25.04.2013 Views

The use of jet pumps/eductors for deliquifing - ALRDC

The use of jet pumps/eductors for deliquifing - ALRDC

The use of jet pumps/eductors for deliquifing - ALRDC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1 File Name<br />

GAS WELL DELIQUIFICATION<br />

USING<br />

• BACK GROUND<br />

JET PUMP TECHNOLOGY<br />

By; Sacha Sarshar, Caltec<br />

• PRINCIPLE OF JET PUMP OPERATION<br />

• SOME SOLUTIONS<br />

• FIELD EXPERIENC SO FAR<br />

• CONCLUDING REMARKS


2 File Name<br />

CAUSES OF LIQUID LOADING<br />

• WELL FLOWING BELOW ANNULAR MIST REGIME<br />

• GAS VELOCITY BELOW A MINIMUM<br />

(5m/s at wellhead)<br />

• POOR WELL DRAW DOWN<br />

• FLUCTUATING THP<br />

SIGNS OF LIQUID LOADING<br />

• WELLHEAD FLOW VELOCITY BELOW MINIMUM<br />

• DECREASING LIQUID/GAS RATIO


3 File Name<br />

REMEDIAL ACTIONS<br />

• MAINTAIN RESERVOIR PRESSURE/FLOW<br />

• IMPROVE WELL FLOW AT PERFORATION<br />

ZONE<br />

• CHANGE TUBING ( increase velocity)<br />

• ARTIFICIAL LIFT (VARIOUS METHODS)<br />

• WATER SHUT OFF<br />

• REDUCE THP, USING A PRESSURE<br />

BOOSTING SYSTEM( <strong>jet</strong> pump application)


IMPORTANT FACTORS TO CONSIDER<br />

• THE SEVERITY OF THE PROBLEM CAUSED BY<br />

DELAYS IN TAKING REMEDIAL ACTION<br />

• EARLY REMEDIAL ACTION AVOIDS OR<br />

DEFERS COSTLY SOLUTIONS<br />

• NOT ALL CASES NEED GAS-LIQUID<br />

SEPARATION<br />

• DEFERRING COSTLY SOLUTIONS IS STILL<br />

COST EFFECTIVE ,AS LOWER COST<br />

SOLUTIONS HAVE A SHORT PAY BACK<br />

PERIOD<br />

4 File Name


5 File Name<br />

JET PUMP-PRINCIPLE OF OPERATION<br />

HP FLOW<br />

NOZZLE<br />

MIXING<br />

TUBE DIFFUSER<br />

LP FLOW<br />

DISCHARGE<br />

FLOW


6 File Name<br />

APPLICATIONS OF JET PUMPS<br />

IN OIL&GAS PRODUCTION<br />

• WELL KICK-OFF/DELIQUIFICATION<br />

• BOOST PRODUCTION OF INDIVIDUAL WELLS<br />

(oil or gas)<br />

• BOOST PRODUCTION OF MANIFOLDED<br />

WELLS (oil or gas)<br />

• BOOST PRESSURE OF LP GAS<br />

• PREVENT FLARING LLP GAS<br />

• DE-BOTTLENECK COMPRESSORS<br />

• DOWN HOLE, GAS MOTIVE FLOW


JET PUMP WITH REPLACABLE INTERNALS<br />

7 File Name


KEY FACTORS AFFECTING PERFORMANCE<br />

• HP/LP PRESSURE RATIO<br />

• LP/HP FLOW RATIO<br />

• DISCHARGE/LP PRESSURE RATIO<br />

OTHER FACTORS;<br />

• TEMPERATURE,Z FACTOR, Cp/Cv ratio etc.<br />

8 File Name


9 File Name<br />

GUIDE TO JET PUMP PERFORMANCE


10 File Name<br />

SOURCES OF MOTIVE (HP) GAS<br />

• HP WELLS/ HP GAS LINE<br />

• LIFT GAS<br />

• COMPRESSOR OUTLET GAS<br />

• HP LIQUID (LIMITED)


11 File Name<br />

EFFECT OF LIQUID IN LP GAS


Spilamberto Field, AGIP, Italy<br />

12 File Name


BP AMETHYST, UK<br />

Problem<br />

WEAK WELLS WERE LOADED<br />

AND HAD RESTRICTED<br />

PRODUCTION UNDER<br />

PREVAILING THP<br />

13 File Name<br />

High Pressure Wells<br />

Gas Eductor<br />

on Plat<strong>for</strong>m<br />

Low Pressure Wells<br />

(initially backedout)<br />

To Downstream<br />

Process/Pipelines


14 File Name<br />

CHEVRON, USA : GEMINI PROJECT (GOM<br />

Process<br />

200 psig<br />

7.4 MMSCFD<br />

850 psig<br />

Ejector<br />

400 psig<br />

GEMINI<br />

Sub sea<br />

Manifold<br />

40MMSCFD<br />

Compressor<br />

Recycle<br />

Export<br />

Sales<br />

1250 psig


15 File Name<br />

HEWITT FIELD JET PUMP<br />

HP wells increased production by 25% & 41%


USE OF TEST SEPARATOR IN WELL REVIVAL<br />

Well<br />

16 File Name<br />

Test<br />

Header<br />

Production<br />

Header<br />

Test<br />

Separator<br />

Booster<br />

Pump<br />

HP gas<br />

Jet Pump


17 File Name<br />

ANGSI FIELD WELL REVIVAL OPTION<br />

HP HEADER<br />

TEST HEADER MAIN<br />

PRODUCTION<br />

HEADER<br />

TO<br />

METERING<br />

SYSTEM<br />

WELLCOM<br />

BOOST<br />

SDV<br />

P<br />

T P<br />

HI-SEP<br />

LIFT GAS LINE<br />

A-1031<br />

M<br />

A-1030<br />

M<br />

EXISTING WELL<br />

TESTING METERS<br />

P<br />

JET PUMP<br />

HI-SEP<br />

P<br />

ALTERNATIVE<br />

PATH FOR<br />

LIQUIDS<br />

P<br />

BOOSTER PUMP<br />

P<br />

P<br />

P<br />

COMMINGLER<br />

WELL REVIVAL<br />

WELLCOM<br />

BOOST<br />

TO EXPORT LINE


Case<br />

3.1<br />

3.2<br />

3.3<br />

18 File Name<br />

Table X3: MALAYSIA: Plat<strong>for</strong>m C: Gas Jet Pump Application<br />

<strong>for</strong> Well- Kick<strong>of</strong>f with Backpressure Reduction<br />

WELL<br />

C7<br />

C7<br />

17/5/07<br />

C7<br />

High Pressure<br />

Pressure<br />

(psia )<br />

3100<br />

3100<br />

3100<br />

Fluid<br />

Flowrate<br />

MMscfd &<br />

bbl/d<br />

25 MMscfd<br />

and 688 bbl/d<br />

8.3 MMscfd<br />

and 230 bbl/d<br />

(1/3 rd flow)<br />

8.3 MMscfd<br />

and 230 bbl/d<br />

(1/3 rd flow)<br />

Well<br />

Name<br />

C3<br />

C3<br />

One or<br />

two LP<br />

wells<br />

Estimated Low Pressure<br />

Pressure<br />

(psia)<br />

100<br />

(initial<br />

465)<br />

165<br />

(initial<br />

465)<br />

240<br />

(initial<br />

465)<br />

Fluid Flowrate<br />

MMscfd & bbl/d<br />

2 MMscfd & 200<br />

bbl/d<br />

Well kick <strong>of</strong>f<br />

2 MMscfd & 200<br />

bbl/d<br />

4.4 MMscfd & 100<br />

bbl/d<br />

Discharge<br />

Pressure<br />

Predicted<br />

(psia)<br />

465<br />

465<br />

465


JET PUMP SOLUTION USING NEW HP WELL<br />

19 File Name


20 File Name<br />

INDE PLATFORM JET PUMP


21 File Name<br />

INDE PLATFORM S.NORTH SEA, UK<br />

Davy Line<br />

Bessemer Line<br />

Juliet<br />

Kilo<br />

Separator<br />

Low Pressure<br />

Gas Wells<br />

Compressor<br />

Subsea Line<br />

Dp<br />

Jet Pump<br />

Export


22 File Name<br />

WELLCOM BOOST SYSTEM<br />

HIGH PRESSURE GAS<br />

JET PUMP<br />

GAS<br />

LOW PRESSURE<br />

OIL WELLS<br />

I-SEP<br />

GAS<br />

COMMINGLER<br />

LIQUID<br />

LIQUID<br />

LIQUID<br />

COMMINGLER<br />

BOOSTER PUMP<br />

TO PIPELINE


23 File Name<br />

A (PD) TWIN SCREW PUMP


I-SEP COMPACT<br />

SEPARATOR<br />

24 File Name


25 File Name<br />

I-SEP<br />

I-SEP IN<br />

DE-GASSING<br />

APPLICATION


26 File Name<br />

I-SEP WITH<br />

REPLACEABLE<br />

INTERNALS


WELLCOM BOOST SYSTEM OFFSHORE MALAYSIA<br />

HI-SEP<br />

Booster<br />

pump<br />

27 File Name<br />

Jet pump<br />

I-SEP


28 File Name<br />

CONCLUDING REMARKS<br />

• THERE ARE NUMEROUS SOLUTIONS FOR<br />

DELIQUIFICATION OF GAS WELLS<br />

• THE APPROPRIATE SOLUTION DEPENDS MAINLY ON<br />

WELL FEATURES,RESERVOIR CONDITIONS,AND<br />

THE EXTENT OF LOADING<br />

• JET PUMPS ARE HIGHLY COST EFFECTIVE TO<br />

OFFLOAD WELLS PROVIDED A MOTIVE HP SOURCE<br />

IS AVAILABLE AND THE WELL STATUS IS NOT<br />

BEYOND THE ABILITY OF THIS SOLUTION<br />

• JET PUMPS CAN BE USED AS ADDITIONAL HELP TO<br />

OTHER SOLUTIONS TO INCREASE PRODUCTION

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!