<strong>2040</strong> MASTER PLAN<br />

Newport News Marine Terminal Build Out<br />

As previously stated, the build out plan for NNMT is to convert the existing terminal solely into<br />

a break bulk, Ro/Ro and project cargo facility. To help facilitate NNMT’s future build out plans,<br />

an additional crane was added to Pier C to enhance break bulk and heavy-lift capabilities. In<br />

addition to the newly added crane, several other key capital improvement projects are needed to<br />

maximize the overall break bulk capacity <strong>of</strong> NNMT and include:<br />

Key features <strong>of</strong> the Newport News Marine Terminal (NNMT) Build-Out <strong>Plan</strong>:<br />

• Construction <strong>of</strong> on-site warehouse facilities on terminal, as needed, based on market<br />

conditions,<br />

• Increase gate/security capacity by incorporating a fully automated gate system<br />

<strong>The</strong> figure attached illustrates NNMT at full build-out after CIP projects are completed.<br />

M<strong>of</strong>fatt & Nichol EX-38