CONSTRUCTION NOISE & VIBRATION Page 7 42.6590.R1:CFCD5<br />
QUALITATIVE ASSESSMENT Rev04<br />
330kV ELECTRICITY CABLE<br />
HOLROYD <strong>to</strong> ROOKWOOD ROAD January 2012<br />
occupants of buildings. Table 1 presents a summary of vibration levels (mm/s) for<br />
the assessment of human comfort, derived from AS 2670.2-1990. In terms of<br />
overall ground vibration levels, Appendix C of Assessing Vibration: a technical<br />
guideline recommends criteria for exposure <strong>to</strong> continuous vibration associated<br />
with construction activities, specifically:<br />
Place Day Night<br />
Residence 0.2-0.4mm/s 0.14-0.28mm/s<br />
Offices 0.4-0.8mm/s same<br />
Workshops 0.8-1.6mm/s same<br />
Table 1: Vibration Levels for Assessment of Human Comfort<br />
Vibration Level (mm/s)<br />
Frequency<br />
(Hz)<br />
Continuous Vibration Intermittent Vibration<br />
Day Night Day Night<br />
1 3.2 2.2 95 31<br />
1.25 2.3 1.6 68 22<br />
1.6 1.6 1.1 47 15<br />
2 1.1 0.8 33 11<br />
2.5 0.8 0.6 24 8.0<br />
3.15 0.6 0.4 17 5.8<br />
4 0.4 0.3 19 4.0<br />
5 0.3 0.2 9.5 3.2<br />
6.3 0.3 0.2 7.6 2.5<br />
8 0.2 0.1 6.0 2.0<br />
10 0.2 0.1 6.0 2.0<br />
12.5 0.2 0.1 6.0 2.0<br />
16 0.2 0.1 6.0 2.0<br />
20 0.2 0.1 6.0 2.0<br />
25 0.2 0.1 6.0 2.0<br />
31.5 0.2 0.1 5.4 1.8<br />
40 0.2 0.1 6.0 2.0<br />
50 0.2 0.1 6.0 2.0<br />
63 0.2 0.1 6.0 2.0<br />
80 0.2 0.1 6.0 2.0<br />
PERRAM & PARTNERS ATKINS ACOUSTICS