Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong> & <strong>Family</strong> <strong>Welfare</strong><br />
(Government <strong>of</strong> India)<br />
<strong>Request</strong> for <strong>Proposal</strong> (<strong>RFP</strong>) for<br />
Setting up <strong>of</strong> 6 AIIMS at<br />
Bhopal / Bhubaneswar/ Jodhpur/ Patna/ Raipur/ Rishikesh<br />
Package – IV HVAC & BMS<br />
Volume – VI<br />
BOQ<br />
• Pre-Bid Queries & Amendment-1 ( HVAC)<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong> & <strong>Family</strong> <strong>Welfare</strong><br />
Nirman Bhavan, Maulana Azad Road<br />
New Delhi – 110011<br />
0
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
Sl. No.<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
Heading<br />
INDEX<br />
Page No.<br />
01 Index 01<br />
02 Reply to the Queries during the Meeting 02<br />
03 Queries by Shapoorji Pallonji<br />
04 Reply to the Queries 03-05<br />
05 Queries by Simplex Infrastructure ltd<br />
06 Reply to the Queries 06<br />
07 Queries by CCC Ltd<br />
08 Queries by B.E. Billimoria Co. Ltd<br />
09 Reply to the Queries 07<br />
10 Queries by Punj Lloyd<br />
11 Reply to the Queries 08<br />
12 Queries by L & T<br />
13 Reply to the Queries 09-10<br />
14 Queries by ACIL<br />
15 Reply to the Queries 11<br />
16 Queries by B. L. Kashyap<br />
17 Queries by Unity Infrastructures ltd<br />
18 Queries by JMC ltd<br />
19 Reply to the Queries 12<br />
20 Approved Makes <strong>of</strong> materials for HVAC<br />
Work ( Revised)<br />
13-17<br />
1
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
Name <strong>of</strong> the work: Setting up <strong>of</strong> 6 AIIMS at<br />
Bhopal, Bhubaneshwar, Jodhpur, Patna, Raipur <strong>and</strong> Rishikesh<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
Clarification / Addition/ Deletion No -1 (HVAC)<br />
1. Reply to queries raised during the meeting is as follows:-<br />
(a) Extension <strong>of</strong> date for submission <strong>of</strong> bid – All bidders were seeking extension <strong>of</strong><br />
two to three weeks as it is difficult for them to collect rates from the market in such<br />
a short period.<br />
Reply – No extension is granted. The bid submission date will remain 03 Mar 2010<br />
upto 1.00 P.M.<br />
(b) M/s L&T:- Bidder wanted that L&T may be permitted to work on their own instead<br />
<strong>of</strong> through specialized firm.<br />
Reply– Not permitted. No change.<br />
(c) M/s L&T:- Bidder also wanted to remove operation & maintenance <strong>of</strong> HVAC work<br />
from the Tender.<br />
Reply– No change. Operation <strong>and</strong> maintenance <strong>of</strong> HVAC work shall remain the<br />
part <strong>of</strong> tender.<br />
(d) M/S CCCL :– They requested not to enforce the MOU with specialized firms.<br />
However they agreed for signing MOU with more than one firm.<br />
Reply – Accepted. MOU with more than one firm is permitted..<br />
(e) Payment <strong>of</strong> Bills:– Bidders wanted that payment may be made to Civil Contractor<br />
instead <strong>of</strong> Specialized firm.<br />
Reply – Not agreed. Payment to be regularized as per tender.<br />
2. Reply to Technical Points: – Attached<br />
Date <strong>of</strong> Submission <strong>of</strong> Bids 03 Mar 2010 up to 1.00 pm<br />
2
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
Reply to Sl no <strong>of</strong> queries:<br />
AIIMS Rishikesh:<br />
Sl.No:<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
I. Shapoorji Pallonji & Co. Ltd<br />
1. Chiller: BOQ gives technical duty <strong>of</strong> the chiller. The chiller will be as per CPWD HVAC<br />
specification. VFD <strong>and</strong> BMS card will be as per the Chiller manufacturer.<br />
Country <strong>of</strong> origin: As per makes specified.<br />
2. Secondary chiller pump: As per revised list <strong>of</strong> makes enclosed. Wilo make added.<br />
3. VFD drive for condenser pump is not required.<br />
4. Cooling tower: Flow: 2800 US GPM.<br />
Temperature. In: 97.5 degree F. Out: 90 degree F.<br />
5. TFA specification as per AHU <strong>and</strong> CPWD specification.<br />
6. Dem<strong>and</strong> control will include regulation <strong>of</strong> fresh air intake through a automatically<br />
controlled motorized damper as per the CO2 level in the return air. The inline fan will<br />
h<strong>and</strong>le the amount <strong>of</strong> exhaust from the occupancy <strong>and</strong> the VAV unit will h<strong>and</strong>le the<br />
variable volume <strong>of</strong> fresh air intake <strong>and</strong> the exhaust. Please see the revised list <strong>of</strong><br />
approved makes.<br />
7. Makes for Axial fans included. Constructional features shall be as per CPWD<br />
specification <strong>and</strong> as per approved make. Any valid technical deviation to suit<br />
manufacturers design will be allowed on merit with the advice <strong>of</strong> the Engineer Incharge.<br />
8. MS Pipe above 150 mm dia: Thickness as per CPWD HVAC specification.<br />
9. Pressure rating shall be as per CPWD HVAC specification.<br />
10. Pressure Independent valve: Revised list includes the makes.<br />
11. Thermostat to be provided.<br />
12. The accessories for Aluminium duct shall be Aluminium.<br />
13. Supreme Make has been added in the revised list.<br />
16. Laminar flow diffuser shall be in consultation with Modular OT design.<br />
17. Motorised Fire damper shall be CBRI Roorkee approved.<br />
18. Pressure rating <strong>of</strong> motorized butterfly valve shall be as per CPWD HVAC specification.<br />
19. Input/ Output summary for BMS to be collected from HLL Office.<br />
20. In place <strong>of</strong> UVGI read-“ Ultra Violet photohydroionization advanced Oxidation metal<br />
catalyst based technology”:<br />
<strong>For</strong> Rishikesh work only. Make will be: RGF<br />
21. Ozone Generator: See the revised approved make list.<br />
22. BOQ items 34 to 41 shall be h<strong>and</strong>led by one specialized vendor on a turn key basis.<br />
Approved vendors are:<br />
Vesda/ System Sensor/ Notifier/Carrier ALC.<br />
23. No Change<br />
3
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
Reply to Queries for AIIMS tenders at six locations:<br />
Sl NO.<br />
1. Screw Chiller: Mono screw acceptable as requested.<br />
2. Secondary Chiller Pump: BOQ gives the duty <strong>of</strong> the pump. Specification is as per<br />
CPWD HVAC specification.<br />
3. Thermal Storage system <strong>and</strong> allied accessories: Your observation is noted. At the time<br />
<strong>of</strong> execution decision will be taken whether to provide this system or not. The tenderer<br />
has to commission the system without thermal storage system if so decided.<br />
4. Scrubber specification: as per approved manufacturer’s spec. with approval from <strong>of</strong> the<br />
Engineer In Charge in consultation with HVAC Consultant.<br />
5. Axial Flow Fans: Makes as in the revised list.<br />
6. Energy Recovery Wheel: Makes as per revised list attached. Duty as per BOQ <strong>and</strong><br />
specifications as per CPWD. This is a part <strong>of</strong> AHU.<br />
7. BMS: Information on Summary: to be collected from HLL Office.<br />
8. Cross linked closed cell insulation: Specification as in BOQ. Reply already given<br />
earlier.<br />
9. Duct Insulation: “50 mm thick insulation” deleted.<br />
10. Expansion tank: Revised list <strong>of</strong> approved makes attached.<br />
11. Thickness <strong>of</strong> inner skin <strong>of</strong> AHU/Drain Tray/Cooling Coils: .8mm/ as specified in CPWD<br />
HVAC specification for GI. Please note that inner skin <strong>of</strong> Air Washer also will be <strong>of</strong><br />
stainless steel.<br />
12. Point No. 25 to Preamble: No change.<br />
13. Point No. 25(a): Choice <strong>of</strong> make from the approved list <strong>of</strong> makes lies with the contractor<br />
but the Engineer-in-charge will give prior approval before order is placed.<br />
14. General: Specifications are as per BOQ/CPWD HVAC specification. The BOQ is based<br />
on the detailed design made by the AC Consultant. The detailed drawings will be given<br />
to the successful bidder after award <strong>of</strong> the work. Meanwhile if any further details are<br />
required contact HLL Office for the needful.<br />
Technical Clarifications <strong>of</strong> AIIMS Jodhpur:<br />
SL NO.<br />
1 to 8: No Change.<br />
9: Please see revised list <strong>of</strong> approved makes.<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
4
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
Technical Clarifications <strong>of</strong> AIIMS Jodhpur:<br />
Sl No:<br />
1. Chiller: Reply already given as above.<br />
2. Chiller plant Manager: Same make as Chiller.<br />
3. Pumps: Horizontal split casing pump is allowed.<br />
4 Already replied as above.<br />
5. Already replied as above.<br />
6. Already replied as above.<br />
7. Already replied as above.<br />
8 Already replied as above.<br />
9. Already replied as above.<br />
10. Deep Freezer: Voltas/ Bluestar make allowed.<br />
11. Already replied as above.<br />
12. Commercial: All relevant details are there in tender documents.<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
5
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
Reply to Sl no <strong>of</strong> queries:<br />
Sl No.<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
II. Simplex Infrastructures Ltd<br />
1. HVAC drawings on Auto Cad <strong>For</strong>mat: The BOQ is based on detailed design done by<br />
the AC Consultant. Work will be done as per CPWD HVAC specifications <strong>and</strong><br />
specifications as in BOQ. These are sufficient to submit the bid. Detailed drawings on<br />
Auto Cad <strong>For</strong>mat will be submitted to the successful bidder after award <strong>of</strong> the Work.<br />
2, 3: Please obtain the CPWD specifications which are priced publications <strong>and</strong> are available<br />
for purchase.<br />
4, 5: No change is allowed. Please note that the inner skin <strong>of</strong> the AHUs/Airwasher/Scrubber<br />
shall be made <strong>of</strong> stainless steel.<br />
6. No change allowed.<br />
7. Approved Makes: Please see revised list attached.<br />
8. BMS Input/ Output Summary for Raipur: to be collected from HLL Office<br />
9. Bhopal: Percentage <strong>of</strong> brine solution for Chiller: As per design <strong>and</strong> recommendation <strong>of</strong><br />
the Manufacturer.<br />
10. Bhopal: ARI does not certify Brine chillers: After award <strong>of</strong> work, it may be decided not<br />
to go for brine chiller <strong>and</strong> thermal storage tank system. The tenderer should be<br />
prepared to execute the work without brine system. Please tender accordingly. Items<br />
connected with brine system may be excluded from execution.<br />
11. 240 TR brine chiller in place <strong>of</strong> 250 TR: Change accepted for not less than 240 TR.<br />
12. Bhopal: 500 TR Chiller with VFD: Yes, chiller to be provided with VFD<br />
for reducing starting current <strong>and</strong> energy savings at part load.<br />
6
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
Reply to Queries received.<br />
Sl No:<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
III. Consolidated Construction Consortium Limited<br />
1. MOU: Considering the high value <strong>of</strong> work, MOU prior to tender is required. No change.<br />
2. Tender Drawings: Reply already given as above,<br />
3. Approved Vendor for IBMS: Sauter Race included.<br />
4. Approved Makes for IBMS: Please see the revised list.<br />
5. General: S<strong>of</strong>t copy Documents: As replied above, it will be given after award <strong>of</strong> work for<br />
preparation <strong>of</strong> working drawings for execution.<br />
Reply to Queries:<br />
Sl No <strong>of</strong> Query.<br />
IV. B.E.Billimoria & Co. Limited<br />
1to6 : Already reply given to these queries as above.<br />
8: Please see the revised list <strong>of</strong> approved makes.<br />
7
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
Reply to queries at Annexure-A:<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
V. Punj Lloyd<br />
There are 14 queries. All the queries are common with reference to queries already replied to<br />
as above.<br />
Queries at Annexure-B:<br />
There are 23 queries which are repetition <strong>of</strong> queries <strong>of</strong> other bidders: Replies already given.<br />
Annexure C:<br />
Reply to Querries:<br />
Sl No.<br />
1. Deviation between BOQ <strong>and</strong> CPWD Specification: Clause 21 <strong>of</strong> Vol IV will supercede<br />
BOQ/ CPWD specification as clearly mentioned in the document. Clause 21 is<br />
applicable to certain specified items only. With reference to other items, wherever there<br />
is a discrepancy between the BOQ <strong>and</strong> tender specification, decision will be taken on<br />
merit in the best interest <strong>of</strong> the work as directed by the Engineer Incharge.<br />
2. Pressure rating <strong>of</strong> butterfly valves: As per CPWD HVAC specification.<br />
3. Pipe Insulation: It will be factory insulated for better quality/insulation <strong>and</strong> speedier<br />
execution <strong>of</strong> work.<br />
4. As per CPWD HVAC specification with additional specification.<br />
5. Pipe insulation thickness specified.<br />
6. Make <strong>of</strong> Axial Flow Fan: Pl see the revised list.<br />
7. Zinc coating <strong>of</strong> Ducting: As per CPWD HVAC specification.<br />
8,9,10,:These points have already been replied to as above.<br />
11. Specification for UVGI <strong>and</strong> Ozone: Specification as per the approved Manufacturer<br />
will be accepted.<br />
12. This point has already been replied to as above.<br />
13. Approved Makes: Please see the revised list.<br />
Technical Comments for Rishikesh Hospital:<br />
1. AHU casing thickness: as per CPWD HVAC specification.<br />
2. Electrical Panel rating: As per the requirement <strong>of</strong> various equipments <strong>and</strong> as per<br />
HVAC CPWD specification.<br />
3. The estimate is based on LS for the entire job <strong>and</strong> is not to be paid against<br />
quantity/length <strong>of</strong> various items.<br />
4. Thickness <strong>of</strong> duct acoustic lining: Given in the BOQ.<br />
AIIMS Raipur:<br />
8
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
As per CPWD HVAC specification.<br />
Reply to queries raised by L&T:<br />
Sl No.<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
VI. L&T<br />
1,2,3. No change.<br />
4. Contradiction between BOQ <strong>and</strong> CPWD Specification:<br />
Please refer to reply given earlier.<br />
Bhopal:<br />
5. Water chiller capacity mentioned: Actual capacity.<br />
6. No change. To be provided with VFD.<br />
7. AHU: Static pressure mentioned is total.<br />
8. Thermal storage tanks: Number <strong>of</strong> tanks: Upto the tenderer.<br />
9. Scrubber: Static pressure: Total.<br />
10. Heat Exchanger: Specification as per approved manufacturer. See Approved List.<br />
11. Chilled water pipe thickness: As per CPWD specification.<br />
12. Chilled water pipe insulation: It shall factory pre insulated with PUF.<br />
13. GSS Duct : Type <strong>of</strong> flange: As per CPWD specification.<br />
14. Operation <strong>and</strong> maintenance: No change.<br />
15. BMS: Input/Output summary: to be collected from HLL Office .<br />
Bhubaneswar:<br />
5. Cond. Water Pump: Tenderer may provide End Suction Back pull type pump.<br />
6. AHU static pressure: <strong>For</strong> the tenderer to suit design.<br />
7. Filter specification: As per CPWD HVAC specification.<br />
8. 2-way modulating valve: Price to be considered in the AHU rate.<br />
9. Heat Recovery Unit: Design left to the tenderer but make <strong>of</strong> heat recovery unit shall be<br />
within List <strong>of</strong> Approved manufacturers.<br />
10. Condensing Units; Price to be included in AHU unit rate. You may consider 2x10<br />
Units.<br />
Distance: Please see the drawing in HLL <strong>of</strong>fice.<br />
11. Pipe thickness: As per CPWD HVAC specification.<br />
12. Welding MS pipe above 500 mm: As per best engineering practice.<br />
13,14:Already replied above.<br />
Jodhpur:<br />
5. Chiller power consumption: As per CPWD HVAC specification.<br />
Pipe below ground level: Please see drawing in HLL <strong>of</strong>fice.<br />
9
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
Raipur:<br />
Other points already replied to.<br />
8. Fire mode fans: yes, fire rated 250 deg C-2 hours.<br />
9. Please see the details in HLL <strong>of</strong>fice.<br />
Rishikesh:<br />
Other points, already replied to as above,<br />
All the points already replied to as above.<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
10
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
Reply to queries raised by ACIL:<br />
Sl No.<br />
AIIMS Rishikesh<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
VII Ahluwalia Construction I Ltd<br />
1. See the Revised Approved List<br />
2. No change<br />
3. NO CHANGE<br />
4. As suggested VFDs to be provided with harmonic filters as per laid down st<strong>and</strong>ards.<br />
5. No change<br />
6. No change<br />
AIIMS Bhopal: 1. Hospital complex<br />
1. Already replied.<br />
2. As per CPWD HVAC specifications.<br />
3. Please see revised list <strong>of</strong> Approved makes.<br />
AIIMS Bhopal: 2. College & Auditorium Complex<br />
1. As per BOQ..<br />
2. As per BOQ/As per specifications <strong>of</strong> approved Manufacturer approved by Engineer- in-<br />
Charge.<br />
AIIMS Bhubaneswar:<br />
1. Revised approved list is final <strong>and</strong> supercedes all previous lists.<br />
2. This is as per CPWD HVAC specifications.<br />
3. Please see the revised Approved List.<br />
AIIMS Raipur:<br />
1. Please see the revised Approved List.<br />
2. ( 2W + 1F) means 2 Working + 1 Future. Future is outside the scope <strong>of</strong> this tender.<br />
3. ( 2W + 1s) means 2 Working + 1 St<strong>and</strong>by.<br />
AIIMS Jodhpur:<br />
1. No change<br />
11
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
VIII. BL Kashyap<br />
All points raised are already replied to as above.<br />
Reply to the queries:<br />
IX. Unity infraprojects Ltd<br />
All the points raised are <strong>of</strong> common nature <strong>and</strong> already replied to earlier as above.<br />
Reply to the queries:<br />
X. JMC Ltd<br />
All the points raised are <strong>of</strong> common nature <strong>and</strong> already replied to earlier as above.<br />
Note <strong>For</strong> all AIIMS:<br />
1. All water cooled centrifugal chilling units will come with VFD drives.<br />
2. All secondary chiller pumps will have VFD drive. AHUs will be provided with VFD as<br />
provided in the BOQ. Cooling Tower Motors shall be with VFD.<br />
3. The entire job will be executed by the HVAC contractor to include supply <strong>of</strong> all<br />
materials/ equipments as required to ensure quality <strong>of</strong> work, use <strong>of</strong> right materials/<br />
equipments <strong>and</strong> comprehensive system engineering.<br />
4. All equipments to be connected to the IBMS shall be IBMS compatible <strong>and</strong> nothing<br />
extra will be paid on this account.<br />
5. All AHUs/ Air washers/ Scrubbers shall be provided with stainless steel for the inner<br />
skin. All these units will be provided with protective door lock <strong>and</strong> protective guard.<br />
12
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
Approved Makes <strong>of</strong> Materials for HVAC Work: (Revised)<br />
Sl<br />
No<br />
Items Approved Makes<br />
1 Centrifugal Chilling<br />
Machine with<br />
VFD( ARI Certified<br />
Imported)<br />
Carrier/Trane/York/Daikin-Macquay<br />
2 Screw Chilling<br />
Machine<br />
Same as above <strong>and</strong> Dunhambush<br />
3 Scroll Compressor Same as above, plus Voltas, Blue Star<br />
4 Primary CHW/Cond<br />
Pump<br />
ITT/Grundfoss/Armstrong/Wilo<br />
5 Secondary CHW with<br />
VFD<br />
ITT/Grundfoss/Armstrong/Wilo<br />
6 Cooling Tower Paharpur/Mihir/Advance/Marley/Bell<br />
7 Hot water Generator Rapidcool/Khokkar/KEPL/Rapid<br />
control/Emerald<br />
8 AHUs all types with Blue Star/Voltas/ETA/Carrier/Trane/<br />
Heating/ Cooling Zeco/Edgetech/Waves/Savier/E Flow/Carryair/<br />
coils/Air Scrubber<br />
Unit<br />
Fedders lloyd<br />
9 Fan Section( Single<br />
Skin) for fresh Air,<br />
Exhaust,Stair<br />
Case, Lift well<br />
pressurization<br />
Same as above at Sl no. 8<br />
10 VFD for AHUs Danfoss/ Siemens/ABB/Allen Bradley<br />
11 Fancoil units Bluestar/Voltas/Zeco/Daikin/Carrier/ETA<br />
12 Centrifugal fans for<br />
AHUs/fresh<br />
air/exhaust fan/kitchen<br />
scrubber<br />
Kruger/Nicotra/Comefri/<br />
13 Propeller fan Alsthom/Khaitan/Crompton/GEC<br />
14 In Line fan System Air/Konaflakt/Kruger/Ostbergg/Wolter<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
13
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
15 Airwasher Roots Cooling/ AC Humidin/Zeco/Waves/<br />
Fedders Lloyd<br />
16 Grills/Diffusers Carryair/Ravistar/Airmaster/Dyna craft<br />
/Fedders Lloyd<br />
17 Fire Dampers UL<br />
Listed<br />
Ravistar/Dyna Craft/Carryair/<br />
18 Fire Damper Motors Belimo/Siemens<br />
19 GI sheet metal duct Jindal/Sail/Tata<br />
20 Factory fabricated Zeco/Techno/Rolastar/Voltas<br />
duct<br />
21 Hessian (fire treated) Navair/pyroguard<br />
22 MS/GI pipe Jindal Hissar/Tata/Sail/Mukut( above 500 mm<br />
dia)<br />
23 Pre-insulated chilled Zeco/seven star<br />
water pipe<br />
24 Thermometer Taylor/H Guru/Fiebig<br />
25 Flow switch Rapidcool/Siemens<br />
26 Auto Airvent Rapid cool/Anergy<br />
27 Filters(pre, fine, Hepa) AAF/Purolator/Thermadyne/Spectrum<br />
28 Flexible pipe<br />
connection<br />
Resist<strong>of</strong>lex/Kanwal<br />
29 GM valve upto 40mm Audco/Leader/Zolloto<br />
30 Butterfly/Non<br />
return/Check Valve<br />
Audco/Advance<br />
31 Motorised butterfly<br />
valve<br />
Bellino/Honeywell/Siemens/Nibco<br />
32 Ball/Gate/Globe-do- CIM/Rapidcool/Leader<br />
33 Ball valve with Y- Rapidcool/Emerald<br />
strainer<br />
34 Pot/Y-Strainer Rapidcool/Emerald<br />
35 Suction Guide Anergy/Emerald<br />
36 Pressure Gauge H Guru/Fiebig/Emerald/Taylor<br />
37 2/3 way modulating<br />
valve for AHU<br />
Honeywell/Siemens/Danfoss/Belimo<br />
38 Room<br />
thermostat/humidistat<br />
Same as above<br />
39 Safety thermostat for<br />
heater<br />
Same as above<br />
40 Dial Penn/H Guru/Feiig/Emerald<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
14
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
thermometer(capillary<br />
Type<br />
41 Cooling/Heating<br />
Mode changer<br />
42 Pre-moulded PUF<br />
section for insulation<br />
43 Closed cell nitrite<br />
rubber with<br />
aluminium foil<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
Siemens/Honeywell<br />
LLyod/Malanpur/Beardsel/Supreme<br />
Armacel/Vid<strong>of</strong>lex/Supreme<br />
44 PUF pipe supports Malanpur/Lloyd/Beardsel<br />
45 Aluminium tape Johnson/Birla 3M<br />
46 Vibration isolator Resist<strong>of</strong>lex/Dunlop<br />
47 V Belt Dunlop/Fenner<br />
48 Expansion<br />
tank(pressurized)<br />
And Air Separator<br />
ITT/Wessels/Grunfoss/Anergy<br />
49 Paints ICI/Asian/Nerolac/Berger<br />
50 Ultra violet germicidal Ruks/Trimed<br />
Irradiation system<br />
51 Precision AC units Emerson/ Blue Box/Stulz<br />
52 Aluminium sheets Hindalco/Balco/Nalco<br />
53 Factory fabricated Atco/seven star/GP Spiro/Om sai Enterprises<br />
spiral duct<br />
54 Mineral wool Lloyd insulation/UP Twiga/Kimmco/<br />
insulation<br />
55 Closed cell fire Paramout/Armacell/Aer<strong>of</strong>lux/Supreme<br />
retardant XLPE(for<br />
duct insulation)<br />
56 Exp<strong>and</strong>ed<br />
MetturBeardsell/Stryne Packing/Supreme<br />
polystyrene(for<br />
Underdeck insulation)<br />
57 Fibreglass rigid Board UP Twiga/Owen Corning/Kimco<br />
58 Tarfelt/CPRX Shalimar tar product/Asian<br />
compound<br />
59 Dash fastners Fisher/HILTI<br />
60 Welding Rods Advani/L&T<br />
61 Copper refrigerant Diamond/star/Rajco<br />
piping<br />
15
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
62 Electrical Panels( in L&T/ /Advance panel <strong>and</strong> switch<br />
AC plant room) gear/Adlec/C&S Electric/Zeta<br />
63 AHU/ventilation In addition to above KEPL/EAP Elektro/Ess<br />
electricalpanels Ess Kay<br />
64 HVAC Controls Danfoss/ Honeywell/Johnson Controls/<br />
Siemens/Penn/Carrier ALC<br />
65 Electric Motors ABB/Areva/BBL/Crompton/Kirloskar/Siemen<br />
s<br />
66 ACB/MCCB ABB/Siemens/Schneider/L&T/C&S Electric/<br />
Mitsubishi<br />
67 MCB Hager/Legr<strong>and</strong>/Merlin Gerin/siemens/Havels/<br />
C&S electric/Adhunik<br />
68 Power/control cables Finolex/polycab/Havels/Universal/Ekta/<br />
Gemscab/ Paragon(Elektron) /Ravi/Rallison<br />
69 Starters/contactors/OL<br />
Relays/push buttons/<br />
Rotary<br />
switches/changeover<br />
switch/fuse <strong>and</strong><br />
fittings/1-phase<br />
preventor/indicating<br />
Lamps/<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
L&T/GE/Siemens/Schneider/C&S<br />
Electric/BCH<br />
70 Voltmeter/Ammeter AE/IMP<br />
71 CT/PT Kappa/AE/Precise<br />
72 Cable tray In addition toat 63, Pilco, Ricco/Slotco<br />
73 Cable lugs Dowell/Jainsons/Lotus<br />
74 IBMS<br />
Approved vendor for<br />
the turnkey IBMS job:<br />
75 IBMS components:<br />
a. S<strong>of</strong>tware,Network<br />
Area<br />
controller,Central<br />
And DDC controller,<br />
Ultrasonic BTU<br />
Meters, Temp.<br />
Siemens/<br />
Honeywell/Johnson/ABB/Schneider/Zicom/<br />
Sauter Race/Carrier- ALC/Trane<br />
Siemens/Honeywell/Johnson/ABB/Schneider/<br />
Easy IO-30p/Sauter Race/Trane/Carrier-ALC<br />
16
Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
Sensors,<br />
network/remote<br />
operator<br />
Terminal/smoke<br />
sensor, Temp plus RH<br />
sensor/Differential<br />
pressure switch<br />
air/water.<br />
b.computer<br />
c. Printer<br />
d. Communication<br />
cable,<br />
76 Ozone Injection<br />
system<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
IBM/HP<br />
HP/Sharp<br />
Delton/Fussion/as approved by the main<br />
vendor.<br />
Ruks/Trimed<br />
77 Bus Ducting L&T/Schneider/C&S Electric/Godrej/Zeta<br />
78 Tube Axial Fans Kruger,Nocotra,Comefree,Flakwood/Wolter<br />
79 Pressure independent<br />
Balancing valve<br />
Danfoss/Flowcan/TA/Belimo<br />
80 Heat Recovery Desiicant Rotors(DRI), Novelair Technology,<br />
Wheels<br />
Eventus(osterberg),Flakwood, Bryair<br />
81 Heat Exchanger Heatx X, Mark, Alfa lavel<br />
82 Thermal storage tank Crystopia, Dynambush, Calmac<br />
83 Spiral duct Sevenstar<br />
84 Deep Freezer Voltas/bLUESTAR<br />
Note:<br />
1. The contractor will use one <strong>of</strong> the approved makes with the prior approval <strong>of</strong> the<br />
engineer-in-charge.<br />
2. Order will be placed with the prior approval <strong>of</strong> the engineer-in-charge.<br />
3. When certain makes are missing in the above list, the make will be decided in<br />
consultation with the Engineer In Charge.<br />