04.04.2013 Views

FPSO and FSO Projects - GustoMSC

FPSO and FSO Projects - GustoMSC

FPSO and FSO Projects - GustoMSC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

production<br />

Product sheet / Rev.1<br />

<strong>GustoMSC</strong> © 06.100<br />

<strong>FPSO</strong> <strong>and</strong> <strong>FSO</strong> <strong>Projects</strong><br />

<strong>GustoMSC</strong> offers design, engineering, project<br />

management <strong>and</strong> consultancy services primarily<br />

for the offshore oil <strong>and</strong> gas, <strong>and</strong> the civil<br />

construction sectors, both new build,<br />

conversion <strong>and</strong> upgrade projects.<br />

The core business of <strong>GustoMSC</strong> is the<br />

development of complete, tailor-made designs<br />

for special vessels such as DP drillships <strong>and</strong><br />

pipelay/installation vessels, heavy duty offshore<br />

cranes <strong>and</strong> crane vessels, mobile production,<br />

storage <strong>and</strong> offloading units <strong>and</strong> offshore jackup<br />

platforms, including all calculations,<br />

drawings <strong>and</strong> specifications necessary to obtain<br />

Class approval.<br />

<strong>FPSO</strong> projects<br />

<strong>GustoMSC</strong> is in the unique position of having the inhouse<br />

capabilities needed to engineer complete<br />

Floating Production Storage & Offloading (<strong>FPSO</strong>)<br />

projects. These capabilities are:<br />

• Project Management<br />

• Engineering<br />

- Naval architecture<br />

- Structural & mechanical design<br />

- Process & marine<br />

- Piping & mechanical (rotating/static equipment)<br />

- Electrical & instrumentation<br />

• Sourcing <strong>and</strong> purchasing<br />

• Site assistance <strong>and</strong> supervision.<br />

The major benefit is that complete <strong>FPSO</strong><br />

engineering projects are managed by a multidisciplinary<br />

project team at a single location. As a<br />

result all interfaces - human, cultural <strong>and</strong> technical -<br />

can be better managed. The integrated approach<br />

The Netherl<strong>and</strong>s USA<br />

Karel Doormanweg 66, 3115 JD, Schiedam Enclave Parkway, Suite 200,<br />

P.O. Box 11, 3100 AA Schiedam Houston TX 77077<br />

Telephone +31 (0)10 232 0000 Telephone +1 281 679 8000<br />

Telefax +31 (0)10 232 0101 Telefax +1 281 679 8008<br />

www.SBMoffshore.com / www.<strong>GustoMSC</strong>.com<br />

allows <strong>FPSO</strong> projects to be developed on a fasttrack<br />

schedule. Due to the rapid availability of<br />

engineering documents the shipyard, the topsides<br />

fabricators <strong>and</strong> equipment suppliers are able to start<br />

their contribution much earlier than when working to<br />

conventional project schedules.<br />

The furthering of engineering documentation is<br />

founded on a risk-based approach. First the most<br />

critical project items are detailed, to allow the<br />

subsequent project parties to start their work,<br />

followed by the less critical systems <strong>and</strong><br />

components.<br />

General equipment <strong>and</strong> systems specifications are<br />

available early in the project, so as to allow the<br />

Purchasing group to source potential suppliers <strong>and</strong><br />

obtain early technical input from suppliers. When the<br />

basic engineering is completed sufficient information<br />

is available to place purchase orders.<br />

Many <strong>GustoMSC</strong> engineers have h<strong>and</strong>s-on<br />

construction experience, since the company<br />

stimulates its engineers to provide assistance <strong>and</strong><br />

supervision during the conversion <strong>and</strong> building<br />

phases of the project at the various locations<br />

(shipyard, topsides fabricators, equipment<br />

suppliers).<br />

Specifics regarding the various <strong>FPSO</strong> <strong>and</strong> <strong>FSO</strong> units<br />

are shown in the enclosed reference list.<br />

Within the SBM Offshore Group, the development of<br />

<strong>FPSO</strong>'s <strong>and</strong> <strong>FSO</strong>'s is a matter of close co-operation<br />

between the three subsidiaries Single Buoy<br />

Moorings, SBM Atlantia <strong>and</strong> <strong>GustoMSC</strong>.<br />

Technology<br />

Creating<br />

Value


production<br />

P<br />

Product sheet / Rev.1<br />

<strong>GustoMSC</strong> © 06.100<br />

The two essential components of an <strong>FPSO</strong> - the<br />

mooring system <strong>and</strong> the high-pressure swivel stack -<br />

are the core business of SBM <strong>and</strong> SBM-IMODCO,<br />

<strong>and</strong> they have an outst<strong>and</strong>ing reputation in this field.<br />

For <strong>FPSO</strong> projects SBM <strong>and</strong> SBM-IMODCO operate<br />

as main contractor vis-à-vis the client. <strong>GustoMSC</strong> is<br />

the designated engineering contractor for both<br />

companies with in-house knowledge on tanker<br />

conversion, marine systems, piping, E&I <strong>and</strong> topside<br />

engineering.<br />

To ensure that the designs incorporate fit-forpurpose<br />

requirements, benefit is obtained from the<br />

operational experience of SBM Production<br />

Contractors, who operate a dozen <strong>FPSO</strong>'s on<br />

longterm lease for various clients.<br />

Typical <strong>GustoMSC</strong> scope of work<br />

The scope of work executed by <strong>GustoMSC</strong> for a<br />

typical conversion comprises some 250 different<br />

activities, divided into the following main groups:<br />

• Project management<br />

• Vessel survey<br />

• Collection <strong>and</strong> review of vessel documentation<br />

• Conversion <strong>and</strong> design calculations <strong>and</strong> drawings<br />

• Classification <strong>and</strong> Authority approval coordination<br />

• Procurement services<br />

• Yard supervision<br />

• Manuals<br />

• As-built drawings<br />

Specific equipment <strong>and</strong> systems for which<br />

<strong>GustoMSC</strong> applies its engineering expertise are:<br />

• Ship's hull<br />

• Tank arrangements<br />

• Accommodation<br />

• Helideck<br />

• Naval architectural calculations<br />

• Structural strength <strong>and</strong> fatigue analysis<br />

• Hydrodynamic analysis <strong>and</strong> simulations<br />

• Mooring system integration<br />

• Power generation <strong>and</strong> distribution facilities<br />

• Ship-related utility systems.<br />

• Safety systems<br />

• Engine room systems<br />

• Instrumentation <strong>and</strong> control systems<br />

Page 2 of 10<br />

• Cargo <strong>and</strong> ballast h<strong>and</strong>ling<br />

• Export metering<br />

• Oil <strong>and</strong> gas separation facilities<br />

• Oil stabilization<br />

• Gas treatment<br />

• Gas compression<br />

• Seawater injection facilities<br />

• Topside related utility systems<br />

• Flare systems<br />

• T<strong>and</strong>em mooring systems<br />

• Stern discharge systems.<br />

Apart from complete <strong>FPSO</strong> projects, <strong>GustoMSC</strong> is<br />

also involved in the engineering of non-st<strong>and</strong>ard<br />

<strong>FPSO</strong> related systems.<br />

For the Schiehallion <strong>FPSO</strong> we created a design for a<br />

large internal turret of 16 m diameter, using our<br />

patented bogie wheel configuration. For the <strong>FSO</strong><br />

'OKHA' we designed <strong>and</strong> delivered a large floating<br />

hose storage <strong>and</strong> offloading reel. The hydraulically<br />

driven winch with spooling device allows for the<br />

hauling in, payout <strong>and</strong> storage of a 300 m floating<br />

export hose.<br />

Technology<br />

Creating<br />

Value


production<br />

P<br />

Product sheet / Rev.1<br />

<strong>GustoMSC</strong> © 06.100<br />

REFERENCES <strong>FSO</strong> PROJECTS<br />

<strong>FSO</strong> XV Domy (decommissioned)<br />

Project Conversion T.T. Nielstor into<br />

<strong>FSO</strong> XV Domy for installation<br />

offshore Nigeria<br />

Client Elf Nigeria (Owner SBM PC)<br />

Conversion yard Sembawang Shipyard,<br />

Singapore<br />

Delivery January 1993<br />

Design criteria<br />

Incoming oil 100,000 bbl/d<br />

Produced water treatment 15,000 bbl/d<br />

Water injection N/A<br />

Oil storage capacity 2,000,000 bbl<br />

Offloading rate 50,000 bbl/hr<br />

Vessel deadweight 269,000 dwt<br />

Accommodation capacity 112 POB<br />

Cargo heating Sloptank only<br />

Helideck Bell 212<br />

Boiler dual fuel conversion Gas / Diesel<br />

<strong>FSO</strong> Angsi<br />

Project Conversion Bertina into <strong>FSO</strong><br />

Angsi for installation in the<br />

South Angsi PM 305 field,<br />

offshore Malaysia<br />

Client Talisman (Owner MISC)<br />

Yard Malaysian Marine <strong>and</strong> Heavy<br />

Engineering (MMHE)<br />

Delivery August 2005<br />

Design criteria<br />

Incoming oil 40,000 bbls/day<br />

Produced water treatment 4,000 bbls/day<br />

Water injection N/A<br />

Oil storage capacity 400,000 bbls<br />

Offloading rate 2,200 m 3 /hr<br />

Accommodation capacity 75 POB<br />

Cargo heating N/A<br />

Helideck Sikorsky S61N / Super Puma<br />

Vessel deadweight 12,800 dwt<br />

Boiler triple fuel HFP / HSD / Fuel Gas<br />

Page 3 of 10<br />

<strong>FSO</strong> Yoho (ex-N’Kossa I)<br />

Project Conversion T.T. Stena concept<br />

into <strong>FSO</strong> N’Kossa I for installation<br />

in the N’Kossa field, offshore<br />

Congo<br />

Client Elf Congo (Owner SBM PC)<br />

Conversion yard Dubai Drydocks, U.A.E.<br />

Delivery April 1996<br />

Design criteria<br />

Incoming oil 125,000 bbl/d<br />

Produced water treatment N/A<br />

Water injection N/A<br />

Oil storage capacity 2,000,000 bbl<br />

Offloading rate 50,000 bbl/hr<br />

Vessel deadweight 270,000 dwt<br />

Accommodation capacity 60 POB<br />

Helideck Dauphin I As 365 N<br />

Boiler dual fuel conversion Gas / Diesel / H.F.O.<br />

<strong>FSO</strong> Oguzhan<br />

Project Newbuild <strong>FSO</strong> Oguzhan, for<br />

installation in the East Livanov field,<br />

Caspian Sea, Turkmenistan<br />

Client Petronas Carigali (Turkmenistan)<br />

Sdn. Bhd. (Owner SBM PC)<br />

Yard M.I.S. yard, Sharjah, UAE<br />

Delivery April 2006<br />

Design criteria<br />

Incoming oil Max. 15,000 bbls<br />

Produced water treatment N/A<br />

Oil storage capacity 60,000 bbls<br />

Offloading rate 700 m 3 /h<br />

Accommodation capacity 22 POB<br />

Cargo heating Steam heated coils in tanks<br />

Vessel deadweight 12,800 dwt<br />

Technology<br />

Creating<br />

Value


production<br />

P<br />

Product sheet / Rev.1<br />

<strong>GustoMSC</strong> © 06.100<br />

REFERENCES <strong>FPSO</strong> PROJECTS<br />

<strong>FPSO</strong> BA VI<br />

Project Conversion M.S. BA VI into<br />

<strong>FPSO</strong> BA VI for installation in<br />

Dragon field, offshore Vietnam<br />

Client Petechim / Vietsovpetro (via<br />

Keppel)<br />

Conversion yard Keppel Shipyard, Singapore<br />

Delivery October 1994<br />

Design criteria<br />

Oil production (heating/stabilising) 100,000 bbl/d<br />

Produced water treatment 10,000 bbl/d<br />

Water injection N/A<br />

Gas venting max 2 MMscfd<br />

Oil storage capacity 1,100,000 bbl<br />

Offloading rate 25,000 bbl/hr<br />

Vessel deadweight 154,000 dwt<br />

Accommodation capacity 40 POB<br />

Boiler dual fuel conversion N/A<br />

Cargo heating Maintain 45°C<br />

<strong>FPSO</strong> Nan Hai Fa Xian<br />

Project Conversion T.T. Agip Campania<br />

into <strong>FPSO</strong> Nan Hai Fa Xian for<br />

installation in Huizhou field,<br />

offshore China<br />

Client ACT-OG (Agip / Chevron /<br />

Texaco Operating Group)<br />

Conversion yard Sembawang Shipyard,<br />

Singapore<br />

Delivery<br />

Design criteria<br />

August 1990<br />

Oil production 80,000 bbl/d<br />

Produced water treatment 50,000 bbl/d<br />

Water injection 60,000 bbl/d<br />

Water injection pressure 2,000 psi<br />

Gas disposal by ground flare 6 MMscfd<br />

Gas treatment for use in boilers<br />

<strong>and</strong> gas turbines<br />

5 MMscfd<br />

Oil storage capacity 1,600,000 bbl<br />

Offloading rate 35,000 bbl/hr<br />

Vessel deadweight 254,000 dwt<br />

Accommodation capacity 86 POB<br />

Cargo heating Yes<br />

Boiler dual fuel conversion Gas / diesel / H.F.O.<br />

Page 4 of 10<br />

<strong>FPSO</strong> Nan Hai Kai Tuo<br />

Project Conversion M.S. Java into<br />

<strong>FPSO</strong> Nan Hai Kai Tuo for<br />

installation in Xijiang oilfield,<br />

offshore China<br />

Client Phillips Petroleum (via SBM)<br />

Conversion yard Keppel Shipyard, Singapore<br />

Delivery November 1994<br />

Design criteria<br />

Oil production 90,000 bbl/d<br />

Produced water treatment 60,000 bbl/d<br />

Water injection N/A<br />

Oil storage capacity 1,000,000 bbl<br />

Offloading rate 38,000 bbl/hr<br />

Vessel deadweight 152,400 dwt<br />

Accommodation capacity 60 POB<br />

Helideck Super Puma 332 L<br />

Boiler dual fuel conversion Crude oil / H.F.O.<br />

Cargo heating Maintain 60°C<br />

Technology<br />

Creating<br />

Value


production<br />

P<br />

Product sheet / Rev.1<br />

<strong>GustoMSC</strong> © 06.100<br />

<strong>FPSO</strong> Tantawan Explorer<br />

Project Conversion T.T. Bayern into<br />

<strong>FPSO</strong> for installation in the<br />

Tantawan field, offshore<br />

Thail<strong>and</strong><br />

Client Chevron (Owner SBM PC)<br />

Conversion yard Sembawang Shipyard,<br />

Singapore<br />

Delivery December 1996<br />

Design criteria<br />

Oil production 50,000 bbl/d<br />

Produced water treatment 25,000 bbl/d<br />

Water injection N/A<br />

Gas export 150 MMscfd<br />

Gas flaring Emergency only<br />

Oil storage capacity 1,000,000 bbl<br />

Offloading rate 24,000 bbl/hr<br />

Accommodation capacity 70 POB<br />

Helideck Super Puma<br />

Boiler dual fuel conversion Gas / Diesel / H.F.O.<br />

<strong>FPSO</strong> Rang Dong<br />

Project Conversion of the T.T. Prostor I<br />

into <strong>FPSO</strong> for installation in the<br />

Rang Dong field, offshore<br />

Vietnam<br />

Client SBM Diamond (SBM/MHI J.V.)<br />

Conversion yard Hitachi Zosen Singapore Ltd.<br />

Delivery<br />

Design criteria<br />

July 1998<br />

Oil production 53,000 bbl/d<br />

Produced water treatment 11,000 bbl/d<br />

Water injection N/A<br />

Gas flaring (max. production<br />

to HP&LP)<br />

12 MMscfd<br />

Oil storage capacity 1,000,000 bbl<br />

Offloading rate 25,000 bbl/hr<br />

Vessel deadweight 150,000 dwt<br />

Accommodation capacity 68 POB<br />

Helideck MI 17<br />

Boiler dual fuel conversion Gas / Diesel / H.F.O.<br />

Page 5 of 10<br />

<strong>FPSO</strong> Firenze (Aquila) (decommissioned)<br />

Project Conversion of the <strong>FPSO</strong><br />

Firenze to upgrade the <strong>FPSO</strong><br />

for its new task in the Aquila<br />

field<br />

Client Agip (Owner FFPP SBM<br />

PC/Saipem J.V.)<br />

Conversion yard Tuzla, Turkey<br />

Delivery<br />

Design criteria<br />

Summer 1997<br />

Oil production 20,000 bbl/d (H2S content max.<br />

11,000 ppm)<br />

Produced water treatment 5,000 bbl/d<br />

Water injection N/A<br />

Gas lift (100 Bar) 11 MMscfd<br />

Gas flaring 12 MMscfd<br />

Oil storage capacity 550,000 bbl (centre tanks only)<br />

Offloading rate 22,000 bbl/hr<br />

Accommodation capacity 50 POB<br />

Helideck Puma<br />

Boiler dual fuel conversion Gas / Diesel / H.F.O.<br />

Technology<br />

Creating<br />

Value


production<br />

P<br />

Product sheet / Rev.1<br />

<strong>GustoMSC</strong> © 06.100<br />

<strong>FPSO</strong> Kuito<br />

Project T.T. Prostor II into <strong>FPSO</strong> for<br />

installation in the Kuito field,<br />

offshore Angola<br />

Client Chevron (Owner SBM PC)<br />

Conversion yard Sembawang Shipyard,<br />

Singapore<br />

Delivery<br />

Design criteria<br />

September 1999<br />

Oil production 100,000 bbl/d (* 100,000 bbl/d)<br />

Produced water treatment 20,000 bbl/d (* 135,000 bbl/d)<br />

Water injection 110,000 bbl/d (* 136,000 bbl/d)<br />

Gas compression 36 MMscfd (* 100 MMscfd)<br />

Gas flaring (max. production to<br />

HP&LP)<br />

60 MMscfd<br />

Power generation 2 x 4.5 MW<br />

Oil storage capacity 1,400,000 bbl<br />

Offloading rate 35,000 bbl/hr<br />

Vessel deadweight 220,600 dwt<br />

Accommodation capacity 70 POB<br />

Helideck Sikorsky<br />

Boiler dual fuel conversion<br />

(* after upgrade)<br />

Gas / Diesel / H.F.O.<br />

<strong>FPSO</strong> Brasil<br />

Project Conversion tanker into <strong>FPSO</strong><br />

for installation in Roncanor<br />

field, offshore Brazil<br />

Client Petrobras (Owner SBM PC)<br />

Conversion yard Keppel Shipyard, Singapore<br />

Delivery December 2002 (first oil)<br />

Design criteria<br />

Oil production 95,000 bbl/d<br />

Produced water treatment 50,000 bwpd<br />

Water injection 90,000 bpd<br />

Gas lift + export 106 MMscfd<br />

Oil storage capacity 1,700,000 bbls<br />

Offloading rate 6,650 m 3 /h (1,000,000 bbl/d)<br />

Vessel deadweight 255,000 dwt<br />

Accommodation capacity 100 POB<br />

Helideck Sikorsky S61N<br />

Boiler dual fuel conversion Gas / M.G.O.<br />

Cargo heating Only slop tanks<br />

Page 6 of 10<br />

<strong>FPSO</strong> Espadarte<br />

Project Conversion <strong>FPSO</strong> VI into<br />

<strong>FPSO</strong> for installation in the<br />

Espadarte field, offshore Brazil<br />

Client Petrobras (Owner SBM PC)<br />

Conversion yard Keppel Shipyard, Singapore<br />

Delivery<br />

Design criteria<br />

February 2000<br />

Oil production 100,000 bbl/d<br />

Produced water treatment 50,000 bbl/d<br />

Water injection 110,000 bbl/d<br />

Gas compression 30 MMscfd<br />

Gas flaring (max. production to<br />

HP&LP)<br />

88 MMscfd<br />

Oil storage capacity 1,900,000 bbl<br />

Offloading rate 40,000 bbl/hr<br />

Vessel deadweight 285,000 dwt<br />

Accommodation capacity 70 POB<br />

Helideck Sikorsky<br />

Boiler dual fuel conversion Gas / Diesel<br />

Technology<br />

Creating<br />

Value


production<br />

P<br />

Product sheet / Rev.1<br />

<strong>GustoMSC</strong> © 06.100<br />

<strong>FPSO</strong> Falcon<br />

Project Conversion tanker into <strong>FPSO</strong><br />

for installation in Yoho field,<br />

offshore Nigeria<br />

Client ExxonMobil (Owner SBM PC)<br />

Conversion yard Keppel Shipyard, Singapore<br />

Delivery December 2002 (first oil)<br />

Design criteria<br />

Oil production 120,000 bopd<br />

Produced water treatment 50,000 bwpd<br />

Water injection 90,000 bpd<br />

Gas injection 120 MMscfd<br />

Oil storage capacity 2,200,000 bbls<br />

Offloading rate 1,000,000 bbl/24h<br />

Vessel deadweight 315,000 dwt<br />

Accommodation capacity 100 POB<br />

Helideck Sikorsky 61/92<br />

Boiler dual fuel conversion Gas / M.G.O.<br />

Cargo heating Slop tanks <strong>and</strong> Off-Spec tank<br />

<strong>FPSO</strong> Xikomba<br />

Project Conversion tanker into <strong>FPSO</strong><br />

for installation in Xikomba field,<br />

offshore Angola<br />

Client ExxonMobil (Owner Sonasing<br />

(J.V. SBM <strong>and</strong> Sonangol))<br />

Conversion yard Dubai Drydocks, UAE<br />

Delivery October 2003 (first oil)<br />

Design criteria<br />

Oil production 90,000 bopd<br />

Produced water treatment 50,000 bwpd<br />

Water injection 90,000 bpd<br />

Gas lift + export 20 MMscfd<br />

Gas injection 95 MMscfd<br />

Oil storage capacity 1,700,000 bbls<br />

Offloading rate 1,000,000 bbls/24h<br />

Vessel deadweight 257,000 dwt<br />

Accommodation capacity 100 POB<br />

Helideck Sikorsky S61N, S92A<br />

Boiler dual fuel conversion Gas / M.G.O.<br />

Cargo heating Slop tanks <strong>and</strong> Off-Spec tank<br />

Page 7 of 10<br />

<strong>FPSO</strong> Serpentina<br />

Project Conversion tanker into <strong>FPSO</strong><br />

for installation in Zafiro field,<br />

Equatorial Guinea<br />

Client ExxonMobil (Owner SBM PC)<br />

Conversion yard Keppel Shipyard, Singapore<br />

Delivery July 2003<br />

Design criteria<br />

Oil production 110,000 bopd<br />

Oil import 185,000 bbls<br />

Produced water treatment 50,000 bwpd<br />

Water injection 150,000 bpd<br />

Gas lift 65 MMscfd<br />

Oil storage capacity 1,900,000 bbls<br />

Offloading rate 1,000,000 bbl/24h<br />

Vessel deadweight 307,000 dwt<br />

Accommodation capacity 100 POB<br />

Helideck Sikorsky 61, S76C, S92<br />

Bell206L-4<br />

Boiler dual fuel conversion Gas / M.G.O.<br />

Cargo heating Slop tanks <strong>and</strong> Off-Spec tank<br />

Technology<br />

Creating<br />

Value


production<br />

P<br />

Product sheet / Rev.1<br />

<strong>GustoMSC</strong> © 06.100<br />

<strong>FPSO</strong> Mystras<br />

Project Conversion tanker into <strong>FPSO</strong><br />

for installation in Okono/Okpoho<br />

field, offshore Nigeria<br />

Client Agip (Owner J.V. SBM/Saipem)<br />

Conversion yard Dubai Drydocks, UAE<br />

Delivery January 2004 (first oil)<br />

Design criteria<br />

Oil production 80,000 bopd<br />

Produced water treatment 55,000 bwpd<br />

Gas injection 50 MMscfd<br />

Gas lift 50 MMscfd<br />

Oil storage capacity 1,040,000 bbls<br />

Offloading rate 1,000,000 bbls/24h<br />

Vessel deadweight 139,000 dwt<br />

Accommodation capacity 100 POB<br />

Helideck Sikorsky S61N, S92A<br />

Boiler dual fuel conversion Gas / M.G.O.<br />

Cargo heating Only slop tanks<br />

<strong>FPSO</strong> Capixaba<br />

Project Conversion tanker Stena<br />

Congress into <strong>FPSO</strong> for<br />

installation in Golfinho field,<br />

offshore Brazil<br />

Client Petrobras (Owner SBM PC)<br />

Conversion yard Keppel Shipyard Tuas,<br />

Singapore<br />

Delivery May 2006 (first oil)<br />

Design criteria<br />

Oil production 100,000 bopd<br />

Produced water treatment 50,000 bwpd<br />

Water injection 138,000 bwpd<br />

Gas lift + export 123 MMscfd<br />

Oil storage capacity 1,600,000 bbls<br />

Offloading rate 1,000,000 bbls/24hrs<br />

Vessel deadweight 273,000 dwt<br />

Accommodation capacity 96 POB<br />

Helideck Sikorsky S61N, S92<br />

Boiler dual fuel conversion Gas / M.G.O.<br />

Cargo heating Only slop tanks<br />

Page 8 of 10<br />

<strong>FPSO</strong> Marlim Sul<br />

Project Conversion tanker into <strong>FPSO</strong><br />

for installation in Yoho field,<br />

offshore Nigeria<br />

Client Petrobras (Owner SBM PC)<br />

Conversion yard Keppel Shipyard Tuas,<br />

Singapore<br />

Delivery May 2004 (first oil)<br />

Design criteria<br />

Oil production 100,000 bopd<br />

Oil import 75,000 bbls<br />

Produced water treatment 62,500 bbls<br />

Water injection 125,000 bpd<br />

Gas lift + export 86 MMscfd<br />

Oil storage capacity 1,600,000 bbls<br />

Offloading rate 1,000,000 bbls/24hrs<br />

Vessel deadweight 278,000 dwt<br />

Accommodation capacity 100 POB<br />

Helideck Sikorsky S61N<br />

Boiler dual fuel conversion Gas / M.G.O.<br />

Cargo heating Only slop tanks<br />

Technology<br />

Creating<br />

Value


production<br />

P<br />

Product sheet / Rev.1<br />

<strong>GustoMSC</strong> © 06.100<br />

<strong>FPSO</strong> Kikeh<br />

Project Conversion tanker Stena<br />

Conductor into <strong>FPSO</strong> for<br />

installation in Kikeh field,<br />

offshore Malaysia<br />

Client Murphy Sabah Oil (Owner<br />

MDFT – Malaysia Deepwater<br />

Floating Terminals)<br />

Conversion yard Malaysian Marine <strong>and</strong> Heavy<br />

Engineering (MMHE)<br />

Delivery 2007<br />

Design criteria<br />

Oil production 150,000 bopd<br />

Produced water treatment 130,000 bwpd<br />

Water injection 260,000 bwpd<br />

Gas injection + export 135 MMscfd<br />

Oil storage capacity 2,000,000 bbls<br />

Offloading rate 6,650 m 3 /h (1,000,000 bpd)<br />

Vessel deadweight 273,000 dwt<br />

Accommodation capacity 118 POB<br />

Helideck Sikorsky S61, S92<br />

Boiler dual fuel conversion Gas / M.G.O.<br />

Cargo heating Only slop tank<br />

<strong>FPSO</strong> P-57<br />

Project Conversion MT Accord into<br />

<strong>FPSO</strong> for installation in<br />

Jubarte Campos Basin, Brazil<br />

Client Petrobras<br />

Conversion yard Keppel Shipyard,<br />

Singapore/BrasFELS Brazil<br />

Delivery 2011<br />

Design criteria<br />

Oil production 180,000 bopd<br />

Produced water treatment 270,000 bwpd<br />

Water injection 360,000 bwpd @ 200 barg<br />

Gas compression 70 MMscfd @ 200 barg<br />

Oil storage capacity 2,000,000 bbls<br />

Offloading rate 1,000,000/24 hr<br />

Vessel deadweight 262,000 dwt<br />

Accommodation capacity 110 POB<br />

Helideck Sikorsky S61, S92<br />

Boiler dual fuel conversion Gas / M.G.O.<br />

Cargo heating Cargo, settling <strong>and</strong> slop tanks<br />

Page 9 of 10<br />

<strong>FPSO</strong> Mondo <strong>and</strong> <strong>FPSO</strong> Saxi-Batuque<br />

Project Conversion tanker Stena Constellation <strong>and</strong> tanker<br />

Litopia into <strong>FPSO</strong>s for installation in the Saxi <strong>and</strong><br />

Batuque fields (Kizomba C development), offshore<br />

Angola<br />

Client Esso Exploration Angola<br />

Conversion yard Keppel Shipyard, Singapore<br />

Delivery 2007 <strong>and</strong> 2008<br />

Design criteria Saxi-Batuque Mondo<br />

Oil production 100,000 bopd 100,000 bopd<br />

Produced water<br />

treatment<br />

80 Mbpd 50 Mbpd<br />

Gas compression 150 MMscfd (445 100 MMscfd (318<br />

barg)<br />

barg)<br />

Water injection 150 Mbpd @ 280 125 Mbpd @ 250<br />

barg<br />

barg<br />

Gas injection 150 MMscf @445 100 MMscf @ 380<br />

barg<br />

barg<br />

Oil storage capacity 2,000,000 bbls 2,000,000 bbls<br />

Offloading rate 1,000,000/24 hr 1,000,000/24 hr<br />

Vessel deadweight 271,000 dwt 266,000 dwt<br />

Accommodation<br />

capacity<br />

100 POB 100 POB<br />

Helideck Sikorsky S-61N, S- Sikorsky S-61N, S-<br />

92A<br />

92A<br />

Cargo heating Cargo <strong>and</strong> slop<br />

tanks<br />

Technology<br />

Creating<br />

Value<br />

Cargo <strong>and</strong> slop<br />

tanks


production<br />

P<br />

Product sheet / Rev.1<br />

<strong>GustoMSC</strong> © 06.100<br />

FLOATING<br />

PRODUCTION<br />

Unit name at built Current name Year built (Conversion) Yard Current owner/manager<br />

Vessel conversion (** incl. Process engineering)<br />

<strong>FPSO</strong> P-57 ** 2009 Keppel Shipyard SBM<br />

<strong>FPSO</strong> Mondo ** 2008 Keppel Shipyard SBM / Sonangol<br />

<strong>FPSO</strong> Saxi-Batuque ** 2008 Keppel Shipyard SBM / Sonangol<br />

<strong>FPSO</strong> Kikeh ** 2007 MMHE Shipyard SBM / MISC<br />

<strong>FPSO</strong> Capixaba ** 2006 Keppel Shipyard SBM<br />

<strong>FPSO</strong> Marlim Sul ** 2004 Keppel Shipyard SBM<br />

<strong>FSO</strong> Angsi 2004 MMHE MISC<br />

<strong>FPSO</strong> Mystras ** 2003 Drydocks World, SBM / Saipem<br />

<strong>FPSO</strong> Serpentina ** 2003 Keppel Shipyard ExxonMobil<br />

<strong>FPSO</strong> Xikomba ** 2002 Drydocks World SBM / Sonangol<br />

<strong>FPSO</strong> Brasil ** 2001 Keppel Shipyard SBM / MISC<br />

<strong>FPSO</strong> Falcon ** <strong>FPSO</strong> Yoho 2000 Keppel Shipyard SBM<br />

<strong>FPSO</strong> Espadarte ** 1999 Keppel Shipyard SBM<br />

<strong>FSO</strong> Yetagun 1998 Keppel Shipyard South East Shipping<br />

<strong>FPSO</strong> Kuito ** 1998 Sembawang Shipyard SBM / Sonangol<br />

<strong>FPSO</strong> Rang Dong 1 ** 1998 Hitachi Zosen Shipyard SBM / Mitsubishi<br />

<strong>FPSO</strong> Tantawan Explorer 1995 Sembawang Shipyard SBM (Chevron)<br />

<strong>FSO</strong> N'Kossa I <strong>FSO</strong> Yoho 1995 Drydocks World ExxonMobil<br />

<strong>FPSO</strong> BA VI ** 1994 Keppel Shipyard / Vietsovpetro<br />

<strong>FPSO</strong> Nan-Hai-Kai Tuo 1993 Keppel Shipyard Conoco-Phillips<br />

<strong>FPSO</strong> Nan-Hai-Fa-Xian 1989 Sembawang Shipyard ACT-OG<br />

Interface process / vessel mooring<br />

<strong>FPSO</strong> Nan-Hai-Kai Tuo 1993 Keppel Shipyard Conoco-Phillips<br />

Mooring system<br />

<strong>FPSO</strong> Schiehallion 1997 Harl<strong>and</strong> <strong>and</strong> Wolff BP<br />

<strong>FSO</strong> Benchamas Explorer 1997 Jurong Shipyard Imodco / SBM<br />

<strong>FSO</strong> Belida 1996 Keppel Shipyard ConocoPhillips<br />

Mooring system integration<br />

Petrobras P35 1998 HHI Petrobras<br />

<strong>FPSO</strong> Schiehallion 1997 Harl<strong>and</strong> <strong>and</strong> Wolff BP<br />

<strong>FPSO</strong> Curlew 1997 Amec Shell Expro<br />

Petrobras P33 1997 Shanhaiguan Shipyard Petrobras<br />

New built vessels (** incl. Process engineering)<br />

<strong>FSO</strong> Oguzhan 2005 M.I.S. Petronas Carigali<br />

KCO gas compressor barges 2004 Lamprell AGIP KCO<br />

LPG <strong>FPSO</strong> Sanha ** 2004 IHI Kure SBM / Sonangol<br />

<strong>FSO</strong> Unity (Amenan/Kpono) 2001 HHI Total<br />

Page 10 of 10<br />

Technology<br />

Creating<br />

Value

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!