27.03.2013 Views

Stream Simulation Design Process - USDA Forest Service

Stream Simulation Design Process - USDA Forest Service

Stream Simulation Design Process - USDA Forest Service

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Geometry & Fit Considerations<br />

• Road grade can be raised to improve structure fit.<br />

• A roadway dip can reduce flood damage if the pipe is<br />

plugged but reduces the available cover height and<br />

may cause a jump in cost.<br />

• Very large embedded pipes may need to be buried<br />

very deeply to fit within the roadway. This needs to<br />

be considered in dewatering. A change in culvert<br />

shape can reduce embedment depth (Round vs..<br />

Pipe Arch)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!