PROPER WATER TREATMENT SOLUTIONS GIVES CONCRETE<br />

RESULTS IN CEMENT INDUSTRY<br />

Samir Fayyad<br />

Vice President, <strong>Technical</strong> – AES Arabia – Saudi Arabia<br />

REF# IDA_DM2010-Fayyad<br />

ABSTRACT<br />

Lafarge has constructed the first private Greenfield cement plant in Aleppo - Syria<br />

with a production capacity of 2.75 million tons per annum. The water requirement<br />

for the cement plant’s power plant is around 5,500 cubic meters per day (CMD) and is<br />

supplied from a single deep well groundwater source. The groundwater, which had<br />

extremely high Total Dissolved Solids (TDS) and Total Suspended Solids (TSS), had<br />

to be conditioned to make it suitable for use as Cooling Tower (CT) makeup and in<br />

other processes. Environmental standards and limited water supplies necessitated<br />

a solution that would exploit the use of available resources, including treatment of<br />

existing process waste streams within the plant.<br />

In response to the client’s tough requirements, AES presented a technical solution<br />

that maximized overall plant recovery to more than 90% while keeping operational<br />

and chemical consumption costs to a minimum. Lime softening followed by high<br />

recovery Reverse Osmosis (RO) ensured water conservation, while the design was<br />

tailored to allow RO reject water to be utilized within the cement manufacturing<br />

process. The plant included a provision to allow for the sludge from the lime<br />

softening process to be decanted and returned back to feed, maximizing recovery<br />

and making the treatment process a true Zero Liquid Waste solution – a land mark in<br />

the region. The plant has been successfully built and commissioned in record time of<br />

4 months.<br />

Water Reuse and <strong>Desalination</strong>: Experience and Opportunity<br />

TECHNICAL PROGRAM 45