Portfolio for growth<br />

Kazakhstan: Karachaganak<br />

Karachaganak performing strongly<br />

• Tenth anniversary of FPSA<br />

• Record production performance<br />

• Operations improvement projects<br />

• Fourth stabilisation train<br />

– Tie in during 2008 shutdown<br />

– On schedule for 2009<br />

• Western export capacity<br />

– Actual 2007: 9 mtpa<br />

– Post fourth train: 10.3 mtpa<br />

– Planned with Phase III: 16.1 mtpa<br />

• Long term Orenburg GSA in-place<br />