Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

As per CPWD HVAC specification.<br />

Reply to queries raised by L&T:<br />

Sl No.<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

VI. L&T<br />

1,2,3. No change.<br />

4. Contradiction between BOQ <strong>and</strong> CPWD Specification:<br />

Please refer to reply given earlier.<br />

Bhopal:<br />

5. Water chiller capacity mentioned: Actual capacity.<br />

6. No change. To be provided with VFD.<br />

7. AHU: Static pressure mentioned is total.<br />

8. Thermal storage tanks: Number <strong>of</strong> tanks: Upto the tenderer.<br />

9. Scrubber: Static pressure: Total.<br />

10. Heat Exchanger: Specification as per approved manufacturer. See Approved List.<br />

11. Chilled water pipe thickness: As per CPWD specification.<br />

12. Chilled water pipe insulation: It shall factory pre insulated with PUF.<br />

13. GSS Duct : Type <strong>of</strong> flange: As per CPWD specification.<br />

14. Operation <strong>and</strong> maintenance: No change.<br />

15. BMS: Input/Output summary: to be collected from HLL Office .<br />

Bhubaneswar:<br />

5. Cond. Water Pump: Tenderer may provide End Suction Back pull type pump.<br />

6. AHU static pressure: <strong>For</strong> the tenderer to suit design.<br />

7. Filter specification: As per CPWD HVAC specification.<br />

8. 2-way modulating valve: Price to be considered in the AHU rate.<br />

9. Heat Recovery Unit: Design left to the tenderer but make <strong>of</strong> heat recovery unit shall be<br />

within List <strong>of</strong> Approved manufacturers.<br />

10. Condensing Units; Price to be included in AHU unit rate. You may consider 2x10<br />

Units.<br />

Distance: Please see the drawing in HLL <strong>of</strong>fice.<br />

11. Pipe thickness: As per CPWD HVAC specification.<br />

12. Welding MS pipe above 500 mm: As per best engineering practice.<br />

13,14:Already replied above.<br />

Jodhpur:<br />

5. Chiller power consumption: As per CPWD HVAC specification.<br />

Pipe below ground level: Please see drawing in HLL <strong>of</strong>fice.<br />

9