Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong> & <strong>Family</strong> <strong>Welfare</strong><br />

(Government <strong>of</strong> India)<br />

<strong>Request</strong> for <strong>Proposal</strong> (<strong>RFP</strong>) for<br />

Setting up <strong>of</strong> 6 AIIMS at<br />

Bhopal / Bhubaneswar/ Jodhpur/ Patna/ Raipur/ Rishikesh<br />

Package – IV HVAC & BMS<br />

Volume – VI<br />

BOQ<br />

• Pre-Bid Queries & Amendment-1 ( HVAC)<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong> & <strong>Family</strong> <strong>Welfare</strong><br />

Nirman Bhavan, Maulana Azad Road<br />

New Delhi – 110011<br />

0


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

Sl. No.<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

Heading<br />

INDEX<br />

Page No.<br />

01 Index 01<br />

02 Reply to the Queries during the Meeting 02<br />

03 Queries by Shapoorji Pallonji<br />

04 Reply to the Queries 03-05<br />

05 Queries by Simplex Infrastructure ltd<br />

06 Reply to the Queries 06<br />

07 Queries by CCC Ltd<br />

08 Queries by B.E. Billimoria Co. Ltd<br />

09 Reply to the Queries 07<br />

10 Queries by Punj Lloyd<br />

11 Reply to the Queries 08<br />

12 Queries by L & T<br />

13 Reply to the Queries 09-10<br />

14 Queries by ACIL<br />

15 Reply to the Queries 11<br />

16 Queries by B. L. Kashyap<br />

17 Queries by Unity Infrastructures ltd<br />

18 Queries by JMC ltd<br />

19 Reply to the Queries 12<br />

20 Approved Makes <strong>of</strong> materials for HVAC<br />

Work ( Revised)<br />

13-17<br />

1


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

Name <strong>of</strong> the work: Setting up <strong>of</strong> 6 AIIMS at<br />

Bhopal, Bhubaneshwar, Jodhpur, Patna, Raipur <strong>and</strong> Rishikesh<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

Clarification / Addition/ Deletion No -1 (HVAC)<br />

1. Reply to queries raised during the meeting is as follows:-<br />

(a) Extension <strong>of</strong> date for submission <strong>of</strong> bid – All bidders were seeking extension <strong>of</strong><br />

two to three weeks as it is difficult for them to collect rates from the market in such<br />

a short period.<br />

Reply – No extension is granted. The bid submission date will remain 03 Mar 2010<br />

upto 1.00 P.M.<br />

(b) M/s L&T:- Bidder wanted that L&T may be permitted to work on their own instead<br />

<strong>of</strong> through specialized firm.<br />

Reply– Not permitted. No change.<br />

(c) M/s L&T:- Bidder also wanted to remove operation & maintenance <strong>of</strong> HVAC work<br />

from the Tender.<br />

Reply– No change. Operation <strong>and</strong> maintenance <strong>of</strong> HVAC work shall remain the<br />

part <strong>of</strong> tender.<br />

(d) M/S CCCL :– They requested not to enforce the MOU with specialized firms.<br />

However they agreed for signing MOU with more than one firm.<br />

Reply – Accepted. MOU with more than one firm is permitted..<br />

(e) Payment <strong>of</strong> Bills:– Bidders wanted that payment may be made to Civil Contractor<br />

instead <strong>of</strong> Specialized firm.<br />

Reply – Not agreed. Payment to be regularized as per tender.<br />

2. Reply to Technical Points: – Attached<br />

Date <strong>of</strong> Submission <strong>of</strong> Bids 03 Mar 2010 up to 1.00 pm<br />

2


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

Reply to Sl no <strong>of</strong> queries:<br />

AIIMS Rishikesh:<br />

Sl.No:<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

I. Shapoorji Pallonji & Co. Ltd<br />

1. Chiller: BOQ gives technical duty <strong>of</strong> the chiller. The chiller will be as per CPWD HVAC<br />

specification. VFD <strong>and</strong> BMS card will be as per the Chiller manufacturer.<br />

Country <strong>of</strong> origin: As per makes specified.<br />

2. Secondary chiller pump: As per revised list <strong>of</strong> makes enclosed. Wilo make added.<br />

3. VFD drive for condenser pump is not required.<br />

4. Cooling tower: Flow: 2800 US GPM.<br />

Temperature. In: 97.5 degree F. Out: 90 degree F.<br />

5. TFA specification as per AHU <strong>and</strong> CPWD specification.<br />

6. Dem<strong>and</strong> control will include regulation <strong>of</strong> fresh air intake through a automatically<br />

controlled motorized damper as per the CO2 level in the return air. The inline fan will<br />

h<strong>and</strong>le the amount <strong>of</strong> exhaust from the occupancy <strong>and</strong> the VAV unit will h<strong>and</strong>le the<br />

variable volume <strong>of</strong> fresh air intake <strong>and</strong> the exhaust. Please see the revised list <strong>of</strong><br />

approved makes.<br />

7. Makes for Axial fans included. Constructional features shall be as per CPWD<br />

specification <strong>and</strong> as per approved make. Any valid technical deviation to suit<br />

manufacturers design will be allowed on merit with the advice <strong>of</strong> the Engineer Incharge.<br />

8. MS Pipe above 150 mm dia: Thickness as per CPWD HVAC specification.<br />

9. Pressure rating shall be as per CPWD HVAC specification.<br />

10. Pressure Independent valve: Revised list includes the makes.<br />

11. Thermostat to be provided.<br />

12. The accessories for Aluminium duct shall be Aluminium.<br />

13. Supreme Make has been added in the revised list.<br />

16. Laminar flow diffuser shall be in consultation with Modular OT design.<br />

17. Motorised Fire damper shall be CBRI Roorkee approved.<br />

18. Pressure rating <strong>of</strong> motorized butterfly valve shall be as per CPWD HVAC specification.<br />

19. Input/ Output summary for BMS to be collected from HLL Office.<br />

20. In place <strong>of</strong> UVGI read-“ Ultra Violet photohydroionization advanced Oxidation metal<br />

catalyst based technology”:<br />

<strong>For</strong> Rishikesh work only. Make will be: RGF<br />

21. Ozone Generator: See the revised approved make list.<br />

22. BOQ items 34 to 41 shall be h<strong>and</strong>led by one specialized vendor on a turn key basis.<br />

Approved vendors are:<br />

Vesda/ System Sensor/ Notifier/Carrier ALC.<br />

23. No Change<br />

3


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

Reply to Queries for AIIMS tenders at six locations:<br />

Sl NO.<br />

1. Screw Chiller: Mono screw acceptable as requested.<br />

2. Secondary Chiller Pump: BOQ gives the duty <strong>of</strong> the pump. Specification is as per<br />

CPWD HVAC specification.<br />

3. Thermal Storage system <strong>and</strong> allied accessories: Your observation is noted. At the time<br />

<strong>of</strong> execution decision will be taken whether to provide this system or not. The tenderer<br />

has to commission the system without thermal storage system if so decided.<br />

4. Scrubber specification: as per approved manufacturer’s spec. with approval from <strong>of</strong> the<br />

Engineer In Charge in consultation with HVAC Consultant.<br />

5. Axial Flow Fans: Makes as in the revised list.<br />

6. Energy Recovery Wheel: Makes as per revised list attached. Duty as per BOQ <strong>and</strong><br />

specifications as per CPWD. This is a part <strong>of</strong> AHU.<br />

7. BMS: Information on Summary: to be collected from HLL Office.<br />

8. Cross linked closed cell insulation: Specification as in BOQ. Reply already given<br />

earlier.<br />

9. Duct Insulation: “50 mm thick insulation” deleted.<br />

10. Expansion tank: Revised list <strong>of</strong> approved makes attached.<br />

11. Thickness <strong>of</strong> inner skin <strong>of</strong> AHU/Drain Tray/Cooling Coils: .8mm/ as specified in CPWD<br />

HVAC specification for GI. Please note that inner skin <strong>of</strong> Air Washer also will be <strong>of</strong><br />

stainless steel.<br />

12. Point No. 25 to Preamble: No change.<br />

13. Point No. 25(a): Choice <strong>of</strong> make from the approved list <strong>of</strong> makes lies with the contractor<br />

but the Engineer-in-charge will give prior approval before order is placed.<br />

14. General: Specifications are as per BOQ/CPWD HVAC specification. The BOQ is based<br />

on the detailed design made by the AC Consultant. The detailed drawings will be given<br />

to the successful bidder after award <strong>of</strong> the work. Meanwhile if any further details are<br />

required contact HLL Office for the needful.<br />

Technical Clarifications <strong>of</strong> AIIMS Jodhpur:<br />

SL NO.<br />

1 to 8: No Change.<br />

9: Please see revised list <strong>of</strong> approved makes.<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

4


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

Technical Clarifications <strong>of</strong> AIIMS Jodhpur:<br />

Sl No:<br />

1. Chiller: Reply already given as above.<br />

2. Chiller plant Manager: Same make as Chiller.<br />

3. Pumps: Horizontal split casing pump is allowed.<br />

4 Already replied as above.<br />

5. Already replied as above.<br />

6. Already replied as above.<br />

7. Already replied as above.<br />

8 Already replied as above.<br />

9. Already replied as above.<br />

10. Deep Freezer: Voltas/ Bluestar make allowed.<br />

11. Already replied as above.<br />

12. Commercial: All relevant details are there in tender documents.<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

5


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

Reply to Sl no <strong>of</strong> queries:<br />

Sl No.<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

II. Simplex Infrastructures Ltd<br />

1. HVAC drawings on Auto Cad <strong>For</strong>mat: The BOQ is based on detailed design done by<br />

the AC Consultant. Work will be done as per CPWD HVAC specifications <strong>and</strong><br />

specifications as in BOQ. These are sufficient to submit the bid. Detailed drawings on<br />

Auto Cad <strong>For</strong>mat will be submitted to the successful bidder after award <strong>of</strong> the Work.<br />

2, 3: Please obtain the CPWD specifications which are priced publications <strong>and</strong> are available<br />

for purchase.<br />

4, 5: No change is allowed. Please note that the inner skin <strong>of</strong> the AHUs/Airwasher/Scrubber<br />

shall be made <strong>of</strong> stainless steel.<br />

6. No change allowed.<br />

7. Approved Makes: Please see revised list attached.<br />

8. BMS Input/ Output Summary for Raipur: to be collected from HLL Office<br />

9. Bhopal: Percentage <strong>of</strong> brine solution for Chiller: As per design <strong>and</strong> recommendation <strong>of</strong><br />

the Manufacturer.<br />

10. Bhopal: ARI does not certify Brine chillers: After award <strong>of</strong> work, it may be decided not<br />

to go for brine chiller <strong>and</strong> thermal storage tank system. The tenderer should be<br />

prepared to execute the work without brine system. Please tender accordingly. Items<br />

connected with brine system may be excluded from execution.<br />

11. 240 TR brine chiller in place <strong>of</strong> 250 TR: Change accepted for not less than 240 TR.<br />

12. Bhopal: 500 TR Chiller with VFD: Yes, chiller to be provided with VFD<br />

for reducing starting current <strong>and</strong> energy savings at part load.<br />

6


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

Reply to Queries received.<br />

Sl No:<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

III. Consolidated Construction Consortium Limited<br />

1. MOU: Considering the high value <strong>of</strong> work, MOU prior to tender is required. No change.<br />

2. Tender Drawings: Reply already given as above,<br />

3. Approved Vendor for IBMS: Sauter Race included.<br />

4. Approved Makes for IBMS: Please see the revised list.<br />

5. General: S<strong>of</strong>t copy Documents: As replied above, it will be given after award <strong>of</strong> work for<br />

preparation <strong>of</strong> working drawings for execution.<br />

Reply to Queries:<br />

Sl No <strong>of</strong> Query.<br />

IV. B.E.Billimoria & Co. Limited<br />

1to6 : Already reply given to these queries as above.<br />

8: Please see the revised list <strong>of</strong> approved makes.<br />

7


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

Reply to queries at Annexure-A:<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

V. Punj Lloyd<br />

There are 14 queries. All the queries are common with reference to queries already replied to<br />

as above.<br />

Queries at Annexure-B:<br />

There are 23 queries which are repetition <strong>of</strong> queries <strong>of</strong> other bidders: Replies already given.<br />

Annexure C:<br />

Reply to Querries:<br />

Sl No.<br />

1. Deviation between BOQ <strong>and</strong> CPWD Specification: Clause 21 <strong>of</strong> Vol IV will supercede<br />

BOQ/ CPWD specification as clearly mentioned in the document. Clause 21 is<br />

applicable to certain specified items only. With reference to other items, wherever there<br />

is a discrepancy between the BOQ <strong>and</strong> tender specification, decision will be taken on<br />

merit in the best interest <strong>of</strong> the work as directed by the Engineer Incharge.<br />

2. Pressure rating <strong>of</strong> butterfly valves: As per CPWD HVAC specification.<br />

3. Pipe Insulation: It will be factory insulated for better quality/insulation <strong>and</strong> speedier<br />

execution <strong>of</strong> work.<br />

4. As per CPWD HVAC specification with additional specification.<br />

5. Pipe insulation thickness specified.<br />

6. Make <strong>of</strong> Axial Flow Fan: Pl see the revised list.<br />

7. Zinc coating <strong>of</strong> Ducting: As per CPWD HVAC specification.<br />

8,9,10,:These points have already been replied to as above.<br />

11. Specification for UVGI <strong>and</strong> Ozone: Specification as per the approved Manufacturer<br />

will be accepted.<br />

12. This point has already been replied to as above.<br />

13. Approved Makes: Please see the revised list.<br />

Technical Comments for Rishikesh Hospital:<br />

1. AHU casing thickness: as per CPWD HVAC specification.<br />

2. Electrical Panel rating: As per the requirement <strong>of</strong> various equipments <strong>and</strong> as per<br />

HVAC CPWD specification.<br />

3. The estimate is based on LS for the entire job <strong>and</strong> is not to be paid against<br />

quantity/length <strong>of</strong> various items.<br />

4. Thickness <strong>of</strong> duct acoustic lining: Given in the BOQ.<br />

AIIMS Raipur:<br />

8


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

As per CPWD HVAC specification.<br />

Reply to queries raised by L&T:<br />

Sl No.<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

VI. L&T<br />

1,2,3. No change.<br />

4. Contradiction between BOQ <strong>and</strong> CPWD Specification:<br />

Please refer to reply given earlier.<br />

Bhopal:<br />

5. Water chiller capacity mentioned: Actual capacity.<br />

6. No change. To be provided with VFD.<br />

7. AHU: Static pressure mentioned is total.<br />

8. Thermal storage tanks: Number <strong>of</strong> tanks: Upto the tenderer.<br />

9. Scrubber: Static pressure: Total.<br />

10. Heat Exchanger: Specification as per approved manufacturer. See Approved List.<br />

11. Chilled water pipe thickness: As per CPWD specification.<br />

12. Chilled water pipe insulation: It shall factory pre insulated with PUF.<br />

13. GSS Duct : Type <strong>of</strong> flange: As per CPWD specification.<br />

14. Operation <strong>and</strong> maintenance: No change.<br />

15. BMS: Input/Output summary: to be collected from HLL Office .<br />

Bhubaneswar:<br />

5. Cond. Water Pump: Tenderer may provide End Suction Back pull type pump.<br />

6. AHU static pressure: <strong>For</strong> the tenderer to suit design.<br />

7. Filter specification: As per CPWD HVAC specification.<br />

8. 2-way modulating valve: Price to be considered in the AHU rate.<br />

9. Heat Recovery Unit: Design left to the tenderer but make <strong>of</strong> heat recovery unit shall be<br />

within List <strong>of</strong> Approved manufacturers.<br />

10. Condensing Units; Price to be included in AHU unit rate. You may consider 2x10<br />

Units.<br />

Distance: Please see the drawing in HLL <strong>of</strong>fice.<br />

11. Pipe thickness: As per CPWD HVAC specification.<br />

12. Welding MS pipe above 500 mm: As per best engineering practice.<br />

13,14:Already replied above.<br />

Jodhpur:<br />

5. Chiller power consumption: As per CPWD HVAC specification.<br />

Pipe below ground level: Please see drawing in HLL <strong>of</strong>fice.<br />

9


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

Raipur:<br />

Other points already replied to.<br />

8. Fire mode fans: yes, fire rated 250 deg C-2 hours.<br />

9. Please see the details in HLL <strong>of</strong>fice.<br />

Rishikesh:<br />

Other points, already replied to as above,<br />

All the points already replied to as above.<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

10


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

Reply to queries raised by ACIL:<br />

Sl No.<br />

AIIMS Rishikesh<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

VII Ahluwalia Construction I Ltd<br />

1. See the Revised Approved List<br />

2. No change<br />

3. NO CHANGE<br />

4. As suggested VFDs to be provided with harmonic filters as per laid down st<strong>and</strong>ards.<br />

5. No change<br />

6. No change<br />

AIIMS Bhopal: 1. Hospital complex<br />

1. Already replied.<br />

2. As per CPWD HVAC specifications.<br />

3. Please see revised list <strong>of</strong> Approved makes.<br />

AIIMS Bhopal: 2. College & Auditorium Complex<br />

1. As per BOQ..<br />

2. As per BOQ/As per specifications <strong>of</strong> approved Manufacturer approved by Engineer- in-<br />

Charge.<br />

AIIMS Bhubaneswar:<br />

1. Revised approved list is final <strong>and</strong> supercedes all previous lists.<br />

2. This is as per CPWD HVAC specifications.<br />

3. Please see the revised Approved List.<br />

AIIMS Raipur:<br />

1. Please see the revised Approved List.<br />

2. ( 2W + 1F) means 2 Working + 1 Future. Future is outside the scope <strong>of</strong> this tender.<br />

3. ( 2W + 1s) means 2 Working + 1 St<strong>and</strong>by.<br />

AIIMS Jodhpur:<br />

1. No change<br />

11


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

VIII. BL Kashyap<br />

All points raised are already replied to as above.<br />

Reply to the queries:<br />

IX. Unity infraprojects Ltd<br />

All the points raised are <strong>of</strong> common nature <strong>and</strong> already replied to earlier as above.<br />

Reply to the queries:<br />

X. JMC Ltd<br />

All the points raised are <strong>of</strong> common nature <strong>and</strong> already replied to earlier as above.<br />

Note <strong>For</strong> all AIIMS:<br />

1. All water cooled centrifugal chilling units will come with VFD drives.<br />

2. All secondary chiller pumps will have VFD drive. AHUs will be provided with VFD as<br />

provided in the BOQ. Cooling Tower Motors shall be with VFD.<br />

3. The entire job will be executed by the HVAC contractor to include supply <strong>of</strong> all<br />

materials/ equipments as required to ensure quality <strong>of</strong> work, use <strong>of</strong> right materials/<br />

equipments <strong>and</strong> comprehensive system engineering.<br />

4. All equipments to be connected to the IBMS shall be IBMS compatible <strong>and</strong> nothing<br />

extra will be paid on this account.<br />

5. All AHUs/ Air washers/ Scrubbers shall be provided with stainless steel for the inner<br />

skin. All these units will be provided with protective door lock <strong>and</strong> protective guard.<br />

12


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

Approved Makes <strong>of</strong> Materials for HVAC Work: (Revised)<br />

Sl<br />

No<br />

Items Approved Makes<br />

1 Centrifugal Chilling<br />

Machine with<br />

VFD( ARI Certified<br />

Imported)<br />

Carrier/Trane/York/Daikin-Macquay<br />

2 Screw Chilling<br />

Machine<br />

Same as above <strong>and</strong> Dunhambush<br />

3 Scroll Compressor Same as above, plus Voltas, Blue Star<br />

4 Primary CHW/Cond<br />

Pump<br />

ITT/Grundfoss/Armstrong/Wilo<br />

5 Secondary CHW with<br />

VFD<br />

ITT/Grundfoss/Armstrong/Wilo<br />

6 Cooling Tower Paharpur/Mihir/Advance/Marley/Bell<br />

7 Hot water Generator Rapidcool/Khokkar/KEPL/Rapid<br />

control/Emerald<br />

8 AHUs all types with Blue Star/Voltas/ETA/Carrier/Trane/<br />

Heating/ Cooling Zeco/Edgetech/Waves/Savier/E Flow/Carryair/<br />

coils/Air Scrubber<br />

Unit<br />

Fedders lloyd<br />

9 Fan Section( Single<br />

Skin) for fresh Air,<br />

Exhaust,Stair<br />

Case, Lift well<br />

pressurization<br />

Same as above at Sl no. 8<br />

10 VFD for AHUs Danfoss/ Siemens/ABB/Allen Bradley<br />

11 Fancoil units Bluestar/Voltas/Zeco/Daikin/Carrier/ETA<br />

12 Centrifugal fans for<br />

AHUs/fresh<br />

air/exhaust fan/kitchen<br />

scrubber<br />

Kruger/Nicotra/Comefri/<br />

13 Propeller fan Alsthom/Khaitan/Crompton/GEC<br />

14 In Line fan System Air/Konaflakt/Kruger/Ostbergg/Wolter<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

13


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

15 Airwasher Roots Cooling/ AC Humidin/Zeco/Waves/<br />

Fedders Lloyd<br />

16 Grills/Diffusers Carryair/Ravistar/Airmaster/Dyna craft<br />

/Fedders Lloyd<br />

17 Fire Dampers UL<br />

Listed<br />

Ravistar/Dyna Craft/Carryair/<br />

18 Fire Damper Motors Belimo/Siemens<br />

19 GI sheet metal duct Jindal/Sail/Tata<br />

20 Factory fabricated Zeco/Techno/Rolastar/Voltas<br />

duct<br />

21 Hessian (fire treated) Navair/pyroguard<br />

22 MS/GI pipe Jindal Hissar/Tata/Sail/Mukut( above 500 mm<br />

dia)<br />

23 Pre-insulated chilled Zeco/seven star<br />

water pipe<br />

24 Thermometer Taylor/H Guru/Fiebig<br />

25 Flow switch Rapidcool/Siemens<br />

26 Auto Airvent Rapid cool/Anergy<br />

27 Filters(pre, fine, Hepa) AAF/Purolator/Thermadyne/Spectrum<br />

28 Flexible pipe<br />

connection<br />

Resist<strong>of</strong>lex/Kanwal<br />

29 GM valve upto 40mm Audco/Leader/Zolloto<br />

30 Butterfly/Non<br />

return/Check Valve<br />

Audco/Advance<br />

31 Motorised butterfly<br />

valve<br />

Bellino/Honeywell/Siemens/Nibco<br />

32 Ball/Gate/Globe-do- CIM/Rapidcool/Leader<br />

33 Ball valve with Y- Rapidcool/Emerald<br />

strainer<br />

34 Pot/Y-Strainer Rapidcool/Emerald<br />

35 Suction Guide Anergy/Emerald<br />

36 Pressure Gauge H Guru/Fiebig/Emerald/Taylor<br />

37 2/3 way modulating<br />

valve for AHU<br />

Honeywell/Siemens/Danfoss/Belimo<br />

38 Room<br />

thermostat/humidistat<br />

Same as above<br />

39 Safety thermostat for<br />

heater<br />

Same as above<br />

40 Dial Penn/H Guru/Feiig/Emerald<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

14


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

thermometer(capillary<br />

Type<br />

41 Cooling/Heating<br />

Mode changer<br />

42 Pre-moulded PUF<br />

section for insulation<br />

43 Closed cell nitrite<br />

rubber with<br />

aluminium foil<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

Siemens/Honeywell<br />

LLyod/Malanpur/Beardsel/Supreme<br />

Armacel/Vid<strong>of</strong>lex/Supreme<br />

44 PUF pipe supports Malanpur/Lloyd/Beardsel<br />

45 Aluminium tape Johnson/Birla 3M<br />

46 Vibration isolator Resist<strong>of</strong>lex/Dunlop<br />

47 V Belt Dunlop/Fenner<br />

48 Expansion<br />

tank(pressurized)<br />

And Air Separator<br />

ITT/Wessels/Grunfoss/Anergy<br />

49 Paints ICI/Asian/Nerolac/Berger<br />

50 Ultra violet germicidal Ruks/Trimed<br />

Irradiation system<br />

51 Precision AC units Emerson/ Blue Box/Stulz<br />

52 Aluminium sheets Hindalco/Balco/Nalco<br />

53 Factory fabricated Atco/seven star/GP Spiro/Om sai Enterprises<br />

spiral duct<br />

54 Mineral wool Lloyd insulation/UP Twiga/Kimmco/<br />

insulation<br />

55 Closed cell fire Paramout/Armacell/Aer<strong>of</strong>lux/Supreme<br />

retardant XLPE(for<br />

duct insulation)<br />

56 Exp<strong>and</strong>ed<br />

MetturBeardsell/Stryne Packing/Supreme<br />

polystyrene(for<br />

Underdeck insulation)<br />

57 Fibreglass rigid Board UP Twiga/Owen Corning/Kimco<br />

58 Tarfelt/CPRX Shalimar tar product/Asian<br />

compound<br />

59 Dash fastners Fisher/HILTI<br />

60 Welding Rods Advani/L&T<br />

61 Copper refrigerant Diamond/star/Rajco<br />

piping<br />

15


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

62 Electrical Panels( in L&T/ /Advance panel <strong>and</strong> switch<br />

AC plant room) gear/Adlec/C&S Electric/Zeta<br />

63 AHU/ventilation In addition to above KEPL/EAP Elektro/Ess<br />

electricalpanels Ess Kay<br />

64 HVAC Controls Danfoss/ Honeywell/Johnson Controls/<br />

Siemens/Penn/Carrier ALC<br />

65 Electric Motors ABB/Areva/BBL/Crompton/Kirloskar/Siemen<br />

s<br />

66 ACB/MCCB ABB/Siemens/Schneider/L&T/C&S Electric/<br />

Mitsubishi<br />

67 MCB Hager/Legr<strong>and</strong>/Merlin Gerin/siemens/Havels/<br />

C&S electric/Adhunik<br />

68 Power/control cables Finolex/polycab/Havels/Universal/Ekta/<br />

Gemscab/ Paragon(Elektron) /Ravi/Rallison<br />

69 Starters/contactors/OL<br />

Relays/push buttons/<br />

Rotary<br />

switches/changeover<br />

switch/fuse <strong>and</strong><br />

fittings/1-phase<br />

preventor/indicating<br />

Lamps/<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

L&T/GE/Siemens/Schneider/C&S<br />

Electric/BCH<br />

70 Voltmeter/Ammeter AE/IMP<br />

71 CT/PT Kappa/AE/Precise<br />

72 Cable tray In addition toat 63, Pilco, Ricco/Slotco<br />

73 Cable lugs Dowell/Jainsons/Lotus<br />

74 IBMS<br />

Approved vendor for<br />

the turnkey IBMS job:<br />

75 IBMS components:<br />

a. S<strong>of</strong>tware,Network<br />

Area<br />

controller,Central<br />

And DDC controller,<br />

Ultrasonic BTU<br />

Meters, Temp.<br />

Siemens/<br />

Honeywell/Johnson/ABB/Schneider/Zicom/<br />

Sauter Race/Carrier- ALC/Trane<br />

Siemens/Honeywell/Johnson/ABB/Schneider/<br />

Easy IO-30p/Sauter Race/Trane/Carrier-ALC<br />

16


Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

Sensors,<br />

network/remote<br />

operator<br />

Terminal/smoke<br />

sensor, Temp plus RH<br />

sensor/Differential<br />

pressure switch<br />

air/water.<br />

b.computer<br />

c. Printer<br />

d. Communication<br />

cable,<br />

76 Ozone Injection<br />

system<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

IBM/HP<br />

HP/Sharp<br />

Delton/Fussion/as approved by the main<br />

vendor.<br />

Ruks/Trimed<br />

77 Bus Ducting L&T/Schneider/C&S Electric/Godrej/Zeta<br />

78 Tube Axial Fans Kruger,Nocotra,Comefree,Flakwood/Wolter<br />

79 Pressure independent<br />

Balancing valve<br />

Danfoss/Flowcan/TA/Belimo<br />

80 Heat Recovery Desiicant Rotors(DRI), Novelair Technology,<br />

Wheels<br />

Eventus(osterberg),Flakwood, Bryair<br />

81 Heat Exchanger Heatx X, Mark, Alfa lavel<br />

82 Thermal storage tank Crystopia, Dynambush, Calmac<br />

83 Spiral duct Sevenstar<br />

84 Deep Freezer Voltas/bLUESTAR<br />

Note:<br />

1. The contractor will use one <strong>of</strong> the approved makes with the prior approval <strong>of</strong> the<br />

engineer-in-charge.<br />

2. Order will be placed with the prior approval <strong>of</strong> the engineer-in-charge.<br />

3. When certain makes are missing in the above list, the make will be decided in<br />

consultation with the Engineer In Charge.<br />

17