Portfolio for growth<br />
Kazakhstan: Karachaganak<br />
Karachaganak performing strongly<br />
• Tenth anniversary of FPSA<br />
• Record production performance<br />
• Operations improvement projects<br />
• Fourth stabilisation train<br />
– Tie in during 2008 shutdown<br />
– On schedule for 2009<br />
• Western export capacity<br />
– Actual 2007: 9 mtpa<br />
– Post fourth train: 10.3 mtpa<br />
– Planned with Phase III: 16.1 mtpa<br />
• Long term Orenburg GSA in-place<br />