26.03.2013 Views

Great Lakes Fishery and Ecosystem Restoration Program Project ...

Great Lakes Fishery and Ecosystem Restoration Program Project ...

Great Lakes Fishery and Ecosystem Restoration Program Project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ProjECt DESCriPtion<br />

The project proposes restoration of a section of the Elk Creek<br />

riparian corridor that is in close proximity to Highway 79 in<br />

the Town of McKean. Elk Creek is a coolwater system that<br />

supports a wide range of native, naturalized, <strong>and</strong> stocked fish<br />

species. Since resident <strong>and</strong> migratory fish species can be found<br />

within the creek, benefits of the project extend well beyond<br />

the immediate project area. Primary reasons for habitat<br />

degradation at the site are streambank failure; insufficient<br />

riffle, run, pool sequences, or similar fluvial geomorphic<br />

impairments; <strong>and</strong> lack of native riparian cover. In recent years<br />

the project area has experienced rapid <strong>and</strong> significant erosion<br />

<strong>and</strong> loss of in-stream habitat. Preliminary field observations<br />

revealed that a headcut has developed within the project<br />

area <strong>and</strong> is likely to continue upstream <strong>and</strong> cause additional<br />

Funding<br />

elk creek<br />

<strong>Project</strong> Manager:<br />

Michael J. Greer<br />

(716) 879-4229<br />

michael.j.greer@usace.army.mil<br />

ELK CREEK<br />

Corridor <strong>Restoration</strong><br />

Erie County, PA<br />

valuable habitat to be lost. This particular reach is open to the<br />

public <strong>and</strong> is a popular recreation spot for sport fishing.<br />

nonfEDErAl PArtnEr<br />

Pennsylvania Fish & Boat Commission<br />

CongrESSionAl intErESt<br />

Senator Robert P. Casey Jr. (D-PA)<br />

Senator Patrick Toomey (R-PA)<br />

Representative Michael Kelly (R-PA-3)<br />

CUrrEnt StAtUS<br />

The preliminary restoration plan is scheduled for completion<br />

in April 2011. The feasibility study will be initiated pending<br />

the availability of funds.<br />

Total Federal Nonfederal<br />

current working estimate $1,200,000 $780,000 $420,000<br />

funding to date $25,000 $25,000 $0<br />

funds required to complete project $1,175,000 $755,000 $420,000<br />

<strong>Great</strong> <strong>Lakes</strong> <strong>Fishery</strong> & <strong>Ecosystem</strong> <strong>Restoration</strong> (GLFER) <strong>Program</strong><br />

updated February 2011 www.glfer.org

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!