10.04.2013 Views

General and Technical Specifications For Construction of Hostels at ...

General and Technical Specifications For Construction of Hostels at ...

General and Technical Specifications For Construction of Hostels at ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>General</strong> <strong>and</strong> <strong>Technical</strong> <strong>Specific<strong>at</strong>ions</strong> <strong>For</strong> <strong>Construction</strong> <strong>of</strong> <strong>Hostels</strong> <strong>at</strong> PDPU Campus,<br />

G<strong>and</strong>hinagar.<br />

Section: D<br />

Title – M<strong>at</strong>erial <strong>Specific<strong>at</strong>ions</strong> – Civil Works Sheet 3 OF 44<br />

3A.3 It shall capable <strong>of</strong> giving required workability, final strength <strong>and</strong> better surface finish.<br />

M-3B Sulph<strong>at</strong>e Resistant Cement (SRC) :<br />

3B.1 Sulph<strong>at</strong>e resistant cement shall be from source like Gujar<strong>at</strong> High Tech or equivalent as approved by the Architect <strong>and</strong><br />

Engineer-in-charge. It shall conform to relevant IS code or BS-4027 & ASTM C-150 Type-II. Test certific<strong>at</strong>es showing<br />

th<strong>at</strong> the cement complies to the specific<strong>at</strong>ions must be submitted to the Architect.<br />

3B.2 It shall be used for structures in or near sea w<strong>at</strong>er, where the soil conditions are aggressive, where repe<strong>at</strong>ed cycles <strong>of</strong><br />

drying <strong>and</strong> wetting are occur, <strong>and</strong> also for structures which are exposed to Sulph<strong>at</strong>e <strong>at</strong>tack & salty we<strong>at</strong>her like<br />

found<strong>at</strong>ions, bridges, dams, tunnels, industrial drains, sewage pipes.<br />

3B.3 It should possess low he<strong>at</strong> <strong>of</strong> hydr<strong>at</strong>ion, more compressive strength <strong>at</strong> 3,7 <strong>and</strong> 28 days than OPC. It should be<br />

capable <strong>of</strong> withst<strong>and</strong>ing <strong>at</strong>tack <strong>of</strong> aggressive substances which damage concrete structure like Sulph<strong>at</strong>es <strong>of</strong> Sodium,<br />

Magnesium, Calcium etc. It should have low co-efficient <strong>of</strong> expansion.<br />

M-4 White Cement :<br />

4.1 The white cement shall conform to IS : 8042-E<br />

M-5 Coloured Cement :<br />

5.1 Coloured cement shall be with white or grey Portl<strong>and</strong> cement mixed with pigments as specified in the item <strong>of</strong> the<br />

work.<br />

5.2 The pigments used for coloured cement shall be <strong>of</strong> approved quality <strong>and</strong> its quantity shall not exceed 10% <strong>of</strong> the<br />

cement used in the mix. The mixture <strong>of</strong> pigment <strong>and</strong> cement shall be properly ground to have a uniform colour <strong>and</strong><br />

shade. The pigments shall have such properties as to provide for durability for colour under exposure to sunlight <strong>and</strong><br />

we<strong>at</strong>her.<br />

5.3 The pigment shall have the property such th<strong>at</strong> it is neither affected by the cement nor detrimental to it.<br />

M-6 S<strong>and</strong> :<br />

6.1 S<strong>and</strong> shall be medium/coarse n<strong>at</strong>ural s<strong>and</strong>, clean, well graded, hard, strong, durable <strong>and</strong> gritty. S<strong>and</strong> particles should<br />

be free from injurious amounts <strong>of</strong> dust, clay, kankar nodules, s<strong>of</strong>t or flaky particles <strong>of</strong> shale, alkali, salts, organic<br />

m<strong>at</strong>ter loam, mica or other deleterious substances <strong>and</strong> shall be got approved from the Engineer-in-charge <strong>and</strong><br />

Architects. The s<strong>and</strong> shall not contain more than 8% <strong>of</strong> silt as determined by field test <strong>and</strong> 3% by labor<strong>at</strong>ory test , if<br />

necessary the s<strong>and</strong> shall be washed to make it clean. All s<strong>and</strong> to be used for plaster, brickwork , concrete shall<br />

be strictly sieved by 4.75 mm seive.<br />

Testing St<strong>and</strong>ards :<br />

A. Silt Content :<br />

Sampling :<br />

Test shall be carried out for every 150 m 3 <strong>of</strong> s<strong>and</strong>. The sample taken for testing shall weigh 10 Kg.<br />

Results :<br />

Permissible content shall be 3% in labor<strong>at</strong>ory test & 8 % in field Test.<br />

B. Fineness Modulus :<br />

Sampling :<br />

Sampling shall be as in A.<br />

Results :<br />

Fine s<strong>and</strong> : 2.2 to 2.6 shall be used as earth filling in plinth, zari, etc.<br />

Medium s<strong>and</strong> : 2.6 to 2.9 shall be sued for Brickwork <strong>and</strong> plaster.<br />

Coarse s<strong>and</strong> : 2.9 to 3.2 shall be used for concrete.<br />

In general, the fineness modulus <strong>of</strong> s<strong>and</strong> shall not be less than 2.5 <strong>and</strong> shall not exceed 3.0. A s<strong>and</strong> having a<br />

fineness modulus more than 3.2 will be unsuitable for making s<strong>at</strong>isfactory concrete.<br />

HCP Design <strong>and</strong> Project Management Pvt. Ltd. Ahmedabad

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!