ATTACHMENT 5: RISK MATRIX<br />
Assessment of hazards – probability and consequence<br />
In some cases it may be appropriate for the SJA group to use<br />
a risk matrix in the assessment of a hazard, i.e. assessing<br />
the probability of an undesirable incident occurring, and its<br />
consequences. A risk evaluation of this kind may help clarify<br />
the need and priority of measures to reduce the risk or its<br />
consequences.<br />
The evaluation method is a rough qualitative approach, and<br />
high-risk hazards may well be subjected to a more detailed<br />
evaluation later on.<br />
Using the risk matrix<br />
A risk matrix is used to assess/estimate risk by plotting the<br />
probability of an undesirable incident along one axis and the<br />
degree of consequences along the other axis. This must be<br />
done for each subtask, cf. the SJA form. If the combination of<br />
probability and consequence (cf. the matrix) reaches Medium<br />
or High, measures will be needed.<br />
Probability<br />
Consequence Low Medium High<br />
Low L L M<br />
Medium L M H<br />
High M H H<br />
Degree of consequence/severity<br />
High Fatal, serious injury, >1 Day Away From Work Case,<br />
considerable damage to equipment or supplies,<br />
considerable pollution or loss of production<br />
Medium Day Away From Work Case or minor injury, minor<br />
damage to equipment or supplies, minor pollution<br />
or loss of production<br />
Low No injuries, minor/slight damage to equipment or<br />
supplies, minor/slight pollution.<br />
Probability:<br />
High Probably, may happen several times<br />
Medium Possible, may happen now and then<br />
Low Not very realistic/likely, but conceivable