While the 2.28-km length of the runway is adequate for the anticipated domestic<br />
operations of B737 and A320, the width of the runway should be widened from its<br />
existing 36m to 45m for safety reasons. This is being considered under DOTC’s<br />
Five-Year <strong>Airport</strong> Development Plan.<br />
The existing runway consisting of asphalt overlaid PCCP, has shown signs of<br />
progressive deterioration and may need resurfacing over the medium-term. A<br />
portion of the existing runway located proximate to the apron, covering an area of<br />
approximately 10,000 sq.m., requires immediate resurfacing. Special attention<br />
should be given to the longitudinal cracks and differential settlement of pavement<br />
portions near the apron area which may need a more thorough geotechnical<br />
investigation.<br />
The existing apron and taxiway configuration are adequate for the current level of<br />
demand. The apron can accommodate from three (3) to four (4) aircraft stands to<br />
cater to aircraft in the mold of B737. A brief review of the other components of the<br />
airport facilities is summarized in Table 2.4-2.<br />
1) Passenger<br />
Terminal<br />
Building<br />
2) Cargo<br />
Terminal<br />
Building<br />
Table 2.4-2 Brief Assessment of Selected <strong>Airport</strong> Components<br />
Facilities Remarks<br />
- Passenger<br />
Handling<br />
Capacity<br />
- Quality of<br />
Services<br />
- Cargo<br />
Handling<br />
Capacity<br />
3) Control Tower and<br />
Administration Building<br />
4) Vehicle<br />
Parking Area<br />
- Vehicle<br />
Parking<br />
Capacity<br />
2-12<br />
• The existing 910 sq. m passenger terminal<br />
area is not enough to provide at least 10<br />
sq.m. per peak hour passenger. Additional<br />
capacity will be needed accommodate a<br />
larger number of peak-hour passengers.<br />
• There are no baggage screening device and<br />
baggage claim conveyor.<br />
• The check-in lobby and the arrival area not<br />
equipped with air conditioning units.<br />
• The building is structurally in good condition.<br />
• The cargo terminal area has sufficient<br />
capacity to handle present level of cargo<br />
traffic.<br />
• The control tower has good visibility of the<br />
entire airport area. It is structurally sound but<br />
rainwater leakage is reported.<br />
• Existing control tower constitutes an<br />
obstacle to transitional surface, and<br />
jeopardizes safe aircraft operations.<br />
• The administration office has adequate<br />
space for daily activity.<br />
• The vehicle parking area has sufficient<br />
capacity for the observed peak-hour<br />
vehicular traffic volume and vehicular traffic<br />
is well regulated.<br />
• Nearby open spaces provide additional<br />
back-up areas for parking.