20.05.2013 Views

Input from Enercon - scc-online.de

Input from Enercon - scc-online.de

Input from Enercon - scc-online.de

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ENERCON<br />

Proposal for IEC 61400-25<br />

LN Wind Power Plant Control and Monitoring System<br />

Werner Bohlen Frank Fischer<br />

• Control of Wind Power Plants<br />

• Introduction of LN WCMS<br />

• Modification of LN WTUR<br />

Energy for the World<br />

AG-Präsentation


ENERCON<br />

Control of Wind Power Plants<br />

Energy for the World<br />

AG-Präsentation


ENERCON<br />

Control of Wind Power Plants<br />

• WPP Active Power Management (installed rated power of the WTGS of a<br />

WPP extends grid capacity)<br />

• WPP Active Power Management (control of active power initiated by the<br />

utility due to grid status, e.g. e.on Erzeugungsmanagement)<br />

• WPP Reactive Power Management (control of reactive power initiated by<br />

the utility due to grid status, e.g. e.on exten<strong>de</strong>d grid connection rules)<br />

• WPP Reactive Power Management (voltage control)<br />

• WPP Controlling Power Range Management<br />

Energy for the World<br />

AG-Präsentation


WCMS Feature:<br />

ENERCON<br />

Control of Wind Power Plants<br />

• Controller using setpoint values (<strong>from</strong> utility) and actual values (<strong>from</strong><br />

measurement unit).<br />

Energy for the World<br />

AG-Präsentation


WCMS Feature:<br />

ENERCON<br />

Control of Wind Power Plants<br />

• Process Data Interface (to the utility) collecting data <strong>from</strong> the WTGs of the<br />

WPP (resp. <strong>from</strong> subordinate WPPs) to generate values for available active<br />

and reactive power of the WPP for controlling power range management.<br />

Energy for the World<br />

AG-Präsentation


WCMS Feature:<br />

ENERCON<br />

Control of Wind Power Plants<br />

• Process Data Interface (to the utility) for active power gradients.<br />

Energy for the World<br />

AG-Präsentation


Measured Values / Processed Values<br />

Available active power of WPP at PCC<br />

ENERCON<br />

Introduction of LN WCMS<br />

Available reactive power generating of WPP at PCC<br />

Available reactive power absorbing of WPP at PCC<br />

Available power factor generating of WPP at PCC<br />

Available power factor absorbing of WPP at PCC<br />

Controls<br />

Start command to the WPP<br />

Stop command to the WPP<br />

Settings<br />

Demand value of active power generation of WPP at PCC<br />

Demand value of reactive power generation of WPP at PCC<br />

Demand value of power factor at PCC<br />

Maximum allowable active power gradient after start of WPP<br />

Minimum allowable active power gradient after change of <strong>de</strong>mand value of active power generation of<br />

WPP<br />

Energy for the World<br />

AG-Präsentation


ENERCON<br />

Modification of LN WTUR<br />

• Generating values for available active and reactive power of the WTGS<br />

(controlling power range management of the WPP).<br />

• Two data sets containing setpoint data for P, Q, cos j<br />

(1) Default values for WTGS operation when the communication is<br />

interrupted resp. the WTGS is part of the WPP, but not subjected to WPP<br />

control<br />

(2) Demand values for WTGS operation when the WTGS is subjected to<br />

WPP control<br />

Energy for the World<br />

AG-Präsentation


ENERCON<br />

Modification of LN WTUR<br />

Measured Values / Processed Values<br />

TotPwrAt<br />

TotPwrRt<br />

Available active power of WTGS* NEW<br />

Available reactive power generating of WTGS* NEW<br />

Available reactive power absorbing of WTGS* NEW<br />

Available power factor generating of WTGS* NEW<br />

Available power factor absorbing of WTGS* NEW<br />

* computed value <strong>de</strong>pending on wind conditions etc.<br />

Energy for the World<br />

AG-Präsentation


Controls<br />

...<br />

WCMS activated NEW<br />

Settings<br />

ENERCON<br />

Modification of LN WTUR<br />

DmdPwrAt Demand value of active power generation of WTGS – Default value<br />

DmdPwrRt Demand value of reactive power generation of WTGS – Default value<br />

DmdPF Demand value of power factor of WTGS – Default value<br />

MaxGdPwrAt Maximum allowable active power gradient after start of WTGS – Default value<br />

Minimum allowable active power gradient after change of maximum value of active power generation of<br />

WTGS – Default value NEW<br />

Demand value of active power generation of WTGS – WCMS value NEW<br />

Demand value of reactive power generation of WTGS – WCMS value NEW<br />

Demand value of power factor of WTGS – WCMS value NEW<br />

Maximum allowable active power gradient after start of WTGS – WCMS value NEW<br />

Minimum allowable active power gradient after change of maximum value of active power generation of<br />

WTGS – WCMS value NEW<br />

Energy for the World<br />

AG-Präsentation

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!