While the 2.28-km length of the runway is adequate for the anticipated domestic<br />

operations of B737 and A320, the width of the runway should be widened from its<br />

existing 36m to 45m for safety reasons. This is being considered under DOTC’s<br />

Five-Year <strong>Airport</strong> Development Plan.<br />

The existing runway consisting of asphalt overlaid PCCP, has shown signs of<br />

progressive deterioration and may need resurfacing over the medium-term. A<br />

portion of the existing runway located proximate to the apron, covering an area of<br />

approximately 10,000 sq.m., requires immediate resurfacing. Special attention<br />

should be given to the longitudinal cracks and differential settlement of pavement<br />

portions near the apron area which may need a more thorough geotechnical<br />

investigation.<br />

The existing apron and taxiway configuration are adequate for the current level of<br />

demand. The apron can accommodate from three (3) to four (4) aircraft stands to<br />

cater to aircraft in the mold of B737. A brief review of the other components of the<br />

airport facilities is summarized in Table 2.4-2.<br />

1) Passenger<br />

Terminal<br />

Building<br />

2) Cargo<br />

Terminal<br />

Building<br />

Table 2.4-2 Brief Assessment of Selected <strong>Airport</strong> Components<br />

Facilities Remarks<br />

- Passenger<br />

Handling<br />

Capacity<br />

- Quality of<br />

Services<br />

- Cargo<br />

Handling<br />

Capacity<br />

3) Control Tower and<br />

Administration Building<br />

4) Vehicle<br />

Parking Area<br />

- Vehicle<br />

Parking<br />

Capacity<br />

2-12<br />

• The existing 910 sq. m passenger terminal<br />

area is not enough to provide at least 10<br />

sq.m. per peak hour passenger. Additional<br />

capacity will be needed accommodate a<br />

larger number of peak-hour passengers.<br />

• There are no baggage screening device and<br />

baggage claim conveyor.<br />

• The check-in lobby and the arrival area not<br />

equipped with air conditioning units.<br />

• The building is structurally in good condition.<br />

• The cargo terminal area has sufficient<br />

capacity to handle present level of cargo<br />

traffic.<br />

• The control tower has good visibility of the<br />

entire airport area. It is structurally sound but<br />

rainwater leakage is reported.<br />

• Existing control tower constitutes an<br />

obstacle to transitional surface, and<br />

jeopardizes safe aircraft operations.<br />

• The administration office has adequate<br />

space for daily activity.<br />

• The vehicle parking area has sufficient<br />

capacity for the observed peak-hour<br />

vehicular traffic volume and vehicular traffic<br />

is well regulated.<br />

• Nearby open spaces provide additional<br />

back-up areas for parking.