Setting up <strong>of</strong> 6-AIIMS Pre-bid Queries &Amendment-1 (HVAC)<br />

Reply to queries at Annexure-A:<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Health</strong>& <strong>Family</strong> <strong>Welfare</strong>(GoI)<br />

V. Punj Lloyd<br />

There are 14 queries. All the queries are common with reference to queries already replied to<br />

as above.<br />

Queries at Annexure-B:<br />

There are 23 queries which are repetition <strong>of</strong> queries <strong>of</strong> other bidders: Replies already given.<br />

Annexure C:<br />

Reply to Querries:<br />

Sl No.<br />

1. Deviation between BOQ <strong>and</strong> CPWD Specification: Clause 21 <strong>of</strong> Vol IV will supercede<br />

BOQ/ CPWD specification as clearly mentioned in the document. Clause 21 is<br />

applicable to certain specified items only. With reference to other items, wherever there<br />

is a discrepancy between the BOQ <strong>and</strong> tender specification, decision will be taken on<br />

merit in the best interest <strong>of</strong> the work as directed by the Engineer Incharge.<br />

2. Pressure rating <strong>of</strong> butterfly valves: As per CPWD HVAC specification.<br />

3. Pipe Insulation: It will be factory insulated for better quality/insulation <strong>and</strong> speedier<br />

execution <strong>of</strong> work.<br />

4. As per CPWD HVAC specification with additional specification.<br />

5. Pipe insulation thickness specified.<br />

6. Make <strong>of</strong> Axial Flow Fan: Pl see the revised list.<br />

7. Zinc coating <strong>of</strong> Ducting: As per CPWD HVAC specification.<br />

8,9,10,:These points have already been replied to as above.<br />

11. Specification for UVGI <strong>and</strong> Ozone: Specification as per the approved Manufacturer<br />

will be accepted.<br />

12. This point has already been replied to as above.<br />

13. Approved Makes: Please see the revised list.<br />

Technical Comments for Rishikesh Hospital:<br />

1. AHU casing thickness: as per CPWD HVAC specification.<br />

2. Electrical Panel rating: As per the requirement <strong>of</strong> various equipments <strong>and</strong> as per<br />

HVAC CPWD specification.<br />

3. The estimate is based on LS for the entire job <strong>and</strong> is not to be paid against<br />

quantity/length <strong>of</strong> various items.<br />

4. Thickness <strong>of</strong> duct acoustic lining: Given in the BOQ.<br />