PROCEDURES<br />

2 nd Cycle – up to Twice Working <strong>Load</strong><br />

25% of working load for each increment<br />

Up to 2 x working load (8 increments)<br />

Maintained minimum 2 hours at each increment ATAU<br />

rate of settlement 0.05mm in 15 minutes is reached.<br />

Maintained 24 hours at 2 times Working <strong>Load</strong>.<br />

Reading is taken at 15 minutes interval<br />

Reading of pile settlement is taken before and after<br />

increment<br />

Unloading at 4 equal stages @ 1 hour interval.<br />

Wait 1 hour after zero load to record residual settlement<br />

Plot load/time graph and load settlement graph.