03.04.2013 Views

Download PDF (6215 kb) - Bioversity International

Download PDF (6215 kb) - Bioversity International

Download PDF (6215 kb) - Bioversity International

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Conclusion<br />

EUROPEAN CENTRAL FORAGES DATABASES 27<br />

During the morning of 8 March the participants had the opportunity to visit the facilities of<br />

the Løken Research Station.<br />

The Section 'Discussion and Recommendations' of the report was presented to the<br />

participants and adopted after some corrections. A task force consisting of Petter Marum,<br />

Ruaraidh Sackville Hamilton and Lorenzo Maggioni will finalize the Guidelines for the<br />

regeneration of accessions in seed collections of the main perennial forage grasses and<br />

legumes of temperate grasslands (Appendix III) while a second task force consisting of Petter<br />

Marum, Merja Veteläinen and Ian Thomas will finalize the Summary of germplasm holdings<br />

(Appendix IV). The participants agreed to supply missing information about Safetyduplication<br />

capacities to L. Maggioni for inclusion in the report (Appendix V).<br />

NGB and Sackville Hamilton will revise and finalize the Protocol for designating primary<br />

holders of accessions (Appendix II) by the end of June 1997. Both Appendixes II and III will<br />

be circulated to the Group before printing of the report. 13<br />

The participants strongly recommend to the Steering Committee that Phase VI of<br />

ECP/GR be implemented and that this include the contribution of the Forages Working<br />

Group. The Group also strongly recommends that the system with a full-time Coordinator<br />

be continued or even strengthened.<br />

The Group welcomes the rapid progress made during Phase V, which was achieved<br />

thanks to the appointment of a full-time Coordinator.<br />

Petter Marum was elected Chairperson of the Group until the end of next meeting.<br />

The next meeting was programmed tentatively for the first semester of 1999. However,<br />

this date may be affected by the initiation of Phase VI of ECP/GR.<br />

13 Appendix II and Appendix III were not circulated to the entire Group before printing, to avoid<br />

further delay of the publication of the present report. These documents remain the responsibility of<br />

the authors. However, relevant comments raised by the Group during the meeting, and<br />

subsequently by the specific task forces, were taken in due consideration by the authors.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!