11.04.2013 Views

Open-file Report 232 - New Mexico Bureau of Geology & Mineral ...

Open-file Report 232 - New Mexico Bureau of Geology & Mineral ...

Open-file Report 232 - New Mexico Bureau of Geology & Mineral ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

I. NP<br />

2. Ark Land Co Projects I&II<br />

3. 1/4 SEC. T.23N R.12W LAT. LONG.<br />

4. Tanner Lake,Pre ELEV.<br />

5. Bisti<br />

b. Coal<br />

7.<br />

8.<br />

9. Fruitland<br />

10.<br />

11.1 NM 3752(&/1/68) secs. 20-23 I1 NM 3755(6/1/68) secs.4,6,8,10,12<br />

NM 3753 secs. 9,10,13-15g NM 3918 secs. 5-9,14-15;<br />

NM3754 secs. 27-30,33,351NM 8745 secs. 20-22<br />

12.Nickelsun (p. 409) see <strong>file</strong> fur more information<br />

I. NP<br />

2. De-Na-Zin Mine<br />

3. N 1/4 SEC.lb T.23N R. 13W LAT. LONG.<br />

4. Tanner Lake ELEV.<br />

5. Bisti<br />

6. Coal<br />

7. dozer/scraper methud<br />

8. 1980- capacity <strong>of</strong> 250,000 tons/yr<br />

9. Fruitland<br />

l0.basal Fruitland seam and a second Beam 40' above! both are 5' thick<br />

11.6unbelt Mining Co. 1nc.g trucked tu San Juan Generating Station<br />

12.Nickelson (p. 408)<br />

1. NP<br />

2. Western Coal Cu.<br />

3. 114 SEC. T.23N R.13W LAT. LONG.<br />

4. Alamo Mesa W,Ta ELEV.<br />

5. Bisti<br />

6. Coal; and T24N<br />

7. 32 holes drilled<br />

8.<br />

9. Fruitland frm.<br />

10.<br />

11.1980-mine mouth generating plant planned<br />

Bee <strong>file</strong> fur lease lands<br />

1P.Nickelson (p. 405)<br />

1- 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!