Petersen Aluminum PAC-CLAD catalog Reed First Source
Petersen Aluminum PAC-CLAD catalog Reed First Source
Petersen Aluminum PAC-CLAD catalog Reed First Source
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Part 1: General Requirements<br />
1.01 Description of Work<br />
A. Furnish and install metal roofing (fascia and/or<br />
mansard) and accessories in accordance with<br />
<strong>Petersen</strong> <strong>Aluminum</strong> Corporation specifications and<br />
all applicable drawings. Roof support (structural)<br />
systems and counterflashings are not included in<br />
the section.<br />
1.02 Products<br />
Metal roofing (Fascia and /or mansard) shall be as<br />
manufactured by <strong>Petersen</strong> <strong>Aluminum</strong> Corporation and<br />
shall consist of one of the following profiles:<br />
A. Integral Batten Panel (11”, 18” or 19” O.C.)<br />
B. Integral Standing Seam Panel (11”, 16”, 18” or<br />
19” O.C.)<br />
C. SNAP-<strong>CLAD</strong> (10”, 12”, 16” or 18” O.C.)<br />
D. Snap-on Batten (11”, 12”, 18” O.C.)<br />
E. Snap-on Standing Seam (12”, 18”, 19” or 20”<br />
O.C.)<br />
F. High Snap-on Standing Seam (11”, 18” or 19”<br />
O.C.)<br />
G. Flush Panel (7”, 11” or 18” O.C.)<br />
H. Reveal Panel (7”, 11” or 18” O.C.)<br />
I. Redi-Roof Standing Seam (12” or 18” O.C.)<br />
J. Redi-Roof Batten (12” O.C.)<br />
K. M & R Panels (41” & 42” widths)<br />
L. Tite-Loc Panels (12”, 16” or 18” O.C.)<br />
1.03 Submittals<br />
A. Submit manufacturer’s current specifications and<br />
related literature.<br />
B. Provide samples in accordance with section<br />
C. Submit shop drawing as required outlining roof<br />
plans, profiles, forming details, trim flashings.<br />
Show details of weather-proofing at all edges and<br />
penetrations.<br />
D. Submit manufacturer’s 20 year paint warranty<br />
covering finish fade, chalk and peel (<strong>PAC</strong>-<strong>CLAD</strong>).<br />
Part 2: Products<br />
2.01 Manufacturer<br />
<strong>Petersen</strong> <strong>Aluminum</strong> Corporation<br />
2.02 Materials<br />
Please refer to the individual specifications for each<br />
panel listed in the <strong>catalog</strong> to properly complete this section.<br />
A. Profile<br />
B. Gauge and grade of sub-strata material.<br />
1. 24 ga. G-90 galvanized steel<br />
2. 22 ga. G-90 galvanized steel<br />
(limited profiles)<br />
3. .032 ga aluminum<br />
4. .040 ga aluminum<br />
(limited profiles)<br />
5. 16 oz. cold rolled copper<br />
(limited profiles)<br />
C. Finish<br />
1. <strong>PAC</strong>-<strong>CLAD</strong> ®<br />
2. <strong>PAC</strong> 500 Bronze anodized<br />
3. <strong>PAC</strong> 300 Clear anodized<br />
D. On Center Dimension<br />
E. Sheet Metal Flashing and Trim: shall be fabricated<br />
from same materials and finish as panels.<br />
F. Fasteners: shall be provided by manufacturer as<br />
required.<br />
07 61 00/PET<br />
BuyLine 3008<br />
2.03 Color<br />
Color shall be as selected for <strong>PAC</strong>-<strong>CLAD</strong> standard color<br />
chart (or custom color as selected by architect: please<br />
consult with manufacturer).<br />
Part 3: Delivery and Execution<br />
3.01 Delivery<br />
A. Suitable facilities for storage and protection of<br />
materials shall be provided by the contractor on the<br />
site.<br />
B. Upon receipt of materials, installer shall inspect the<br />
shipment for damage and to insure shipment is<br />
complete.<br />
3.02 Installation<br />
A. All surfaces on which the work is to be applied shall<br />
be examined for flatness as appropriate to<br />
application.<br />
B. Panels shall be installed so that horizontal lines are<br />
level and vertical lines are even.<br />
C. All sheet metal work shall conform to standards set<br />
forth in the SMACNA architectural sheet metal<br />
manual.<br />
D. Fasteners shall be concealed as pro-vided by<br />
manufacturer.<br />
3.03 Touch-up<br />
Only minor scratches and abrasions shall be allowed to<br />
be touched up. Any other damaged materials shall be<br />
replaced.<br />
3.04 Clean-up<br />
Leave work areas clean and remove all scrap and debris<br />
from surrounding area.<br />
A complete specification is available online at<br />
www.pac-clad.com<br />
Calvary Church<br />
Naperville, IL<br />
Owner: Calvary Church<br />
General Contractor: Paul H. Schwendener<br />
Roofing Contractor: James Mansfield & Sons., Inc. and<br />
A-1 Roofing<br />
Profile: Snap-Clad & Flat Seam Panels<br />
Color: Musket Gray Kynar & TCS II 23