12.05.2013 Views

Contracts in Use Survey 2010 - RICS

Contracts in Use Survey 2010 - RICS

Contracts in Use Survey 2010 - RICS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chart 14:<br />

The rise and fall of Guaranteed Maximum Price provisions<br />

Two stage procurement<br />

In <strong>2010</strong>, 2.8% of the sample was identified as us<strong>in</strong>g two stage procurement, only a little<br />

down on the 3.4% recorded <strong>in</strong> the 2007 survey and still almost twice as frequent as<br />

experienced <strong>in</strong> 2004 (1.5%). Chart 16 shows the growth of two stage procurement<br />

dur<strong>in</strong>g the 2000’s as the <strong>in</strong>dustry grew and its peak <strong>in</strong> 2007.<br />

Chart 15:<br />

The use of two stage procurement (by contract number)<br />

By value, the pattern of the use of stage procurement is similar if less pronounced:<br />

Page 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!