19.05.2013 Views

Advances in Levee Evaluations, Operation ... - Royal Haskoning

Advances in Levee Evaluations, Operation ... - Royal Haskoning

Advances in Levee Evaluations, Operation ... - Royal Haskoning

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Port of New York already on same page 3D model<strong>in</strong>g<br />

Pictures above and quote below:<br />

Cavaliere et al, Geo-Strata, July-August, 2011, pp44-47.<br />

Quote<br />

As an agency, the Port Authority of New York and New Jersey (PA) is mov<strong>in</strong>g towards creat<strong>in</strong>g Build<strong>in</strong>g Information management (BIM) models for new facilities, as well as<br />

exist<strong>in</strong>g facilities undergo<strong>in</strong>g major modification. The creation of 3-D CAD strata models allows the geotechnical eng<strong>in</strong>eer to contribute to that effort. The strata models can be<br />

comb<strong>in</strong>ed with the BIM models be<strong>in</strong>g created by other professional discipl<strong>in</strong>es. By comb<strong>in</strong><strong>in</strong>g all these models, the PA can not only perform <strong>in</strong>terference checks, but also<br />

assess the impact of subsurface conditions on underground utilities and foundation locations.<br />

…<br />

Although <strong>in</strong>itiat<strong>in</strong>g the geotechnical database required considerable effort, once established, its population and ma<strong>in</strong>tenance has become a relatively simple and rout<strong>in</strong>e<br />

operation. With the automation of the field logs, what was once a tedious manual operation has become a much simpler QA/QC check. The geotechnical database has been a<br />

great <strong>in</strong>vestment for the Port Authority. It is generic and can be used with most design models. As the design profession transitions towards BIM, the PA fully expects to be able<br />

to provide subsurface <strong>in</strong>formation to make these models complete.<br />

Unquote<br />

Sp<strong>in</strong>-off: Probabilistic Module(s)<br />

Probabilistic? Why?<br />

USA will migrate to Risk Based Flood Insurance Rates<br />

Quantitative Risk or Reliability Assessments are needed (QRA)<br />

Systematic consistency is needed<br />

<strong>in</strong> order to compare different Flood Pla<strong>in</strong>s throughout the State/Nation<br />

The highly automated REAL ® workflow already allows us to process QRAs for all<br />

discussed failure modes through<br />

Monte Carlo simulations<br />

Taylor Series (First Order Second Moment + Reliability Index β method)<br />

analyses<br />

and of course Expert Op<strong>in</strong>ion Elicitation can always be <strong>in</strong>cluded, if desired<br />

…….<br />

www.fugro.com<br />

www.fugro.com<br />

01-May-12<br />

25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!