10.04.2013 Views

General and Technical Specifications For Construction of Hostels at ...

General and Technical Specifications For Construction of Hostels at ...

General and Technical Specifications For Construction of Hostels at ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PART - A<br />

<strong>General</strong> <strong>and</strong> <strong>Technical</strong> specific<strong>at</strong>ions<br />

Index<br />

Sections Title Sheet no<br />

A Applicable St<strong>and</strong>ards 1 to 5<br />

B List <strong>of</strong> Approved Make 1 to 2<br />

C Theoretical Cement Consumption 1 to 4<br />

D M<strong>at</strong>erial <strong>Specific<strong>at</strong>ions</strong> – Civil 1 to 44<br />

E Item <strong>Specific<strong>at</strong>ions</strong> - Civil Works<br />

CW-1.00 - Earth Works 1 to 15<br />

CW-2.00 - RCC & PCC Works 1 to 18<br />

CW-3.00 - Centering Works 1 to 4<br />

CW-4.00 - Masonry Work 1 to 19<br />

CW-5.00 - Doors & Windows Works 1 to 19<br />

CW-7.00 - Plaster & Pointing works 1 to 10<br />

CW-8.00 - W<strong>at</strong>erpro<strong>of</strong>ing Works 1 to 11<br />

CW-9.00 - Paving & Floor Finishing Works 1 to 29<br />

CW-10.00-Iron <strong>and</strong> Steel Works 1 to 6<br />

CW-11.00 - Painting & Polishing Works 1 to 23<br />

CW-13.00 - Miscellaneous Works 1 to 10<br />

CW-15.00 - <strong>General</strong> Development <strong>and</strong> Road works 1 to 20<br />

F Plumbing Work<br />

F1 List <strong>of</strong> M<strong>at</strong>erials <strong>and</strong> Approved Makes 1 to 4<br />

F2 Specific<strong>at</strong>ion Of M<strong>at</strong>erials – Plumbing 1 to 7<br />

F3 Item <strong>Specific<strong>at</strong>ions</strong> - Plumbing Works<br />

PW- 1.00 - W<strong>at</strong>er Supply Works 1 to 17<br />

PW- 2.00 - Sanitary Install<strong>at</strong>ion Works 1 to 18<br />

PW- 3.00 - Internal Drainage Works 1 to 9<br />

PW- 4.00 - External Drainage Works 1 to 8<br />

G Electrical works -<br />

G1 M<strong>at</strong>erial specific<strong>at</strong>ion & Applicable St<strong>and</strong>ard 1 to 30<br />

G2 <strong>General</strong> & Special Conditions 1 to 8<br />

G3 Item <strong>Specific<strong>at</strong>ions</strong> & List <strong>of</strong> Approved makes – Electrical works 1 to 22<br />

HCP Design <strong>and</strong> Project Management Pvt. Ltd. Ahmedabad

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!