18 AFI<strong>11</strong>-<strong>261</strong> 15 OCTOBER 2012<br />
Chapter 4<br />
REQUESTING A LINK 16 DESIGN<br />
4.1. Design Requests. Any unit planning to participate in local Link 16 operations/training<br />
where a Link 16 network design does not exist or has not been designated may submit a Link 16<br />
design request to ensure operational needs are met. A request worksheet can be found in<br />
Attachment 2 <strong>of</strong> this publication. A request form is in JMTOP, pages A-D-A-5 through A-D-A-<br />
8. <strong>Air</strong> <strong>Force</strong> units will contact ACC/A3CJ to initiate this process.<br />
4.1.1. Existing Designs. Prior to requesting a new design, review existing designs for<br />
applicability. The AF NDF will provide description documents for designs containing <strong>Air</strong><br />
<strong>Force</strong> platforms. Users should review <strong>the</strong> description document and consider designs that<br />
support at least <strong>the</strong> maximum number and type <strong>of</strong> participants required, applicability <strong>of</strong><br />
interface units to o<strong>the</strong>r links/TDLs, functional capabilities, connectivity/relay requirements,<br />
cryptographic isolation, and pulse density compliance. When an existing design meets <strong>the</strong><br />
unit’s need, download <strong>the</strong> terminal IDLs for platform participants and <strong>the</strong> network<br />
description document (NDD) from <strong>the</strong> TDLOMO Community Webpage at<br />
https://www.us.army.mil/suite/grouppage/189842.<br />
4.2. Designated Designs. Units planning to participate in Link 16 operations/training under <strong>the</strong><br />
direction <strong>of</strong> an external TDLM or network manager will identify <strong>the</strong> design to be used using <strong>the</strong><br />
Link 16 section <strong>of</strong> <strong>the</strong> appropriate OPTASK LINK. Changes must be coordinated with <strong>the</strong><br />
TDLM/network manager.<br />
4.3. Design Support. If a new design or a modification to an existing design is required,<br />
contact ACC/A3CJ with unit platform requirements as indicated in Para 4.1 above. Users who<br />
are unsure whe<strong>the</strong>r an existing design fulfills <strong>the</strong> requirement should contact ACC/A3CJ to<br />
request advice regarding a network design.