LPG/Ammonia Reference Projects - Goce.de
LPG/Ammonia Reference Projects - Goce.de
LPG/Ammonia Reference Projects - Goce.de
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Propane<br />
liquid injection<br />
N12 N11 N22 N14<br />
GOC Engineering GmbH<br />
Bachovenstr. 8; 53489 Sinzig, Germany<br />
to Atm. Vent to to<br />
Flare Flare<br />
PSV PSV<br />
N30<br />
N15 N20 N13<br />
PSV<br />
(Vacuum Breaker)<br />
Phone: + 49(0)2642 9939300<br />
Info@goce.<strong>de</strong>; www.goce.<strong>de</strong><br />
R E F E R E N C E S<br />
ETHYLENE<br />
PROPYLENE<br />
<strong>LPG</strong><br />
AMMONIA<br />
/REF_LEG_<strong>LPG</strong>
PROJECT<br />
PROJECT<br />
DESCRIPTION<br />
PROJECT<br />
PHASES<br />
GOC<br />
DISCIPLINES<br />
GOC<br />
WORK SCOPE<br />
Ethylene<br />
Propylene<br />
<strong>LPG</strong><br />
<strong>Ammonia</strong><br />
Project name:<br />
<strong>Ammonia</strong> Storage Terminal<br />
Country:<br />
Varna, Bulgaria<br />
Client:<br />
adapt for Oiltanking<br />
Year:<br />
2000<br />
GOC project:<br />
7001<br />
Terminal to import <strong>Ammonia</strong> by ships<br />
Marine unloading system @ 1500m³/h<br />
Refrigerated storage tanks @ 2 x 15,500 m³<br />
Send out system including<br />
Discharge to production plant @ 37,5 to/h<br />
Rail tank car loading @ 61 to/h<br />
Technical/commercial study<br />
Process<br />
Mechanical & rotating equipment<br />
Commercial<br />
GOC Engineering GmbH<br />
Bachovenstr.8; 53489 Sinzig, Germany<br />
Technical study<br />
costing of plant equipment<br />
Phone: +49 (0)2642 9939300<br />
Info@goce.<strong>de</strong> ; www.goce.<strong>de</strong><br />
/ 7001/ Page 2 of 13
PROJECT<br />
PROJECT<br />
DESCRIPTION<br />
PROJECT<br />
PHASES<br />
GOC<br />
DISCIPLINES<br />
GOC<br />
WORK SCOPE<br />
Ethylene<br />
Propylene<br />
<strong>LPG</strong><br />
<strong>Ammonia</strong><br />
Project name:<br />
Ethylene Terminal<br />
Country:<br />
Petroquimica Triunfo, Brazil<br />
Client:<br />
Whessoe Oil&Gas<br />
Year:<br />
2000<br />
GOC project:<br />
7003 Source: KILGAS<br />
Ethylene storage system as part of a production plant<br />
Refrigerated storage tank @ 1 x 7,100 m³<br />
Ethylene BOG compressor<br />
Ethylene vaporizer<br />
Methanol Sysem<br />
Send out system including<br />
Discharge to production plant 25 m³/h @ -104 °C<br />
Technical/commercial study<br />
Process<br />
Mechanical & rotating equipment<br />
Commercial<br />
Technical review<br />
Costing study<br />
GOC Engineering GmbH<br />
Bachovenstr.8; 53489 Sinzig, Germany<br />
Phone: +49 (0)2642 9939300<br />
Info@goce.<strong>de</strong> ; www.goce.<strong>de</strong><br />
/ 7003/ Page 3 of 13
PROJECT<br />
PROJECT<br />
DESCRIPTION<br />
PROJECT<br />
PHASES<br />
GOC<br />
DISCIPLINES<br />
GOC<br />
WORK SCOPE<br />
Ethylene<br />
Propylene<br />
<strong>LPG</strong><br />
<strong>Ammonia</strong><br />
Project name:<br />
Salalah Gas Pipeline<br />
Country:<br />
Oman<br />
Client:<br />
ILF & Partners<br />
Year:<br />
2000<br />
GOC project:<br />
7004<br />
<strong>LPG</strong> extraction plant as part of the Salalah Gas Pipeline in Oman<br />
including<br />
Dehydration system<br />
Gas treatment unit<br />
Compression unit<br />
Cryogenic gas processing unit<br />
Fractionation system<br />
Product storage<br />
Loading unit<br />
Technical study<br />
Process<br />
Mechanical & rotating equipment<br />
Commercial<br />
GOC Engineering GmbH<br />
Bachovenstr.8; 53489 Sinzig, Germany<br />
Technical review of outline documents<br />
Site selection review<br />
Phone: +49 (0)2642 9939300<br />
Info@goce.<strong>de</strong> ; www.goce.<strong>de</strong><br />
/ 7004/ Page 4 of 13
PROJECT<br />
PROJECT<br />
DESCRIPTION<br />
PROJECT<br />
PHASES<br />
GOC<br />
DISCIPLINES<br />
GOC<br />
WORK SCOPE<br />
Ethylene<br />
Propylene<br />
<strong>LPG</strong><br />
<strong>Ammonia</strong><br />
Project name:<br />
<strong>LPG</strong> Terminal DMCC<br />
Country:<br />
India<br />
Client:<br />
Whessoe Oil&Gas<br />
Year:<br />
2001<br />
GOC project:<br />
7006<br />
<strong>LPG</strong> import terminal in India to import Propane or Butane<br />
Marine unloading system , <strong>de</strong>sing flow rate 1000 t/h<br />
Refrigerated storage tanks , 2 x 25,000 m³<br />
BOG Reliquefaction system<br />
<strong>LPG</strong> blending system<br />
<strong>LPG</strong> Heater system<br />
Safety System<br />
Instrumentation & control<br />
Pipng & valves<br />
Utility system<br />
Flare System<br />
Ten<strong>de</strong>r phase<br />
Process Tanks<br />
Mechanical & rotating equipment Piping & valves<br />
Electrical & instrumentation<br />
Commercial<br />
GOC Engineering GmbH<br />
Bachovenstr.8; 53489 Sinzig, Germany<br />
Pre-bid assistance<br />
Process <strong>de</strong>sign<br />
Process <strong>de</strong>scription<br />
Layout<br />
Costing of equipment<br />
Phone: +49 (0)2642 9939300<br />
Info@goce.<strong>de</strong> ; www.goce.<strong>de</strong><br />
/ 7006/ Page 5 of 13
PROJECT<br />
PROJECT<br />
DESCRIPTION<br />
PROJECT<br />
PHASES<br />
GOC<br />
DISCIPLINES<br />
GOC<br />
WORK SCOPE<br />
Ethylene<br />
Propylene<br />
<strong>LPG</strong><br />
<strong>Ammonia</strong><br />
Project name:<br />
<strong>LPG</strong> Recovery Plant<br />
Country:<br />
Poland<br />
Client:<br />
ILF<br />
Year:<br />
2001<br />
GOC project:<br />
7008<br />
<strong>LPG</strong> Recovery Plant for Wladyslawowo CHP Project<br />
Slug catcher<br />
Deethanizer<br />
Debutanizer<br />
Cold separator<br />
Con<strong>de</strong>nser<br />
Feed cooler<br />
Reflux pumps<br />
Transfer pumps<br />
Reboiler<br />
Flare System<br />
Ten<strong>de</strong>r phase<br />
Process<br />
Mechanical & rotating equipment Piping & valves<br />
Electrical & instrumentation<br />
Commercial<br />
GOC Engineering GmbH<br />
Bachovenstr.8; 53489 Sinzig, Germany<br />
Pre-bid assistance<br />
Process <strong>de</strong>sign<br />
Process flow diagram<br />
Sizing of equipment<br />
Costing of equipment<br />
Phone: +49 (0)2642 9939300<br />
Info@goce.<strong>de</strong> ; www.goce.<strong>de</strong><br />
/ 7008/ Page 6 of 13
PROJECT<br />
PROJECT<br />
DESCRIPTION<br />
PROJECT<br />
PHASES<br />
GOC<br />
DISCIPLINES<br />
GOC<br />
WORK SCOPE<br />
Ethylene<br />
Propylene<br />
<strong>LPG</strong><br />
<strong>Ammonia</strong><br />
Project name:<br />
<strong>Ammonia</strong> Storage Facillty<br />
Country:<br />
Middle East<br />
Client:<br />
UK<br />
Year:<br />
2001<br />
GOC project:<br />
7009/7013/7014<br />
New <strong>Ammonia</strong> storage facility within a existing production plant<br />
Refrigerated storage tank , 5000 mt<br />
Reliquefaction system<br />
Send out system<br />
Safety System<br />
Instrumentation & control<br />
Pipng & valves<br />
Utility system<br />
Interface with existing system<br />
Ten<strong>de</strong>r phase<br />
Process Tanks<br />
Mechanical & rotating equipment Piping & valves<br />
Electrical & instrumentation<br />
Commercial<br />
GOC Engineering GmbH<br />
Bachovenstr.8; 53489 Sinzig, Germany<br />
Pre-bid assistance<br />
Process <strong>de</strong>sign<br />
Process flow diagram<br />
Sizing of equipment<br />
Costing of equipment<br />
Phone: +49 (0)2642 9939300<br />
Info@goce.<strong>de</strong> ; www.goce.<strong>de</strong><br />
/ 7009_7013_7014/ Page 7 of 13
PROJECT<br />
PROJECT<br />
DESCRIPTION<br />
PROJECT<br />
PHASES<br />
GOC<br />
DISCIPLINES<br />
GOC<br />
WORK SCOPE<br />
Ethylene<br />
Propylene<br />
<strong>LPG</strong><br />
<strong>Ammonia</strong><br />
Project name:<br />
PPC Off-site Facilities<br />
Country:<br />
Middle East<br />
Client:<br />
adapt for<br />
Intecsa-Uh<strong>de</strong><br />
Year:<br />
2003-2004<br />
GOC project:<br />
7031/7037/7057<br />
<strong>LPG</strong> storage facility within a grassroot petrochemical complex<br />
Refrigerated storage tank for Propane , 120,000 m³<br />
Refrigerated storage tank for Butane, 60,000 m³<br />
Tank instrumentation<br />
Tank safety valves<br />
Engineering<br />
Process<br />
Electrical & instrumentation<br />
Safety<br />
GOC Engineering GmbH<br />
Bachovenstr.8; 53489 Sinzig, Germany<br />
Sizing of tank safety valves<br />
Design, engineering for tank instrumentation<br />
Inquiry specification for instrumentation and valves<br />
Phone: +49 (0)2642 9939300<br />
Info@goce.<strong>de</strong> ; www.goce.<strong>de</strong><br />
/ 7031/ Page 8 of 13
PROJECT<br />
PROJECT<br />
DESCRIPTION<br />
PROJECT<br />
PHASES<br />
GOC<br />
DISCIPLINES<br />
GOC<br />
WORK SCOPE<br />
Ethylene<br />
Propylene<br />
<strong>LPG</strong><br />
<strong>Ammonia</strong><br />
Project name:<br />
PPC Off-site Facilities<br />
Country:<br />
Middle East<br />
Client:<br />
adapt for<br />
Intecsa-Uh<strong>de</strong><br />
Year:<br />
2004<br />
GOC project:<br />
7037<br />
<strong>LPG</strong> storage facility within a grassroot petrochemical complex<br />
Refrigerated storage tank for Propane , 120,000 m³<br />
Refrigerated storage tank for Butane, 60,000 m³<br />
Tank instrumentation<br />
Tank safety valves<br />
Engineering<br />
Process<br />
Electrical & instrumentation<br />
Safety<br />
Roll- over Study<br />
GOC Engineering GmbH<br />
Bachovenstr.8; 53489 Sinzig, Germany<br />
Phone: +49 (0)2642 9939300<br />
Info@goce.<strong>de</strong> ; www.goce.<strong>de</strong><br />
/ 7037/ Page 9 of 13
PROJECT<br />
PROJECT<br />
DESCRIPTION<br />
PROJECT<br />
PHASES<br />
GOC<br />
DISCIPLINES<br />
GOC<br />
WORK SCOPE<br />
Ethylene<br />
Propylene<br />
<strong>LPG</strong><br />
<strong>Ammonia</strong><br />
Project name:<br />
<strong>LPG</strong> Terminal, La Libertad<br />
Country:<br />
Ecuador<br />
Client:<br />
adapt for<br />
Dragados<br />
Year:<br />
2005<br />
GOC project:<br />
7045 Source: Dragados<br />
Propane and Butane unloading and storage<br />
Marine unloading facilities<br />
1 x 21,000 m³ DWST single containment tank fore Propane<br />
1 x 47,000 m³ DWST single containment tank for Butane<br />
BOG handling<br />
Send out pumps<br />
<strong>LPG</strong> Send out system with static mixer , <strong>LPG</strong> Heater and <strong>LPG</strong> booster pumps<br />
Flare system<br />
Instrumentation and control<br />
Utility system<br />
Ten<strong>de</strong>r<br />
Process<br />
Electrical & instrumentation<br />
Safety<br />
GOC Engineering GmbH<br />
Bachovenstr.8; 53489 Sinzig, Germany<br />
Functional technical specification<br />
Costing study<br />
Phone: +49 (0)2642 9939300<br />
Info@goce.<strong>de</strong> ; www.goce.<strong>de</strong><br />
/ 7045/ Page 10 of 13
PROJECT<br />
PROJECT<br />
DESCRIPTION<br />
PROJECT<br />
PHASES<br />
GOC<br />
DISCIPLINES<br />
GOC<br />
WORK SCOPE<br />
Ethylene<br />
Propylene<br />
<strong>LPG</strong><br />
<strong>Ammonia</strong><br />
Project name:<br />
Panipat Naphta Cracker<br />
Country:<br />
India<br />
Client:<br />
Larsen & Toubro Ltd.<br />
for IOCL<br />
Year:<br />
2005<br />
GOC project:<br />
7054<br />
Ethylene storage and transfer system including<br />
2 x 21,600 m³ full containment tank for Ethylene<br />
Ethylene BOG compression system<br />
Ethylene emergency vaporisation system<br />
Ethylene pumping system<br />
Propylene storage and transfer system including<br />
2 x 15,3600 m³ full containment tank for Propylene<br />
Propylene BOG compression system<br />
Propylene heating system<br />
Pre- Bid assistance<br />
Process Tanks<br />
Mechanical & rotating eqipment<br />
Electrical & instrumentation<br />
Safety<br />
GOC Engineering GmbH<br />
Bachovenstr.8; 53489 Sinzig, Germany<br />
Process engineering<br />
Tank engineering<br />
Costing study<br />
Phone: +49 (0)2642 9939300<br />
Info@goce.<strong>de</strong> ; www.goce.<strong>de</strong><br />
/ 7054/ Page 11 of 13
PROJECT<br />
PROJECT<br />
DESCRIPTION<br />
PROJECT<br />
PHASES<br />
GOC<br />
DISCIPLINES<br />
GOC<br />
WORK SCOPE<br />
Ethylene<br />
Propylene<br />
<strong>LPG</strong><br />
<strong>Ammonia</strong><br />
Project name:<br />
PPC Off-site Facilities<br />
Country:<br />
Middle East<br />
Client:<br />
adapt for<br />
Intecsa-Uh<strong>de</strong><br />
Year:<br />
2005<br />
GOC project:<br />
7057<br />
<strong>LPG</strong> storage facility within a grassroot petrochemical complex<br />
Refrigerated storage tank for Propane , 120,000 m³<br />
Refrigerated storage tank for Butane, 60,000 m³<br />
Tank instrumentation<br />
Tank safety valves<br />
Engineering<br />
Process<br />
Electrical & instrumentation<br />
Safety<br />
GOC Engineering GmbH<br />
Bachovenstr.8; 53489 Sinzig, Germany<br />
Purge and cool-down procedure for refrigerated tanks<br />
Phone: +49 (0)2642 9939300<br />
Info@goce.<strong>de</strong> ; www.goce.<strong>de</strong><br />
Propane<br />
liquid injection<br />
N12 N11 N22 N14<br />
to Atm. Vent to to<br />
Flare Flare<br />
PSV PSV<br />
N30<br />
N15 N20 N13<br />
PSV<br />
(Vacuum Breaker)<br />
/ 7057/ Page 12 of 13
PROJECT<br />
PROJECT<br />
DESCRIPTION<br />
PROJECT<br />
PHASES<br />
GOC<br />
DISCIPLINES<br />
GOC<br />
WORK SCOPE<br />
Ethylene<br />
Propylene<br />
<strong>LPG</strong><br />
<strong>Ammonia</strong><br />
Project name:<br />
Ethylene storage tank<br />
Country:<br />
Germany<br />
Client:<br />
Ineos<br />
Year:<br />
2005/2006<br />
GOC project:<br />
7056<br />
Existing Ethylene storage tank within a Ethylene production plant<br />
1 x 4,000 m³ single containment tank for Ethylene<br />
Ethylene send out system with<br />
Ethylene pumps installed in a pump cellar below gound level.<br />
Ethylene vaporizer system<br />
Technical and commercial study<br />
Process Tanks<br />
Mechanical & rotating eqipment<br />
Electrical & instrumentation<br />
Safety<br />
GOC Engineering GmbH<br />
Bachovenstr.8; 53489 Sinzig, Germany<br />
Detailed study to upgra<strong>de</strong> the safety level of the Ethylene tank.<br />
Process engineering<br />
Tank engineering<br />
Process engineering<br />
Tank engineering<br />
Costing study<br />
Phone: +49 (0)2642 9939300<br />
Info@goce.<strong>de</strong> ; www.goce.<strong>de</strong><br />
/ 7056/ Page 13 of 13