25.03.2013 Views

What To Expect From Your New home - You - Pulte Homes

What To Expect From Your New home - You - Pulte Homes

What To Expect From Your New home - You - Pulte Homes

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The following language is added to Section 9<br />

of the Warranty<br />

If the Insurer of this Limited Warranty decides to pay<br />

the reasonable costs of repairing a claim:<br />

1. The Homeowner will have ten (10) days to<br />

respond to the offer to make payment.<br />

2. If the payment offer is in excess of $5,000.00,<br />

the offer must have been made pursuant to a binding<br />

bid by an independent third-party contractor that<br />

the Homeowner may contract to perform the repairs,<br />

except where:<br />

a. The payment offer is made in settlement of a<br />

legal action; or<br />

b. The Homeowner is represented by legal<br />

counsel; or<br />

Item Observation Action Required Coverage<br />

Slab out of level Slab elevation differential<br />

exceeds 3" or 1% of the slab,<br />

whichever is greater<br />

Slab on grade<br />

bulged, humped,<br />

or domed<br />

Cracks in the center<br />

of a slab (not in<br />

contraction joints)<br />

Cracks in slab in the<br />

contraction joints<br />

Unevenness in slab exceeding<br />

1" per 32", or unevenness<br />

exceeding ¾" within 24" of<br />

a foundation wall<br />

Cracks in excess of ¼" in width<br />

or ¼" in vertical displacement<br />

through the center of the slab<br />

Cracks in excess of 3 ⁄8" in width<br />

or 3 ⁄8" in vertical displacement<br />

in the contraction joint<br />

25<br />

c. The payment offer has been reviewed<br />

on-site by a HUD-approved fee inspector.<br />

3. The payment will be made jointly to the<br />

Homeowner and the Homeowner’s mortgagee. The<br />

Homeowner is required, if requested, to identify<br />

the mortgagee to the party making the payment.<br />

Section 11:<br />

State-Specific Addenda<br />

Concrete Addendum (applicable only if your <strong>home</strong><br />

is located in Colorado, Kansas, or Missouri).<br />

The following language is added to Section 12.4<br />

(Performance Standards): The following language<br />

is substituted for the Performance Standards<br />

for Basement Floors (Concrete/Slab on Grade):<br />

The Builder will repair slab by<br />

either full or partial replacement<br />

of the slab.<br />

Filling, topping, grinding, or partial<br />

floor replacement are acceptable<br />

repairs by the Builder.<br />

Patching, caulking, grouting,<br />

injecting, filling, and grinding are<br />

all acceptable repair methods.<br />

Patching, caulking, grouting,<br />

injecting, filling, and grinding are<br />

all acceptable repair methods.<br />

Two years<br />

Two years<br />

Two years<br />

Two years

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!