Reclaiming land under tidal water - Department of Environment and ...
Reclaiming land under tidal water - Department of Environment and ...
Reclaiming land under tidal water - Department of Environment and ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Guideline<br />
<strong>Reclaiming</strong> <strong>l<strong>and</strong></strong> <strong>under</strong> <strong>tidal</strong> <strong>water</strong><br />
Port authorities as an advice agency for applications within port limits. For particular port operational<br />
areas within port limits as stipulated in the SP Reg such as the area adjacent to navigation channels<br />
<strong>and</strong> swing basins, port authorities will act as a concurrence agency.<br />
Fisheries Queens<strong>l<strong>and</strong></strong> within the <strong>Department</strong> <strong>of</strong> Agriculture, Fisheries <strong>and</strong> Forestry (DAFF) is a<br />
concurrence agency if the development involves removal, destruction or damage or a marine plant<br />
<strong>and</strong>/or constructing or raising <strong>water</strong>way barrier works. They will also be an advice agency when the<br />
reclamation adjoins a declared fish habitat area (FHA).<br />
The Gold Coast Waterways Authority (established <strong>under</strong> the Gold Coast Waterways Authority Act 2012)<br />
is a concurrence agency for the application.<br />
An applicant has 20 business days from the receipt <strong>of</strong> the acknowledgment notice to refer a copy <strong>of</strong> the<br />
application, the notice <strong>and</strong> any applicable fee/s to each referral agency for assessment<br />
Further approvals<br />
An approval <strong>under</strong> the Sustainable Planning Act 2009 does not remove the need to obtain any further<br />
approval(s) for the work that may be required pursuant to other legislation, both State <strong>and</strong> Commonwealth.<br />
Applicants are advised to check with all relevant statutory authorities for such approvals as may be required.<br />
Refer to the Marine Park Zoning Plans for requirements for marine park permits. 9<br />
Disclaimer<br />
While this document has been prepared with care it contains general information <strong>and</strong> does not pr<strong>of</strong>ess to <strong>of</strong>fer legal,<br />
pr<strong>of</strong>essional or commercial advice. The Queens<strong>l<strong>and</strong></strong> Government accepts no liability for any external decisions or actions<br />
taken on the basis <strong>of</strong> this document. Persons external to the <strong>Department</strong> <strong>of</strong> <strong>Environment</strong> <strong>and</strong> Heritage Protection should<br />
satisfy themselves independently <strong>and</strong> by consulting their own pr<strong>of</strong>essional advisors before embarking on any proposed<br />
course <strong>of</strong> action.<br />
Approved by<br />
John Lane May 2013<br />
Director, <strong>Environment</strong>al Planning<br />
<strong>Department</strong> <strong>of</strong> <strong>Environment</strong> <strong>and</strong> Heritage<br />
Protection<br />
Signature Date<br />
Enquiries:<br />
Permit <strong>and</strong> Licence Management<br />
Ph. 1300 130 372<br />
Fax. (07) 3330 5875<br />
Email: palm@ehp.qld.gov.au<br />
9 The Information Sheet - Permits for (State only) marine parks is available on the <strong>Department</strong> <strong>of</strong> National Parks, Recreation Sport <strong>and</strong><br />
Racing (NPRSR) web site: www.nprsr.qld.gov.au<br />
Page 3 <strong>of</strong> 3 • 130508 • EM1923 • Version 1 <strong>Department</strong> <strong>of</strong> <strong>Environment</strong> <strong>and</strong> Heritage Protection