Removal of the vehicle involved building temporary track parallel to the existing track work on which ARIES<br />

had been stabled, adjacent to FORMOSA.<br />

The carriage was then jacked up and lowered on to 'trollies', moving sideways on beams before being<br />

lowered on to the temporary rails.<br />

ARIES was then winched aboard a low-loader via an intermediary ramp of track.<br />