />
3,605<br />
3,605<br />
37,862<br />
37,862<br />
-<br />
711<br />
-<br />
711<br />
15,000<br />
15,000<br />
10,227<br />
10,227<br />
18,043<br />
118<br />
-<br />
18,161<br />
1,169,092<br />
(270)<br />
1,168,822<br />
48,663<br />
1,120,158<br />
FY13<br />
Budgeted<br />
Funding Variance<br />
8,000<br />
-<br />
560<br />
2,200<br />
10,760<br />
3,340<br />
3,340<br />
37,300<br />
37,300<br />
-<br />
730<br />
-<br />
730<br />
15,000<br />
15,000<br />
15,500<br />
15,500<br />
17,900<br />
-<br />
-<br />
17,900<br />
1,245,963<br />
(1,000)<br />
1,244,963<br />
31,269<br />
1,213,694<br />
0<br />
-<br />
(421)<br />
(2,101)<br />
(2,521)<br />
(265)<br />
(265)<br />
(562)<br />
(562)<br />
-<br />
19<br />
-<br />
19<br />
0<br />
0<br />
5,273<br />
5,273<br />
(143)<br />
(118)<br />
-<br />
(261)<br />
76,871<br />
(730)<br />
76,141<br />
(17,394)<br />
93,535
CHIEF MECHANICAL OFFICER<br />
FY13 PRODUCTION REPORT<br />
Plan YTD Actuals YTD Variance Actuals % Variance Actuals % YTD Actuals<br />
PROJECT # WBS PROJECT NAME FY13 Plan Plan JAN Actuals JAN through JAN through JAN YTD to Plan YTD YTD to Plan YTD to FY12 Plan Units Completed ‐ <strong>January</strong> <strong>January</strong> Comments<br />
20047439 C.ME.201291 Amfleet I Coach Overhaul Level 2 68 5 4 14 16 2 114% 24%<br />
Acceleration due to aggressive schedule & delay<br />
82547, 81543, 82549, 82550<br />
of Acela MWP.<br />
20047440 C.ME.100101 Amfleet II Coach Overhaul Level 1 30 3 2 9 6 (3) 67% 20% 25003, 25097<br />
Working around availability due to holiday<br />
demand and mix of Amfleet I and II cars.<br />
20127400 C.ME.100022 Amfleet Food Service to Coach Conversion 2 1 1 2 1 (1) 50% 50% 85000/82978 Last car should be released in March.<br />
20117405 C.ME.100869 Amfleet II Diner Overhaul Level 1 6 1 1 2 2 0 100% 33% 28003 n/a<br />
20082564 C.ME.100413 Amfleet I Coach Overhaul Level 1 24 2 5 8 11 3 138% 46%<br />
82758, 82752, 82693, 82756, Working around availability due to holiday<br />
82755<br />
demand and mix of Amfleet I and II cars.<br />
20077405 C.ME.100377 Amfleet I Café/Club Overhaul Level 2 21 1 2 5 7 2 140% 33% 48196, 43375<br />
Acceleration due to aggressive schedule of Level<br />
2 cars.<br />
20097417 C.ME.100649 Cab Car Overhaul 5 1 0 2 0 (2) 0% 0% n/a<br />
CAPITAL TOTAL BEAR 156 14 15 42 43 1 102% 28%<br />
20037429 C.ME.100039 Superliner I Sleeper Overhaul ‐ Level 3 7 1 1 4 4 0 100% 57% 32022<br />
20037434 C.ME.100040 Superliner II Sleeper Overhaul ‐ Level 2 7 1 0 4 4 0 100% 57%<br />
20037435 C.ME.100041 Superliner II Lounge Overhaul 8 1 0 3 1 (2) 33% 13% Equipment not arriving as scheduled<br />
20037436 C.ME.100042 Superliner II Coach Overhaul ‐ Level 2 2 1 0 2 1 (1) 50% 50% Work in Progress<br />
20037437 C.ME.100043 Superliner II Diner Overhaul ‐ Level 2 6 0 1 2 2 0 100% 33% 38042<br />
20037438 C.ME.100044 Superliner II Trans Sleeper Dorm Overhaul ‐ Level 2 9 0 1 2 2 0 100% 22% 39009<br />
20057418 C.ME.100176 Superliner I Lounge Overhaul 7 1 0 3 0 (3) 0% 0% Units not arriving as scheduled<br />
20057422 C.ME.100177 Superliner I Coach Overhaul ‐ Level 2 28 3 4 10 11 1 110% 39% 34050, 31023, 34093, 34098<br />
20067417 C.ME.100240 Superliner I Diner Overhaul 3 0 0 0 0 0 0% 0%<br />
20079871 C.ME.100384 Superliner I Sleeper Overhaul ‐ Level 2 16 1 1 6 4 (2) 67% 25% 32051 Material issues and amount of work needed<br />
20097405 C.ME.100641 Horizon Coach Overhaul ‐ Level 2 14 2 1 2 3 1 150% 21% 54551<br />
20097407 C.ME.100643 Horizon Café Overhaul 6 1 0 2 1 (1) 50% 17% Work in Progress<br />
20097404 C.ME.100640 Surfliner Coach Overhaul 5 0 1 3 1 (2) 33% 20% 6414<br />
20097410 C.ME.100644 Surfliner Cab Car Overhaul 2 0 0 1 1 0 100% 50%<br />
20097413 C.ME.100646 Surfliner Custom Coach Overhaul 4 0 0 2 1 (1) 50% 25%<br />
20097414 C.ME.100647 Surfliner Café Overhaul 3 1 0 2 1 (1) 50% 33%<br />
Surfliner units are worked in 42 days, but we<br />
never know when California will send units<br />
Surfliner units are worked in 42 days, but we<br />
never know when California will send units<br />
Surfliner units are worked in 42 days, but we<br />
never know when California will send units<br />
20067411 C.ME.100239 Viewliner Sleeper Overhaul ‐ Level 2 13 1 1 4 4 0 100% 31% 62007<br />
20067420 C.ME.100241 Heritage Diner Overhaul 7 0 2 2 4 2 200% 57% 8504, 8530<br />
Worked Heritage Diners as we received them. 5<br />
to 6 additional Heritage Diners on Production<br />
Schedule for BEE<br />
20079897 C.ME.100005 F59 Overhaul 6 1 0 2 1 (1) 50% 17% Units not arriving as scheduled<br />
20067400 C.ME.100006 P32‐8 Overhaul 1 0 0 0 0 0 0% 0%<br />
CAPITAL TOTAL BEECH GROVE 154 15 13 56 46 (10) 82% 30%<br />
20067402 C.ME.100237 AEM‐7 AC Overhauls 6 0 1 2 3 1 150% 50% 916<br />
Due to material not being available from supplier<br />
for the HHP.<br />
Due to material and shop count issues 660 was<br />
20047419 C.ME.100097 AEM‐7 DC Overhauls 6 1 0 2 1 (1) 50% 17%<br />
moved before this. 953 will be released in<br />
February.<br />
20057407 C.ME.100174 HHP‐8 Locomotive Overhauls 4 0 1 1 1 0 100% 25% 660<br />
CAPITAL TOTAL WILMINGTON 16 1 2 5 5 0 100% 31%<br />
A - 4.8
PROJECT # WBS PROJECT NAME FY13 Plan Plan JAN Actuals JAN<br />
CHIEF MECHANICAL OFFICER<br />
FY13 PRODUCTION REPORT<br />
Plan YTD<br />
through JAN<br />
Actuals YTD Variance Actuals<br />
through JAN YTD to Plan YTD<br />
% Variance Actuals<br />
YTD to Plan YTD<br />
20107421 C.ME.100787 Superliner II Sleeper L‐1 6 1 2 2 2 0 100% 33% 32505, 32102<br />
% YTD Actuals<br />
to FY12 Plan Units Completed ‐ <strong>January</strong> <strong>January</strong> Comments<br />
20097419 C.ME.100651 Superliner II Lounge L‐1 1 0 0 1 1 0 100% 100%<br />
20097418 C.ME.100650 Superliner II Diner L‐1 4 0 0 1 1 0 100% 25%<br />
20107422 C.ME.100788 Superliner II Trans Dorm L‐1 1 0 0 0 0 0 0% 0%<br />
CAPITAL TOTAL DIVISIONS 12 1 2 4 4 0 100% 33%<br />
20107405 C.ME.100785 Acela Overhaul 2 0 0 0 0 0 0% 0%<br />
CAPITAL TOTAL HIGH SPEED RAIL 2 0 0 0 0 0 0% 0%<br />
CAPITAL TOTAL CMO<br />
LCPM (events ‐ not units):<br />
340 31 32 107 98 (9) 92% 29%<br />
20097421 C.ME.100653 P‐42 Locomotive Paint (Beech Grove) 17 1 1 6 3 (3) 50% 18% 29<br />
We do not regularly receive P‐42 locos for Paint<br />
Event<br />
20097421 C.ME.100653 F‐59 Locomotive Paint (Beech Grove) 6 1 0 2 1 (1) 50% 17% Our F‐59 work is now overhaul<br />
20097421 C.ME.100653 P32‐8 Locomotive Paint (Beech Grove) 1 0 0 0 0 0 0% 0%<br />
20097421 C.ME.100653 COT&S 5 Year Air (Chicago) 42 1 3 10 8 (2) 80% 19% 52, 176, 100<br />
Unit 70 and 14 scheduled in FY13 will not be<br />
completed due to wreck status.<br />
20097421 C.ME.100653 COT&S 8 Year Air (Chicago) 28 3 2 3 3 0 100% 11% 140, 168<br />
20097421 C.ME.100653 Radiator Hatch (Chicago) 28 2 2 11 7 (4) 64% 25% 122, 148 Work in Progress<br />
20097421 C.ME.100653 Air Compressor (Chicago) 26 2 3 11 7 (4) 64% 27% 122, 148, 177 Work in Progress<br />
20097421 C.ME.100653 Air Dryer (Chicago) 47 3 4 9 10 1 111% 21% 52, 100, 17, 25<br />
20097421 C.ME.100653 Engine Change (Chicago) 30 2 2 9 7 (2) 78% 23% 161, 189 Work in Progress<br />
20097421 C.ME.100653 5 Year Truck (Chicago) 38 1 3 8 5 (3) 63% 13% 52, 100, 176<br />
Production deferred due to truck shortage.<br />
Trucks for unit 174 will be sent to Relco due to<br />
repair of wrecked unit. Forecast adjusted.<br />
20097421 C.ME.100653 HVAC (Chicago) 41 1 4 9 9 0 100% 22% 176, 100, 52, 79<br />
20097421 C.ME.100653 Injectors (Chicago) 86 7 8 21 26 5 124% 30%<br />
199, 25, 89, 176, 122, 100,<br />
140, 84<br />
Completion of units from FY12<br />
20097421 C.ME.100653 Radiator Fans (Chicago) 14 0 1 3 4 1 133% 29% 17<br />
20097421 C.ME.100653 Equipment Blowers (Chicago) 7 0 1 2 2 0 100% 29% 89<br />
20097421 C.ME.100653 Air Compressor (Albany) ‐ P42 3 1 1 2 2 0 100% 67% 102<br />
20097421 C.ME.100653 Engine Change (Albany) ‐ P42 1 0 0 0 0 0 0% 0%<br />
20097421 C.ME.100653 Injectors (Albany) ‐ P42 6 1 0 2 1 (1) 50% 17% Work in Progress<br />
20097421 C.ME.100653 Radiator Hatch (Albany) ‐ P42 3 1 1 2 2 0 100% 67% 102<br />
20097421 C.ME.100653 Radiator Fans (Albany) ‐ P42 0 0 1 0 2 2 0% 0% 102<br />
20097421 C.ME.100653 Equipment Blowers (Albany) ‐ P42 3 1 0 2 0 (2) 0% 0% Work in Progress<br />
20097421 C.ME.100653 COT&S (Albany) ‐ P32 1 0 0 1 0 (1) 0% 0% Work in Progress<br />
20097421 C.ME.100653 Air Compressor (Albany) ‐ P32 4 0 1 1 1 0 100% 25% 701<br />
20097421 C.ME.100653 10 Year Truck (Albany) ‐ P32 4 1 0 2 0 (2) 0% 0% Deferred due to truck shortage.<br />
20097421 C.ME.100653 Injectors (Albany) ‐ P32 6 0 0 2 3 1 150% 50%<br />
20097421 C.ME.100653 Radiator Hatch (Albany) ‐ P32 6 0 0 2 1 (1) 50% 17% Work in Progress<br />
20097421 C.ME.100653 Equipment Blowers (Albany) ‐ P32 0 0 0 0 0 0 0% 0%<br />
20097421 C.ME.100653 Radiator (Albany) ‐ P32 0 0 0 0 0 0 0% 0%<br />
PROJECT TOTAL LCPM 448 29 38 120 104 (16) 87% 23%<br />
A - 4.9
Engineering Department<br />
FY13 Major Production Summary thru <strong>January</strong> <strong>2013</strong><br />
FY13<br />
Operation Actual<br />
System Total<br />
Surfacing (pass miles) 119.7<br />
Wood Ties (each) 10,953<br />
TLMs -Ties (each) 0<br />
Holland Welder-(TLMs+RCO+rail gang) (each) 162<br />
Field Welding -Division & Production (each) 530<br />
Undercutting (track miles) 0.3<br />
SES Track Panels Installed (feet) 698<br />
Turnouts - SES (each) 4<br />
Turnouts - DIVs (each) 5<br />
Turnouts - Sys Prod (each) 0<br />
Rail - (TLMs+HBG+Sys+CENTRAL Rail Gangs) (track miles) 4.4<br />
Curve Patch Rail Divs (Track Miles) 0.00<br />
Rail Train-Pick Up (track miles) 0.0<br />
Rail Train- Unload (track miles) 7.6<br />
Slot Machine (miles) - NED+MAD+HBG 0.00<br />
Vac Trains MAD-NED NYD TLS (miles) 5.20<br />
Badger Ditcher (Pass miles) 0.0<br />
Shoulder Cleaner (track miles) 0.0<br />
Rail Grinding (pass miles) 655.7<br />
Switch Grinding (pass miles) 115.5<br />
Switch Grinding (each) 224<br />
Bridge Decks Retimbered (each) 0<br />
Bridge Ties (each) 0<br />
Bridge Converted to Ballast Deck (each) 1<br />
Bridge Converted to Ballast Deck (track feet) 40<br />
Electric Catenary Hardware Renewed (miles) 0.0<br />
ET Transformers (each) 2<br />
ET Breakers (each) 9<br />
Signal Cable Replaced (miles) 18.7<br />
Concrete System Tie Gang Central+NED+NYD+MAD+SES (each) 495<br />
Vac Train 3165 (miles) NY Tunnels 9.1<br />
NY Tunnels Install New Track Panels (miles) 0.1<br />
A - 4.10
ACTUAL ANALYSIS<br />
TO<br />
PRIOR YEAR
National Railroad Passenger Corporation and Subsidiaries (<strong>Amtrak</strong>)<br />
Consolidated Statements of Operations<br />
(In Thousands of Dollars)<br />
Preliminary Subject to Audit Four Months Ended<br />
<strong>January</strong> 31,<br />
<strong>2013</strong> 2012 fav / (unfav)<br />
Revenues:<br />
Passenger related ..................................................................................................... $ 761,370<br />
Commuter ................................................................................................................ 36,199<br />
State capital payments ............................................................................................. 13,156<br />
Other ........................................................................................................................ 138,671<br />
Total revenues ........................................................................................................ 949,396<br />
Expenses:<br />
Salaries, wages, and benefits ................................................................................... 673,829<br />
Train operations ....................................................................................................... 95,193<br />
Fuel, power, and utilities ......................................................................................... 124,945<br />
Materials .................................................................................................................. 67,620<br />
Facility, communication, and office related ............................................................ 57,199<br />
Advertising and sales .............................................................................................. 28,793<br />
Casualty and other claims ....................................................................................... 22,246<br />
Depreciation, net of amortization ............................................................................ 224,618<br />
Other ........................................................................................................................ 99,766<br />
Indirect cost capitalized to property and equipment ............................................... (31,961)<br />
Total expenses ........................................................................................................ 1,362,248<br />
Net loss from continuing operations before<br />
other (income) and expense .............................................................................. 412,852<br />
Other (Income) and Expense:<br />
Interest income ........................................................................................................ (20,604)<br />
Interest expense ....................................................................................................... 21,659<br />
Loss on early extinguishment of debt ..................................................................... -<br />
Other expense, net ................................................................................................. 1,055<br />
Net loss .................................................................................................................... $ 413,907<br />
$ 710,381<br />
62,317<br />
10,046<br />
145,413<br />
928,157<br />
653,943<br />
86,930<br />
114,674<br />
73,751<br />
56,705<br />
21,577<br />
25,909<br />
218,769<br />
100,445<br />
(38,167)<br />
1,314,536<br />
386,379<br />
(2,116)<br />
31,166<br />
-<br />
29,050<br />
$ 415,429<br />
Unaudited Consolidated Financial Statements are Subject to Change<br />
A - 5.1<br />
50,989<br />
(26,118)<br />
3,110<br />
(6,742)<br />
21,239<br />
(19,886)<br />
(8,263)<br />
(10,271)<br />
6,131<br />
(494)<br />
(7,216)<br />
3,663<br />
(5,849)<br />
679<br />
(6,206)<br />
(47,712)<br />
(26,473)<br />
18,488<br />
9,507<br />
-<br />
27,995<br />
1,522<br />
7.2% /a<br />
-41.9% /b<br />
31.0% /c<br />
-4.6% /d<br />
2.3%<br />
3.0% /e<br />
9.5% /f<br />
9.0% /g<br />
-8.3% /h<br />
0.9%<br />
33.4% /i<br />
-14.1% /j<br />
2.7% /k<br />
-0.7%<br />
-16.3% /l<br />
3.6%<br />
6.9%<br />
873.7%<br />
-30.5%<br />
0.0%<br />
-96.4% /m<br />
-0.4%
<strong>January</strong> <strong>2013</strong> YTD Consolidated Statement of Operations - Variance Explanations<br />
Revenues:<br />
/a Passenger related revenues were favorable to prior year by $51.0M primarily due to<br />
increased ticket yield versus the same period last year. Ticket revenues for the Northeast<br />
Corridor are up 5%, State/Corridor trains are up 5% and Long Distance trains are up<br />
5%.<br />
/b Commuter revenues were unfavorable by $26.1M primarily due to the expiration of the<br />
Caltrans contract.<br />
/c State capital payments were favorable by $3.1M primarily due to increased contributions<br />
from state partners.<br />
/d Other revenues were unfavorable by $6.7M primarily due to revenues received in FY12<br />
from the Connecticut Easement Agreement easement partially offset by increase<br />
reimbursable and freight access revenues in FY13.<br />
Expenses:<br />
/e Salaries, wages and benefits were unfavorable by $19.9M primarily due to increased benefit<br />
costs, contractual wage increases and increased operating activity.<br />
/f Train Operations were unfavorable by $8.3M primarily due to increased host railroad usage<br />
fees and incentive payments, increased costs for connecting bus service and increases in<br />
commissary expenses.<br />
/g Fuel, Power and Utilities were unfavorable by $10.3M primarily due to changes in the<br />
valuation of fuel hedge contracts and fuel hedge settlements.<br />
/h Materials were favorable by $6.1M primarily due to increased capitalization of component<br />
repair partially offset by increased reimbursable work for NYDOT and ConnDOT.<br />
/i Advertising and sales were unfavorable by $7.2M primarily due to the timing and increases<br />
of planned advertising programs.<br />
/j Casualty and other claims were favorable by $3.7M primarily due to lower actuarial<br />
revisions of anticipated passenger claims.<br />
/k Depreciation, net of amortization was unfavorable by $5.8M, primarily due to an increase<br />
in the depreciable fixed asset base.<br />
A - 5.2
<strong>January</strong> <strong>2013</strong> YTD Consolidated Statement of Operations - Variance Explanations (cont.)<br />
/l Indirect cost capitalized to P&E were unfavorable by $6.2M primarily due to lower capital<br />
spend.<br />
/m Net interest expense decreased $28.0M as a result of the purchase of the equity stake in<br />
previously-leased Acela maintenance facilities and reduced interest expense due to lower<br />
outstanding balances.<br />
A - 5.3
National Railroad Passenger Corporation and Subsidiaries (<strong>Amtrak</strong>)<br />
Consolidated Statements of Cash Flows<br />
(In Thousands of Dollars)<br />
Four Month Ended<br />
<strong>January</strong> 31,<br />
<strong>2013</strong> 2012<br />
Cash Flows From Operating Activities:<br />
Net loss ............................................................................................................................................... $ (413,907) $ (415,429)<br />
Adjustments to reconcile net loss to net cash used in operating activities:<br />
Depreciation ................................................................................................................................. 224,618<br />
Other .............................................................................................................................................<br />
Changes in assets and liabilities:<br />
540<br />
Accounts receivable .................................................................................................................... 29,262<br />
Materials and supplies ................................................................................................................. (19,108)<br />
Prepaid expenses ......................................................................................................................... (24,677)<br />
Other current assets ..................................................................................................................... (7,527)<br />
Other assets, deposits, and deferred charges ............................................................................... 81,266<br />
Accounts payable, deferred ticket revenue, accrued expenses and other current liabilities…… (44,681)<br />
Deferred state capital payments .................................................................................................. (13,156)<br />
Other liabilities and deferred credits ........................................................................................... 74,903<br />
Net cash used in operating activities .................................................................................................. (112,467)<br />
Cash Flows From Investing Activities:<br />
Change in restricted cash and cash equivalents ................................................................................. 473<br />
Purchases and refurbishments of property and equipment ................................................................ (303,807)<br />
Proceeds from disposals of property and equipment ......................................................................... 435<br />
Net cash used in investing activities .................................................................................................. (302,899)<br />
Cash Flows From Financing Activities:<br />
Proceeds from federal paid-in capital ................................................................................................ 591,978<br />
Proceeds from federal and state capital payments ............................................................................. 39,828<br />
Repayments of debt and capital lease obligations .............................................................................. (176,061)<br />
Proceeds from issuance of debt........................................................................................................... 15,433<br />
Net cash provided by financing activities .......................................................................................... 471,178<br />
Net change in cash and cash equivalents ........................................................................................... 55,812<br />
Beginning balance of cash and cash equivalents................................................................................ 210,820<br />
Ending balance of cash and cash equivalents..................................................................................... $ 266,632<br />
Supplemental Disclosure of Cash Payments<br />
Interest paid, net of amount capitalized.............................................................................................. $ 29,051<br />
Supplemental Disclosure of Noncash Investing and Financing Activities<br />
Other non-cash changes in property, includes<br />
accruals of amounts due for purchases….....….....….....….....….....….....….....….....….....….....… $ (4,815)<br />
Unaudited Consolidated Financial Statements are Subject to Change<br />
A - 5.4<br />
218,769<br />
899<br />
(84,634)<br />
(5,951)<br />
(8,366)<br />
(3,932)<br />
(7,593)<br />
(103,120)<br />
(10,046)<br />
42,296<br />
(377,107)<br />
(59,164)<br />
(356,354)<br />
1,645<br />
(413,873)<br />
794,611<br />
37,274<br />
(198,624)<br />
41,932<br />
675,193<br />
(115,787)<br />
126,779<br />
$ 10,992<br />
$ 38,175<br />
$ (7,944)
National Railroad Passenger Corporation and Subsidiaries (<strong>Amtrak</strong>)<br />
Consolidated Balance Sheets<br />
(In Thousands of Dollars, Except Share Data)<br />
(Unaudited) (Audited)<br />
<strong>January</strong> 31, September 30,<br />
ASSETS<br />
Current Assets:<br />
<strong>2013</strong> 2012 $ Change % Change<br />
Cash and cash equivalents ................................................................................................ $ 266,632 $ 210,820 55,812 26.5% /a<br />
Restricted cash and cash equivalents................................................................................<br />
Accounts receivable, net of allowances of $8,082 and $7,236<br />
7,657 8,130 (473) (5.8%) /a<br />
at <strong>January</strong> 31, <strong>2013</strong> and September 30, 2012, respectively………............................<br />
Materials and supplies, net of allowances of $58,904 and $55,373<br />
179,964 209,760 (29,796) (14.2%) /b<br />
at <strong>January</strong> 31, <strong>2013</strong> and September 30, 2012, respectively………............................ 253,998 234,896 19,102 8.1% /c<br />
Prepaid expenses............................................................................................................... 38,388 13,712 24,676 180.0% /d<br />
Other current assets .......................................................................................................... 32,618 25,091 7,527 30.0% /e<br />
Total current assets ........................................................................................................ 779,257 702,409 76,848 10.9%<br />
Property and Equipment:<br />
Locomotives ..................................................................................................................... 1,494,883 1,485,812<br />
Passenger cars and other rolling stock ............................................................................. 2,713,248 2,699,572<br />
Right-of-way and other properties ................................................................................... 10,751,304 10,689,217<br />
Construction in progress................................................................................................... 1,192,099 1,020,317<br />
Leasehold improvements ................................................................................................. 490,566 496,353<br />
Property and equipment, gross ..................................................................................... 16,642,100 16,391,271<br />
Less - Accumulated depreciation and amortization ......................................................... (6,197,561) (6,024,334)<br />
Total property and equipment, net ............................................................................... 10,444,539 10,366,937<br />
Other Assets, Deposits, and Deferred Charges:<br />
Notes receivable on sale-leasebacks ................................................................................ 52,476 51,850<br />
Deferred charges, deposits, and other .............................................................................. 168,196 253,295<br />
Total other assets, deposits, and deferred charges ...................................................... 220,672 305,145<br />
Total assets ...................................................................................................................... $ 11,444,468 $ 11,374,491<br />
LIABILITIES and CAPITALIZATION<br />
Current Liabilities:<br />
Accounts payable ............................................................................................................. $ 252,921 $ 290,757<br />
Accrued expenses and other current liabilities ................................................................ 535,074 529,579<br />
Deferred ticket revenue .................................................................................................... 105,540 122,092<br />
Current maturities of long-term debt and capital lease obligations ................................. 151,736 149,380<br />
Total current liabilities .................................................................................................. 1,045,271 1,091,808<br />
Long-Term Debt and Capital Lease Obligations:<br />
Capital lease obligations .................................................................................................. 895,498 1,062,341<br />
Mortgages ......................................................................................................................... 128,425 139,605<br />
Equipment and other debt ................................................................................................ 45,082 45,220<br />
Railroad rehabiliation and improvement financing loan .................................................. 176,588 159,497<br />
Total long-term debt and capital lease obligations ..................................................... 1,245,593 1,406,663<br />
Other Liabilities and Deferred Credits:<br />
Deferred state capital payments ....................................................................................... 999,338 972,666<br />
Casualty reserves .............................................................................................................. 158,152 140,452<br />
Deferred gain on sale-leasebacks ..................................................................................... 51,683 53,745<br />
Postretirement employee benefits obligation ................................................................... 1,440,898 1,402,939<br />
Environmental reserve ..................................................................................................... 56,882 54,317<br />
Other liabilities.................................................................................................................. 74,380 57,701<br />
Total other liabilities and deferred credits .................................................................. 2,781,333 2,681,820<br />
Total liabilities ................................................................................................................ 5,072,197 5,180,291<br />
Commitments and Contingencies<br />
Capitalization:<br />
Preferred stock - $100 par, 109,396,994 shares authorized,<br />
issued and outstanding at <strong>January</strong> 31, <strong>2013</strong> and September 30, 2012.........................<br />
Common stock - $10 par, 10,000,000 shares authorized, 9,385,694<br />
10,939,699 10,939,699<br />
issued and outstanding at <strong>January</strong> 31, <strong>2013</strong> and September 30, 2012......................... 93,857 93,857<br />
Debt and other paid-in capital .......................................................................................... 25,800,066 25,208,088<br />
Accumulated deficit.......................................................................................................... (29,663,907) (29,250,000)<br />
Accumulated other comprehensive loss............................................................................ (797,444) (797,444)<br />
Total capitalization ......................................................................................................... 6,372,271 6,194,200<br />
Total liabilities and capitalization ................................................................................. $ 11,444,468 $ 11,374,491<br />
Unaudited Consolidated Financial Statements are Subject to Change<br />
A - 5.5<br />
9,071<br />
13,676<br />
62,087<br />
171,782<br />
(5,787)<br />
250,829<br />
(173,227)<br />
77,602<br />
626<br />
(85,099)<br />
(84,473)<br />
69,977<br />
(37,836)<br />
5,495<br />
(16,552)<br />
2,356<br />
(46,537)<br />
(166,843)<br />
(11,180)<br />
(138)<br />
17,091<br />
(161,070)<br />
26,672<br />
17,700<br />
(2,062)<br />
37,959<br />
2,565<br />
16,679<br />
99,513<br />
(108,094)<br />
-<br />
-<br />
591,978<br />
(413,907)<br />
-<br />
178,071<br />
69,977<br />
0.6%<br />
0.5%<br />
0.6%<br />
16.8%<br />
(1.2%)<br />
1.5%<br />
2.9%<br />
0.7% /f<br />
1.2% /g<br />
(33.6%) /h<br />
(27.7%)<br />
0.6%<br />
(13.0%) /i<br />
1.0% /j<br />
(13.6%) /k<br />
1.6% /l<br />
(4.3%)<br />
(15.7%) /m<br />
(8.0%) /n<br />
(0.3%) /o<br />
10.7% /p<br />
(11.5%)<br />
2.7% /q<br />
12.6% /r<br />
(3.8%) /s<br />
2.7% /t<br />
4.7% /u<br />
28.9% /v<br />
3.7%<br />
(2.1%)<br />
0.0%<br />
0.0%<br />
2.3% /w<br />
1.4% /x<br />
0.0%<br />
2.9%<br />
0.6%
<strong>January</strong> <strong>2013</strong> Balance Sheet Variance Explanations:<br />
/a Cash and cash equivalents increased $55.3M – reflects the timing of FY12 and FY13<br />
appropriations and grants net of cash used for operations, capital investments and debt service<br />
during the period.<br />
/b Accounts receivable, net decreased $29.8M – due primarily to decreases in general receivables<br />
and outstanding credit card receivables.<br />
/c Materials and supplies, net increased $19.1M – due to inventory purchases and usage in support<br />
of operations.<br />
/d Prepaid expenses increased $24.7M – due to the timing of capitalization of leased equipment and<br />
the renewal of insurance premiums.<br />
/e Other current assets increased $7.5M – primarily due to an increase in pre-paid payroll taxes.<br />
/f Property and equipment, net of accumulated depreciation and amortization increased $77.6M –<br />
reflects improvements to property and right of way partially offset by the accumulated<br />
depreciation on assets and the disposition of out of service equipment.<br />
/g Notes receivable on sale-leasebacks increased $0.6M – reflects increases in defeased deposits<br />
related to the replacement or elimination of certain guarantors of the sale-leaseback of<br />
Amfleet/Superliner passenger cars.<br />
/h Deferred charges, deposits and other decreased $85.1M – due to a decrease in deferred<br />
locomotive charges as a result of capital lease retirement.<br />
/i Accounts payable decreased $37.8 – reflects a decrease in general accounts payable as a result of<br />
reduced capital spend.<br />
/j Accrued expenses and other current liabilities increased $5.5M – reflects reductions in accrued<br />
vacation due to the December Holidays.<br />
/k Deferred ticket revenue decreased 16.6M - reflects the change from prior fiscal year end in<br />
advance ticket sales.<br />
/l Current maturities of long-term debt and lease obligations increased $2.4M – reflects an increase<br />
in the current portion of capital lease obligations.<br />
/m Capital lease obligations decreased $166.8M – reflects a reduction of defeased lease payments on<br />
leased locomotives and rolling stock due to their replacement or termination.<br />
/n Mortgages decreased $11.2M – reflects principal payments on the Penn Station mortgage.<br />
/o Equipment and other debt decreased slightly– primarily relates to the purchase of leased<br />
equipment as well as principal on the PEDFA bond for 30 th Street Station construction.<br />
/p Railroad rehabilitation and improvement financing loan increased $17.1M – relates to the<br />
purchase of new electric locomotives.<br />
A - 5.6
<strong>January</strong> <strong>2013</strong> Balance Sheet Variance Explanations: (continued)<br />
/q Deferred state capital payments increased $26.7M – due to contributions from New Jersey (NJT),<br />
New York (LIRR), and Maryland (MARC) for joint benefit projects less amortization.<br />
/r Casualty reserves increased $17.7M – reflects the most recent actuarial analysis and calculation<br />
of future reserve levels for employee, passenger and other claims.<br />
/s Deferred gain on sale-leasebacks decreased $2.1M – reflects amortization of deferred gain on sale<br />
and leaseback transactions for Amfleet and Superliner passenger cars and a reduction for<br />
terminated lease transactions.<br />
/t Postretirement employee benefits obligation increased $38.0M – reflects the most recent actuarial<br />
analysis reflecting the aging of the workforce and projected increases in future healthcare rates.<br />
/u Environmental reserve increased $2.6M – reflects the estimated liability for environmental cleanup<br />
projects.<br />
/v Other liabilities increased $16.7M – reflects future cancellation payments resulting from<br />
retirement of High Speed Maintenance Facility leases.<br />
/w Debt and other paid-in capital increased $592.0M – reflects appropriations and grants received<br />
since FY12.<br />
/x Accumulated deficit increased $413.9M – reflects net losses incurred since FY12.<br />
A - 5.7
EGISLATIVE EPORT
House Approvals<br />
SubComm<br />
Markup<br />
6/7/12<br />
----------<br />
Committee<br />
Markup<br />
6/20/12<br />
House Vote<br />
6/29/12<br />
Status of FY<strong>2013</strong> Transportation<br />
Appropriations Bill<br />
Current to <strong>January</strong> 31, <strong>2013</strong><br />
Senate Approvals<br />
SubComm<br />
Markup<br />
4/17/12<br />
-------<br />
Committee<br />
Markup<br />
4/19/12<br />
Senate Vote<br />
Conference Approvals<br />
House Vote<br />
Senate Vote<br />
Public Law<br />
Background:<br />
<strong>Amtrak</strong> submitted its Fiscal <strong>2013</strong> appropriations request on February 3. The request is $2.167<br />
billion, which includes $450 million for operations, $1.445 billion for general capital, $212<br />
million for debt service, and $60 million for NEC items (Gateway and Stair-Step programs). The<br />
PRIIA authorized total is $2.233 billion.<br />
The Obama Administration released its Fiscal <strong>2013</strong> appropriations proposals on February 13. The<br />
Administration proposes a restructuring of passenger rail programs within the DOT budget. The<br />
previous major accounts (High-Speed Intercity Passenger Rail, <strong>Amtrak</strong> operations, <strong>Amtrak</strong><br />
capital) are consolidated into a National High <strong>Performance</strong> Rail System program. This program is<br />
divided into two accounts, Network Development and System Preservation, to be funded from<br />
surface transportation funds, rather than general funds. Within the System Preservation account,<br />
there is $1.546 for <strong>Amtrak</strong> (operations $631 million, general capital $652 million, ADA capital<br />
$50 million, debt service $213 million). Another $1 billion is proposed for Network Development<br />
(as individual grants). An “Immediate Transportation Investments” category would provide<br />
during Fiscal 2012 $4 billion for Network Development and $2 billion for System Preservation<br />
(essentially for <strong>Amtrak</strong> state of good repair items).<br />
The Senate Appropriations Committee on April 19 approved S.2322, Fiscal <strong>2013</strong> Transportation,<br />
Housing and Urban Development appropriations. It includes $1.450 billion for <strong>Amtrak</strong>, of which<br />
$400 million is for operations and $1.050 billion for capital. Of the capital amount, $20 million is<br />
for the Northeast Corridor Gateway program and up to $271 million is available for debt service.<br />
The bill also provides $19 million for <strong>Amtrak</strong> Office of Inspector General. The bill provides $100<br />
million for “high-performance” passenger rail service.<br />
The House Appropriations Committee on June 20 approved H.R.5972, Fiscal <strong>2013</strong> Transportation,<br />
Housing and Urban Development appropriations. It includes $1.802 billion for <strong>Amtrak</strong>, of which<br />
$350 million is for operations, $952 million for capital, and $500 million for state-of-good repair<br />
infrastructure projects on segments owned by <strong>Amtrak</strong> or states. Of the capital amount, $50<br />
million is for the ADA program and up to $271 million is available for debt service. Of the stateof-good<br />
repair funds, $80 million can go to <strong>Amtrak</strong> operations with DOT approval. The bill also<br />
provides $25 million for <strong>Amtrak</strong> Office of Inspector General.<br />
The House on September 13 approved, 329-91, H.J.Res.117, a continuing appropriations<br />
resolution funding most federal programs through March 27, <strong>2013</strong>, at their Fiscal 2012 levels, plus<br />
0.612%. For <strong>Amtrak</strong>, on an annualized basis, that is $1.427 billion ($469 million is for operations,<br />
$273 million for debt service, $431 million for capital, $50 million for ADA compliance, and<br />
$201 million for a new working capital account).<br />
B - 1
The Senate on September 22 approved H.J.Res.117, without amendment, 62-30.<br />
H.J.Res.117 was enacted as P.L. 112-175 on September 28.<br />
H.R.1, the Disaster Relief Act of 2012, making supplemental appropriations in connection with<br />
Hurricane Sandy repairs and mitigation, was introduced in the Senate on December 17 and<br />
approved on December 28, 62-32. It included $336 million for <strong>Amtrak</strong> costs and losses as well as<br />
infrastructure recovery, mitigation, and resiliency. The House adjourned without taking up a<br />
companion bill. Any further, possible action H.R.1 and other pending bills ended with the end of<br />
the 112th Congress. The new, 113th Congress began on <strong>January</strong> 3, <strong>2013</strong>, and all bills must be<br />
reintroduced, in order to move forward.<br />
H.R.152, the Disaster Relief Appropriations Act of <strong>2013</strong>, was introduced <strong>January</strong> 4, <strong>2013</strong>, as an<br />
emergency supplemental funding bill for Hurricane Sandy repairs and mitigation. As introduced,<br />
the bill included $32 million for <strong>Amtrak</strong> operating losses and costs. An amendment by Rep.<br />
Rodney Frelinghuysen, expanding the scope of the bill, was adopted on <strong>January</strong> 15, 228-192. It<br />
added $86 million for <strong>Amtrak</strong> capital projects in the Northeast Corridor addressing infrastructure<br />
recovery, mitigation, and resiliency. The House approved H.R.152 on <strong>January</strong> 15, 241-180. The<br />
Senate approved it on <strong>January</strong> 28, 62-36. It was signed into law on <strong>January</strong> 29 as P.L.113-2.<br />
B - 2
Bill Number Title/Sponsor<br />
H.Res.15<br />
H.R.152<br />
S.4<br />
Transportation Security<br />
Rep. Sheila Jackson Lee (D-TX)<br />
Disaster Relief Appropriations<br />
Act of <strong>2013</strong><br />
Rep. Harold Rogers (R-KY)<br />
Rebuild America Act<br />
Sen. Harry Reid (D-NV)<br />
Summary and Status of Legislation Impacting <strong>Amtrak</strong> - 112th Congress<br />
Co-<br />
Sponsors<br />
Resolves that the Transportation Security<br />
Administration should continue efforts to<br />
improve transportation security, including<br />
0<br />
on rail systems, and continuing<br />
development of the National Explosives<br />
Detection Canine Team Program.<br />
0<br />
14<br />
Summary Legislative Action to Date<br />
1/3/<strong>2013</strong> Referred to Committee on<br />
Homeland Security.<br />
1/4/<strong>2013</strong> Introduced in House.<br />
Making supplemental appropriations in<br />
1/15/<strong>2013</strong> Frelinguysen amendment to<br />
connection with Superstorm Sandy. The<br />
H.R.152 approved, 228-192.<br />
initial bill provided $32 million for <strong>Amtrak</strong> for<br />
1/15/<strong>2013</strong> Approved by House, 241-180.<br />
operating costs and losses arising from the<br />
1/28/<strong>2013</strong> Approved by Senate, 62-36.<br />
storm. An amendment by Rep. Rodney<br />
Frelinghuysen (R-NJ) to expand the bill was<br />
1/29/<strong>2013</strong> Enacted as P.L.113-2.<br />
approved and included $86 million in capital<br />
projects in the Northeast Corridor that<br />
address infrastructure recovery, mitigation,<br />
and resiliancy, bringing the <strong>Amtrak</strong> total to<br />
$118 million.<br />
Expresses the sense of the Senate that<br />
Congress should increase jobs and<br />
improve infrastructure by making<br />
investments in transportation, including rail.<br />
B - 3<br />
1/22/<strong>2013</strong> Referred to Committee on<br />
Commerce, Science and Transportation.
OUTE ERFORMANCE<br />
EPORT
National Railroad Passenger Corporation (<strong>Amtrak</strong>)<br />
Financial <strong>Performance</strong> of Routes - Fully allocated overhead, excluding Depreciation and Interest (see notes below)<br />
<strong>January</strong> <strong>2013</strong> YTD<br />
Route <strong>Performance</strong> Results Exclude Depreciation and Interest.<br />
All numbers are in $ millions except Passenger Mile and Seat Mile Calculations.<br />
Northeast Corridor Trains<br />
Route<br />
Number Train Name<br />
Revenue Costs<br />
OPEB's OPEB's Capital Charge Charge* (Loss) Mile (cents) Mile (cents)<br />
RT01 Acela $172.1 $90.1 $82.1 $2.7 $79.3 n/a $79.3 39.6 24.4<br />
RT05 Northeast Regional $189.7 $141.4 $48.4 $3.3 $45.0 n/a $45.0 11.4 5.4<br />
RT99 NEC Special Trains $3.2 $1.0 $2.1 $0.0 $2.1 n/a $2.1 182.9 21.8<br />
Total $365.0 $232.5 $132.6 $6.1 $126.5 n/a $126.5 21.3 10.8<br />
State Supported and Other<br />
Short Distance Corridor Trains<br />
Route<br />
Number Train Name<br />
Total<br />
Total Costs excl.<br />
OPEB's, Capital<br />
Charge and Other<br />
Core<br />
Contribution /<br />
(Loss) excl.<br />
Total Costs excl. Core<br />
OPEB's, Capital Contribution /<br />
Total Charge and Other (Loss) excl.<br />
Revenue Costs<br />
OPEB's OPEB's<br />
Contribution /<br />
(Loss) before<br />
Contribution /<br />
(Loss) before<br />
Capital Charge<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Pass<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Pass<br />
Mile (cents)<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Seat<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Seat<br />
Mile (cents)<br />
RT03 Ethan Allen Express $1.6 $1.6 ($0.0) $0.0 ($0.1) n/a ($0.1) (2.4) (1.0)<br />
RT04 Vermonter $2.6 $3.5 ($0.9) $0.1 ($1.0) n/a ($1.0) (12.4) (5.4)<br />
RT07 Maple Leaf $8.2 $9.8 ($1.6) $0.3 ($1.9) n/a ($1.9) (5.0) (2.5)<br />
RT09 The Downeaster $4.7 $5.1 ($0.4) $0.1 ($0.5) n/a ($0.5) (3.9) (1.3)<br />
RT12 New Haven - Springfield $4.2 $7.6 ($3.4) $0.2 ($3.6) n/a ($3.6) (32.3) (15.8)<br />
RT14 Keystone Service $13.8 $15.2 ($1.4) $0.3 ($1.7) n/a ($1.7) (4.1) (1.7)<br />
RT15 Empire Service $14.3 $20.9 ($6.6) $0.5 ($7.1) n/a ($7.1) (17.1) (5.8)<br />
RT20 Chicago-St.Louis $11.4 $11.5 ($0.1) $0.4 ($0.4) n/a ($0.4) (1.2) (0.5)<br />
RT21 Hiawathas $7.7 $7.5 $0.2 $0.3 ($0.1) n/a ($0.1) (0.4) (0.1)<br />
RT22 Wolverines $6.8 $11.5 ($4.8) $0.4 ($5.1) n/a ($5.1) (15.4) (7.0)<br />
RT23 Illini $5.7 $6.3 ($0.6) $0.2 ($0.8) n/a ($0.8) (3.8) (1.4)<br />
RT24 Illinois Zephyr $5.1 $5.8 ($0.7) $0.2 ($0.9) n/a ($0.9) (6.9) (2.4)<br />
RT29 Heartland Flyer $1.4 $2.7 ($1.3) $0.1 ($1.4) n/a ($1.4) (31.2) (12.0)<br />
RT35 Pacific Surfliner $30.0 $34.2 ($4.2) $1.0 ($5.3) n/a ($5.3) (7.2) (2.1)<br />
RT36 Cascades $23.6 $22.7 $0.8 $0.7 $0.1 n/a $0.1 0.4 0.2<br />
RT37 Capitols $19.2 $22.4 ($3.2) $0.6 ($3.9) n/a ($3.9) (10.4) (3.0)<br />
RT39 San Joaquins $26.2 $30.2 ($4.0) $0.7 ($4.7) n/a ($4.7) (8.4) (3.3)<br />
RT40 Adirondack $2.3 $4.2 ($1.9) $0.1 ($2.0) n/a ($2.0) (16.8) (13.3)<br />
RT41 Blue Water $2.1 $4.3 ($2.2) $0.1 ($2.3) n/a ($2.3) (20.4) (8.2)<br />
RT46 Washington-Lynchburg $4.1 $2.7 $1.5 $0.1 $1.4 n/a $1.4 10.1 6.7<br />
RT47 Washington-Newport News $11.7 $10.1 $1.6 $0.3 $1.3 n/a $1.3 3.3 1.9<br />
RT50 Washington - Norfolk $1.3 $1.0 $0.3 $0.0 $0.2 n/a $0.2 4.7 1.9<br />
RT54 Hoosier State $0.3 $3.3 ($3.0) $0.0 ($3.0) n/a ($3.0) (157.2) (73.2)<br />
RT56 Kansas City-St.Louis $4.7 $4.8 ($0.1) $0.1 ($0.3) n/a ($0.3) (2.3) (1.1)<br />
RT57 Pennsylvanian $3.7 $5.2 ($1.4) $0.1 ($1.6) n/a ($1.6) (9.6) (5.7)<br />
RT65 Pere Marquette $1.1 $1.9 ($0.8) $0.1 ($0.8) n/a ($0.8) (15.9) (8.6)<br />
RT66 Carolinian $6 $6.8 8 $6 $6.8 8 $0 $0.1 1 $0 $0.2 2 ($0 ($0.1) 1) n/a ($0 ($0.1) 1) (0 (0.5) 5) (0 (0.4) 4)<br />
RT67 Piedmont $2.3 $2.5 ($0.3) $0.1 ($0.4) n/a ($0.4) (5.5) (2.5)<br />
RT96 Non NEC Special Trains $0.9 $0.9 ($0.1) $0.0 ($0.1) n/a ($0.1) (4.0) (2.2)<br />
Total $227.9 $266.4 ($38.5) $7.3 ($45.8) n/a ($45.8) (7.1) (2.9)<br />
Long Distance Trains<br />
Route<br />
Number Train Name<br />
Capital<br />
Capital<br />
Charge*<br />
Fully<br />
Allocated<br />
Contribution /<br />
Fully<br />
Allocated<br />
Contribution /<br />
(Loss)<br />
RT16 Silver Star $12.6 $27.2 ($14.6) $0.8 ($15.4) n/a ($15.4) (22.6) (13.8)<br />
RT18 Cardinal $2.7 $8.0 ($5.3) $0.2 ($5.5) n/a ($5.5) (38.6) (22.2)<br />
RT19 Silver Meteor $13.6 $26.4 ($12.8) $0.7 ($13.5) n/a ($13.5) (19.4) (11.9)<br />
RT25 Empire Builder $20.3 $38.0 ($17.7) $1.2 ($18.8) n/a ($18.8) (16.6) (8.6)<br />
RT26 Capitol Limited $7.1 $14.3 ($7.2) $0.4 ($7.6) n/a ($7.6) (22.2) (14.5)<br />
RT27 California Zephyr $16.0 $36.3 ($20.3) $1.1 ($21.4) n/a ($21.4) (24.1) (13.5)<br />
RT28 Southwest Chief $14.9 $36.6 ($21.7) $1.1 ($22.8) n/a ($22.8) (23.7) (14.4)<br />
RT30 City of New Orleans $7.3 $14.3 ($7.0) $0.4 ($7.4) n/a ($7.4) (19.8) (12.4)<br />
RT32 Texas Eagle $9.3 $17.1 ($7.8) $0.6 ($8.3) n/a ($8.3) (13.5) (9.9)<br />
RT33 Sunset Limited $4.3 $17.2 ($12.9) $0.5 ($13.4) n/a ($13.4) (49.6) (24.2)<br />
RT34 Coast Starlight $14.7 $31.6 ($16.9) $0.9 ($17.9) n/a ($17.9) (24.4) (15.1)<br />
RT45 Lake Shore Limited $11.0 $22.6 ($11.6) $0.6 ($12.2) n/a ($12.2) (20.1) (11.3)<br />
RT48 Palmetto $6.1 $11.0 ($4.9) $0.3 ($5.2) n/a ($5.2) (18.6) (8.0)<br />
RT52 Crescent $10.6 $31.2 ($20.6) $0.9 ($21.5) n/a ($21.5) (46.2) (22.1)<br />
RT63 Auto Train $24.8 $45.9 ($21.1) $1.4 ($22.5) n/a ($22.5) (30.9) (20.7)<br />
Total $175.3 $377.7 ($202.4) $11.0 ($213.4) n/a ($213.4) (23.9) (13.9)<br />
Total National Train System<br />
Total<br />
Revenue<br />
* Under Development - will be included once it is completed.<br />
Total Costs excl.<br />
OPEB's, Capital<br />
Charge and Other<br />
Costs<br />
Core<br />
Contribution /<br />
(Loss) excl.<br />
OPEB's OPEB's<br />
Reconciling Items between National Train System and Consolidated Statement of Operations<br />
Revenue Expense Net<br />
Total National Train System $768.2 $900.9 ($132.7)<br />
Ancillary Customers $115.6 $118.9 ($3.3)<br />
Freight and Other Customers $52.4 $117.8 ($65.4)<br />
Depreciation, net $0.0 $224.6 ($224.6)<br />
Operating Results $936.2 $1,362.2 ($426.0)<br />
Interest Expense, net $0.0 $1.1 ($1.1)<br />
State Capital Payments $13.2 $0.0 $13.2<br />
Net Results $949.4 $1,363.3 ($413.9)<br />
Contribution /<br />
(Loss) before<br />
Capital Charge<br />
Capital<br />
Charge*<br />
Fully<br />
Allocated<br />
Contribution /<br />
(Loss)<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Pass<br />
Mile (cents)<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Seat<br />
Mile (cents)<br />
$768.2 $876.5 ($108.3) $24.4 ($132.7) n/a ($132.7) (6.2) (3.1)<br />
C - 1<br />
Notes:<br />
- This report is being produced using the <strong>Amtrak</strong> <strong>Performance</strong> Tracking (SAM_APT) system, which<br />
drives costs to all customers, including freight and commuter railroads. This report reflects the<br />
information as it existed in SAP at the time it was produced. Future changes to SAP data may affect<br />
the placement of data within this report. Project (PRJ) related costs are excluded from this fully<br />
allocated report because they are paid for with Capital funding.<br />
- <strong>Amtrak</strong> does not report depreciation on a route level due to the distortion caused by the sale and<br />
leaseback transactions of the late 1990’s and early 2000’s. Allocating depreciation and interest would<br />
unfairly burden routes whose equipment was sold and then leased back. Those transactions caused<br />
the value of those assets to increase and therefore their depreciation to increase, which is unrelated<br />
to the actual capital cost of that equipment. A synthetic capital charge is under development and will<br />
be allocated to routes and included in this report when available.
National Railroad Passenger Corporation (<strong>Amtrak</strong>)<br />
Financial <strong>Performance</strong> of Routes - Fully allocated overhead, excluding Depreciation and Interest (see notes below)<br />
<strong>January</strong> 2012 YTD<br />
Route <strong>Performance</strong> Results Exclude Depreciation and Interest.<br />
All numbers are in $ millions except Passenger Mile and Seat Mile Calculations.<br />
Northeast Corridor Trains<br />
Route<br />
Number Train Name<br />
Revenue Costs<br />
OPEB's OPEB's Capital Charge Charge* (Loss) Mile (cents) Mile (cents)<br />
RT01 Acela $169.7 $97.6 $72.1 $2.3 $69.8 n/a $69.8 33.4 20.5<br />
RT05 Northeast Regional $177.7 $152.8 $24.8 $2.9 $21.9 n/a $21.9 5.5 2.5<br />
RT99 NEC Special Trains $1.2 $0.6 $0.6 $0.0 $0.6 n/a $0.6 61.9 11.6<br />
Total $348.6 $251.0 $97.5 $5.2 $92.3 n/a $92.3 15.2 7.6<br />
State Supported and Other<br />
Short Distance Corridor Trains<br />
Route<br />
Number Train Name<br />
Total<br />
Total<br />
Revenue<br />
Total Costs excl.<br />
OPEB's, Capital<br />
Charge and Other<br />
Total Costs excl.<br />
OPEB's, Capital<br />
Charge and Other<br />
Costs<br />
Core<br />
Contribution /<br />
(Loss) excl.<br />
Core<br />
Contribution /<br />
(Loss) excl.<br />
OPEB's OPEB's<br />
Contribution /<br />
(Loss) before<br />
Contribution /<br />
(Loss) before<br />
Capital Charge<br />
Fully<br />
Allocated<br />
Contribution /<br />
RT03 Ethan Allen Express $1.6 $1.8 ($0.2) $0.0 ($0.2) n/a ($0.2) (7.6) (2.9)<br />
RT04 Vermonter $2.5 $3.5 ($1.0) $0.1 ($1.0) n/a ($1.0) (13.6) (5.6)<br />
RT07 Maple Leaf $8.4 $9.7 ($1.3) $0.2 ($1.5) n/a ($1.5) (3.9) (1.9)<br />
RT09 The Downeaster $3.3 $4.7 ($1.4) $0.1 ($1.5) n/a ($1.5) (11.7) (3.9)<br />
RT12 New Haven - Springfield $4.0 $7.8 ($3.8) $0.2 ($4.0) n/a ($4.0) (36.1) (16.9)<br />
RT14 Keystone Service $14.1 $15.7 ($1.6) $0.3 ($1.9) n/a ($1.9) (4.6) (1.9)<br />
RT15 Empire Service $14.8 $24.6 ($9.7) $0.5 ($10.2) n/a ($10.2) (23.9) (7.8)<br />
RT20 Chicago-St.Louis $9.2 $13.6 ($4.4) $0.3 ($4.7) n/a ($4.7) (12.6) (5.4)<br />
RT21 Hiawathas $7.9 $8.4 ($0.5) $0.2 ($0.7) n/a ($0.7) (3.2) (1.2)<br />
RT22 Wolverines $6.0 $11.8 ($5.8) $0.3 ($6.1) n/a ($6.1) (19.5) (8.8)<br />
RT23 Illini $5.4 $6.9 ($1.5) $0.2 ($1.7) n/a ($1.7) (8.4) (3.5)<br />
RT24 Illinois Zephyr $5.3 $5.3 ($0.0) $0.1 ($0.1) n/a ($0.1) (1.1) (0.4)<br />
RT29 Heartland Flyer $1.9 $3.1 ($1.2) $0.1 ($1.3) n/a ($1.3) (27.4) (11.5)<br />
RT35 Pacific Surfliner $23.3 $37.3 ($14.0) $0.8 ($14.8) n/a ($14.8) (22.7) (6.3)<br />
RT36 Cascades $17.4 $21.6 ($4.2) $0.5 ($4.7) n/a ($4.7) (11.8) (5.6)<br />
RT37 Capitols $20.2 $24.1 ($3.9) $0.6 ($4.5) n/a ($4.5) (12.1) (3.4)<br />
RT39 San Joaquins $18.4 $28.3 ($9.9) $0.5 ($10.5) n/a ($10.5) (20.1) (7.4)<br />
RT40 Adirondack $3.9 $4.1 ($0.2) $0.1 ($0.3) n/a ($0.3) (2.6) (1.9)<br />
RT41 Blue Water $2.0 $4.6 ($2.6) $0.1 ($2.7) n/a ($2.7) (22.5) (9.1)<br />
RT46 Washington-Lynchburg $4.0 $2.4 $1.6 $0.1 $1.5 n/a $1.5 10.5 7.2<br />
RT47 Washington-Newport News $11.0 $10.6 $0.4 $0.2 $0.1 n/a $0.1 0.4 0.2<br />
RT50 Washington - Norfolk $0.0 $0.0 $0.0 $0.0 $0.0 n/a $0.0 --- ---<br />
RT54 Hoosier State $0.3 $1.7 ($1.4) $0.0 ($1.5) n/a ($1.5) (80.4) (35.0)<br />
RT56 Kansas City-St.Louis $4.6 $4.8 ($0.2) $0.1 ($0.3) n/a ($0.3) (2.6) (1.2)<br />
RT57 Pennsylvanian $3.4 $5.0 ($1.6) $0.1 ($1.7) n/a ($1.7) (10.8) (6.3)<br />
RT65 Pere Marquette $1.1 $2.1 ($1.0) $0.0 ($1.0) n/a ($1.0) (19.2) (10.6)<br />
RT66 Carolinian $7 $7.2 2 $7 $7.2 2 ($0 ($0.1) 1) $0 $0.2 2 ($0 ($0.2) 2) n/a ($0 ($0.2) 2) (0 (0.7) 7) (0 (0.5) 5)<br />
RT67 Piedmont $2.1 $2.5 ($0.5) $0.1 ($0.6) n/a ($0.6) (9.3) (4.4)<br />
RT96 Non NEC Special Trains $1.0 $0.7 $0.3 $0.0 $0.3 n/a $0.3 8.4 10.7<br />
Total $204.3 $273.9 ($69.7) $6.0 ($75.6) n/a ($75.6) (12.0) (4.9)<br />
Long Distance Trains<br />
Route<br />
Number Train Name<br />
Capital<br />
Capital<br />
Charge*<br />
Fully<br />
Allocated<br />
Contribution /<br />
(Loss)<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Pass<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Pass<br />
Mile (cents)<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Seat<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Seat<br />
Mile (cents)<br />
RT16 Silver Star $12.7 $26.1 ($13.4) $0.6 ($14.0) n/a ($14.0) (19.6) (12.1)<br />
RT18 Cardinal $2.6 $8.3 ($5.7) $0.2 ($5.9) n/a ($5.9) (41.3) (21.4)<br />
RT19 Silver Meteor $13.6 $24.2 ($10.7) $0.6 ($11.2) n/a ($11.2) (15.4) (9.4)<br />
RT25 Empire Builder $19.3 $38.0 ($18.7) $0.9 ($19.7) n/a ($19.7) (17.8) (9.1)<br />
RT26 Capitol Limited $6.6 $14.8 ($8.2) $0.3 ($8.5) n/a ($8.5) (25.2) (15.6)<br />
RT27 California Zephyr $14.7 $36.0 ($21.3) $0.9 ($22.2) n/a ($22.2) (25.5) (13.1)<br />
RT28 Southwest Chief $14.3 $35.3 ($21.0) $0.8 ($21.8) n/a ($21.8) (22.4) (13.2)<br />
RT30 City of New Orleans $6.7 $12.9 ($6.3) $0.3 ($6.5) n/a ($6.5) (17.8) (11.1)<br />
RT32 Texas Eagle $8.3 $19.5 ($11.2) $0.5 ($11.6) n/a ($11.6) (21.7) (14.2)<br />
RT33 Sunset Limited $4.0 $16.9 ($12.9) $0.4 ($13.3) n/a ($13.3) (51.2) (23.9)<br />
RT34 Coast Starlight $13.2 $31.2 ($17.9) $0.7 ($18.6) n/a ($18.6) (29.0) (15.7)<br />
RT45 Lake Shore Limited $10.6 $23.6 ($13.0) $0.5 ($13.6) n/a ($13.6) (22.1) (12.3)<br />
RT48 Palmetto $5.8 $9.8 ($4.0) $0.2 ($4.3) n/a ($4.3) (15.4) (6.5)<br />
RT52 Crescent $11.2 $23.3 ($12.1) $0.5 ($12.6) n/a ($12.6) (23.9) (12.4)<br />
RT63 Auto Train $24.3 $35.7 ($11.4) $0.9 ($12.3) n/a ($12.3) (17.5) (11.0)<br />
Total $167.9 $355.7 ($187.8) $8.2 ($196.0) n/a ($196.0) (22.3) (12.5)<br />
Total National Train System<br />
Total<br />
Revenue<br />
* Under Development - will be included once it is completed.<br />
Total Costs excl.<br />
OPEB's, Capital<br />
Charge and Other<br />
Costs<br />
Core<br />
Contribution /<br />
(Loss) excl.<br />
OPEB's OPEB's<br />
Reconciling Items between National Train System and Consolidated Statement of Operations<br />
Revenue Expense Net<br />
Total National Train System $720.7 $900.1 ($179.4)<br />
Ancillary Customers $169.7 $96.5 $73.2<br />
Freight and Other Customers $27.7 $99.2 ($71.5)<br />
Depreciation, net $0.0 $218.8 ($218.8)<br />
Operating Results $918.1 $1,314.5 ($396.4)<br />
Interest Expense, net $0.0 $29.0 ($29.0)<br />
State Capital Payments $10.0 $0.0 $10.0<br />
Net Results $928.2 $1,343.6 ($415.4)<br />
Contribution /<br />
(Loss) before<br />
Capital Charge<br />
Capital<br />
Charge*<br />
Fully<br />
Allocated<br />
Contribution /<br />
(Loss)<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Pass<br />
Mile (cents)<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Seat<br />
Mile (cents)<br />
$720.7 $880.6 ($159.9) $19.5 ($179.4) n/a ($179.4) (8.5) (4.1)<br />
C - 2<br />
Notes:<br />
- This report is being produced using the <strong>Amtrak</strong> <strong>Performance</strong> Tracking (SAM_APT) system, which<br />
drives costs to all customers, including freight and commuter railroads. This report reflects the<br />
information as it existed in SAP at the time it was produced. Future changes to SAP data may affect<br />
the placement of data within this report. Project (PRJ) related costs are excluded from this fully<br />
allocated report because they are paid for with Capital funding.<br />
- <strong>Amtrak</strong> does not report depreciation on a route level due to the distortion caused by the sale and<br />
leaseback transactions of the late 1990’s and early 2000’s. Allocating depreciation and interest would<br />
unfairly burden routes whose equipment was sold and then leased back. Those transactions caused<br />
the value of those assets to increase and therefore their depreciation to increase, which is unrelated to<br />
the actual capital cost of that equipment. A synthetic capital charge is under development and will be<br />
allocated to routes and included in this report when available.
National Railroad Passenger Corporation (<strong>Amtrak</strong>)<br />
Financial <strong>Performance</strong> of Routes - Fully allocated overhead, excluding Depreciation and Interest<br />
<strong>January</strong> <strong>2013</strong> YTD vs. <strong>January</strong> 2012 YTD Variances<br />
Route <strong>Performance</strong> Results Exclude Federal Support for Operations, Depreciation, Interest and Capital Charges<br />
All numbers are in $ millions except Passenger Mile and Seat Mile Calculations.<br />
Northeast Corridor Trains<br />
Route<br />
Number Train Name<br />
Revenue Costs<br />
OPEB's OPEB's Capital Charge Charge* (Loss) Mile (cents) Mile (cents)<br />
RT01 Acela $2.5 $7.5 $10.0 ($0.4) $9.5 n/a $9.5 6.2 3.9<br />
RT05 Northeast Regional $12.1 $11.4 $23.5 ($0.4) $23.1 n/a $23.1 5.9 2.9<br />
RT99 NEC Special Trains $1.9 ($0.4) $1.5 ($0.0) $1.5 n/a $1.5 120.9 10.1<br />
Total $16.5 $18.6 $35.0 ($0.9) $34.2 n/a $34.2 6.1 3.2<br />
State Supported and Other<br />
Short Distance Corridor Trains<br />
Route<br />
Number Train Name<br />
Total<br />
Total Costs excl.<br />
OPEB's, Capital<br />
Charge and Other<br />
Core<br />
Contribution /<br />
(Loss) excl.<br />
Total Costs excl. Core<br />
OPEB's, Capital Contribution /<br />
Total Charge and Other (Loss) excl.<br />
Revenue Costs<br />
OPEB's OPEB's<br />
Contribution /<br />
(Loss) before<br />
Contribution /<br />
(Loss) before<br />
Capital Charge<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Pass<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Pass<br />
Mile (cents)<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Seat<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Seat<br />
Mile (cents)<br />
RT03 Ethan Allen Express ($0.0) $0.2 $0.2 ($0.0) $0.2 n/a $0.2 5.3 2.0<br />
RT04 Vermonter $0.1 ($0.1) $0.1 ($0.0) $0.0 n/a $0.0 1.2 0.2<br />
RT07 Maple Leaf ($0.2) ($0.1) ($0.3) ($0.0) ($0.4) n/a ($0.4) (1.1) (0.6)<br />
RT09 The Downeaster $1.4 ($0.4) $1.0 ($0.0) $0.9 n/a $0.9 7.7 2.6<br />
RT12 New Haven - Springfield $0.2 $0.2 $0.4 ($0.0) $0.4 n/a $0.4 3.8 1.2<br />
RT14 Keystone Service ($0.3) $0.5 $0.2 ($0.0) $0.2 n/a $0.2 0.5 0.1<br />
RT15 Empire Service ($0.6) $3.7 $3.1 ($0.0) $3.1 n/a $3.1 6.8 2.0<br />
RT20 Chicago-St.Louis $2.2 $2.1 $4.3 ($0.1) $4.3 n/a $4.3 11.4 4.9<br />
RT21 Hiawathas ($0.2) $0.8 $0.7 ($0.1) $0.6 n/a $0.6 2.7 1.0<br />
RT22 Wolverines $0.8 $0.3 $1.0 ($0.1) $0.9 n/a $0.9 4.1 1.8<br />
RT23 Illini $0.3 $0.6 $0.9 ($0.0) $0.9 n/a $0.9 4.6 2.1<br />
RT24 Illinois Zephyr ($0.2) ($0.5) ($0.7) ($0.1) ($0.7) n/a ($0.7) (5.8) (2.0)<br />
RT29 Heartland Flyer ($0.5) $0.5 ($0.1) ($0.0) ($0.1) n/a ($0.1) (3.8) (0.5)<br />
RT35 Pacific Surfliner $6.6 $3.1 $9.7 ($0.2) $9.5 n/a $9.5 15.5 4.2<br />
RT36 Cascades $6.1 ($1.1) $5.0 ($0.2) $4.8 n/a $4.8 12.2 5.8<br />
RT37 Capitols ($1.0) $1.7 $0.7 ($0.1) $0.6 n/a $0.6 1.7 0.4<br />
RT39 San Joaquins $7.8 ($1.9) $6.0 ($0.2) $5.8 n/a $5.8 11.7 4.2<br />
RT40 Adirondack ($1.6) ($0.1) ($1.6) ($0.0) ($1.7) n/a ($1.7) (14.2) (11.4)<br />
RT41 Blue Water $0.1 $0.3 $0.4 ($0.0) $0.4 n/a $0.4 2.2 0.9<br />
RT46 Washington-Lynchburg $0.1 ($0.2) ($0.1) ($0.0) ($0.1) n/a ($0.1) (0.4) (0.4)<br />
RT47 Washington-Newport News $0.7 $0.4 $1.2 ($0.0) $1.1 n/a $1.1 3.0 1.8<br />
RT50 Washington - Norfolk $1.3 ($1.0) $0.3 ($0.0) $0.2 n/a $0.2 --- ---<br />
RT54 Hoosier State $0.0 ($1.6) ($1.5) ($0.0) ($1.5) n/a ($1.5) (76.7) (38.1)<br />
RT56 Kansas City-St.Louis $0.1 ($0.0) $0.1 ($0.0) $0.0 n/a $0.0 0.4 0.1<br />
RT57 Pennsylvanian $0.4 ($0.2) $0.2 ($0.0) $0.2 n/a $0.2 1.2 0.6<br />
RT65 Pere Marquette ($0.0) $0.2 $0.2 ($0.0) $0.2 n/a $0.2 3.3 2.0<br />
RT66 Carolinian ($0 ($0.3) 3) $0 $0.4 4 $0 $0.1 1 ($0 ($0.0) 0) $0 $0.1 1 n/a $0 $0.1 1 02 0.2 02 0.2<br />
RT67 Piedmont $0.2 $0.0 $0.2 ($0.0) $0.2 n/a $0.2 3.7 1.9<br />
RT96 Non NEC Special Trains ($0.1) ($0.2) ($0.3) ($0.0) ($0.4) n/a ($0.4) (12.4) (13.0)<br />
Total $23.6 $7.6 $31.2 ($1.3) $29.9 n/a $29.9 4.9 1.9<br />
Long Distance Trains<br />
Route<br />
Number Train Name<br />
Capital<br />
Capital<br />
Charge*<br />
Fully<br />
Allocated<br />
Contribution /<br />
Fully<br />
Allocated<br />
Contribution /<br />
(Loss)<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Pass<br />
Mile (cents)<br />
Fully Allocated<br />
Contribution /<br />
(Loss) per Seat<br />
Mile (cents)<br />
RT16 Silver Star ($0.1) ($1.2) ($1.2) ($0.2) ($1.4) n/a ($1.4) (3.0) (1.7)<br />
RT18 Cardinal $0.2 $0.3 $0.5 ($0.0) $0.4 n/a $0.4 2.7 (0.8)<br />
RT19 Silver Meteor $0.0 ($2.2) ($2.2) ($0.2) ($2.3) n/a ($2.3) (4.0) (2.4)<br />
RT25 Empire Builder $1.1 ($0.0) $1.0 ($0.2) $0.8 n/a $0.8 1.2 0.5<br />
RT26 Capitol Limited $0.5 $0.5 $1.0 ($0.1) $0.9 n/a $0.9 3.0 1.1<br />
RT27 California Zephyr $1.3 ($0.2) $1.0 ($0.2) $0.8 n/a $0.8 1.4 (0.4)<br />
RT28 Southwest Chief $0.5 ($1.3) ($0.8) ($0.3) ($1.0) n/a ($1.0) (1.3) (1.2)<br />
RT30 City of New Orleans $0.6 ($1.4) ($0.7) ($0.1) ($0.9) n/a ($0.9) (2.1) (1.4)<br />
RT32 Texas Eagle $1.0 $2.4 $3.4 ($0.1) $3.3 n/a $3.3 8.1 4.3<br />
RT33 Sunset Limited $0.3 ($0.2) $0.0 ($0.1) ($0.1) n/a ($0.1) 1.6 (0.3)<br />
RT34 Coast Starlight $1.4 ($0.4) $1.0 ($0.2) $0.8 n/a $0.8 4.5 0.6<br />
RT45 Lake Shore Limited $0.4 $1.0 $1.4 ($0.1) $1.3 n/a $1.3 2.1 1.0<br />
RT48 Palmetto $0.3 ($1.2) ($0.8) ($0.1) ($0.9) n/a ($0.9) (3.1) (1.5)<br />
RT52 Crescent ($0.6) ($7.9) ($8.5) ($0.4) ($8.9) n/a ($8.9) (22.3) (9.6)<br />
RT63 Auto Train $0.5 ($10.2) ($9.6) ($0.6) ($10.2) n/a ($10.2) (13.5) (9.7)<br />
Total $7.4 ($22.0) ($14.6) ($2.8) ($17.4) n/a ($17.4) (1.6) (1.4)<br />
Total National Train System<br />
Total<br />
Revenue<br />
Total Costs excl.<br />
OPEB's, Capital<br />
Charge and Other<br />
Costs<br />
Core<br />
Contribution /<br />
(Loss) excl.<br />
OPEB's OPEB's<br />
Contribution /<br />
(Loss) before<br />
Capital Charge<br />
Capital<br />
Charge*<br />
Fully<br />
Allocated<br />
Contribution /<br />
(Loss)<br />
$47.5 $4.1 $51.6 ($4.9) $46.7 n/a $46.7 2.2 1.0<br />
C - 3
ORKFORCE TATISTICS
Departments<br />
National Railroad Passenger Corporation<br />
Headcount Summary<br />
<strong>January</strong> <strong>2013</strong><br />
Core<br />
Non-Core<br />
Capital<br />
Totals<br />
Variance Variance Variance Variance<br />
Actual Budget Fav (UnFav) Actual Budget Fav (UnFav) Actual Budget Fav (UnFav) Actual Budget Fav (UnFav)<br />
President's Office 5 5 0 0 0 0 0 0 0 5 5 0<br />
Office of Inspector General 93 93 0 0 0 0 0 0 0 93 93 0<br />
General Counsel 143 159 16 0 0 0 0 0 0 143 159 16<br />
Finance 250 271 21 0 5 5 0 0 0 250 276 26<br />
Procurement 473 495 22 7 0 (7) 0 0 0 480 495 15<br />
Real Estate 8 0 (8) 24 32 8 0 0 0 32 32 0<br />
<strong>Amtrak</strong> Technologies 229 245 16 0 0 0 17 15 (2) 246 260 14<br />
Government Affairs 49 56 7 0 0 0 0 0 0 49 56 7<br />
NEC IID 26 38 12 0 0 0 0 0 0 26 38 12<br />
Human Capital 197 217 20 0 0 0 0 0 0 197 217 20<br />
Marketing & Sales 1,238 1,342 104 0 0 0 0 0 0 1,238 1,342 104<br />
Police & Security 465 520 55 4 0 (4) 3 0 (3) 472 520 48<br />
Emergency Management & Corporate Security 38 36 (2) 0 0 0 0 0 0 38 36 (2)<br />
Corporate Research & Strategy<br />
Operating Departments<br />
5 5 0 0 0 0 0 0 0 5 5 0<br />
Chief Transportation Officer 68 49 (20) 0 0 0 0 0 0 68 49 (20)<br />
Operations Management 7 2 (5) 0 0 0 0 0 0 7 2 (5)<br />
Operations Research Planning 3 3 0 0 0 0 0 0 0 3 3 0<br />
Chief Safety Officer 21 25 4 0 0 0 0 0 0 21 25 4<br />
Chief of Customer Service 42 46 4 0 0 0 0 0 0 42 46 4<br />
Transportation 8,032 8,110 78 397 371 (26) 13 0 (13) 8,442 8,481 39<br />
Mechanical 4,097 3,990 (107) 130 121 (9) 340 549 209 4,567 4,660 93<br />
Engineering 2,363 1,915 (448) 7 0 (7) 668 1,394 726 3,038 3,309 271<br />
Engineering Reimbursable 0 0 0 475 398 (77) 0 0 0 475 398 (77)<br />
Sub-Total Operating Departments 14,633 14,140 (493) 1,009 889 (120) 1,021 1,943 922 16,663 16,972 309<br />
Total Headcounts 17,852 17,622 (230) 1,044 926 (118) 1,041 1,958 917 19,937 20,506 569<br />
Note: The Policy and Development department was reorgnanized in FY12 in alignment with the Strategic plan. Budgeted heads for that department have been placed under NEC IID.<br />
D - 1
Headcount - Department Input Detail<br />
<strong>January</strong> <strong>2013</strong><br />
Total Core incl PRJ Commuter Reimbursable Commercial Total Non-Core Capital<br />
Variance Variance Variance Variance Variance Variance<br />
Actual Budget Fav/ (UnFav) Actual Budget Fav/ (UnFav) Actual Budget Fav/ (UnFav) Actual Budget Fav/ (UnFav) Actual Budget Fav/ (UnFav) Actual Budget Fav/ (UnFav)<br />
President's Office 5 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Office of Inspector General 93 93 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
General Counsel<br />
General Counsel 143 159 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Sub-Total General Counsel 143 159 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Finance<br />
Finance 250 271 21 0 0 0 0 5 5 0 0 0 0 5 5 0 0 0<br />
Corporate Common 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Sub-Total Finance 250 271 21 0 0 0 0 5 5 0 0 0 0 5 5 0 0 0<br />
Procurement 473 495 22 6 0 (6) 1 0 (1) 0 0 0 7 0 (7) 0 0 0<br />
Real Estate 8 0 (8) 0 0 0 0 0 0 24 32 8 24 32 8 0 0 0<br />
<strong>Amtrak</strong> Technologies 229 245 16 0 0 0 0 0 0 0 0 0 0 0 0 17 15 (2)<br />
Government Affairs 49 56 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
High Speed Rail 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
NEC IID 26 38 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Human Capital 197 217 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Marketing & Sales<br />
Marketing And Sales 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Pricing 21 23 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Sales Distribution and Customer Service 1,166 1,256 90 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Chief Market Research & Analysis 5 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Chief Mktg & Sales Promotion 42 51 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
VP Marketing & Product Mgmt 3 6 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Chief, Prod Plan & Bus Strategy 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Sub-Total Marketing 1,238 1,342 104 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Police & Security 465 520 55 0 0 0 4 0 (4) 0 0 0 4 0 (4) 3 0 (3)<br />
Emergency Management & Corporate Security 38 36 (2) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Corporate Research & Strategy 5 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Operating Departments<br />
Chief Transportation Officer 68 49 (20) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Operations Management 7 2 (5) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Operations Research Planning 3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Chief Safety Officer 21 25 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Chief of Customer Service 42 46 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />
Transportation 8,032 8,110 78 379 208 (171) 18 163 145 0 0 0 397 371 (26) 13 0 (13)<br />
Mechanical 4,097 3,990 (107) 50 0 (50) 79 120 41 1 1 0 130 121 (9) 340 549 209<br />
Engineering<br />
Engineering 2,363 1,915 (448) 4 0 (4) 0 0 0 3 0 (3) 7 0 (7) 668 1,394 726<br />
Engineering - Reimbursable 0 0 0 0 0 0 475 398 (77) 0 0 0 475 398 (77) 0 0 0<br />
Sub-Total Engineering 2,363 1,915 (448) 4 0 (4) 475 398 (77) 3 0 (3) 482 398 (84) 668 1,394 726<br />
Sub-Total Operating Departments 14,633 14,140 (493) 433 208 (225) 572 681 109 4 1 (3) 1,009 889 (120) 1,021 1,943 922<br />
Total Headcounts 17,852 17,622 (230) 439 208 (231) 577 686 109 28 33 5 1,044 926 (118) 1,041 1,958 917<br />
D - 2
Premium Based Benefits 1<br />
Non-Agreement 9,885<br />
Agreement 25,530<br />
Total Premium Based Benefits 35,415<br />
Federal Employers Liability Act (FELA)<br />
Non-Agreement 2<br />
14<br />
Agreement 2<br />
2,704<br />
Total FELA Cost 2,717<br />
Month Variance to YTD Variance to<br />
Actual Budget Last Year Actual Budget Last Year<br />
(2,023)<br />
2,293<br />
270<br />
3<br />
530<br />
533<br />
941<br />
2,706<br />
3,647<br />
3<br />
561<br />
564<br />
39,774<br />
112,144<br />
151,918<br />
61<br />
12,238<br />
12,299<br />
(9,337)<br />
(6,687)<br />
(16,024)<br />
4<br />
697<br />
701<br />
(10,045)<br />
(16,413)<br />
(26,458)<br />
Average per Employee<br />
Non-Agreement 3,489 (837) 319 14,096 (3,760) (3,888)<br />
Agreement 1,735 56 171 7,654 (823) (1,055)<br />
Weighted Avg per Employee 1,996 (78) 190 8,609 (1,267) (1,466)<br />
Payroll Based Benefits 3<br />
23,758<br />
592<br />
3,338<br />
82,223<br />
Percentage of Payroll 19% 1% 4% 17% 0% 0%<br />
Other Employee Benefits 4<br />
National Railroad Passenger Corporation (<strong>Amtrak</strong>)<br />
Employee Benefits Summary Analysis - <strong>January</strong> <strong>2013</strong><br />
(Including Employees Assigned to Capital)<br />
(525)<br />
Total Employee Benefits 61,365<br />
($ thousands - except calculations)<br />
(49)<br />
1,345<br />
3,339<br />
10,889<br />
(12,061)<br />
234,379<br />
2,342<br />
7,700<br />
(5,281)<br />
1<br />
Includes health, dental and life insurance, miscellaneous employee insurance, service fees and OPEB's.<br />
OPEB's represent the accrued expense for the future liability of health care for pensioned employees.<br />
2<br />
Estimated split between Agreement and Non-agreement employees.<br />
3<br />
Includes Railroad retirement and unemployment and sickness taxes.<br />
4<br />
Includes Pension and fees, vacation accrual and miscellaneous employee services.<br />
D - 3<br />
4<br />
732<br />
736<br />
1,957<br />
8,677<br />
(15,089)
ERFORMANCE NDICATORS
Total Minutes<br />
% of<br />
Total Subtotal Passenger Holds Engine Failures<br />
National Railroad Passenger Corporation<br />
Delay Minutes <strong>Performance</strong> <strong>Report</strong> - Summary<br />
for the Month of <strong>January</strong>, <strong>2013</strong><br />
<strong>Amtrak</strong> Delays<br />
Host Railroads Delays<br />
Top Three Delay Codes Top Three Delay Codes<br />
All Crew related<br />
delays, delays in<br />
block All Else Subtotal<br />
Freight Train<br />
Interference Slow Orders<br />
Passenger Train<br />
Interference All else<br />
Other Minutes<br />
of Delay<br />
Northeast Corridor<br />
Acela 9,835 2.7% 3,250 436 948 57 1,809 5,109 13 294 582 4,220 1,476<br />
Northeast Regionals 29,560 8.1% 9,728 2,353 2,603 330 4,442 15,333 1,051 1,492 2,430 10,360 4,499<br />
Subtotal Northeast Corridor 39,395 10.8% 12,978 2,789 3,551 387 6,251 20,442 1,064 1,786 3,012 14,580 5,975<br />
Other Corridor Routes<br />
Vermonter 2,757 0.8% 1,174 90 187 86 811 1,331 75 449 236 571 252<br />
Downeaster 3,473 1.0% 427 36 42 0 349 2,994 363 898 476 1,257 52<br />
Clocker/Keystone 3,401 0.9% 1,246 343 453 104 346 1,635 0 0 291 1,344 520<br />
Empire 23,700 6.5% 3,665 1,131 591 878 1,065 16,458 3,608 3,356 1,623 7,871 3,577<br />
Hiawatha 5,276 1.4% 1,722 348 54 68 1,252 3,368 532 551 77 2,208 186<br />
Illinois Services 16,585 4.6% 2,450 615 394 225 1,216 12,159 3,803 1,254 3,176 3,926 1,976<br />
Michigan Services 19,072 5.2% 7,419 538 2,180 524 4,177 9,463 2,621 807 2,406 3,629 2,190<br />
Missouri Services 2,125 0.6% 211 74 6 16 115 981 224 62 277 418 933<br />
Heartland Flyer 2,068 0.6% 185 47 9 47 82 1,723 194 1,396 0 133 160<br />
Pacific Surfliner 19,208 5.3% 2,928 938 539 464 987 13,436 604 1,513 5,443 5,876 2,844<br />
Cascades 12,272 3.4% 1,758 222 85 246 1,205 9,196 2,456 2,091 1,383 3,266 1,318<br />
Capitols 10,741 2.9% 2,287 419 729 190 949 4,635 330 110 1,491 2,704 3,819<br />
San Joaquins 12,078 3.3% 1,725 365 175 228 957 8,389 2,446 715 3,685 1,543 1,964<br />
Hoosier State 1,104 0.3% 218 25 12 53 128 630 229 74 11 316 256<br />
Carolinian 5,320 1.5% 1,175 370 245 196 364 3,410 879 484 800 1,247 735<br />
Pennsylvanian 1,666 0.5% 470 129 151 6 184 1,006 346 23 29 608 190<br />
Piedmont 2,209 0.6% 606 220 19 29 338 970 196 428 137 209 633<br />
Subtotal Other Corridor 143,055 39.3% 29,666 5,910 5,871 3,360 14,525 91,784 18,906 14,211 21,541 37,126 21,605<br />
Long Distance<br />
Silver Star 13,883 3.8% 3,367 1,228 263 473 1,403 8,681 2,454 2,328 1,313 2,586 1,835<br />
Cardinal 4,823 1.3% 967 173 328 120 346 2,600 978 471 316 835 1,256<br />
Silver Meteor 14,277 3.9% 3,513 950 317 434 1,812 9,628 2,291 1,831 2,126 3,380 1,136<br />
Empire Builder 19,256 5.3% 4,203 1,314 857 272 1,760 11,978 5,374 3,142 758 2,704 3,075<br />
Capitol Ltd. 7,150 2.0% 1,256 375 186 177 518 4,239 1,557 477 203 2,002 1,655<br />
California Zephyr 20,927 5.7% 3,489 475 729 1,036 1,249 12,005 4,473 1,371 1,393 4,768 5,433<br />
Southwest Chief 11,441 3.1% 2,175 755 362 232 826 5,027 1,031 1,330 693 1,973 4,239<br />
City of New Orleans 9,288 2.6% 1,198 257 38 167 736 5,755 2,332 880 740 1,803 2,335<br />
Texas Eagle 18,456 5.1% 3,120 1,283 379 419 1,039 11,957 4,228 2,686 1,216 3,827 3,379<br />
Sunset Ltd. 10,354 2.8% 2,018 547 429 188 854 5,419 2,310 1,309 236 1,564 2,917<br />
Coast Starlight 15,661 4.3% 3,623 1,013 795 452 1,363 8,900 1,732 1,297 2,585 3,286 3,138<br />
Lake Shore Ltd. 12,626 3.5% 3,369 1,471 415 376 1,107 8,216 2,479 682 697 4,358 1,041<br />
Palmetto 5,892 1.6% 778 222 86 151 319 4,155 1,585 485 818 1,267 959<br />
Crescent 7,813 2.1% 1,449 300 159 243 747 3,653 995 943 907 808 2,711<br />
Auto Train 9,849 2.7% 1,126 0 174 323 629 8,584 2,953 2,195 1,663 1,773 139<br />
Subtotal Long Distance 181,696 49.9% 35,651 10,363 5,517 5,063 14,708 110,797 36,772 21,427 15,664 36,934 35,248<br />
Total Minutes of Delay 364,146 100.0% 78,295 19,062 14,939 8,810 35,484 223,023 56,742 37,424 40,217 88,640 62,828<br />
Percentage of Total 21.5% 5.2% 4.1% 2.4% 9.7% 61.2% 15.6% 10.3% 11.0% 24.3% 17.3%<br />
E - 1
Per 10K Train Miles<br />
Minutes of Delay<br />
2400<br />
2100<br />
1800<br />
1500<br />
1200<br />
900<br />
600<br />
300<br />
0<br />
Total Host-Responsible Delays by Host Railroad<br />
BNSF CN CP CSX NS UP<br />
E - 2<br />
Previous 12<br />
Months (through<br />
Jan. 2012)<br />
MMost t RRecent t 12<br />
Months (through<br />
Jan. <strong>2013</strong>)<br />
Current Month<br />
Last Year (Jan.<br />
2012)<br />
Current Month<br />
This Year (Jan.<br />
<strong>2013</strong>)
Minute es of Delay per 10K Train-Miles<br />
300<br />
250<br />
200<br />
150<br />
100<br />
50<br />
0<br />
Slow Orders (DSR)<br />
Delays to <strong>Amtrak</strong> Trains by Delay Type and Responsible Party<br />
(Major Hosts Only - BNSF, CN, CP, CSX, NS, UP)<br />
Most Recent Twelve Months - February 2012 through <strong>January</strong> <strong>2013</strong><br />
Freight Trn Interference (FTI)<br />
Signals (DCS)<br />
Psgr Train Interference (PTI)<br />
Route (RTE)<br />
M of W (DMW)<br />
Commuter Trn Interf. (CTI)<br />
All Other Host (DTR, DBS)<br />
Psgr. Related (ADA, HLD)<br />
Engine Failure (CCR, ENG)<br />
Crew & System (SYS)<br />
Host Responsible <strong>Amtrak</strong> Responsible Third Party Responsible<br />
72.5% 21.9% 5.6%<br />
E - 3<br />
All Other <strong>Amtrak</strong> (INJ, ITI, OTH)<br />
Service (SVS)<br />
Car Failure (CAR)<br />
Connection (CON)<br />
Weather (WTR)<br />
Trespassers (TRS)<br />
Customs (CUI)<br />
Police (POL)<br />
Drawbridges (MBO)<br />
Utilities (UTL)
Host<br />
MINUTES OF DELAY BY HOST<br />
Per 10K Train Miles<br />
(Red numbers indicate not meeting standard)<br />
Total Host Responsible Delays<br />
Current Month Quarter to Date<br />
<strong>January</strong> <strong>2013</strong> Jan. <strong>2013</strong> - Jan. <strong>2013</strong><br />
PRIIA Section 207 Standard 900 900<br />
Largest Two Delay Categories - Quarter to Date<br />
#1 #2<br />
Jan. <strong>2013</strong> - Jan. <strong>2013</strong> Jan. <strong>2013</strong> - Jan. <strong>2013</strong><br />
<strong>Amtrak</strong> Blue Water 340 340 PTI 127 DCS 83 99<br />
Wolverine 486 486 PTI 327 DCS 76 99<br />
BBrRR Cardinal 2,150 2,150 PTI 646 DSR 579 132<br />
BNSF California Zephyr 572 572 DSR 182 FTI 113 1,027<br />
Carl Sandburg / Illinois Zephyr 448 448 DSR 115 RTE 111 257<br />
Cascades 1,302 1,302 DSR 329 FTI 313 343<br />
Coast Starlight 1,005 1,005 DSR 268 FTI 199 186<br />
Empire Builder 695 695 FTI 285 DSR 223 2,147<br />
Heartland Flyer 1,346 1,346 DSR 1,091 FTI 152 238<br />
Pacific Surfliner 898 898 DSR 272 RTE 196 22<br />
San Joaquin 717 717 PTI 332 FTI 221 284<br />
Southwest Chief 327 327 DSR 81 FTI 74 2,198<br />
Sunset Limited 584 584 DSR 422 FTI 65 190<br />
Texas Eagle 1,792 1,792 DSR 1,223 FTI 259 126<br />
CFRC Auto Train 9,557 9,557 DSR 7,273 DCS 1,332 16<br />
Silver Meteor 8,575 8,575 PTI 2,795 DSR 2,598 61<br />
Silver Star 5,268 5,268 DSR 2,591 FTI 1,287 61<br />
CN Adirondack 2,291 2,291 FTI 981 RTE 695 49<br />
Blue Water 1,114 1,114 FTI 896 RTE 89 159<br />
City of New Orleans 985 985 FTI 405 DCS 167 930<br />
Illini / Saluki 1,152 1,152 FTI 647 PTI 175 306<br />
Lincoln Service 824 824 FTI 464 DCS 118 37<br />
Texas Eagle 1,323 1,323 FTI 779 DCS 323 37<br />
Wolverine 1,287 1,287 FTI 387 DCS 334 27<br />
CP Adirondack 2,349 2,349 DSR 1,090 PTI 504 178<br />
Empire Builder 978 978 FTI 662 DCS 125 384<br />
Ethan Allen Express 3,137 3,137 DSR 1,831 FTI 493 60<br />
Hiawatha 607 607 FTI 161 DSR 153 53<br />
CSX Auto Train 1,371 1,371 FTI 521 PTI 293 898<br />
Capitol Limited 569 569 DSR 180 DCS 137 307<br />
Cardinal 607 607 FTI 292 DCS 154 698<br />
Carolinian 1,392 1,392 FTI 425 PTI 318 295<br />
Hoosier State 654 654 DMW 157 RTE 139 169<br />
Lake Shore Ltd 1,255 1,255 FTI 405 DCS 307 633<br />
Maple Leaf 1,584 1,584 FTI 424 RTE 358 298<br />
New York - Niagara Falls 1,551 1,551 FTI 542 RTE 341 296<br />
Palmetto 915 915 FTI 384 PTI 186 659<br />
Pere Marquette 619 619 DCS 189 DSR 171 135<br />
Richmond/Newport News/Norfolk 985 985 DCS 220 FTI 187 189<br />
Silver Meteor 981 981 FTI 343 DCS 168 1,091<br />
Silver Star 911 911 FTI 305 DSR 218 1,148<br />
Fla DOT Silver Meteor 748 748 CTI 323 RTE 147 68<br />
Silver Star 1,352 1,352 CTI 630 DCS 384 68<br />
MBTA Downeaster 1,203 1,203 DSR 509 CTI 483 38<br />
Metra Empire Builder 1,130 1,130 CTI 850 PTI 102 29<br />
Hiawatha 1,455 1,455 CTI 838 DCS 184 29<br />
MNRR Acela Express 363 363 CTI 199 DSR 91 56<br />
Adirondack 706 706 CTI 301 RTE 192 64<br />
All Other NE Regional 576 576 CTI 257 DSR 205 56<br />
Ethan Allen Express 620 620 CTI 319 RTE 177 64<br />
Lake Shore Ltd 1,005 1,005 CTI 668 RTE 238 64<br />
Lynchburg 453 453 CTI 306 DSR 69 56<br />
Maple Leaf 719 719 CTI 466 DCS 96 64<br />
New York - Albany** 585 585 CTI 338 RTE 121 64<br />
New York - Niagara Falls 500 500 CTI 225 RTE 94 64<br />
Richmond/Newport News/Norfolk 491 491 DSR 498 RTE 125 56<br />
Vermonter 600 600 CTI 375 RTE 91 56<br />
NECR Vermonter 462 462 DSR 294 DBS 70 238<br />
NMDOT Southwest Chief 994 994 DSR 426 PTI 180 80<br />
NS Blue Water 2,156 2,156 DCS 633 FTI 524 61<br />
Capitol Limited 1,046 1,046 FTI 438 RTE 281 481<br />
Cardinal 490 490 FTI 277 PTI 117 79<br />
Carolinian 415 415 DSR 164 PTI 111 202<br />
Crescent 582 582 FTI 186 DSR 174 1,141<br />
Lake Shore Ltd 1,145 1,145 FTI 423 RTE 214 339<br />
Lynchburg 247 247 FTI 105 DCS 63 166<br />
Pennsylvanian 488 488 FTI 225 DCS 166 249<br />
Pere Marquette 2,919 2,919 FTI 1,041 DCS 518 39<br />
Piedmont 451 451 DSR 199 FTI 91 173<br />
Richmond/Newport News/Norfolk 779 779 DSR 498 RTE 125 81<br />
Silver Star 684 684 PTI 490 DBS 182 28<br />
Wolverine 1,353 1,353 PTI 439 DCS 313 173<br />
PanAm Downeaster 503 503 PTI 162 FTI 115 77<br />
SCRRA Coast Starlight 2,628 2,628 CTI 1,382 PTI 1,005 48<br />
Pacific Surfliner 874 874 PTI 379 CTI 271 95<br />
SDNRR Pacific Surfliner 1,303 1,303 PTI 415 CTI 411 60<br />
UP California Zephyr 960 960 FTI 432 DCS 199 1,431<br />
Capitol Corridor 474 474 PTI 153 RTE 113 168<br />
Cascades 612 612 FTI 305 DCS 227 125<br />
Coast Starlight 967 967 PTI 294 DCS 209 1,159<br />
Lincoln Service 745 745 PTI 418 DCS 112 231<br />
Missouri River Runner 260 260 PTI 82 DCS 65 271<br />
Pacific Surfliner 891 891 PTI 599 DCS 86 174<br />
San Joaquin 796 796 DCS 248 PTI 243 88<br />
Sunset Limited 1,067 1,067 FTI 482 DSR 232 1,784<br />
Texas Eagle 1,431 1,431 FTI 560 DSR 258 1,104<br />
VTR Ethan Allen Express 142 142 FTI 47 DSR 47 24<br />
The numbers included in this document are preliminary and are for informational purposes only. Final data regarding compliance with PRIIA Section 207 standards, including any<br />
Major Maintenance and Construction Allowances, are published quarterly in the official FRA report.<br />
** Includes only trains that operate solely between New York and Albany<br />
Excludes hosts with fewer than 15 route miles.<br />
Delays on the <strong>Amtrak</strong>-owned portion of the Northeast Corridor are shown in a separate report, with tighter delay standards.<br />
Northeast Regional: Lynchburg includes all trains between Lynchburg and points on the NEC; Richmond / Newport News includes all trains between Richmond or Newport news and points on the NEC.<br />
E - 4<br />
Route Miles
MINUTES OF DELAY BY SERVICE<br />
Per 10K Train Miles<br />
(Red numbers indicate not meeting standard)<br />
Total Host Responsible Delays<br />
Service Host<br />
Current Month Quarter to Date<br />
Jan. <strong>2013</strong> - Jan. <strong>2013</strong><br />
Route Miles<br />
<strong>January</strong> <strong>2013</strong> Jan. <strong>2013</strong> - Jan. <strong>2013</strong><br />
#1 #2<br />
PRIIA Section 207 Standard 900 900<br />
Largest Two Delay Categories - Quarter to Date<br />
Acela Express<br />
Acela Express MNRR 363 363 CTI 199 DSR 91 56<br />
All Other NEC Corridor Routes<br />
Northeast Regional<br />
Richmond/Newport News/Norfolk CSX 985 985 DCS 220 FTI 187 189<br />
MNRR 491 491 CTI 244 DCS 82 56<br />
NS 779 779 DSR 498 RTE 125 81<br />
Lynchburg MNRR 453 453 CTI 306 DSR 69 56<br />
NS 247 247 FTI 105 DCS 63 166<br />
All Other Northeast Regional MNRR 576 576 CTI 257 DSR 205 56<br />
Non-NEC Corridor Routes<br />
Capitol Corridor UP 474 474 PTI 153 RTE 113 168<br />
Carolinian CSX 1,392 1,392 FTI 425 PTI 318 295<br />
NS 415 415 DSR 164 PTI 111 202<br />
Cascades BNSF 1,302 1,302 DSR 329 FTI 313 343<br />
UP 612 612 FTI 305 DCS 227 125<br />
Downeaster MBTA 1,203 1,203 DSR 509 CTI 483 38<br />
PanAm 503 503 PTI 162 FTI 115 77<br />
Empire Corridor<br />
Adirondack CN 2,291 2,291 FTI 981 RTE 695 49<br />
CP 2,349 2,349 DSR 1,090 PTI 504 178<br />
MNRR 706 706 CTI 301 RTE 192 64<br />
Ethan Allen Express CP 3,137 3,137 DSR 1,831 FTI 493 60<br />
MNRR 620 620 CTI 319 RTE 177 64<br />
VTR 142 142 FTI 47 DSR 47 24<br />
Maple Leaf CSX 1,584 1,584 FTI 424 RTE 358 298<br />
MNRR 719 719 CTI 466 DCS 96 64<br />
New York - Albany** MNRR 585 585 CTI 338 RTE 121 64<br />
New York - Niagara Falls CSX 1,551 1,551 FTI 542 RTE 341 296<br />
MNRR 500 500 CTI 225 RTE 94 64<br />
Heartland Flyer BNSF 1,346 1,346 DSR 1,091 FTI 152 238<br />
Hiawatha CP 607 607 FTI 161 DSR 153 53<br />
Metra 1,455 1,455 CTI 838 DCS 184 29<br />
Hoosier State CSX 654 654 DMW 157 RTE 139 169<br />
Illinois<br />
Carl Sandburg / Illinois Zephyr BNSF 448 448 DSR 115 RTE 111 257<br />
Illini / Saluki CN 1,152 1,152 FTI 647 PTI 175 306<br />
Lincoln Service CN 824 824 FTI 464 DCS 118 37<br />
UP 745 745 PTI 418 DCS 112 231<br />
Michigan<br />
Blue Water <strong>Amtrak</strong> 340 340 PTI 127 DCS 83 99<br />
CN 1,114 1,114 FTI 896 RTE 89 159<br />
NS 2,156 2,156 DCS 633 FTI 524 61<br />
Pere Marquette CSX 619 619 DCS 189 DSR 171 135<br />
NS 2,919 2,919 FTI 1,041 DCS 518 39<br />
Wolverine <strong>Amtrak</strong> 486 486 PTI 327 DCS 76 99<br />
CN 1,287 1,287 FTI 387 DCS 334 27<br />
NS 1,353 1,353 PTI 439 DCS 313 173<br />
Missouri River Runner UP 260 260 PTI 82 DCS 65 271<br />
Pacific Surfliner BNSF 898 898 DSR 272 RTE 196 22<br />
SCRRA 874 874 PTI 379 CTI 271 95<br />
SDNRR 1,303 1,303 PTI 415 CTI 411 60<br />
UP 891 891 PTI 599 DCS 86 174<br />
Pennsylvanian NS 488 488 FTI 225 DCS 166 249<br />
Piedmont NS 451 451 DSR 199 FTI 91 173<br />
San Joaquin BNSF 717 717 PTI 332 FTI 221 284<br />
UP 796 796 DCS 248 PTI 243 88<br />
Vermonter MNRR 600 600 CTI 375 RTE 91 56<br />
NECR 462 462 DSR 294 DBS 70 238<br />
Long-Distance Routes<br />
Auto Train CSX 1,371 1,371 FTI 521 PTI 293 898<br />
CFRC 9,557 9,557 DSR 7,273 DCS 1,332 16<br />
California Zephyr BNSF 572 572 DSR 182 FTI 113 1,027<br />
UP 960 960 FTI 432 DCS 199 1,431<br />
Capitol Limited CSX 569 569 DSR 180 DCS 137 307<br />
NS 1,046 1,046 FTI 438 RTE 281 481<br />
Cardinal BBrRR 2,150 2,150 PTI 646 DSR 579 132<br />
CSX 607 607 FTI 292 DCS 154 698<br />
NS 490 490 FTI 277 PTI 117 79<br />
City of New Orleans CN 985 985 FTI 405 DCS 167 930<br />
Coast Starlight BNSF 1,005 1,005 DSR 268 FTI 199 186<br />
SCRRA 2,628 2,628 CTI 1,382 PTI 1,005 48<br />
UP 967 967 PTI 294 DCS 209 1,159<br />
Crescent NS 582 582 FTI 186 DSR 174 1,141<br />
Empire Builder BNSF 695 695 FTI 285 DSR 223 2,147<br />
CP 978 978 FTI 662 DCS 125 384<br />
Metra 1,130 1,130 CTI 850 PTI 102 29<br />
Lake Shore Ltd CSX 1,255 1,255 FTI 405 DCS 307 741<br />
MNRR 1,005 1,005 CTI 668 RTE 238 64<br />
NS 1,145 1,145 FTI 423 RTE 214 339<br />
Palmetto CSX 915 915 FTI 384 PTI 186 659<br />
Silver Meteor CSX 981 981 FTI 343 DCS 168 1,091<br />
CFRC 8,575 8,575 PTI 2,795 DSR 2,598 61<br />
Fla DOT 748 748 CTI 323 RTE 147 68<br />
Silver Star CSX 911 911 FTI 305 DSR 218 1,148<br />
CFRC 5,268 5,268 DSR 2,591 FTI 1,287 61<br />
Fla DOT 1,352 1,352 CTI 630 DCS 384 68<br />
NS 684 684 PTI 490 DBS 182 28<br />
Southwest Chief BNSF 327 327 DSR 81 FTI 74 2,198<br />
NMDOT 994 994 DSR 426 PTI 180 80<br />
Sunset Limited BNSF 584 584 DSR 422 FTI 65 190<br />
UP 1,067 1,067 FTI 482 DSR 232 1,784<br />
Texas Eagle BNSF 1,792 1,792 DSR 1,223 FTI 259 126<br />
CN 1,323 1,323 FTI 779 DCS 323 37<br />
UP 1,431 1,431 FTI 560 DSR 258 1,104<br />
The numbers included in this document are preliminary and are for informational purposes only. Final data regarding compliance with PRIIA Section 207 standards, including any<br />
Major Maintenance and Construction Allowances, are published quarterly in the official FRA report.<br />
** Includes only trains that operate solely between New York and Albany<br />
Excludes hosts with fewer than 15 route miles.<br />
Delays on the <strong>Amtrak</strong>-owned portion of the Northeast Corridor are shown in a separate report, with tighter delay standards.<br />
Northeast Regional: Lynchburg includes all trains between Lynchburg and points on the NEC; Richmond / Newport News includes all trains between Richmond or Newport news and points on the NEC.<br />
E - 5
<strong>Amtrak</strong> OFF-NEC Delay Code Definitions<br />
Code Code Description Explanation<br />
FTI Freight Train Interference Delays from freight trains<br />
PTI Passenger Train Interference Delays for meeting or following All Other passenger trains<br />
CTI Commuter Train Interference Delays for meeting or following commuter trains<br />
DSR Slow Order Delays Temporary slow orders, except heat or cold orders<br />
DCS Signal Delays Signal failure or All Other signal delays, wayside defect-detector false-alarms,<br />
defective road crossing protection, efficiency tests, drawbridge stuck open<br />
DBS Debris Debris strikes<br />
RTE Routing Routing-dispatching delays including diversions, late track bulletins, etc.<br />
DMW Maintenance of Way Maintenance of Way delays including holds for track repairs or MW foreman to clear<br />
DTR Detour Delays from detours<br />
Code Code Description Explanation<br />
ADA Passenger Related All delays related to disabled passengers, wheel chair lifts, guide dogs, etc.<br />
HLD Passenger Related All delays related to passengers, checked-baggage, large groups, etc.<br />
SYS Crew & System Delays related to crews including lateness, lone-engineer delays<br />
ENG Locomotive Failure Mechanical failure on engines.<br />
CCR Cab Car Failure Mechanical failure on Cab Cars<br />
CAR Car Failure Mechanical failure on all types of cars<br />
SVS Servicing All switching and servicing delays<br />
CON Hold for Connection Holding for connections from All Other trains or buses.<br />
ITI Initial Terminal Delay Delay at initial terminal due to late arriving inbound trains causing late release of equipment.<br />
INJ Injury Delay Delay due to injured passengers or employees.<br />
OTH Miscelaneous Delays Lost-on-run, heavy trains, unable to make normal speed, etc.<br />
Code Code Description Explanation<br />
NOD Unused Recovery Time Waiting for scheduled departure time at a station<br />
CUI Customs U.S. and Canadian customs delays; Immigration-related delays<br />
POL Police-Related Police/fire department holds on right-of-way or on-board trains<br />
TRS Trespassers Trespasser incidents including road crossing accidents, trespasser / animal strikes,<br />
vehicle stuck on track ahead, bridge strikes<br />
MBO Drawbridge Openings Movable bridge openings for marine traffic where no bridge failure is involved<br />
WTR Weather-Related All severe-weather delays, landslides or washouts, earthquakerelated<br />
delays, heat or cold orders<br />
* These delay codes are applicable to Off-NEC routes only.<br />
H o s t R a i l r o a d R e s p o n s i b l e D e l a y s*<br />
A m t r a k R e s p o n s i b l e D e l a y s*<br />
T h i r d - P a r t y D e l a y s*<br />
E - 6
SERVICE<br />
JANUARY JANUARY FY13 FY12<br />
<strong>2013</strong> 2012 Change YTD YTD Change<br />
<strong>Amtrak</strong> System 85.7% 85.5% 0.2% 85.0% 83.5% 1.5%<br />
<strong>Amtrak</strong> Premium 85.4% 92.1% -6.8% 88.5% 90.7% -2.1%<br />
Acela Express<br />
85.4% 92.1% -6.8% 88.5% 90.7% -2.1%<br />
<strong>Amtrak</strong> Corridor 88.3% 89.9% -1.7% 87.4% 87.7% -0.2%<br />
Keystone<br />
91.4% 91.3% 0.2% 90.0% 89.7% 0.3%<br />
Northeast Regional<br />
86.7% 89.3% -2.6% 86.2% 86.7% -0.5%<br />
Richmond / Newport News /Norfolk 89.4% 92.3% -2.9% 86.8% 88.6% -1.9%<br />
Lynchburg 91.9% 91.9% 0.0% 88.8% 90.7% -1.8%<br />
All Other Northeast Regiona 85.7% 88.3% -2.6% 85.9% 86.0% -0.1%<br />
Short Distance 86.0% 83.8% 2.2% 85.1% 82.5% 2.6%<br />
Capitols<br />
Carolinian<br />
Cascades<br />
Downeaster<br />
Empire Corridor<br />
92.9% 94.2% -1.3% 93.6% 94.1% -0.6%<br />
75.8% 88.7% -12.9% 72.0% 79.3% -7.3%<br />
68.5% 66.8% 1.7% 77.9% 75.0% 3.0%<br />
81.5% 90.3% -8.9% 81.3% 83.3% -2.0%<br />
88.0% 92.4% -4.4% 86.7% 89.1% -2.3%<br />
Adirondack 69.4% 79.0% -9.7% 69.5% 75.6% -6.1%<br />
Ethan Allen Express 83.9% 77.4% 6.5% 79.4% 71.1% 8.3%<br />
Maple Leaf 74.2% 83.9% -9.7% 71.5% 79.7% -8.1%<br />
New York - Albany** 93.2% 97.0% -3.8% 92.5% 93.4% -0.9%<br />
New York - Niagara Falls 89.5% 96.0% -6.5% 88.9% 95.5% -6.7%<br />
Heartland Flyer<br />
Hiawatha<br />
Hoosier State<br />
Illinois<br />
87.1% 85.5% 1.6% 67.8% 78.0% -10.3%<br />
96.7% 94.1% 2.6% 90.6% 92.2% -1.7%<br />
82.4% 61.1% 21.2% 79.9% 62.9% 17.0%<br />
87.1% 79.4% 7.7% 84.7% 78.4% 6.3%<br />
Carl Sandburg / Illinois Zephyr 92.7% 90.3% 2.4% 91.6% 88.0% 3.7%<br />
Illini / Saluki 71.0% 64.5% 6.5% 70.5% 72.2% -1.6%<br />
Lincoln Service 92.3% 81.5% 10.9% 88.4% 76.8% 11.6%<br />
Michigan<br />
57.3% 52.6% 4.7% 59.5% 43.5% 16.0%<br />
Blue Water 62.9% 67.7% -4.8% 70.7% 60.8% 9.9%<br />
Pere Marquette 58.1% 55.7% 2.3% 62.2% 52.7% 9.5%<br />
Wolverine 55.1% 46.5% 8.6% 55.0% 34.7% 20.2%<br />
Missouri<br />
Pacific Surfliner<br />
Pennsylvanian<br />
Piedmont<br />
San Joaquins<br />
Vermonter<br />
99.2% 96.0% 3.2% 94.7% 90.9% 3.9%<br />
89.5% 70.7% 18.8% 86.7% 75.4% 11.3%<br />
91.9% 95.2% -3.2% 95.4% 93.4% 2.0%<br />
79.8% 86.3% -6.5% 77.0% 76.4% 0.6%<br />
89.5% 91.1% -1.6% 87.9% 89.1% -1.2%<br />
83.9% 87.1% -3.2% 90.3% 82.5% 7.8%<br />
Long Distance 78.7% 79.0% -0.3% 76.9% 73.9% 3.0%<br />
Auto Train<br />
California Zephyr<br />
Capitol Limited<br />
Cardinal<br />
City of New Orleans<br />
Coast Starlight<br />
Crescent<br />
Empire Builder<br />
Lake Shore Ltd<br />
Palmetto<br />
Silver Meteor<br />
Silver Star<br />
Southwest Chief<br />
Sunset Limited<br />
Texas Eagle<br />
** Includes only trains that operate solely between New York and Albany<br />
Issued by the Office of the Chief, Business Operations<br />
END-POINT ON-TIME PERFORMANCE REPORT<br />
JANUARY<br />
E - 7<br />
82.3% 87.1% -4.8% 78.8% 89.8% -11.1%<br />
85.5% 61.3% 24.2% 78.0% 39.8% 38.2%<br />
83.9% 80.6% 3.2% 85.3% 61.0% 24.3%<br />
81.5% 42.3% 39.2% 69.5% 51.4% 18.1%<br />
85.5% 82.3% 3.2% 85.8% 84.1% 1.6%<br />
90.3% 64.5% 25.8% 78.0% 80.5% -2.4%<br />
79.0% 80.6% -1.6% 82.2% 86.2% -3.9%<br />
77.4% 70.7% 6.7% 64.8% 67.3% -2.5%<br />
73.4% 89.5% -16.1% 79.4% 72.0% 7.4%<br />
87.1% 88.7% -1.6% 81.5% 86.2% -4.7%<br />
41.9% 79.0% -37.1% 56.6% 78.5% -21.8%<br />
61.3% 85.5% -24.2% 61.2% 78.9% -17.6%<br />
96.8% 93.5% 3.2% 93.1% 75.2% 17.9%<br />
84.6% 66.7% 17.9% 85.6% 71.4% 14.1%<br />
82.3% 82.3% 0.0% 84.1% 79.7% 4.5%