PROCEDURES<br />
2 nd Cycle – up to Twice Working <strong>Load</strong><br />
25% of working load for each increment<br />
Up to 2 x working load (8 increments)<br />
Maintained minimum 2 hours at each increment ATAU<br />
rate of settlement 0.05mm in 15 minutes is reached.<br />
Maintained 24 hours at 2 times Working <strong>Load</strong>.<br />
Reading is taken at 15 minutes interval<br />
Reading of pile settlement is taken before and after<br />
increment<br />
Unloading at 4 equal stages @ 1 hour interval.<br />
Wait 1 hour after zero load to record residual settlement<br />
Plot load/time graph and load settlement graph.