not possible to provide full treatment, or even hydraulically pass, a peak flow of 210 MGD or<br />

higher. In addition to the existing 10 MG SRT, the secondary bypass conduit must be available<br />

for intermittent and limited use to prevent overflow of process tanks and channels and<br />

associated property damage via loss of biomass.<br />

From these conclusions, the alternative evaluation to follow in Section 4 will begin with an<br />

established treatment capacity of 110 MGD.<br />

Page 3-16