Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />
Reply to queries at Annexure-A:<br />
<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />
V. Punj Lloyd<br />
There are 14 queries. All the queries are common with reference to queries already replied to<br />
as above.<br />
Queries at Annexure-B:<br />
There are 23 queries which are repetition <strong>of</strong> queries <strong>of</strong> other bidders: Replies already given.<br />
Annexure C:<br />
Reply to Querries:<br />
Sl No.<br />
1. Deviation between BOQ <strong>and</strong> CPWD Specification: Clause 21 <strong>of</strong> Vol IV will supercede<br />
BOQ/ CPWD specification as clearly mentioned in the document. Clause 21 is<br />
applicable to certain specified items only. With reference to other items, wherever there<br />
is a discrepancy between the BOQ <strong>and</strong> tender specification, decision will be taken on<br />
merit in the best interest <strong>of</strong> the work as directed by the Engineer Incharge.<br />
2. Pressure rating <strong>of</strong> butterfly valves: As per CPWD HVAC specification.<br />
3. Pipe Insulation: It will be factory insulated for better quality/insulation <strong>and</strong> speedier<br />
execution <strong>of</strong> work.<br />
4. As per CPWD HVAC specification with additional specification.<br />
5. Pipe insulation thickness specified.<br />
6. Make <strong>of</strong> Axial Flow Fan: Pl see the revised list.<br />
7. Zinc coating <strong>of</strong> Ducting: As per CPWD HVAC specification.<br />
8,9,10,:These points have already been replied to as above.<br />
11. Specification for UVGI <strong>and</strong> Ozone: Specification as per the approved Manufacturer<br />
will be accepted.<br />
12. This point has already been replied to as above.<br />
13. Approved Makes: Please see the revised list.<br />
Technical Comments for Rishikesh Hospital:<br />
1. AHU casing thickness: as per CPWD HVAC specification.<br />
2. Electrical Panel rating: As per the requirement <strong>of</strong> various equipments <strong>and</strong> as per<br />
HVAC CPWD specification.<br />
3. The estimate is based on LS for the entire job <strong>and</strong> is not to be paid against<br />
quantity/length <strong>of</strong> various items.<br />
4. Thickness <strong>of</strong> duct acoustic lining: Given in the BOQ.<br />
AIIMS Raipur:<br />