Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
Reply to Sl no <strong>of</strong> queries:<br />
Sl No.<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
II. Simplex Infrastructures Ltd<br />
1. HVAC drawings on Auto Cad <strong>For</strong>mat: The BOQ is based on detailed design done by<br />
the AC Consultant. Work will be done as per CPWD HVAC specifications <strong>and</strong><br />
specifications as in BOQ. These are sufficient to submit the bid. Detailed drawings on<br />
Auto Cad <strong>For</strong>mat will be submitted to the successful bidder after award <strong>of</strong> the Work.<br />
2, 3: Please obtain the CPWD specifications which are priced publications <strong>and</strong> are available<br />
for purchase.<br />
4, 5: No change is allowed. Please note that the inner skin <strong>of</strong> the AHUs/Airwasher/Scrubber<br />
shall be made <strong>of</strong> stainless steel.<br />
6. No change allowed.<br />
7. Approved Makes: Please see revised list attached.<br />
8. BMS Input/ Output Summary for Raipur: to be collected from HLL Office<br />
9. Bhopal: Percentage <strong>of</strong> brine solution for Chiller: As per design <strong>and</strong> recommendation <strong>of</strong><br />
the Manufacturer.<br />
10. Bhopal: ARI does not certify Brine chillers: After award <strong>of</strong> work, it may be decided not<br />
to go for brine chiller <strong>and</strong> thermal storage tank system. The tenderer should be<br />
prepared to execute the work without brine system. Please tender accordingly. Items<br />
connected with brine system may be excluded from execution.<br />
11. 240 TR brine chiller in place <strong>of</strong> 250 TR: Change accepted for not less than 240 TR.<br />
12. Bhopal: 500 TR Chiller with VFD: Yes, chiller to be provided with VFD<br />
for reducing starting current <strong>and</strong> energy savings at part load.<br />
6