Behaviour of ballasted track during high speed train passage
Behaviour of ballasted track during high speed train passage
Behaviour of ballasted track during high speed train passage
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Journal papers (1)<br />
• Monitoring the dynamic displacements <strong>of</strong> railway <strong>track</strong>. D Bowness, W<br />
Powrie, A C Lock, J A Priest and D J Richards. Proc I Mech E Part F, J<br />
Rail and Rapid Transit 221 (F1), 13-22, March 2007. Awarded IMechE<br />
John F Alcock Memorial Prize and Thomas Hawksley Gold Medal<br />
• Stress changes in the ground below <strong>ballasted</strong> railway <strong>track</strong> <strong>during</strong> <strong>train</strong><br />
<strong>passage</strong>. W Powrie, L A Yang and C R I Clayton. Proc I Mech E, Part F, J<br />
Rail and Rapid Transit 221 (F2), 247-261, May 2007<br />
• Dynamic stress analysis <strong>of</strong> a <strong>ballasted</strong> railway <strong>track</strong> bed <strong>during</strong> <strong>train</strong><br />
<strong>passage</strong>. L Yang. W Powrie and J A Priest. J ASCE Geotechnical and<br />
Geoenvironmental Engineering 135(5), 680-689, May 2009<br />
• Determination <strong>of</strong> dynamic <strong>track</strong> modulus from measurement <strong>of</strong> <strong>track</strong><br />
velocity <strong>during</strong> <strong>train</strong> <strong>passage</strong>. J A Priest and W Powrie. J ASCE<br />
Geotechnical and Geoenvironmental Engineering 135(11), 1732-1740,<br />
November 2009<br />
High Speed Track<br />
Railways Day - 15 February 2011