08.06.2013 Views

Environmental and Social Management Framework for Tanzania ...

Environmental and Social Management Framework for Tanzania ...

Environmental and Social Management Framework for Tanzania ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(iii) a clear analysis of total financial needs, what other partners are doing, <strong>and</strong><br />

what the expected gap would be.<br />

(iv) agreed to use one-third of the IDA country allocation to benefit from the twothirds<br />

top up from regional funds.<br />

1.2.1 <strong>Tanzania</strong><br />

The Ministry of Health <strong>and</strong> <strong>Social</strong> Welfare <strong>for</strong> mainl<strong>and</strong> <strong>Tanzania</strong> oversees<br />

laboratory services at referral <strong>and</strong> national levels <strong>and</strong> will have the overall<br />

responsibility <strong>for</strong> the project. The 2009-2015 National Health Laboratory Strategic<br />

Plan, prepared by the Diagnostic Services Section (DDS), aims at establishing<br />

quality laboratory services at all levels in an ef<strong>for</strong>t to ensure equitable, gender<br />

sensitive services, with an efficient <strong>and</strong> effective governance system <strong>and</strong><br />

establishing partnership with public <strong>and</strong> private laboratories. The plan was<br />

developed in consultation with the national disease programs (e.g., TB, malaria), <strong>and</strong><br />

serves as a good framework <strong>for</strong> the project. The Laboratory Services group within<br />

the DDS is responsible <strong>for</strong> managing the National Health Laboratory Quality<br />

Assurance <strong>and</strong> Training Center, a new facility constructed by USG/PEPFAR, which<br />

the government would like to develop into a regional training institute.<br />

The Central Tuberculosis Reference Laboratory (CTRL), which will play a key role in<br />

the regional project, heads the national TB laboratory network <strong>and</strong> will participate in<br />

the proposed regional lab network. The reference laboratory is managed by the<br />

National Tuberculosis <strong>and</strong> Leprosy Program <strong>and</strong> the National Institute <strong>for</strong> Medical<br />

Research <strong>and</strong> physically located in the Central Pathology Laboratory at Muhimbili<br />

Hospital. The current space is inadequate <strong>and</strong> instead of functioning as a public<br />

health laboratory it responds more to the clinical needs of the hospital. The<br />

reference laboratory is responsible <strong>for</strong>:<br />

(i) per<strong>for</strong>ming acid-fast bacilli (AFB) smears,<br />

(ii) Löwenstein-Jensen cultures, <strong>and</strong> drug susceptibility testing (DST);<br />

(iii) maintaining AFB smear microscopy quality assurance;<br />

(iv) conducting drug resistance surveillance (as the only public laboratory in<br />

the country conducting drug sensitivity testing); <strong>and</strong><br />

(v) providing support <strong>for</strong> coordination, training, <strong>and</strong> operational research.<br />

The National Institute <strong>for</strong> Medical Research, which will serve as a key center <strong>for</strong><br />

conducting operational research, collaborates closely with various stakeholders,<br />

including the flagship Field Epidemiology Training Program, <strong>and</strong> the Medical<br />

Research Centre within Muhimbili University of Health <strong>and</strong> Allied Sciences, which<br />

will facilitate close links between training <strong>and</strong> research.<br />

In <strong>Tanzania</strong>, the activities under the regional project will be carried out through the<br />

institutions noted above. No new structures would be established <strong>for</strong> the proposed<br />

project. The Health Sector Re<strong>for</strong>m Secretariat, which manages the portion of the<br />

Bank’s Health Sector Development Project (HSDP) that does not go through basket<br />

financing, will have overall responsibility <strong>for</strong> coordinating the fiduciary aspects <strong>for</strong> the<br />

proposed activities. A full time public health specialist will be recruited to coordinate<br />

the activities under the regional project.<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!