New Legaspi Airport Draft FS - PPP Center
New Legaspi Airport Draft FS - PPP Center
New Legaspi Airport Draft FS - PPP Center
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
6. geology<br />
7. socio-economic studies<br />
Baseline conditions of the project site will be established by conducting site<br />
investigations to gather primary data on air, water, terrestrial, geological,<br />
and other pertinent parameters. Secondary information covering geology,<br />
meteorology, hydrology, and demographic characteristics concerning the<br />
site will also be obtained from various national and local agencies,<br />
including from the Philippine Atmospheric, Geophysical and Astronomical<br />
Sciences Administration (PAGASA), Philippine Institute of Volcanology and<br />
Seismology (PHIVOLCS), Barangay Health <strong>Center</strong>s, Municipal Planning<br />
and Health Offices. A perception survey and public consultation will also<br />
be conducted for the proposed airport development project.<br />
The potential impacts of the project on land, water, air, and people will be<br />
identified, predicted and assessed in terms of their negative or positive<br />
effects. Based on the impacts predicted and assessed, mitigating and<br />
enhancement measures will be recommended accordingly and<br />
corresponding Environmental Management and Monitoring Plans will be<br />
prepared.<br />
1-17