APPLICATION FOR ENVIRONMENTAL CLEARANCE FORM I &IA
APPLICATION FOR ENVIRONMENTAL CLEARANCE FORM I &IA
APPLICATION FOR ENVIRONMENTAL CLEARANCE FORM I &IA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1. Construction Phase<br />
1.1. Water Supply<br />
Water Supply and Waste Water Management<br />
Annexure IV<br />
During construction phase, water will be utilized for domestic use of construction<br />
laborers and for construction activity. Water will be supplied by MCGM for drinking<br />
and other domestic purposes of the construction laborers. Water to be used for<br />
construction will be supplied by tankers.10- 20cmd will be used for construction<br />
and 10 cmd for domestic use of construction workers.<br />
1.2. Waste water generation<br />
Waste water during the construction phase will be sewage generation, estimated<br />
as 2 cmd.<br />
Table No. 11: Water Requirement and Waste water generation during<br />
Construction Phase<br />
Sr. Purpose Source Quantity Waste water<br />
No.<br />
(cmd) generated (cmd)<br />
1. Domestic use of MCGM 10 8 cmd<br />
construction laborers<br />
(@80% of water<br />
supply)<br />
2. Construction activity Tankers 10-20 -<br />
Total 20-30<br />
1.3. Management<br />
1. Temperory sanitation facility will be provided for construction workers<br />
2. Care will be taken to ensure that the water used for construction purposes<br />
does not accumulate on the site to prevent breeding of mosquitoes.<br />
2. Operation Phase<br />
2.1. Water Supply<br />
During operation phase, water supplied by MCGM will be used for domestic<br />
purpose and partly for flushing. Treated water from proposed Sewage Treatment<br />
Plant will be used for other purposes like gardening cooling and flushing..<br />
2.2 Water requirement<br />
Water requirement Will be 267 CMD , of which treated wastewater will be 100<br />
CMD and remaining 167 CMD will be fresh water.<br />
33