05.04.2013 Views

By order of the air force instruction 11-261 - Air Force E-Publishing ...

By order of the air force instruction 11-261 - Air Force E-Publishing ...

By order of the air force instruction 11-261 - Air Force E-Publishing ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

18 AFI<strong>11</strong>-<strong>261</strong> 15 OCTOBER 2012<br />

Chapter 4<br />

REQUESTING A LINK 16 DESIGN<br />

4.1. Design Requests. Any unit planning to participate in local Link 16 operations/training<br />

where a Link 16 network design does not exist or has not been designated may submit a Link 16<br />

design request to ensure operational needs are met. A request worksheet can be found in<br />

Attachment 2 <strong>of</strong> this publication. A request form is in JMTOP, pages A-D-A-5 through A-D-A-<br />

8. <strong>Air</strong> <strong>Force</strong> units will contact ACC/A3CJ to initiate this process.<br />

4.1.1. Existing Designs. Prior to requesting a new design, review existing designs for<br />

applicability. The AF NDF will provide description documents for designs containing <strong>Air</strong><br />

<strong>Force</strong> platforms. Users should review <strong>the</strong> description document and consider designs that<br />

support at least <strong>the</strong> maximum number and type <strong>of</strong> participants required, applicability <strong>of</strong><br />

interface units to o<strong>the</strong>r links/TDLs, functional capabilities, connectivity/relay requirements,<br />

cryptographic isolation, and pulse density compliance. When an existing design meets <strong>the</strong><br />

unit’s need, download <strong>the</strong> terminal IDLs for platform participants and <strong>the</strong> network<br />

description document (NDD) from <strong>the</strong> TDLOMO Community Webpage at<br />

https://www.us.army.mil/suite/grouppage/189842.<br />

4.2. Designated Designs. Units planning to participate in Link 16 operations/training under <strong>the</strong><br />

direction <strong>of</strong> an external TDLM or network manager will identify <strong>the</strong> design to be used using <strong>the</strong><br />

Link 16 section <strong>of</strong> <strong>the</strong> appropriate OPTASK LINK. Changes must be coordinated with <strong>the</strong><br />

TDLM/network manager.<br />

4.3. Design Support. If a new design or a modification to an existing design is required,<br />

contact ACC/A3CJ with unit platform requirements as indicated in Para 4.1 above. Users who<br />

are unsure whe<strong>the</strong>r an existing design fulfills <strong>the</strong> requirement should contact ACC/A3CJ to<br />

request advice regarding a network design.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!