15.05.2013 Views

SBM Offshore to Supply the Ichthys turret

SBM Offshore to Supply the Ichthys turret

SBM Offshore to Supply the Ichthys turret

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Press releease<br />

- <strong>SBM</strong> <strong>Offshore</strong> N. V.<br />

1. Turrett<br />

and Moorinng<br />

system for f <strong>Ichthys</strong> FFPSO<br />

<strong>SBM</strong> Offshhore<br />

is pleassed<br />

<strong>to</strong> announce<br />

it has beeen<br />

awarded d a contract by b <strong>the</strong> Ichthyys<br />

LNG Proje ect for <strong>the</strong><br />

engineerinng,<br />

procuremment,<br />

fabricat tion and suppply<br />

of a Turre et and Mooring<br />

system. TThis<br />

system will w be<br />

integrated by <strong>the</strong> clientt<br />

in<strong>to</strong> <strong>the</strong> <strong>Ichthys</strong><br />

FPSO aand<br />

installed offshore NW W Australia. TThe<br />

contract t also includees<br />

assistancee<br />

during <strong>the</strong> iintegration<br />

of<br />

<strong>the</strong> Turret in<strong>to</strong><br />

<strong>the</strong> FPSO<br />

as well as during instaallation<br />

on <strong>the</strong> e field<br />

offshore. TThe<br />

value of this order is around US$ $ 0.5 billion. Large L complex<br />

<strong>turret</strong> moooring<br />

system ms for new-<br />

build FPSOOs<br />

are one oof<br />

<strong>the</strong> core pr roducts of <strong>the</strong><br />

Company.<br />

Installationn<br />

of <strong>the</strong> Turreet<br />

and Mooring<br />

system inn<br />

<strong>the</strong> field is anticipated in n mid 2015.<br />

‐ The Icchthys<br />

LNG PProject’s<br />

FPS SO, a new buuild<br />

335 meter-long<br />

vessel,<br />

will be mooored<br />

in water<br />

depths of<br />

250 mmetres<br />

and located<br />

in <strong>the</strong> Browse Basin,<br />

off <strong>the</strong> no orth-west coa ast of Westerrn<br />

Australia, 820<br />

kilomeetres<br />

south-wwest<br />

of Darwin.<br />

‐ Approximate<br />

dimensions<br />

of <strong>the</strong> e Turret: diammeter<br />

20 meters;<br />

height 65 6 metres annd<br />

weight 7,0 000 <strong>to</strong>ns.<br />

‐ The Turret<br />

can acccommodate<br />

up <strong>to</strong> 15 riseers<br />

and will be<br />

designed for f 40 years oof<br />

operation without beinng<br />

disconnnected.<br />

The Ichthyys<br />

LNG Projeect<br />

is a joint venture v betwween<br />

INPEX (76%, <strong>the</strong> op pera<strong>to</strong>r) and Total (24%) . Gas from thhe<br />

<strong>Ichthys</strong> Fieeld,<br />

in <strong>the</strong> Brrowse<br />

Basin approximateely<br />

200 kilom metres offshore<br />

of Westerrn<br />

Australia, will w undergo<br />

preliminaryy<br />

processingg<br />

offshore <strong>to</strong> remove wateer<br />

and extrac ct condensat te. The gas wwill<br />

<strong>the</strong>n be exported e <strong>to</strong><br />

onshore processing<br />

facilities<br />

in Darwin<br />

via an 8889<br />

kilometre e subsea pipeline.<br />

The Icchthys<br />

Projec ct is expectedd<br />

<strong>to</strong> producee<br />

8.4 million t<strong>to</strong>nnes<br />

of LN NG and 1.6 mmillion<br />

<strong>to</strong>nnes s of LPG per annum, alonng<br />

with approximately<br />

80,000 barrels<br />

of conddensate<br />

per day d at peak.<br />

2. Financial<br />

Agendaa<br />

Full-year Results 2011<br />

- Press Re elease (07.300<br />

CET)<br />

Full-year Results 2011<br />

- Analysts Presentation<br />

(Amsterda am)<br />

Publicatioon<br />

Annual Report<br />

and Ag genda Annuaal<br />

General Meeting M of Sh hareholders<br />

Trading UUpdate<br />

Q1 22012<br />

- Press Release (077.30<br />

CET)<br />

Annual GGeneral<br />

Meetting<br />

of Share eholders (Rottterdam)<br />

Half-yearr<br />

Results 20112<br />

- Press Re elease (07.330<br />

CET)<br />

Half-yearr<br />

Results 20112<br />

- Analysts s Presentatioon<br />

(Amsterda am)<br />

Trading UUpdate<br />

Q3 22012<br />

- Press Release (077.30<br />

CET)<br />

www.sbmoffsshore.com<br />

<strong>SBM</strong> OFFSHORRE<br />

SIGNS S CONTRA ACT FOR<br />

SUPPLY Y OF THE TURRET FOR ICHT THYS FPSSO<br />

Page 1 of 2<br />

2 February<br />

20122<br />

02 March h<br />

02 March h<br />

28 March h<br />

16 May<br />

16 May<br />

16 Augus st<br />

16 Augus st<br />

15 Novem mber<br />

20122<br />

20122<br />

20122<br />

20122<br />

20122<br />

20122<br />

20122<br />

20122


3. Corpoorate<br />

Profilee<br />

Dutch limitted<br />

liability company<br />

<strong>SBM</strong> M <strong>Offshore</strong> NN.V.<br />

is <strong>the</strong> ho olding compa any of a grouup<br />

of internat tional, marinee<br />

technologyy<br />

orientated companies. Its business is <strong>to</strong> serve on o a global basis<br />

<strong>the</strong> offshore<br />

oil and gas industryy<br />

by supplying<br />

engineereed<br />

products, vessels andd<br />

systems, an nd offshore oil o and gas pproduction<br />

se ervices.<br />

The produuct<br />

line compprises:<br />

Offshoore<br />

import/exxport<br />

termina als for crude oil, refined products, p LPG G and LNG, mostly based<br />

on <strong>the</strong> singgle<br />

point mmooring<br />

principle,<br />

Floatin ng Productionn<br />

and/or S<strong>to</strong>rage<br />

and Off floading systtems<br />

(FSOs and FPSOs) )<br />

and ot<strong>the</strong>r<br />

floating production fa acilities baseed<br />

on ship hu ulls, semi-sub bmersibles aand<br />

Tension Leg Platformms<br />

(TLPs);<br />

Offshoore<br />

oil and gaas<br />

production n services thhrough<br />

<strong>the</strong> le easing of inte egrated produuction<br />

and st <strong>to</strong>rage facilitiies<br />

ownedd<br />

and operated<br />

by <strong>SBM</strong> <strong>Offshore</strong>; O<br />

Designn,<br />

constructioon<br />

and supply<br />

of semi-suubmersible<br />

drilling<br />

platfor rms;<br />

Speciaal<br />

designs annd<br />

engineerin ng services aand<br />

delivery of specific hardware<br />

commponents<br />

for r dynamicallyy<br />

positiooned<br />

drillshipps,<br />

semi-subm mersible drillling<br />

platforms,<br />

jack-up dr rilling platformms,<br />

jack-up platforms p for<br />

civil coonstruction,<br />

llarge<br />

capacit ty offshore crranes,<br />

elevating<br />

and liftin ng systems, ccrane<br />

vessels<br />

and o<strong>the</strong>r<br />

speciaalised<br />

work vvessels;<br />

Offshoore<br />

constructtion<br />

and insta allation contrracting<br />

servic ces.<br />

The Boardd<br />

of Managemment<br />

For fur<strong>the</strong>er<br />

informatioon:<br />

<strong>SBM</strong> Offshhore<br />

N.V.<br />

Karel Doormanweg<br />

666<br />

3115 JD SSchiedam<br />

Post addrress:<br />

P.O. Box 331<br />

3100 AA SSchiedam<br />

The Ne<strong>the</strong>erlands<br />

Contact pperson:<br />

Mr. Sebastiaan de Ronde BBresser<br />

Telephonne:<br />

(+ +377) 92 05 85 8 15<br />

Mobile:<br />

(+ +33) 643 919 312<br />

Fax:<br />

(+ +377) 92 05 89 8 40<br />

E-mail:<br />

seebastiaan.derondebresseer@sbmoffsh<br />

hore.com<br />

Website: wwww.sbmoffsh<br />

hore.com<br />

Disclaimer<br />

Some of <strong>the</strong> statements conntained<br />

in this re elease that are nnot<br />

his<strong>to</strong>rical fac cts are statements<br />

of future exppectations<br />

and o<strong>the</strong>r o forward-<br />

looking stateements<br />

based onn<br />

management’ s current views and assumptio ons and involve known and unkknown<br />

risks and uncertainties thhat<br />

could cause actual results, pperformance,<br />

or r events <strong>to</strong> differr<br />

materially from m those in such statements. Such<br />

forward-look king statements<br />

are subject <strong>to</strong>o<br />

various risks aand<br />

uncertaintie es, which may ccause<br />

actual res sults and perform mance of <strong>the</strong> Coompany’s<br />

busin ness <strong>to</strong> differ<br />

materially annd<br />

adversely fromm<br />

<strong>the</strong> forward-lo ooking statemennts.<br />

Certain suc ch forward-looking<br />

statements ccan<br />

be identified d by <strong>the</strong> use of<br />

forward-lookiing<br />

terminology such as “believ ves”, “may”, “willl”,<br />

“should”, “wo ould be”, “expec cts” or “anticipate tes” or similar ex xpressions, or thhe<br />

negative <strong>the</strong>rreof,<br />

or o<strong>the</strong>r vaariations<br />

<strong>the</strong>reof f, or comparablee<br />

terminology, or o by discussions<br />

of strategy, pllans,<br />

or intentions.<br />

Should one or<br />

more of <strong>the</strong>se<br />

risks or uncerrtainties<br />

materia alise, or should uunderlying<br />

assu umptions prove incorrect, actuaal<br />

results may va ary materially froom<br />

those describbed<br />

in this releaase<br />

as anticipate ed, believed, or expected. <strong>SBM</strong> M <strong>Offshore</strong> NV does d not intend, and does not assume a any<br />

obligation, <strong>to</strong>o<br />

update any inddustry<br />

informatio on or forward-loooking<br />

statemen nts set forth in th his release <strong>to</strong> reeflect<br />

subsequen nt events or<br />

circumstancees.<br />

www.sbmoffsshore.com<br />

Page 2 of 2<br />

Schieedam,<br />

2 February<br />

2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!