23.03.2013 Views

Akron Water Pollution Control Station No Feasible Alternative

Akron Water Pollution Control Station No Feasible Alternative

Akron Water Pollution Control Station No Feasible Alternative

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Contract 84-1 – Primary Tank Renovations, 1986<br />

• Contract 86-3 – Monitoring & Sampling Improvements – Final Effluent Monitoring System,<br />

Permanent Sampling, 1987<br />

• Contract 87-1 – Headworks Improvements – Bar Screen Replacement, Demolition of<br />

Chlorine Building, Raw Influent Sampling <strong>Station</strong>, Back Flow Preventor Building, 1988<br />

• Contract 87-2 – New Plant Discharge Structure, Secondary Bypass Modifications, 1987<br />

• Contract 87-3 – Grit Handling Improvements – Grit Collector & Screw Replacement, Grit<br />

Loading Building, 1989<br />

• Contract 88-1A – Distributed <strong>Control</strong> System, 1992<br />

• Contract 88-1B – Process <strong>Control</strong> Improvements & DCS I/O Installation, 1992<br />

• Contract 109 – Final Clarifier Covers 1C & 2C, 1991<br />

• Contract 111 – Gravity Thickener Improvements, 1992<br />

• Contract 112 – Waste Liquor Treatment Improvements, 1993<br />

• Contract 114 – Disinfection Improvements, 1993<br />

• Contract 116 – Final Tank Effluent Sample Building, 1993<br />

• Contract 118 – Activated Treatment Renovations, 1993<br />

• Contract 120 – Final Clarifier Covers, 1993<br />

• Contract 123 – South Waste Liquor Equalization Tank, 1993<br />

• Contract 131 – Grease Handling Improvements, 1996<br />

• Contract 134 – Waste Activated Sludge Thickening, 1996<br />

• CSO Rack 40 (Cuyahoga Street) Storage Basin Project, 2006<br />

Page 2-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!