y r # r lA'ftpt v_________<br />
(a) any certificate covering testing of<br />
1 f-f<br />
(i) strength/loading tests carried out on crush barriers, guard<br />
rails, hand rails, balustrading, walls or fences;<br />
(f7) ^ T ^ t v i r n , {T * 4 H -irr ^ 0A<br />
QPytftA $TUsCTl*-'1 6*<br />
t t W ( * c r i H * « U v m v l ‘ T U r ^ ne:<br />
(/ i'J ItV ^f £ £,r /M> UrOLTiO/v Ot £ 1,6 c r& iw h w r<br />
fr up> Wf> P / V ^ fr/V ~ / M 1<br />
£&ATI*t>Ar6 >Tie,J<br />
24. The Holder shall arrange for <strong>the</strong> Stadium to be inspected by a suitably qualified<br />
Chartered Engineer (Structural or Civil) in <strong>the</strong> presence of a representative of <strong>the</strong><br />
County Council within, 7 months of <strong>the</strong> date of <strong>the</strong> Certificate and at least once In each<br />
period of 12 months <strong>the</strong>reafter and <strong>the</strong> Holder shall as soon as possible after<br />
each Inspection supply to <strong>the</strong> County Council a Certificate by <strong>the</strong> said<br />
Chartered Engineer as to <strong>the</strong> current compliance or non-compliance with good<br />
engineering and building practices and with <strong>the</strong> relevant British Standard i<br />
Specifications and Codes of Practice and with <strong>the</strong> appropriate provisions and<br />
recommendations of <strong>the</strong> Guide of all structural parts of <strong>the</strong> Stadium excluding <strong>the</strong><br />
crush barriers and handrails.<br />
25. (1) The Holder shall arrange for all crush barriers and handrails within <strong>the</strong><br />
Stadium to be tested in accordance with <strong>the</strong> appropriate provisions of <strong>the</strong><br />
Guide by a suitably qualified Chartered Engineer (Structural or Civil)<br />
in <strong>the</strong> presence of a representative of <strong>the</strong> County Council within 2 months<br />
of <strong>the</strong> date of this Certificate and for <strong>the</strong> results <strong>the</strong>reof to be notified f<br />
in writing to <strong>the</strong> County Council as soon as possible <strong>the</strong>reafter.<br />
(2)(i) The Holder shall ensure that not more than 7 months after <strong>the</strong> date of tnis<br />
Certificate and <strong>the</strong>reafter not less than once in each period of 12 months<br />
a representative sample of crush barriers and handrails amounting to not<br />
less than 20“ 0: tne total number of such barriers and rails is tested in<br />
i accordance with <strong>the</strong> Guide, a sultatdy qualified<br />
i~ /ctmctaral or Civil) In <strong>the</strong> presence of a representative of <strong>the</strong> Comity<br />
; ' j <strong>the</strong>reof notmed In writing to <strong>the</strong> Coun* Conncl -<br />
as soon as possible <strong>the</strong>reafter. .......<br />
a -ecord shall be kept of those crush barriers and handrails tested ^<br />
,(il}: ' accordance with sub-paragraph (2)(!) alone and a barrier so.tested shall<br />
not be tested again within a period of 4$ years <strong>the</strong>reafter.<br />
I t f2 ) At least once in each period of 12 months <strong>the</strong> Bolder shall supply to<br />
<strong>the</strong> Chief Fire Officer a report as to <strong>the</strong> condition of <strong>the</strong> emergency<br />
■ power Suppfy certLfied by an independent Electrical Engineer*.<br />
26 The Polder shall within 7 months of <strong>the</strong> date of this certificate and <strong>the</strong>reafter<br />
not less than once in each period of 12 months supply to <strong>the</strong> Chief Fire Ofncer<br />
<strong>the</strong> certificate of an independent Electrical Engineer as to <strong>the</strong> current<br />
---- - compliance or non-compliance of <strong>the</strong> electrical installation within <strong>the</strong>, Stad u m<br />
with Section E of <strong>the</strong> I.E.E. Regulations or o<strong>the</strong>r sections or Regulations<br />
<strong>the</strong> time being in force relating to <strong>the</strong> Electrical Equipment of Buildings^<br />
!