<strong>of</strong> a copy <strong>of</strong> the punch list by signing the punch list. The CITY<br />

REPRESENTATIVE shall notify the RESIDENT that the grinder pump and low<br />

pressure system have been tested and approved and that the RESIDENT may<br />

now connect to the system.<br />

17. The RESIDENT/PLUMBER shall then install the lines necessary to connect<br />

the existing on-site system to the grinder pump. The RESIDENT/PLUMBER<br />

shall then request a rough-in inspection from the CITY REPRESENTATIVE for<br />

the plumbing work completed. The CITY REPRESENTATIVE will inspect,<br />

approve the work and provide the RESIDENT/ PLUMBER with a green card as<br />

pro<strong>of</strong> <strong>of</strong> rough-in plumbing inspection and approval.<br />

18. The grinder pump/low-pressure sewer system can now be operated by the<br />

RESIDENT.<br />

19. The CONTRACTOR shall place sod similar to the existing grass around the<br />

grinder pump installation and the connection to the existing service assembly.<br />

The CONTRACTOR shall repair/replace any existing features on the property<br />

that were affected by their work. The RESIDENT/PLUMBER shall be<br />

responsible for any site restoration work required as a result <strong>of</strong> their work.<br />

20. The RESIDENT/PLUMBER shall then contact a licensed waste hauler and<br />

request that the existing septic tank be pumped out. The waste hauler will<br />

provide the RESIDENT with an invoice verifying that the tank was pumped out.<br />

The RESIDENT/PLUMBER shall then fill in the septic tank with select fill<br />

material.<br />

21. The RESIDENT/PLUMBER shall contact the CITY REPRESENTATIVE for<br />

final inspection. The RESIDENT shall provide the CITY REPRESENTATIVE with<br />

the invoice verifying that the septic tank was pumped out. The CITY<br />

REPRESENTATIVE will provide the RESIDENT with a green card as pro<strong>of</strong> <strong>of</strong><br />

final inspection and approval <strong>of</strong> all work completed by the RESIDENT as part <strong>of</strong><br />

the grinder pump installation project.<br />

22. The CONTRACTOR shall notify the CITY REPRESENTATIVE when the<br />

clean-up and site restoration work identified in the punch list has been<br />

completed. The CITY REPRESENTATIVE shall inspect the site, determine if all<br />

elements <strong>of</strong> the contract have been met and issue a letter <strong>of</strong> Final Acceptance for<br />

the work at that site. The CONTRACTOR shall then submit a copy <strong>of</strong> the Letter<br />

<strong>of</strong> Final Acceptance as part <strong>of</strong> the final pay request for that project.<br />

If there are any questions, please contact either Walter Hardin or Ronald Rackley<br />

at 817-237-6890 or Paul Bounds at 817-392-8567.