Shotcreting a Permanent Structural Shotcrete Wail<br />

Page<br />

P39. Nozzleman Gunning Prequalification Test Panels . . . . . . . . . . . . . . . . . . . . . . 43<br />

P40. Nozzleman Applying Shotcrete and Blow Pipe Removing Rebound . . . . . . . . . . 43<br />

P41. Rough Screeding Shotcrete Face . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43<br />

P42. Final Hand Texturing with Rubber Float . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43<br />

P43. Completed Permanent Structural Shotcrete Wall Prior to Painting, I-5, Tacoma, WA43<br />

P44. Completed Permanent Structural Shotcrete Wall After Painting, I-5, Tacoma, WA 43<br />

Nail Testing<br />

P45. Typical Nail Testing Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49<br />

Problem Solving on Construction<br />

P46. Mass Excavation and Stabilizing Berm .............................. 60<br />

P47. Drilling Through Stabilizing Berm ................................. 60<br />

P48. Excavating Stabilizing Berm After Nails Installed ...................... 60<br />

P49. Exhuming A Failed Sacrificial Test Nail ............................ 67<br />

P50. Exhumed Test Nail with Inadequate Grouting ......................... 67<br />

Handling Difficult Ground<br />

P51. Drilling Through Shotcrete Facing Due to Caving Ground ................ 80<br />

P52. False Form to Repair Excavation Face Slough ........................ 80<br />

P53. Backfilling Void Behind False Form ............................... 80<br />

P54. Use <strong>of</strong> Segmental Slot Excavation to Prevent Face Sloughing .............. 80<br />

P55. Shotcrete and Excavation to Finish Face in Segmental Slot Excavations ...... 80<br />

P56. Completed Shotcrete Face Closure in Segmental Slot Excavations ........... 80<br />

P57. Use <strong>of</strong> PVC Pipe Weepholes Through Shotcrete Face in Heavy Seepage Areas . 81<br />

P58. Drain Strips over Weepholes on Shotcrete, Face ....................... 81<br />

P59. Close-up <strong>of</strong> Drain Strip on Shotcrete Face ........................... 81<br />

P60. <strong>On</strong>e Example <strong>of</strong> Dispute Resolution ............................... 81<br />

Photo Credits - Photographs in this manual were compiled by the FHWA Region 10 Office<br />

<strong>of</strong> Structures. Photos illustrating construction problems are intentionally<br />

not credited. Other photos were provided courtesy <strong>of</strong>:<br />

Pl, 18, 19, 24, 25, 28, 31-37, 46-48 (CALTRANS);<br />

P2, 3, 5, 16, 23, 27 (CALTRANS/FHWA);<br />

P4, 7, 17, 35, 41,43, 44 (WASHINGTON <strong>DOT</strong>/FHWA);<br />

P6, 57, 58, 59 (SCHNABEL FOUNDATION CO.);<br />

~13, 14,’ is, 26 (GILDER ASSOCIATES);<br />

P9, 10, 29, 38 (VIRGINIA <strong>DOT</strong>/FHWA);<br />

Pl 1, 30, 40,42 (OREGON <strong>DOT</strong>);<br />

P12, 39, 45 (OREGON <strong>DOT</strong>/FHWA);<br />

P8 (TEXAS <strong>DOT</strong>);<br />

P22 (KULCHIN-CONDON & ASSOCIATES).<br />

. . .<br />