23.04.2013 Views

Download - GOC Engineering & Consulting Company

Download - GOC Engineering & Consulting Company

Download - GOC Engineering & Consulting Company

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project Execution<br />

Decommissioning of tank starts at approx.<br />

2,5 m liquid level ( April 2004)<br />

Temporary connection between RT Loading<br />

pumps and HP send out pumps<br />

Result : Tank more or less 100 % liquid<br />

emptied<br />

Warming up<br />

Purging with nitrogen<br />

Purging with air<br />

Opening the tank<br />

Grossmann/Gastech2005 Revamping LNG Peak Shaving Plant 20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!