<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

State Level Expert Appraisal Committee (<strong>SEAC</strong>)<br />

held on 10 th to 12 th October, 2012 at 10:00 A.M.<br />

The following members were present for the committee <strong>meeting</strong>.<br />

1. Dr. Sukumar Devotta<br />

2. Er. G. K. Deshpande<br />

3. Ar. Mukund S. Athavale<br />

4. Dr. Prashant P. Bhave<br />

5. Pr<<strong>st</strong>rong>of</<strong>st</strong>rong>. Tarun Kant<br />

6. Dr. Jay S. Samant<br />

7. Er. Chandrakant I. Sambutwad<br />

8. Er. Balbir Singh Sehgal<br />

9. Shri A. R. Parshurame<br />

... Chairman 10 th to 12 th October, 2012<br />

… Member 10 th to 12 th October, 2012<br />

… Member 10 th to 12 th October, 2012<br />

… Member 10 th to 12 th October, 2012<br />

… Member 10 th to 12 th October, 2012<br />

… Member 10 th to 12 th October, 2012<br />

… Member 10 th to 12 th October, 2012<br />

… Member 10 th to 12 th October, 2012<br />

… Member<br />

Secretary<br />

Member Secretary <strong>SEAC</strong>, <strong>Environment</strong> Department welcomed the members <<strong>st</strong>rong>of</<strong>st</strong>rong> the committee.<br />

Chairman<br />

1<br />

10 th to 12 th October, 2012


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 1<br />

Subject: <strong>Environment</strong>al <strong>Clearance</strong> for the proposed con<strong>st</strong>ruction project "Royal Jade<br />

Garden" at S. No.132(P), at Wakad, Pune by M/s. S.P.Developers<br />

(File No.: <strong>SEAC</strong> 2011/CR-802/TC-2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : Royal Jade Garden<br />

Project Proponent : M/s. S.P.Developers<br />

Consultant : MITCON Consultancy & Engineers Pvt. Ltd<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

: Sr. No. 132 (P) Wakad, Tal Haveli, Di<strong>st</strong> Pune<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Housing project<br />

Category : 8 (b), B1<br />

Whether in<br />

Corporation /<br />

Municipal / Other<br />

area<br />

Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

DCR<br />

Total plot area<br />

(Sq.m)<br />

Deductions<br />

Net plot area<br />

Permissible FSI<br />

(including TDR etc.)<br />

Proposed Built –UP<br />

Area (FSI & Non<br />

FSI)<br />

Ground – coverage<br />

percentage (%)<br />

(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

plot not open to sky)<br />

E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />

configuration (s)<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />

and shops<br />

Pimpri Chinchwad Muncipal Corporation<br />

PCMC, DCR<br />

Total Area <<strong>st</strong>rong>of</<strong>st</strong>rong> the Plot: 138757 Sq. M<br />

15<<strong>st</strong>rong>61</<strong>st</strong>rong>34 Sq.M.<br />

Proposed B/U Area: 310744.17 Sq. M (FSI+Non FSI )<br />

32 %<br />

595.45 crores<br />

13 Buildings with 18 floors+ 1 no commercial building + 1no school<br />

1260 FLATS<br />

Chairman<br />

2


Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />

residents / users<br />

Tenant density per<br />

hector<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

building(s)<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

20233<br />

1458 tenents/ha.<br />

60 meter<br />

Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way 24.00 Mt. WIDE D.P Road on North, Ea<strong>st</strong> side & 18m in South <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

Proposed Site.<br />

Turning radius for 6 m width and a turning radius <<strong>st</strong>rong>of</<strong>st</strong>rong> 7.5 m<br />

easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />

tender movement<br />

from all around the<br />

building excluding<br />

the width for the<br />

plantation<br />

Total Water<br />

1490.4 m<br />

Requirement<br />

3 / day<br />

Rain Water<br />

Total no. <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge bores16 nos.<br />

Harve<strong>st</strong>ing (RWH) Size <<strong>st</strong>rong>of</<strong>st</strong>rong> pit 3.0 x 3.0 x 1.5<br />

Strom water<br />

Overflow/surplus water from the recharge pit will be discharged into<br />

drainage<br />

<strong>st</strong>orm water drainage.<br />

Sewage and wa<strong>st</strong>e Sewage generation (CMD): 1192.4 m<br />

water<br />

3<br />

• STP technology: MBBR Process<br />

• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD): -<br />

4 No <<strong>st</strong>rong>of</<strong>st</strong>rong> STPs<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

Solid wa<strong>st</strong>e<br />

Dry wa<strong>st</strong>e – 3.64 T/day<br />

Management<br />

Wet wa<strong>st</strong>e – 5.4 T/day<br />

4 nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> 'SAVECO 1000' to treated the Bio Wa<strong>st</strong>e generated for<br />

compo<strong>st</strong>ing.<br />

Green Belt<br />

Landscape area will be 42158 Sq. M<br />

Development<br />

(19.6 %)<br />

1000 No. <<strong>st</strong>rong>of</<strong>st</strong>rong> trees will be planted.<br />

Energy During con<strong>st</strong>ruction:<br />

Total Demanded load For Project = 120 KVA 2 DG set<br />

During Operation:<br />

Source :- MSCEDCL<br />

Run Load in KW-11821<br />

Alternative Back 100% : Diesel Generator<br />

(DG) Set for lifts, Common Lighting, Water pumps & other essential<br />

services. Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> D.G. Set for Common Amenities<br />

DG sets Capacity with No.s: 125 KVA -3,160 KVA-4,1000 KVA -4<br />

Chairman<br />

3


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Traffic Management Parking details:<br />

• Number and area <<strong>st</strong>rong>of</<strong>st</strong>rong> podia: 1<br />

• Total Parking area: 40,698.85 Sq.m<br />

• Area per car<br />

• 2-Wheelar: 2887 Nos.<br />

• 4-Wheeler: 1627 Nos.<br />

Cycles: 2887 Nos.<br />

Bus: 183 Nos.<br />

• Public Transport<br />

<strong>Environment</strong>al<br />

Management plan<br />

Budgetary<br />

Allocation<br />

Decision:<br />

Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal roads (m): 12m<br />

• Capital co<strong>st</strong>: 1458 Lakhs<br />

• O & M co<strong>st</strong>: 154.5 Lakhs<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed. <strong>SEAC</strong> noted that there are discrepancies in the shape <<strong>st</strong>rong>of</<strong>st</strong>rong> the plot shown in different<br />

drawings and EIA report. The plot area is not clear. PP informed that a new plot has been added<br />

and NA order is yet to be obtained. <strong>SEAC</strong> further noted that earlier sugge<strong>st</strong>ion <<strong>st</strong>rong>of</<strong>st</strong>rong> furnishing li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

(#2100) trees per species has not been complied with.<br />

The PP is directed to comply with the following observations:<br />

1. Finalize the project and submit plot area details demarcating all reservations<br />

2. Submit the revised EIA report.<br />

3. Submit consent for water and drainage with timelines from competent authorities.<br />

4. Submit a letter from competent authority regarding the possible completion date <<strong>st</strong>rong>of</<strong>st</strong>rong> 24 m<br />

DP road.<br />

<strong>SEAC</strong> may visit the site in the near future and take up full appraisal after the compliance is<br />

received.<br />

Chairman<br />

4


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 2<br />

Subject: <strong>Environment</strong>al clearance for the proposed proposed con<strong>st</strong>ruction project at<br />

Wagholi, by M/s. Wagholi Properties Pvt. Ltd<br />

(File No.: <strong>SEAC</strong> 2011/CR-696 /TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : A Township project<br />

Project Proponent : M/s. Wagholi Properties Pvt. Ltd.<br />

Consultant : M/s Mitcon Consultancy Limited, Pune.<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Con<strong>st</strong>ruction project<br />

Category : 8 (b), B1<br />

Whether in<br />

Corporation /<br />

Municipal / Other<br />

area<br />

Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

DCR<br />

Total plot area<br />

(Sq.m)<br />

Deductions<br />

Net plot area<br />

Permissible FSI<br />

(including TDR etc.)<br />

Proposed Built –UP<br />

Area (FSI & Non<br />

FSI)<br />

Ground – coverage<br />

percentage (%)<br />

(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

plot not open to sky)<br />

E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

: Gut No. 1281, 1283, 1277, 1278 Village Wagholi, Taluka Haveli,<br />

Di<strong>st</strong>rict Pune<br />

Gram panchayat<br />

Special Township Policy ( Urban Development Department)<br />

453,100.00 Sq. M<br />

1<br />

Proposed B/U Area: 57<<strong>st</strong>rong>61</<strong>st</strong>rong>70.3 Sq. M (FSI+Non FSI )<br />

21.795 %<br />

400 Cr<br />

Chairman<br />

5


No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />

configuration (s)<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />

and shops<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />

residents / users<br />

Tenant density per<br />

hector<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

building(s)<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

1528<br />

<<strong>st</strong>rong>61</<strong>st</strong>rong>28<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

floors<br />

Type-C Type-D Type-R Type-S High Rise Club House<br />

Luxury<br />

Villa<br />

Mid<br />

luxury<br />

Villa<br />

Chairman<br />

6<br />

Row<br />

House<br />

Super<br />

Luxury<br />

Villa<br />

H1<br />

(4<br />

BHK)<br />

H2<br />

(3<br />

BHK)<br />

W<br />

(4 BHK)<br />

Entr<br />

ance<br />

C1<br />

2 2 2 3 30 30 26 2 2<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> Units 25 131 16 8 636 424 288 1 1<br />

Population per<br />

unit<br />

4 4 4 6 4 4 4 - -<br />

Total Population 100 524 64 48 2544 1696 1152 - -<br />

Not defined<br />

100 mts<br />

Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way 30m<br />

Turning radius for<br />

easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />

tender movement<br />

from all around the<br />

building excluding<br />

the width for the<br />

plantation<br />

Total Water<br />

Requirement<br />

12m<br />

NO. OF UNITS-1528 NO. OF PERSONS - <<strong>st</strong>rong>61</<strong>st</strong>rong>28<br />

Description Water<br />

Requirem<br />

ent<br />

m 3 /day<br />

Dome<strong>st</strong>ic<br />

for<br />

residence<br />

(@ 90<br />

LPCD )<br />

Loss<br />

m 3 /da<br />

y<br />

Sewag<br />

e<br />

genera<br />

tion<br />

m 3 /da<br />

y<br />

Water Use<br />

m 3 /day<br />

Fresh Recycl<br />

ed<br />

551.52 82.73 468.79 551.5<br />

2<br />

Nil<br />

Podiu<br />

m C2


Rain Water<br />

Harve<strong>st</strong>ing (RWH)<br />

Strom water<br />

drainage<br />

Sewage and wa<strong>st</strong>e<br />

water<br />

Solid wa<strong>st</strong>e<br />

Management<br />

Green Belt<br />

Development<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Flushing for<br />

residence<br />

(@ 45<br />

LPCD )<br />

275.76 41.37 234.39 Nil 275.76<br />

Landscaping 447.82 Nil Nil Nil 447.82<br />

Club house 24 3.6 20.4 24 Nil<br />

TOTAL 1299.1 127.7 723.58 575.5<br />

2<br />

Total no. <<strong>st</strong>rong>of</<strong>st</strong>rong> pits is 165.<br />

Size <<strong>st</strong>rong>of</<strong>st</strong>rong> pit 3.0x3.0x2.5 M<br />

Chairman<br />

7<br />

723.58<br />

In total 2 nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> rain water harve<strong>st</strong>ing tanks are proposed within the<br />

plot premises with total holding volume <<strong>st</strong>rong>of</<strong>st</strong>rong> 3,20,000 litres.<br />

Capital co<strong>st</strong> – 80 (Rs, in Lacs)<br />

O & M co<strong>st</strong> – 7 (Rs.in Lacs/Yr)<br />

Overflow/surplus water from the recharge pit will be discharged into<br />

<strong>st</strong>orm water drainage<br />

Sewage generation: 723.58 m 3 / day<br />

STP Technology: MBR process<br />

STP: 750 m 3 / day<br />

Capital co<strong>st</strong> – 100 (Rs, in Lacs)<br />

O & M co<strong>st</strong> – 10 (Rs.in Lacs/Yr)<br />

Dry wa<strong>st</strong>e – 1.1 T/d<br />

Wet wa<strong>st</strong>e – 1.66 T/d<br />

Biodegradable and non biodegradable wa<strong>st</strong>e will be segregated. Dry<br />

wa<strong>st</strong>e will be sent for recycling and wet wa<strong>st</strong>e will be treated by<br />

‘Organic Wa<strong>st</strong>e Converter’ for compo<strong>st</strong>ing.<br />

45-50 kg /day<br />

Extensively used as manure for development <<strong>st</strong>rong>of</<strong>st</strong>rong> green belt and<br />

landscape development<br />

Capital co<strong>st</strong> – 45 (Rs, in Lacs)<br />

O & M co<strong>st</strong> – 5 (Rs.in Lacs/Yr)<br />

Green belt area: 67245 Sq. M (15 %)<br />

2000 No. <<strong>st</strong>rong>of</<strong>st</strong>rong> trees will be planted.<br />

Capital co<strong>st</strong> – 100 (Rs, in Lacs)<br />

O & M co<strong>st</strong> – 12 (Rs.in Lacs/Yr)<br />

Energy During Con<strong>st</strong>ruction<br />

• Total Demanded load For Project = 200KW.<br />

During Operation<br />

• Total Demanded load For the Project = 18000 KVA.<br />

During con<strong>st</strong>ruction: Total Demanded load For Project is 200 KW.<br />

Alternative Back Up feeder <<strong>st</strong>rong>of</<strong>st</strong>rong> LT cable form LT panel – 300Sq.mm


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

A2XFY1100V.<br />

During Operation:<br />

• Total Connected load: 10X2000 KVA)<br />

• HSD 150 lits / Hr / DG set<br />

Traffic Management Total Parking for 2 Wheelers: 6945<br />

4 Wheelers: 5102<br />

<strong>Environment</strong>al<br />

Management plan<br />

Budgetary<br />

Allocation<br />

Cycles: 3473<br />

Capital co<strong>st</strong>: 325 Lakhs<br />

O & M co<strong>st</strong>: 34<br />

Decision:<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed. <strong>SEAC</strong> noted that Government Order for special township is yet to be obtained.<br />

Government permission for drinking water from river is obtained. It was noted that PP has since<br />

modified the project increase con<strong>st</strong>ruction area sub<strong>st</strong>antially.<br />

The proponent is directed to comply with the following observations:<br />

1. Submit permission from Government for special township and also compliance <strong>st</strong>atements<br />

with all conditions mentioned there<<strong>st</strong>rong>of</<strong>st</strong>rong>.<br />

2. As per the Pune Regional Plan, permissible maximum height is 36m. Submit special<br />

permission for the proposed 100m from competent authority.<br />

3. Submit an undertaking that treated wa<strong>st</strong>ewater shall not be discharged into nearby water<br />

bodies.<br />

4. Submit NOC from RRZ<br />

5. Submit consent for drainage with timelines from competent authority. Ponding <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

wa<strong>st</strong>ewater is not acceptable as a su<strong>st</strong>ainable solution.<br />

6. Submit green belt plan showing plantation <<strong>st</strong>rong>of</<strong>st</strong>rong> Salix species & Termanilia arjuna along the<br />

river front area<br />

This will be deferred until further the Government order is obtained.<br />

Full appraisal <<strong>st</strong>rong>of</<strong>st</strong>rong> the project will be taken up only after compliance <<strong>st</strong>rong>of</<strong>st</strong>rong> the above.<br />

Chairman<br />

8


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 3<br />

Subject: <strong>Environment</strong> clearance for the expansion <<strong>st</strong>rong>of</<strong>st</strong>rong> Residential project at villge Boisar,<br />

Tal Palghar, Di<strong>st</strong> Thane by M/s. Vatsalya Developers<br />

(File No.: <strong>SEAC</strong> 2011 / CR -1000 / TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : “Dream City”- Residential Township<br />

Project Proponent : M/s.Vatsalya Developers<br />

Consultant : M/s. Enviro Analy<strong>st</strong>s & Engineers Pvt. Ltd.<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

: S. No. 74,75,76, 85 at Village Boisar, Tal-Palghar, Di<strong>st</strong>Thane<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : ResidentialTownship Project<br />

Category : 8 (a), B2<br />

Whether in<br />

Corporation /<br />

Municipal / Other<br />

area<br />

Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

DCR<br />

Total plot area<br />

(Sq.m)<br />

Deductions<br />

Net plot area<br />

Permissible FSI<br />

(including TDR etc.)<br />

Proposed Built –UP<br />

Area (FSI & Non<br />

FSI)<br />

Ground – coverage<br />

percentage (%)<br />

(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

plot not open to sky)<br />

E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />

configuration (s)<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />

and shops<br />

Grampanchayat<br />

Town planning<br />

1,14,558.00<br />

90,954.86<br />

0.75<br />

Total BUA Area: 90,954.86<br />

24%<br />

98 Cr.<br />

42 No <<strong>st</strong>rong>of</<strong>st</strong>rong> Buildings<br />

G+3 & G+2<br />

No <<strong>st</strong>rong>of</<strong>st</strong>rong> flats: 2268<br />

No. <<strong>st</strong>rong>of</<strong>st</strong>rong> Shops:262<br />

Chairman<br />

9


Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />

residents / users<br />

Tenant density per<br />

hector<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

building(s)<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

School:01<br />

Hospital: 01<br />

12,219<br />

196/hector<br />

15<br />

Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way 6m<br />

Total Water<br />

Requirement<br />

Rain Water<br />

Harve<strong>st</strong>ing (RWH)<br />

Strom water<br />

drainage<br />

Dry Season:<br />

• Fresh water (CMD) & source: 1044CMD by MIDC<br />

• Grampanchayat<br />

• Recycled water (CMD): 622 CMD<br />

• Total Water Requirement (CMD): 1,579 CMD<br />

• Fire fighting (Cum): UG Tanks = 25 cum, OH Tanks = 9 No <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

5cum<br />

Wet Season:<br />

• Fresh Water (CMD) & Source: 1044 CMD by MIDC<br />

• Grampanchayat<br />

• Recycled Water (CMD):535 CMD<br />

• Total Water Requirement (CMD):1579 CMD<br />

• Swimming pool make up (CMD):NA<br />

• Fire fighting (Cum): UG Tanks = 25 cum, OH Tanks = 9 No <<strong>st</strong>rong>of</<strong>st</strong>rong> 5<br />

cum<br />

Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the ground water table – 3 m<br />

Size and no <<strong>st</strong>rong>of</<strong>st</strong>rong> RWH tank(s) and quantity: 2 Nos, 500 cu.m<br />

Borewell Recharge pits: 27nos<br />

Size: 3m x3m x3m<br />

Percolation pit: 201<br />

Size: 0.5m x 0.5m x 2m<br />

Budgetary allocation (capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

Capital co<strong>st</strong>: Rs. 15 Lakhs<br />

O & M Co<strong>st</strong> : Rs. 0.5 Lakhs<br />

Natural water drainage pattern:<br />

• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water: 4424.3CMD<br />

• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD:<br />

Percolation Trench Length: 3941 mtrs<br />

Width: 0.50 mtrs<br />

Fixed Depth: 1.00 mtrs<br />

Size: 500 mm wide percolation pit<br />

Facility <<strong>st</strong>rong>of</<strong>st</strong>rong> water holding pond, capacity 43.0 Million Lit ( 14,290.00<br />

sq.mt<br />

x 3.0 m effective depth)<br />

Chairman<br />

10


Sewage and wa<strong>st</strong>e<br />

water<br />

Solid wa<strong>st</strong>e<br />

Management<br />

Green Belt<br />

Development<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Sewage generation: 1263 KLD<br />

• STP Technology: SAFF Technology<br />

• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD): 1300 KLD<br />

• Budgetary allocation:<br />

Capital Co<strong>st</strong>: Rs. 100 Lakhs<br />

O&M Co<strong>st</strong>: Rs10 Lakhs<br />

• Dry wa<strong>st</strong>e (Kg/day):1879Kg/Day<br />

• Wet wa<strong>st</strong>e (Kg/day):2759 Kg/Day<br />

• Biomedical wa<strong>st</strong>e (Kg/month) (if applicable): 20kg.day<br />

• STP sludge (Dry sludge) (Kg/Day): 310 Kg/Day<br />

Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> Wa<strong>st</strong>e:<br />

• Dry wa<strong>st</strong>e:segregated/sale/Collection by local authority<br />

• Wet Wa<strong>st</strong>e:Will be processed converted to manure by processing<br />

in compo<strong>st</strong>ing pits.<br />

• Hazardous Wa<strong>st</strong>e: Used oil from DG Sets<br />

• Biomedical Wa<strong>st</strong>e: will be handed over to MPCB authorized<br />

dealer for disposal<br />

Budgetary allocation (capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

For Solid wa<strong>st</strong>e management :<br />

Capital Co<strong>st</strong> : Rs. 10 Lakhs<br />

O & M Co<strong>st</strong> : Rs.1.5 Lakhs<br />

Total R.G. Area:<br />

RG on Ground: 12459 sq.m<br />

Total No. <<strong>st</strong>rong>of</<strong>st</strong>rong> trees: 279<br />

Energy Power Supply:<br />

• Maximum Demand: 3.84 MVA<br />

• Connected Load: 7.68 MVA<br />

• Source: MSEB<br />

DG set will be provided for backup power to emergency facilities.<br />

Energy saving by Non-conventional method:<br />

Energy Conservation Measures:<br />

• Ro<<strong>st</strong>rong>of</<strong>st</strong>rong>s will be insulated to minimize heat gain with 80 mm<br />

expanded<br />

• poly<strong>st</strong>yrene or equivalent insulation.<br />

• Light fixtures will be used with energy saving CFL & T5<br />

• fluorescent tube with electronic chocks.<br />

• DG sets shall be PLC controlled to optimize their usage based on<br />

• the actual load requirements<br />

• Use <<strong>st</strong>rong>of</<strong>st</strong>rong> Solar energy for <strong>st</strong>reet & landscape lightings.<br />

• Small capacity transformers having low no load and load losses.<br />

• Selection <<strong>st</strong>rong>of</<strong>st</strong>rong> Energy efficient equipments (BEE STAR RATED).<br />

Traffic Management Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> the junction to the main road & design <<strong>st</strong>rong>of</<strong>st</strong>rong> confluence:<br />

5 Entires and Exits<br />

One main approach road exi<strong>st</strong>ing<br />

Parking Details:<br />

• Total parking area:<br />

Chairman<br />

11


<strong>Environment</strong>al<br />

Management plan<br />

Budgetary<br />

Allocation<br />

Decision:<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

• Area per Car:<br />

• 4-wheelers:576 nos<br />

• Public Transport:<br />

Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal roads (m):9m, 12m & 15m wide internal<br />

roads<br />

Capital co<strong>st</strong>: 367 Lakhs<br />

O & M co<strong>st</strong>: 18.35 Lakhs<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed.<br />

<strong>SEAC</strong> noted that EC was accorded to the Phase I <<strong>st</strong>rong>of</<strong>st</strong>rong> the project and now PP approached for the<br />

entire project including Phase I & Phase II.<br />

The proponent is directed to comply with the following observations:<br />

1. It is noted that the current right <<strong>st</strong>rong>of</<strong>st</strong>rong> way is 6 m. Accordingly, the maximum height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

building shall be re<strong>st</strong>ricted to 15m as per MoEF OM dated 7 th February 2012.<br />

2. Phase-I was approved with a temporary holding pond for treated wa<strong>st</strong>ewater. This is not a<br />

su<strong>st</strong>ainable solution and was approved only as a temporary measure. This cannot be<br />

agreed for Phase II also. Submit consent for su<strong>st</strong>ainable arrangement for disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> excess<br />

treated wa<strong>st</strong>e water with timelines from competent authority as this will be mandatory.<br />

3. Submit compliance with the EC conditions accorded for Phase I.<br />

4. Submit revised water balances for dry and wet seasons without <strong>st</strong>orage pond<br />

5. Submit point wise compliance report to ECBC guidelines<br />

6. Submit RWH calculations with geotechnical and hydrogeological reports; also include<br />

terrace water harve<strong>st</strong>ing<br />

7. Increase O & M <<strong>st</strong>rong>of</<strong>st</strong>rong> EMP budget sub<strong>st</strong>antially and submit the revised EMP budget<br />

8. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> biomedical wa<strong>st</strong>e and disposal according to the BMW Rules<br />

9. Landscape plan should show location <<strong>st</strong>rong>of</<strong>st</strong>rong> different tree species (#600 trees) proposed on<br />

site map<br />

10. Submit SWD details<br />

11. Consider providing a gap <<strong>st</strong>rong>of</<strong>st</strong>rong> 6 m between buildings (for about 40 m length <<strong>st</strong>rong>of</<strong>st</strong>rong> the building)<br />

for better access, ventilation and lighting<br />

Chairman<br />

12


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 4<br />

Subject: <strong>Environment</strong>al clearance for the proposed “Vermont” residential Project Gat No.<br />

1204 (2138), 1205 (2139), 1206 (2140), 1208 (2194), opp wagheshware Temple,<br />

BAIF road, college, Wagholi, tal Haveli, Di<strong>st</strong> Pune by M/s. Sia Developers<br />

(File No. <strong>SEAC</strong> 2011/ CR-169/ TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : “Vermont”<br />

Project Proponent : M/s. Sia Developers<br />

Consultant : M/s. Saitech Research & Development Organization<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

: Gat No.1204 ( 2138), 1205 ( 2139) ,1206 ( 2140) , 1207 (2141) ,<br />

1208(2194), Opp. Wagheshwar Temple, BAIF Road, College, Wagholi,<br />

Tal.- Haveli , Di<strong>st</strong>. - Pune.<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Residential & Commercial<br />

Category : 8 (a) B2<br />

Whether in<br />

Corporation /<br />

Municipal / Other<br />

area<br />

Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

DCR<br />

Total plot area<br />

(Sq.m)<br />

Deductions<br />

Net plot area<br />

Permissible FSI<br />

(including TDR etc.) 0.75<br />

Proposed Built –UP<br />

Area (FSI & Non<br />

FSI)<br />

Ground – coverage<br />

percentage (%)<br />

(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

plot not open to sky)<br />

E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

Grampanchayat<br />

Town Planning<br />

Plot Area – 24,500 m 2<br />

Deductions -3675.0 m 2<br />

Net Plot Area - 20825.0 m 2<br />

47327.64 m 2 ( FSI – 26581.15 m 2 + Non - FSI – 20746.49 m 2 )<br />

5047.05 m 2 i.e. 20.60 % <<strong>st</strong>rong>of</<strong>st</strong>rong> Total Plot Area & 24.23% <<strong>st</strong>rong>of</<strong>st</strong>rong> Net plot area<br />

Rs.48 crore<br />

Chairman<br />

13


No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />

configuration (s)<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />

and shops<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />

residents / users<br />

Tenant density per<br />

hector<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

building(s)<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

A- Type – P+11 floors – 64 Tenements<br />

B- Type –P+12 floors –134 Tenements<br />

C- Type –P+12 floors –114 Tenements<br />

D & E –Type - P+11 floors – 86 Tenements Each<br />

Commercial 1 – LG+UG+1 Floor<br />

Commercial 2 – LG+UG+1 Floor<br />

A- Type – 64 Tenements<br />

B- Type –134 Tenements<br />

C- Type – 114 Tenements<br />

D & E –Type - 86 Tenements Each<br />

Total Tenements -484 Nos.<br />

Commercial Buildings – 2Nos.<br />

Residential – 2420 Nos.<br />

Commercial – 567 Nos.<br />

Floating Population – 150 Nos.<br />

Total = 3137 Nos.<br />

250 Nos.<br />

39.0 M<br />

Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way 12.0 m<br />

Turning radius for<br />

easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />

tender movement<br />

from all around the<br />

building excluding<br />

the width for the<br />

plantation<br />

Total Water<br />

Requirement<br />

Rain Water<br />

Harve<strong>st</strong>ing (RWH)<br />

7.5 m<br />

Dry season :<br />

• Fresh water (CMD) : 242.14 m 3 /day <<strong>st</strong>rong>of</<strong>st</strong>rong> Source: Grampanchayat<br />

• Recycled water (CMD): 140.58 m 3 /day<br />

• Total water Requirement (CMD): 382.72 m 3 /day<br />

• Club-house & Swimming pool make up (Cum):- 10.0 m 3 /day<br />

• Fire fighting (Cum): 20,000 cu.m.<br />

Wet Season:<br />

• Fresh water (CMD) : 242.14 m 3 /day & Source: Grampanchayat<br />

• Recycled water (CMD): 140.58 m 3 /day<br />

• Total water Requirement (CMD): 382.72 m 3 /day<br />

• Swimming pool make up (Cum): 10.0 m 3 /day<br />

• Fire fighting (Cum): 20,000 cu.m.<br />

• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table – SW - 3m & NE - 10 M , NW –<br />

50M below ground level<br />

Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge Bore – 10 Nos.<br />

Chairman<br />

14


Strom water<br />

drainage<br />

Sewage and wa<strong>st</strong>e<br />

water<br />

Solid wa<strong>st</strong>e<br />

Management<br />

Green Belt<br />

Development<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Quantity – 10063.65 m 3 /Year<br />

Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Bore Dia – 1.5 mX 1.5 m X 1.5 m<br />

Budgetary allocation ( Capital co<strong>st</strong> and O & M co<strong>st</strong>)-<br />

Capital co<strong>st</strong>: 10.0 Lakh<br />

O & M Co<strong>st</strong> : 4.0 Lakh/Year<br />

Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water - Volume – 10063.65 m 3 /Year<br />

Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD - Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Bore Dia. – 1.5 mX 1.5 m X 1.5 m<br />

• Sewage generation (CMD) – 323.07 CMD<br />

• STP technology – MMBR(Moving Media Bio Reactor)<br />

• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD) – 325 CMD<br />

• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP – Refer Storm & drainage layout<br />

• DG sets (during emergency) - 140 KVA x 1 No.<br />

Budgetary allocation (Capital co<strong>st</strong> and O & M co<strong>st</strong>) –<br />

Capital co<strong>st</strong>: 35.0 Lakh.<br />

O & M Co<strong>st</strong> : 10.0 Lakh / Year<br />

Wa<strong>st</strong>e generation in the pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction phase:<br />

• Wa<strong>st</strong>e generation: 26000 m 3<br />

Operation phase:<br />

• Dry wa<strong>st</strong>e (Kg/day): 564.66 Kg/day<br />

• Wet wa<strong>st</strong>e (Kg/day): 846.99 Kg/day<br />

• Hazardous wa<strong>st</strong>e (Kg/month): Spent oil – 65 Lit/ yr<br />

• Biomedical wa<strong>st</strong>e (Kg/month) (If applicable):Not Applicable<br />

• STP Sludge (Dry sludge) (Kg/day): 29.07 Kg/Day ( 100% Dry )<br />

Budgetary allocation( capital Co<strong>st</strong> & O&M co<strong>st</strong>)<br />

Capital co<strong>st</strong>: 24.0 Lakh<br />

O & M Co<strong>st</strong> : 7.0 Lakh / Year<br />

Total RG area: 2981.54 m 2<br />

RG area under green belt: 2,129.80 m 2<br />

Total Lawn area = 636.47 Sq. M<br />

Total Plantation area = 1,493.27 Sq. M<br />

3.Total Hardscape area on ground = 8,51.73 Sq. M<br />

• Number & li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> trees species to be planted in the ground RG: - 344<br />

Nos.<br />

• Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />

Capital co<strong>st</strong>: Rs. 34.38 Lakh<br />

O & M Co<strong>st</strong> : Rs. 5.50 Lakh / Year<br />

Energy Power Supply:<br />

• Maximum demand –2362 KW<br />

• Connected Demand – 2362 KW<br />

Source - Maharashtra State Electricity Di<strong>st</strong>ribution Company<br />

Limited(MSEDCL)<br />

Energy saving by non-conventional method:<br />

Chairman<br />

15


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

• Energy Saving measures – CFL, LED, Solar, etc.<br />

• Details Calculation & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving – 25%<br />

• % saving by Solar Water – 96%<br />

• Compliance <<strong>st</strong>rong>of</<strong>st</strong>rong> the ECBC guideline( YES/NO) (If yes then submit<br />

compliance in tabular - No<br />

• Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />

Capital co<strong>st</strong>: 25.0 Lakh .<br />

O & M Co<strong>st</strong> : 8.0 Lakh / Year<br />

DG Set:<br />

• Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used - 140 KVA x 1No.<br />

• Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used - HSD - 28 Lit./Hr<br />

During Operation –<br />

Transformer – 630 KVA x 4 Nos.<br />

Traffic Management Required parking Area – 8770.0 m 2<br />

Proposed parking Area – 11<<strong>st</strong>rong>61</<strong>st</strong>rong>8.85 m 2 ( including Driveways)<br />

• 2- Wheeler – 575 Nos.<br />

• 4-Wheeler – 312 Nos.<br />

• Public Transport – 575 Nos.<br />

<strong>Environment</strong>al<br />

Management plan<br />

Budgetary<br />

Allocation<br />

Decision:<br />

Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal road(m):<br />

Driveways <<strong>st</strong>rong>of</<strong>st</strong>rong> 6.0 & 7.5 m<br />

Con<strong>st</strong>ruction Phase ( With break up):<br />

Capital Co<strong>st</strong> - STP – Rs. 35.0 Lakh<br />

RWH – Rs. 10.0 Lakh<br />

MSW – Rs. 24.0 Lakh<br />

Solar sy<strong>st</strong>em – Rs. 25.0 Lakh<br />

Landscape – Rs. 34.38 Lakh<br />

• O& M co<strong>st</strong> ( Please ensure manpower and other details): -<br />

Operation Phase:<br />

O & M co<strong>st</strong>:<br />

STP – Rs.10.0 Lakh / Year<br />

RWH – Rs. 4.0 Lakh / Year<br />

MSW – Rs. 7.0 Lakh / Year<br />

Solar sy<strong>st</strong>em – Rs. 8.0 Lakh / Year<br />

Landscape – Rs. 5.50 Lakh / Year<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed.<br />

Chairman<br />

16


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

PP informed that con<strong>st</strong>ruction was initiated at the site as per NA approval with FSI 12797 sq.m<br />

and total BUA 19,900 sq.m including Non-FSI area. This is a violation <<strong>st</strong>rong>of</<strong>st</strong>rong> EIA Notification, 2006.<br />

<strong>Environment</strong> Department may look into the matter and take an appropriate action.<br />

<strong>SEAC</strong> noted that-<br />

1. The current right <<strong>st</strong>rong>of</<strong>st</strong>rong> way is 12m. As per MoEF OM dated 7 th February 2012, the maximum<br />

height allowed is 15m but the proposed (and also the exi<strong>st</strong>ing building) maximum height<br />

is 39m.<br />

2. Proposed FSI 0.9 is not yet approved.<br />

3. Consent for water and drainage from competent authority are not yet obtained.<br />

Considering this, <strong>SEAC</strong> is con<strong>st</strong>rained to recommend the rejection <<strong>st</strong>rong>of</<strong>st</strong>rong> prior environmental<br />

clearance to the proposal.<br />

Chairman<br />

17


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 5<br />

Subject: <strong>Environment</strong>al clearance for proposed Barshi Lift Irrigation Scheme (with<br />

irrigable command <<strong>st</strong>rong>of</<strong>st</strong>rong> 15,000 hectares), Taluka Barshi, Di<strong>st</strong>rict Solapur<br />

(File No. <strong>SEAC</strong> 2010/ CR-751 /TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : A lift irrigation scheme with lifting <<strong>st</strong>rong>of</<strong>st</strong>rong> water from Ridhore K.T. weir in<br />

two <strong>st</strong>ages, providing irrigation benefits to 15000 ha <<strong>st</strong>rong>of</<strong>st</strong>rong> area in Barshi &<br />

Madha <<strong>st</strong>rong>of</<strong>st</strong>rong> Solapur Di<strong>st</strong>rict by canals.<br />

Project Proponent : Ujjani Canal Division No. 8, Solapur, MKVDC Pune<br />

Consultant : M/s. Voyants Solutions Pvt. Ltd<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

: Pump house <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>age I <<strong>st</strong>rong>of</<strong>st</strong>rong> this lift irrigation scheme is proposed on the<br />

left bank <<strong>st</strong>rong>of</<strong>st</strong>rong> river Sina at Ridhore K.T. weir, Tal Madha, Di<strong>st</strong> Solapur.<br />

This weir is situated near village Ridhore on Sina River.<br />

Pump house <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>age II <<strong>st</strong>rong>of</<strong>st</strong>rong> this lift irrigation scheme is proposed near<br />

village Lakshchiwadi, Tal Barshi.<br />

Command area <<strong>st</strong>rong>of</<strong>st</strong>rong> scheme lies both the on the Gorda nallah and barshi<br />

Kuradwadi railway line<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Irrigation project<br />

Category : 1 (c), B1<br />

Command area Command GCA CCA ICA Villages<br />

area<br />

Benefited<br />

Barshi 24260 19410 12550 20<br />

Madha 4740 3790 2450 5<br />

Total 29000 23200 15000 25<br />

Decision:<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed. PP <strong>st</strong>ated that the project has been granted the admini<strong>st</strong>rative approval or technical<br />

sanction by competent authorities.<br />

Chairman<br />

18


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

<strong>SEAC</strong> deliberated the issues related to the project and EIA submitted. PP shall revise EIA<br />

incorporating the following observations:<br />

1. Submit hi<strong>st</strong>ory <<strong>st</strong>rong>of</<strong>st</strong>rong> the project as PP informed that about 50% work has been completed<br />

prior to EIA Notification, 2006.<br />

2. Consider the cumulative impact <<strong>st</strong>rong>of</<strong>st</strong>rong> few other projects proposed in the same region.<br />

3. Include in the impact assessment impacts <<strong>st</strong>rong>of</<strong>st</strong>rong> diversion <<strong>st</strong>rong>of</<strong>st</strong>rong> water from the river to other<br />

valley and provide full ju<strong>st</strong>ification with impacts on common areas. .<br />

4. Submit more details on ecology, biodiversity and social and economic aspects.<br />

5. Submit benefit- co<strong>st</strong> ratio details<br />

6. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> quarries and barrow pit required for banking work and its treatment after<br />

use.<br />

7. Submit the plan for disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> extra excavated material.<br />

8. Avoid excessive land acquisition <<strong>st</strong>rong>of</<strong>st</strong>rong> land for dumping the material and other purposes.<br />

Chairman<br />

19


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 6<br />

Subject: <strong>Environment</strong>al clearance for proposed Ashti Lift Irrigation Scheme (with irrigable<br />

command <<strong>st</strong>rong>of</<strong>st</strong>rong> 12,500 hectares), Taluka Mohol, Di<strong>st</strong>rict Solapur<br />

(File No. <strong>SEAC</strong> 2010/ CR-747 /TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : Ujjawani <strong>st</strong>orage water 1.0 TMC available at Ashti tank through Ujjani<br />

LBC and 0.55 TMC from Ashti self catchment.<br />

Project Proponent : Ujjani Canal Division No. 8, Solapur, MKVDC Pune<br />

Consultant : M/s. Voyants Solutions Pvt. Ltd<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

: Ashti M.I. Tank is con<strong>st</strong>ructed near village Yewati, Tal Mohol, Di<strong>st</strong><br />

Solapur<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Irrigation project<br />

Category : 1 (c), B1<br />

Ashti nalla originates near village Bhend, Tal Madha, Di<strong>st</strong> Solapur.<br />

It flows from north to south and it joins river Bhima near village<br />

Ajansond, Tal Pandharpur, Di<strong>st</strong> Solapur.<br />

Command area Command GCA CCA ICA Villages<br />

area<br />

Benefited<br />

Mohol 11833 10650 8520 12<br />

Madha 667 600 480 3<br />

Total 12500 11250 9000 15<br />

Decision:<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed. PP <strong>st</strong>ated that the project has been granted the admini<strong>st</strong>rative approval or technical<br />

sanction by competent authorities.<br />

<strong>SEAC</strong> deliberated issues related to the project and EIA submitted. PP shall submit revised EIA<br />

incorporating the following observations:<br />

Chairman<br />

20


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

1. Submit hi<strong>st</strong>ory <<strong>st</strong>rong>of</<strong>st</strong>rong> the project as PP informed that about 50% work has been completed<br />

prior to EIA Notification, 2006.<br />

2. Consider the cumulative impact <<strong>st</strong>rong>of</<strong>st</strong>rong> few other projects proposed in the same region.<br />

3. Include in the impact assessment impacts <<strong>st</strong>rong>of</<strong>st</strong>rong> diversion <<strong>st</strong>rong>of</<strong>st</strong>rong> water from the river to other<br />

valley and provide full ju<strong>st</strong>ification with impacts on common areas. .<br />

4. More details on ecology, biodiversity and social and economic aspects.<br />

5. Submit benefit- co<strong>st</strong> ratio details<br />

6. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> quarries and barrow pit required for banking work and its treatment after<br />

use.<br />

7. Submit the plan for disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> extra excavated material.<br />

8. Avoid excessive land acquisition <<strong>st</strong>rong>of</<strong>st</strong>rong> land for dumping the material and other purposes.<br />

Chairman<br />

21


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 7<br />

Subject: <strong>Environment</strong>al clearance Proposed Residential Building on plot bearing Sr. No.<br />

19/1 to 4 & 19/5/1 & 19/5/2, at po<strong>st</strong> Pisoli, Tal Haveli, Di<strong>st</strong>. Pune by M/s. Tricon<br />

Builders<br />

(File No. <strong>SEAC</strong> 2211/CR-130/TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : “Sunshine Hills” (Expansion Project)<br />

Project Proponent : M/s. Tricon Builders<br />

Consultant : M/s. Saitech Research & Development Organization<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the : Sr. No.19/1 to 4, 19/5//1 & 19/5/2 at Po<strong>st</strong> - Pisoli, Taluka – Haveli,<br />

project<br />

Pune, Maharashtra.<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Housing Project<br />

Category : 8 (a) B2<br />

Whether in<br />

Corporation /<br />

Municipal / Other<br />

area<br />

Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

DCR<br />

Total plot area<br />

(Sq.m)<br />

Deductions<br />

Net plot area<br />

Permissible FSI<br />

(including TDR etc.)<br />

Proposed Built –UP<br />

Area (FSI & Non<br />

FSI)<br />

Town Planning<br />

Regional Planning<br />

20300 m 2<br />

1138.52 m 2<br />

191<<strong>st</strong>rong>61</<strong>st</strong>rong>.48 m 2<br />

19488.51 m 2<br />

Before Expansion<br />

FSI area (m 2 ): 11622.18 m 2<br />

FSI Club House Area: 243.19 m 2<br />

Non FSIA area (m 2 ): 8013.92 m 2<br />

Total BUA area (m 2 ): 19879.29 m 2<br />

After Expansion<br />

FSI area (m 2 ): 19487.68 m 2<br />

FSI Club House Area: 243.19 m 2<br />

Non FSIA area (m 2 ): 13072.29 m 2<br />

Total BUA area (m 2 ): 32803.16 m 2<br />

Chairman<br />

22


Ground – coverage<br />

percentage (%)<br />

(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

plot not open to sky)<br />

E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />

configuration (s)<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />

and shops<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />

residents / users<br />

Tenant density per<br />

hector<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

building(s)<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

25 %<br />

. 60 Crores<br />

Residential: - Total Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> Buildings = 9 nos.<br />

Building Configuration:<br />

Buildings A1, A2, A3, B1, B2, B3: P + 7<br />

Buildings A4, A5 & A6: P + 9<br />

Total tenants: 366 nos.<br />

Residential Population: 1830 persons<br />

30 m<br />

Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way 15.00 m<br />

Turning radius for<br />

easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />

tender movement<br />

from all around the<br />

building excluding<br />

the width for the<br />

plantation<br />

Total Water<br />

Requirement<br />

9 m<br />

Dry season:<br />

• Source: Grampanchayat<br />

• Fresh water : 148 m 3 /day<br />

• Recycled water (Flushing) : 99 m 3 /day<br />

• Recycled water (Gardening) : 30 m 3 /day<br />

• Total Water Requirement : 277 m 3 /day<br />

• Fire fighting : 200 m 3<br />

• Excess treated water : 60 m 3 /day<br />

Wet Season:<br />

• Source : Grampanchayat<br />

• Fresh water : 148 m 3 /day<br />

• Recycled water (Flushing) : 99 m 3 /day<br />

Chairman<br />

23


Rain Water<br />

Harve<strong>st</strong>ing (RWH)<br />

Strom water<br />

drainage<br />

Sewage and wa<strong>st</strong>e<br />

water<br />

Solid wa<strong>st</strong>e<br />

Management<br />

Green Belt<br />

Development<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

• Total Water Requirement : 247 m 3 /day<br />

• Swimming pool make up : NA<br />

• Fire fighting : 200 m 3<br />

• Excess treated water : 90 m 3 /day<br />

Size <<strong>st</strong>rong>of</<strong>st</strong>rong> the recharge pit = 0.6 m x 0.6 m x 3 m<br />

No <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pit proposed = 30 Nos.<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

Capital Co<strong>st</strong>: 10 Lakhs<br />

O & M Co<strong>st</strong> per Annum: 0.75 Lakhs<br />

• Natural water drainage pattern :<br />

• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water :<br />

• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD: Appropriate size <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water drainage channels<br />

provide.<br />

• Sewage generation : 222 m 3 /day<br />

• STP technology : Activated Sludge Process<br />

• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP : 225 m 3 /day<br />

• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP : On Ground<br />

• DG sets (during emergency): 1 no. X 100 KVA<br />

1 no. X 50 KVA<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>) :<br />

• Capital Co<strong>st</strong>: Rs. 40 Lakhs<br />

• O & M Co<strong>st</strong> per Annum: Rs 5.50 Lakhs<br />

Wa<strong>st</strong>e generation in the Pre Con<strong>st</strong>ruction & Con<strong>st</strong>ruction phase:<br />

• Wa<strong>st</strong>e generation : 25 kg /day<br />

Wa<strong>st</strong>e generation in the operation Phase:<br />

• Dry wa<strong>st</strong>e : 330 kg/day<br />

• Wet wa<strong>st</strong>e : 494 kg/day<br />

• STP Sludge (Dry sludge) : 2 kg/day<br />

Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>e:<br />

• Dry wa<strong>st</strong>e : Handed over to authorized recycler for further handling<br />

and disposal<br />

• Wet wa<strong>st</strong>e: converted to compo<strong>st</strong> using Organic Wa<strong>st</strong>e Processor<br />

[OWP] model no. EPL 500<br />

• E – wa<strong>st</strong>e : Handed over to authorized Vendor<br />

2. Total area provided for the <strong>st</strong>orage & Treatment <<strong>st</strong>rong>of</<strong>st</strong>rong> the solid wa<strong>st</strong>e :<br />

For EPL 500 - 100 m 2<br />

3. Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

Capital Co<strong>st</strong> : 17 Lakhs<br />

O & M Co<strong>st</strong>: 4 Lakhs/Annum<br />

Total RG area: 2500 m 2<br />

RG on the ground : 2500 m 2<br />

Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>) :<br />

Capital Co<strong>st</strong> : 22 Lakhs<br />

O & M Co<strong>st</strong> : 2 Lakh/annum<br />

Chairman<br />

24


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Energy Sr. No. Power Requirement<br />

1 Source <<strong>st</strong>rong>of</<strong>st</strong>rong> power supply :Maharashtra State Electricity<br />

Di<strong>st</strong>ribution Company Ltd.<br />

2 During Con<strong>st</strong>ruction Phase<br />

a) Demand Load<br />

3 During Operation Phase,<br />

a) Demand Load<br />

b) Connected Load<br />

4 DG set as Power Back – up during<br />

operation phase<br />

Chairman<br />

25<br />

20 KW<br />

1421.33 KVA<br />

1599 KW<br />

1 no. x 100 KVA<br />

1 no. x 50 KVA<br />

5 Transformer 3 nos. x 630 KVA<br />

6 Fuel used Diesel<br />

• Energy saving measures<br />

• Maximize the use <<strong>st</strong>rong>of</<strong>st</strong>rong> natural lighting & ventilation through design.<br />

• CFL based lighting will be done in the common areas, landscape<br />

areas, signage’s, Entry gates and boundary compound walls etc.<br />

• Acou<strong>st</strong>ic enclosures to D.G. sets for prevention <<strong>st</strong>rong>of</<strong>st</strong>rong> noise.<br />

• Solar Water Heating Sy<strong>st</strong>em will be provided for all buildings.<br />

• Auto Timer Switches Will Be Provided for Street Lights, Garden<br />

Lights, Parking & Staircase Lights & Other Common Area Lights.<br />

Wiring & Controlling shall be done for full, ½ & 1/3 rd use <<strong>st</strong>rong>of</<strong>st</strong>rong> lights<br />

in common area, for saving electrical energy.<br />

• Automatic water pumps to ensure optimum use <<strong>st</strong>rong>of</<strong>st</strong>rong> electricity & to<br />

avoid water tank overflows.<br />

• To create awareness among<strong>st</strong> residence <<strong>st</strong>rong>of</<strong>st</strong>rong> society regarding<br />

operation <<strong>st</strong>rong>of</<strong>st</strong>rong> all electrical sy<strong>st</strong>ems & for use <<strong>st</strong>rong>of</<strong>st</strong>rong> energy efficient<br />

light fittings i.e. use <<strong>st</strong>rong>of</<strong>st</strong>rong> CFL Lamps, T5 Tubes & LED Lights. in<br />

their flats for the energy saving.


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

DG Set:<br />

• Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used :<br />

During Con<strong>st</strong>ruction Phase: 1 no. X 30 KVA<br />

During Operational phase: 1 no. X 100 KVA<br />

• Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used : Diesel<br />

Traffic Management Total parking area: 5640 sq.m<br />

<strong>Environment</strong>al<br />

Management plan<br />

Budgetary<br />

Allocation<br />

Decision:<br />

Capital co<strong>st</strong>: 129.67 Lakha<br />

O & M co<strong>st</strong>: 20.66 Lakhs<br />

Chairman<br />

26<br />

1 no. X 50 KVA<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed. PP informed that con<strong>st</strong>ruction was initiated at the site as per NA approval with a total<br />

BUA 19,878 sq.m including Non-FSI area. This is a violation <<strong>st</strong>rong>of</<strong>st</strong>rong> EIA Notification, 2006.<br />

<strong>Environment</strong> Department may look into the violation and take appropriate action.<br />

<strong>SEAC</strong> noted that-<br />

1. The current right <<strong>st</strong>rong>of</<strong>st</strong>rong> way is 9m. As per MoEF OM dated 7 th February 201, the maximum<br />

height allowed is 15m but the proposed maximum height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building (including the<br />

completed ones) is 30m.<br />

2. Proposed FSI <<strong>st</strong>rong>of</<strong>st</strong>rong> 0.9 is not yet approved.<br />

3. Consent for water and drainage from competent authority has not yet been obtained.<br />

Considering this, <strong>SEAC</strong> is con<strong>st</strong>rained to recommend the rejection <<strong>st</strong>rong>of</<strong>st</strong>rong> prior environmental<br />

clearance to the proposal.


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 8<br />

Subject: <strong>Environment</strong> clearance for proposed project “Simplicity” residential &<br />

Commercial Development at Handewadi, Pune by M/s. J.K.P. Developers<br />

(File No. <strong>SEAC</strong> 2211/CR-133 /TC2)<br />

PP was absent<br />

Chairman<br />

27


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 9<br />

Subject: TOR for proposed Kondane Irrigation Project at villages Kondane & Chochi, Tal.<br />

Karjat,Di<strong>st</strong>t.Raigad by M/s. Water Resources Deptt., Superintending Engineer,<br />

Thane Irrigation Circle, Thane<br />

(File No. <strong>SEAC</strong> 2412/ CR-210/ TC2)<br />

PP was absent<br />

Chairman<br />

28


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 10<br />

Subject: TOR for proposed proposed Sangola Lift Irrigation Project at village Tandulwadii,<br />

Tal. Malshiras Di<strong>st</strong>t.Solapur by Executive Engineer,Ujjani Canal Division No.9<br />

(File No. <strong>SEAC</strong> 2412/ CR-211/ TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : Lift irrigation scheme with lifting water from to exi<strong>st</strong>ing in single <strong>st</strong>age,<br />

irrigation about 6525 ha area in Tal Sangola Di<strong>st</strong> Solapur<br />

Project Proponent : Ujjani Canal Division No. 9, Solapur.<br />

Consultant : M/s. Voyants Solutions Pvt. Ltd<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

: Village Chincholi, Tal Malshiras<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Irrigation project<br />

Category : 1 (c), B1<br />

Command area GCA: 24667 ha<br />

CCA:17876<br />

ICA: 6525<br />

Decision:<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. <strong>SEAC</strong> decided to<br />

consider the project under category B1. Besides the model TOR (http://ec.maharashtra.gov.in),<br />

the project proponent shall also cover following points during the preparation <<strong>st</strong>rong>of</<strong>st</strong>rong> EIA:<br />

1. Consider cumulative impact <<strong>st</strong>rong>of</<strong>st</strong>rong> few other projects proposed in the same region.<br />

2. Include in the impact assessment impacts <<strong>st</strong>rong>of</<strong>st</strong>rong> diversion <<strong>st</strong>rong>of</<strong>st</strong>rong> water from the river to other<br />

valley and provide full ju<strong>st</strong>ification with impacts on common areas.<br />

3. Submit more details on ecology, biodiversity and social and economic aspects.<br />

4. Submit benefit- co<strong>st</strong> ratio details<br />

5. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> quarries and barrow pit required for banking work and its treatment after<br />

use.<br />

6. Submit the plan for disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> extra excavated material<br />

7. Avoid excessive land acquisition for dumping the material<br />

While preparing EIA following points also should be considered.<br />

• Where the documents provided in a language other than English, an English translation should<br />

be provided for information to public.<br />

Chairman<br />

29


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

• These TORs should be considered for the preparation <<strong>st</strong>rong>of</<strong>st</strong>rong> draft EIA including other information<br />

as per the generic <strong>st</strong>ructure given in the EIA Notification, 2006.<br />

• The environmental consultant to be engaged for preparation <<strong>st</strong>rong>of</<strong>st</strong>rong> EIA/EMP report should be<br />

accredited by Quality Council <<strong>st</strong>rong>of</<strong>st</strong>rong> India (QCI)/ NABET. For data collection and analysis only<br />

MoEF or NABL approved laboratories should be used.<br />

• Consultant should include a Certificate in the EIA report, li<strong>st</strong>ing the various experts involved<br />

and their contributions to EIA Report and data generated by other organization(s)/ Laboratories<br />

(<strong>st</strong>atus <<strong>st</strong>rong>of</<strong>st</strong>rong> approval <<strong>st</strong>rong>of</<strong>st</strong>rong> such laboratories).<br />

As soon as the draft EIA report is prepared, the same may be submitted to the Maharashtra<br />

Pollution Control Board (MPCB) for conducting public hearing as per EIA Notification, 2006.<br />

On revising the EIA Report, addressing all concerns raised during the public hearing/public<br />

consultation, the same shall be submitted to the <strong>SEAC</strong>, Maharashtra for appraisal.<br />

Chairman<br />

30


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 11<br />

Subject: <strong>Environment</strong> clearance for proposed con<strong>st</strong>ruction project at Gat No.166,167,271 to<br />

291 <<strong>st</strong>rong>of</<strong>st</strong>rong>f Pune-Nagpur Road,Sanaswadi, Tal.Shirur,Di<strong>st</strong>t.Pune by M/s. John deer<br />

Pvt. Ltd by M/s. John Deere India Pvt.Ltd<br />

(File No. <strong>SEAC</strong> 2212/ CR-38 / TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : John Deere India<br />

Project Proponent : M/s. John Deere India Pvt.Ltd<br />

Consultant : M/s. Ultra- Tech <strong>Environment</strong>al Consultancy & Laboratory<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the : Gat No.166,167,271 to 291 <<strong>st</strong>rong>of</<strong>st</strong>rong>f Pune-Nagpur Road, Sanaswadi,<br />

project<br />

Tal.Shirur,Di<strong>st</strong>t.Pune<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Con<strong>st</strong>ruction project<br />

Category : 8 (a), B2<br />

Previous<br />

consideration/s<br />

Whether in<br />

Corporation /<br />

Municipal / Other<br />

area<br />

Total plot area<br />

Deductions<br />

Net plot area<br />

Permissible FSI<br />

(including TDR etc.)<br />

Proposed Built –UP<br />

Area (FSI & Non<br />

FSI)<br />

Ground – coverage<br />

percentage (%)<br />

(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

New case<br />

Planning Authority: Town Planning Department, Pune.<br />

Jurisdiction : Collector, Pune in Village Sanaswadi<br />

Plot Area: 4, 54, 200 Sq. mtr.<br />

Deductions :<br />

• Road widening: 6434 Sq.mtr.<br />

• 24 m wide T.P Road: - 25713 Sq. mtr.<br />

• Area under Canal: 5916 Sq. mtr.<br />

Total Deduction area: 38064Sq.mtr.<br />

Net Plot Area : 397435 Sq.mt.<br />

90279 Sq. Mt.<br />

Total Con<strong>st</strong>ructed:67535 Sq. Mtr<br />

Proposed:- 13209 Sq.mtr<br />

Total: - 80743 Sq. mtr.<br />

FSI<br />

Indu<strong>st</strong>rial Land : 0.5 FSI<br />

Agricultural Land : 0.2 FSI<br />

Exi<strong>st</strong>ing: 64962.64 Sq.mtr.<br />

Proposed: 11153.00 Sq.mt.<br />

Total : 7<<strong>st</strong>rong>61</<strong>st</strong>rong>15.64 Sq.mt.19.15%<br />

Chairman<br />

31


plot not open to sky)<br />

E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />

configuration (s)<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Rs. 516 Crores<br />

Building Configuration Exi<strong>st</strong>ing<br />

Sr. No. Building Name<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> Building in<br />

Mtr.<br />

1 Vehicle Assembly and Paint Shop (G+1) 14<br />

2 Engine 12<br />

3 Transmission 12<br />

4 PV & V Lab (G+1) 12<br />

5 Utility Bldg 1 & 2 4<br />

6 Tractor Shipping Dock (Export & Dome<strong>st</strong>ic) 6<br />

7 132 Sub<strong>st</strong>ation Control Room (G+2) 8<br />

8 E-Coat Paint Shop and Sub<strong>st</strong>ation (G+1) 18<br />

9 Aggregate Paint Shop 14<br />

10 Thinner Store 4<br />

11 Main Gate Bldg & Security Office 6<br />

12 Canteen 4<br />

13 Admin Bldg 6<br />

14 Photoshop 5<br />

15 Jig <strong>st</strong>ripping 9<br />

16 Day Tank Platform 6<br />

17 Paint Shop Dock 6<br />

18 Cooling Tower Pump & Haz. Material Shed 4<br />

19 Ca<strong>st</strong>rol Room 3<br />

20 Hot Water Shed 7<br />

21 Weigh Bridge Cabin 3<br />

22 Toilet Block Near Dock 7 4<br />

23 Roller Te<strong>st</strong> Bench 4<br />

24 Desludge Pit & Paint Storage Shed 6<br />

25 ETP Shed 5<br />

26 Chemical Storage Room ED ETP 3<br />

27 Panel Room ED ETP 3<br />

28 Haz Storage Shed 5<br />

29 Security Cabin PV & V 4<br />

30 Water Cooler Platform 3<br />

31 ETP Chemical House 3<br />

32 Meter Room<br />

Total<br />

4<br />

Building Configuration Proposed<br />

Sr.<br />

No.<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Building Height <<strong>st</strong>rong>of</<strong>st</strong>rong> Building (Mtr.)<br />

1 Engine <<strong>st</strong>rong>of</<strong>st</strong>rong>fice (G+1) 9<br />

2 Transmission <<strong>st</strong>rong>of</<strong>st</strong>rong>fice (G+1) 9<br />

3 Dome<strong>st</strong>ic dock <<strong>st</strong>rong>of</<strong>st</strong>rong>fice 6<br />

4 Dome<strong>st</strong>ic dispatch docks 6<br />

Chairman<br />

32


Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

building(s)<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

5 Transmission dock 6<br />

6 Engine ca<strong>st</strong>ing <strong>st</strong>orage dock -14 6<br />

7 Extension <<strong>st</strong>rong>of</<strong>st</strong>rong> engine dock-12 6<br />

8 Aggregate paint shop dock 6.5<br />

9 Agg paint shop - dispatch area 6.5<br />

10 E- coat new dock for sheet metal 6<br />

11 Finished goods <strong>st</strong>orage & packaging shed 7.5<br />

12 Project <strong>st</strong>ore shed 6<br />

13 Canteen (G+1)<br />

Creche / medical center future expansion<br />

10<br />

14 (G+1) 4<br />

15 Coolant treatment plant 6<br />

16 Jig <strong>st</strong>ripping relocation 8<br />

17 Tyre <strong>st</strong>orage shed<br />

Building Configuration Exi<strong>st</strong>ing<br />

9<br />

Sr. No. Building Name<br />

Vehicle Assembly and Paint Shop<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> Building in Mtr.<br />

1 (G+1) 14<br />

2 Engine 12<br />

3 Transmission 12<br />

4 PV & V Lab (G+1) 12<br />

5 Utility Bldg 1 & 2<br />

Tractor Shipping Dock (Export &<br />

4<br />

6 Dome<strong>st</strong>ic) 6<br />

7 132 Sub<strong>st</strong>ation Control Room (G+2)<br />

E-Coat Paint Shop and Sub<strong>st</strong>ation<br />

8<br />

8 (G+1) 18<br />

9 Aggregate Paint Shop 14<br />

10 Thinner Store 4<br />

11 Main Gate Bldg & Security Office 6<br />

12 Canteen 4<br />

13 Admin Bldg 6<br />

14 Photoshop 5<br />

15 Jig <strong>st</strong>ripping 9<br />

16 Day Tank Platform 6<br />

17 Paint Shop Dock<br />

Cooling Tower Pump & Haz. Material<br />

6<br />

18 Shed 4<br />

19 Ca<strong>st</strong>rol Room 3<br />

20 Hot Water Shed 7<br />

21 Weigh Bridge Cabin 3<br />

22 Toilet Block Near Dock 7 4<br />

23 Roller Te<strong>st</strong> Bench 4<br />

24 Desludge Pit & Paint Storage Shed 6<br />

25 ETP Shed 5<br />

26 Chemical Storage Room ED ETP 3<br />

27 Panel Room ED ETP 3<br />

28 Haz Storage Shed 5<br />

29 Security Cabin PV & V 4<br />

Chairman<br />

33


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

30 Water Cooler Platform 3<br />

31 ETP Chemical House 3<br />

32 Meter Room 4<br />

Total<br />

Building Configuration Proposed<br />

Sr.<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Building<br />

No.<br />

1 Engine <<strong>st</strong>rong>of</<strong>st</strong>rong>fice (G+1) 9<br />

2 Transmission <<strong>st</strong>rong>of</<strong>st</strong>rong>fice (G+1) 9<br />

3 Dome<strong>st</strong>ic dock <<strong>st</strong>rong>of</<strong>st</strong>rong>fice 6<br />

4 Dome<strong>st</strong>ic dispatch docks 6<br />

5 Transmission dock 6<br />

6 Engine ca<strong>st</strong>ing <strong>st</strong>orage dock -14 6<br />

7 Extension <<strong>st</strong>rong>of</<strong>st</strong>rong> engine dock-12 6<br />

8 Aggregate paint shop dock 6.5<br />

9 Agg paint shop - dispatch area 6.5<br />

10 E- coat new dock for sheet metal 6<br />

11 Finished goods <strong>st</strong>orage & packaging shed 7.5<br />

12 Project <strong>st</strong>ore shed 6<br />

13 Canteen (G+1)<br />

Creche / medical center future expansion<br />

10<br />

14 (G+1) 4<br />

15 Coolant treatment plant 6<br />

16 Jig <strong>st</strong>ripping relocation 8<br />

Chairman<br />

34<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> Building<br />

(Mtr.)<br />

17 Tyre <strong>st</strong>orage shed 9<br />

Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way 60 mt. wide road- MIDC Fire Station 25 Km towards Nagar Road.<br />

Turning radius for<br />

easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />

tender movement<br />

from all around the<br />

building excluding<br />

the width for the<br />

plantation<br />

Total Water<br />

Requirement<br />

14 M<br />

Dry Season<br />

Fresh water (CMD):<br />

Exi<strong>st</strong>ing : 769, Proposed : 872<br />

Source: Bhima River<br />

Recycled water (CMD):<br />

Exi<strong>st</strong>ing : 343 , Proposed : 462<br />

Total water requirement (CMD):


Rain Water<br />

Harve<strong>st</strong>ing (RWH)<br />

Strom water<br />

drainage<br />

Sewage and wa<strong>st</strong>e<br />

water<br />

Solid wa<strong>st</strong>e<br />

Management<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Exi<strong>st</strong>ing : 1112 , Proposed : 1334<br />

Fire fighting(cum): 1480 cum<br />

Wet Season<br />

Fresh water (CMD): 464 Source: Bhima River<br />

Recycled water (CMD): 462 ( from RWH)<br />

Total water requirement (CMD): 926<br />

Fire fighting(cum): 1480 cum<br />

Size and no <<strong>st</strong>rong>of</<strong>st</strong>rong> RWH tank and Quantity<br />

Storage Pond -1 – 320.95 CUM<br />

Storage pond -2 – 274.75 CUM<br />

Storage Pond-3- 175.84 CUM<br />

Storage Tank-1- 507.00 CUM<br />

Storage Tank-2- 468 CUM<br />

Storage Tank-3- 468 CUM<br />

Storage Tank-4- 507 CUM<br />

Size, nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits and Quantity: 13 nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> Recharge pits <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

size - 4.25m x 4.25m x 3 m ht (704.43 cum)<br />

• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water: Run <<strong>st</strong>rong>of</<strong>st</strong>rong>f after development : 1<<strong>st</strong>rong>61</<strong>st</strong>rong>8.84 cum<br />

• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD: <strong>st</strong>arts with width 600mm x depth 600 mm<br />

• Exi<strong>st</strong>ing Sewage: 140 M 3 /day<br />

• Exi<strong>st</strong>ing Effluent: 207 M 3/day<br />

• Proposed Sewage (Exi<strong>st</strong>ing + Proposed): 198 M 3/day<br />

• Proposed Effluent (Exi<strong>st</strong>ing + Proposed): 273 M 3/day<br />

STP Technology : Fluidized Aerobic Bioreactor<br />

Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP : 2 Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> STP each <<strong>st</strong>rong>of</<strong>st</strong>rong> capacity 150 m3<br />

Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> ETP : 350 M3<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />

Capital Co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> STP : Rs. 73.74 lacs<br />

O & M Co<strong>st</strong> : Rs. 12 lacs/annum<br />

Capital Co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> ETP : Rs. 189.27 lacs<br />

O & M Co<strong>st</strong> : Rs. 60 lacs/Annum<br />

Wa<strong>st</strong>e generation in Pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction Phase<br />

Wa<strong>st</strong>e generation :<br />

Cutting = 15000 Cubic Meter<br />

Filling = 32000 Cubic Meter<br />

Top soil preservation/conservation:<br />

• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> the top soil to be preserved: 11000 Cu. M<br />

Wa<strong>st</strong>e generation in the operation Phase:<br />

Wa<strong>st</strong>e Exi<strong>st</strong>ing<br />

kg/day<br />

Chairman<br />

35<br />

Proposed<br />

Kg/day<br />

Total<br />

Kg/day


Green Belt<br />

Development<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Canteen wa<strong>st</strong>e 200 50 250<br />

Paper/Pla<strong>st</strong>ic/wood etc 1000 200 1200<br />

Biomedical wa<strong>st</strong>e 0.500 0.200 0.700<br />

STP sludge 200 50 250<br />

Hazardous wa<strong>st</strong>e details<br />

Sr.<br />

no.<br />

Item no.<br />

as per<br />

HW<br />

Schedule<br />

Chairman<br />

36<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>e Quantity Disposal<br />

1 5.1 Used / Spent Oil 920 Kg/day To Authorized<br />

2 5.2 Wa<strong>st</strong>e/ residue containing Oil<br />

(wa<strong>st</strong>e oil / skimmed oil/ Coolant<br />

oil)<br />

3 5.2 Wa<strong>st</strong>e/ residue containing Oil<br />

(oil soaked & cotton wa<strong>st</strong>e &<br />

miscellaneous items)<br />

Reprocessor<br />

3146 kg/day To Authorized<br />

Reprocessor<br />

870 kg/day To CHWTSDF<br />

4. 12.5 Phosphate sludge 160 kg/day To CHWTSDF<br />

5. 20.1 Contaminated aromatic, aliphatic<br />

or nepthenic solvents (spent<br />

thinner)<br />

770 Lit/day To Authorized<br />

Reprocessor/<br />

To CHWTSDF<br />

6. 21.1 Wa<strong>st</strong>e residue <<strong>st</strong>rong>of</<strong>st</strong>rong> paints 2700 Kg/day To CHWTSDF<br />

7. 33.3 Empty discarded containers/<br />

barrels/ Liners contaminated<br />

with Hazardous wa<strong>st</strong>e chemicals<br />

8. 34.2 Toxic metal containg residue<br />

from water purification<br />

9 ETP<br />

sludge<br />

Chemical sludge from wa<strong>st</strong>e<br />

water treatment<br />

570 Kg/day To Authorized<br />

Reprocessor/<br />

To CHWTSDF<br />

240 Kg/day To Authorized<br />

Reprocessor/<br />

To CHWTSDF<br />

1200 kg/day To CHWTSDF<br />

10 --- Used scrap batteries 8 nos/day To Authorized<br />

11 --- E-Wa<strong>st</strong>e 1000 kg/<br />

annum<br />

Total RG area: 1, 07,562 Sq.mt.<br />

RG area under green belt: : 1,07,562 Sq.mt.<br />

S<<strong>st</strong>rong>of</<strong>st</strong>rong>tscape area: 103979 Sq.mt.<br />

Water Body Area: 2000 Sq.mt.<br />

Hardscape Area: 1583 Sq.mt.<br />

Reprocessor<br />

To Authorized<br />

Reprocessor


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Plantation:<br />

• Number and li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> trees species to be planted in the ground RG:<br />

SR.<br />

NO<br />

TREE DETAILS<br />

NAME OF TREE NOS.<br />

1 NEEM TREE 50<br />

2 APTA TREE 50<br />

3 SUBABHUL TREE 0<br />

4 GULMOHAR TREE 50<br />

5 UMBER TREE --<br />

6 ASHOK TREE 50<br />

7 SURU TREE 50<br />

8 CHAFA TREE 50<br />

9 BABUL TREE 0<br />

10 PAM TREE 0<br />

11 BADAM TREE 50<br />

12 PAPAYE TREE 0<br />

13 MANGO TREE 0<br />

PELTO FOR U COPPER 0<br />

14 PELTO FOR U COPPER 0<br />

15 NILMOHAR TREE 0<br />

16 BOTTAL TREE 50<br />

17 KARANJ TREE 50<br />

18 TABOBIA ROISIA TREE 50<br />

19 RAIN TREE 50<br />

20 HADDU TREE 0<br />

21 SITA ASHOKA TREE 50<br />

22 NILAGIRI TREE 50<br />

23 CHANDAN TREE 0<br />

24 CADIA TREE 0<br />

25 SPEIS OF CASIA 0<br />

26 PANGARA TREE 0<br />

27 SINGAPURI CHERI 0<br />

28 FICUS <strong>SEAC</strong>ES 50<br />

29 SISOO TREE<br />

30 TUBOIA ARGENTA<br />

31 POWER PUF<br />

32 TACOMA<br />

0<br />

33 CHIKU TREE 50<br />

34 SAPTAPARIN 50<br />

35 BITTI 0<br />

36 SISILPHENIA 0<br />

37 LAGESTRO NIA THERO LIE<br />

38 LAGESTRO NIA THERO<br />

0<br />

Chairman<br />

37


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

LIELANC ESTRA<br />

39 DINKA RAJA<br />

40 UPHORBLAULBA<br />

41 TRAVELLERPAUM<br />

42 PAPAI<br />

43 FICUS BLACK<br />

44 CASIA BIOFLORA 50<br />

45 BOKAR TREE<br />

46 MAHUGANI<br />

47 CASA MULTIJUGA<br />

48 BAMBAX<br />

49 ASHOKA MINCHIRA<br />

50 JAMBUL TREE 50<br />

51 GOLLDEN BAMBU<br />

52 FISH TAIL PAM 50<br />

53 VAD TREE<br />

TOTA<br />

1000<br />

L<br />

Trees to be cut 40 nos.<br />

Trees to be transplanted 40 nos.<br />

TREE DETAILS<br />

SR. NO NAME OF TREE NOS.<br />

1. NEEM TREE 850<br />

2. APTA TREE 104<br />

3. SUBABHUL TREE 80<br />

4. GULMOHAR TREE 375<br />

5. UMBER TREE 8<br />

6. ASHOK TREE 124<br />

7. SURU TREE 31<br />

8. CHAFA TREE 219<br />

9. BABUL TREE 1293<br />

10. PAM TREE 19<br />

11. BADAM TREE 4<br />

12. PAPAYE TREE 22<br />

13. MANGO TREE 30<br />

14. PELTO FOR U COPPER 44<br />

15. PELTO FOR U COPPER 42<br />

16. NILMOHAR TREE 13<br />

17. BOTTAL TREE 54<br />

18. KARANJ TREE 9<br />

19. TABOBIA ROISIA TREE 44<br />

20. RAIN TREE 31<br />

21. HADDU TREE 2<br />

22. SITA ASHOKA TREE 2<br />

23. NILAGIRI TREE 5<br />

Chairman<br />

38


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

24. CHANDAN TREE 51<br />

25. CADIA TREE 2<br />

26. SPEIS OF CASIA 15<br />

27. PANGARA TREE 45<br />

28. SINGAPURI CHERI 28<br />

29. FICUS <strong>SEAC</strong>ES 155<br />

30. SISOO TREE 5<br />

31. TUBOIA ARGENTA 53<br />

32. POWER PUF 31<br />

33. TACOMA 103<br />

34. CHIKU TREE 1<br />

35. SAPTAPARIN 27<br />

36. BITTI 41<br />

37. SISILPHENIA 11<br />

38. LAGESTRO NIA THERO LIE 7<br />

39.<br />

LAGESTRO NIA THERO<br />

LIELANC ESTRA<br />

8<br />

40. DINKA RAJA 1<br />

41. UPHORBLAULBA 1<br />

42. TRAVELLERPAUM 6<br />

43. PAPAI 23<br />

44. FICUS BLACK 8<br />

45. CASIA BIOFLORA 2<br />

46. BOKAR TREE 57<br />

47. MAHUGANI 10<br />

48. CASA MULTIJUGA 16<br />

49. BAMBAX 2<br />

50. ASHOKA MINCHIRA 1<br />

51. JAMBUL TREE 3<br />

52. GOLLDEN BAMBU 1<br />

53. FISH TAIL PAM 2<br />

54. VAD TREE 5<br />

total 4126<br />

Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />

Capital Co<strong>st</strong> :Rs. 200 Lakhs<br />

O & M Co<strong>st</strong> : Rs 20 Lakhs/ Year<br />

Energy Power supply:<br />

Connected Load : 17769 kW<br />

Maximum demand : 5500 kVA<br />

Source: MSEDCL<br />

Energy saving by non-conventional method<br />

Details calculations & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving<br />

Chairman<br />

39


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

• All light fixture will be equipped with the electronic balla<strong>st</strong> to<br />

improve the power factor and controlled voltage will be through<br />

Electromizer to reduce the power consumption.<br />

• Power factor will be maintained to Unity so as to lower the<br />

Maximum Dermand,Cable losses because <<strong>st</strong>rong>of</<strong>st</strong>rong> lagging power<br />

factor.<br />

• Maximum motors used in this facility will be <<strong>st</strong>rong>of</<strong>st</strong>rong> Energy<br />

efficienent class 1 to improve Efficiency & reduce losses.<br />

• Power & Di<strong>st</strong>ribution Transformers will be selected as per the<br />

ECBC <strong>st</strong>andard to lower the core & copper losses as compare to<br />

the conventional transformers.<br />

• All AHUs and majority <<strong>st</strong>rong>of</<strong>st</strong>rong> the continuous running pumps will be<br />

equipped with the variable frequency drives, it will maintain good<br />

power factor near unity and reduce the losses.<br />

Detail calculations & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving:<br />

Exi<strong>st</strong>ing :<br />

# Description<br />

1 Elimination <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

external power pack<br />

2 Avoid idle running <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

ring press machine<br />

3 ED Paint shop photo<br />

sensor in<strong>st</strong>allation<br />

4 ED Paint shop limit<br />

switch in<strong>st</strong>allation<br />

5 PV&V lab LED light<br />

in<strong>st</strong>allation<br />

6 PV&V lab Cooling<br />

Tower automation<br />

7 Engine removed<br />

unnecessary heat<br />

conditioning<br />

8 Engine switching Off<br />

blower in idle mode<br />

9 Engine T5 light<br />

in<strong>st</strong>allation<br />

10 Engine CMM<br />

removing external<br />

compressor<br />

Chairman<br />

40<br />

KWH<br />

Saving<br />

Annual<br />

Total Co<strong>st</strong><br />

Saving<br />

(Rs in Lacs)<br />

Saving<br />

tCO2/<br />

Mwh<br />

14976 0.87 12<br />

164736 9.60 135<br />

57720 3.37 47<br />

39936 2.33 33<br />

101130 5.90 83<br />

75423<br />

45000<br />

70000<br />

2986<br />

13585<br />

4.40<br />

2.62<br />

4.08<br />

0.17<br />

0.79<br />

62<br />

37<br />

57<br />

3<br />

11


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

11 Engine J hook<br />

lighting modification<br />

12 PV&V lab VFD<br />

in<strong>st</strong>allation for<br />

Ventilation<br />

13 Elctromizer panel for<br />

Shop, Street & Office<br />

lighting<br />

Proposed :<br />

Chairman<br />

41<br />

9600<br />

2496<br />

200000<br />

0.56<br />

0.15<br />

9<br />

8<br />

2<br />

164<br />

Total 597588 43.84 654<br />

# Description<br />

KWH<br />

Saving<br />

%<br />

Savin<br />

g<br />

Annual<br />

Total<br />

Co<strong>st</strong><br />

Saving<br />

(Rs in<br />

Lacs)<br />

Saving in<br />

tCo2/Mwh<br />

1 Replacement <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

400w MH lighting<br />

by T5 lighting 770328 3.1 53 624<br />

2 Replacement <<strong>st</strong>rong>of</<strong>st</strong>rong> V<br />

belt Drive by flat<br />

belt<br />

3 Air compressed<br />

sy<strong>st</strong>em, Intermittent<br />

air controller<br />

in<strong>st</strong>allation<br />

206981 0.8 14 168<br />

181125 0.7 13 147<br />

4 Wind mill credit in<br />

Electricity bill 571429 2.3 40 463<br />

5 Automation <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

<<strong>st</strong>rong>of</<strong>st</strong>rong>fice lighting 150000 0.6 10.5 122<br />

Total 187986<br />

3<br />

Capital Co<strong>st</strong> :<br />

Exi<strong>st</strong>ing :35.67 Lakhs<br />

Proposed : Rs. 70 Lakhs<br />

O & M Co<strong>st</strong> : --<br />

Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used<br />

7.5 130.5 1524


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

1500 kVA - 2 Nos.<br />

1800 kVA - 1 No.<br />

500 kVA - 1 No.<br />

320 kVA - 1 No.<br />

160 kVA- 1 No.<br />

• Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used: HSD<br />

Traffic Management Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> the junction to the main road & design <<strong>st</strong>rong>of</<strong>st</strong>rong> confluence<br />

Nagar Highway Proposed road is 60M wide, Entrance to Factory is 30<br />

M wide Road & internal road is 12 m wide Road.<br />

Parking details:<br />

• Total Parking area: 26054.37 Sq. Mtr.<br />

• 4 Wheeler: 808 nos.<br />

• 2 Wheeler : 808 Nos.<br />

• Public Transport: 25 nos.<br />

<strong>Environment</strong>al<br />

Management plan<br />

Budgetary<br />

Allocation<br />

Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal roads (m): 12 mt. to 15 mt. wide road<br />

Con<strong>st</strong>ruction phase (with Break-up):<br />

• Capital co<strong>st</strong>--<br />

• O & M co<strong>st</strong> (Please ensure manpower and other details)—<br />

SR. NO. PARAMETERS<br />

Chairman<br />

42<br />

TOTAL COST<br />

(Rs. In Lacs)<br />

1 water for du<strong>st</strong> suppression 8.00<br />

2 site sanitation & safety 4.00<br />

3 <strong>Environment</strong>al monitoring 4.00<br />

4 Disinfection 2.00<br />

5 Health check up 2.00<br />

TOTAL 20.00<br />

Operation Phase (with Break-up)-<br />

• Capital co<strong>st</strong><br />

• O&M co<strong>st</strong> (Please ensure manpower and other details)<br />

# PARAMETER<br />

SET UP<br />

COST<br />

Rs. In lacs<br />

OPERATIONAL<br />

&<br />

MAINTAINACE<br />

COST (Rs. In<br />

lacs/annum)<br />

1 Recycled Plant 550 60<br />

2 Rain Water Harve<strong>st</strong>ing 200 10


Decision:<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

3<br />

<strong>Environment</strong>al<br />

Monitoring by MoEF<br />

Approved Laboratory<br />

Chairman<br />

43<br />

MoEF<br />

Recognized<br />

Laboratory 12<br />

4 Solar Lights 10 6<br />

5 Gardening 200 20<br />

6 Solid wa<strong>st</strong>e Management ---- 120<br />

Total co<strong>st</strong> Rs in lacs 960 226<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed.<br />

PP informed that in the year 2000, <strong>Environment</strong> Department had issued a letter <strong>st</strong>ating that EC is<br />

not applicable to this project. The EC is sought under category 8 (a). PP also <strong>st</strong>ated that the<br />

con<strong>st</strong>ruction done before 2006 was 47,793sq.m. After 2006, an additional 19,741 sq.m<br />

con<strong>st</strong>ruction was added without EC. Prima-facie it appears to be a violation <<strong>st</strong>rong>of</<strong>st</strong>rong> EIA Notification,<br />

2006, as the TBUA exceeded 20,000 m2. <strong>Environment</strong> Department may look into the matter and<br />

take appropriate action.<br />

The current proposal is for further expansion.<br />

The proponent is directed to comply with the following observations:<br />

1. Submit extract <<strong>st</strong>rong>of</<strong>st</strong>rong> relevant rules/ letter from competent authority for the use <<strong>st</strong>rong>of</<strong>st</strong>rong> 0.2 FSI on<br />

the agricultural land for the proposed project, as NA Order is yet to be obtained.<br />

2. Submit undertaking that nalla adjacent to the plot shall neither be diverted nor used to<br />

discharge treated wa<strong>st</strong>ewater<br />

3. Submit revised water balance <strong>st</strong>atement with appropriate details and ju<strong>st</strong>ification as it is<br />

shown that 181 CMD is lo<strong>st</strong> in the indu<strong>st</strong>rial cooling area (this is very high water loss) and<br />

488 CMD is designated for gardening without any supporting calculations.<br />

4. STP & ETP treated wa<strong>st</strong>ewaters are combined and used for gardening and excess water is<br />

<strong>st</strong>ored in a pond. Ponding <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>e water is not a su<strong>st</strong>ainable solution. Arrange for<br />

alternative arrangements. Consider only STP treated wa<strong>st</strong>ewater for land use applications;<br />

explore the possibility <<strong>st</strong>rong>of</<strong>st</strong>rong> utilizing ETP treated wa<strong>st</strong>ewater independently as it may <strong>st</strong>ill<br />

have some chemical contamination. Alternatively, the ETP treated wa<strong>st</strong>ewater<br />

characteri<strong>st</strong>ics should match with those <<strong>st</strong>rong>of</<strong>st</strong>rong> STP treated wa<strong>st</strong>ewater for combined handling.<br />

5. Ensure that surface run-<<strong>st</strong>rong>of</<strong>st</strong>rong>f water is free from any chemical contamination before feeding<br />

to RWH pits.<br />

6. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> Energy conservation measure and ECBC compliances


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

7. Detail plan for the exi<strong>st</strong>ing trees and proposed trees to be submitted on a map. This should<br />

include location <<strong>st</strong>rong>of</<strong>st</strong>rong> tree species. Trees to be planted which should be large evergreen trees.<br />

Fruit tree species to be avoided. Suitable tree species like Salix species, Termanalia<br />

species to be planted along the nallah boundary.<br />

<strong>SEAC</strong> may visit the site in the near future and take up full appraisal after the compliance is<br />

received.<br />

Chairman<br />

44


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 12<br />

Subject: TOR for Proposed Chanera Irrigation Project at Chanera,Tal.Roha, Di<strong>st</strong>t. Raigad<br />

by M/s. Kokan Irrigation Development Corp.Thane<br />

(File No. <strong>SEAC</strong> 2412/ CR-222/ TC2)<br />

Decision:<br />

PP <strong>st</strong>ated that Phansad wild life sanctuary, which is a protected area under the Wild Life<br />

Protection Act 1972, is adjacent to the project site. As per the general conditions <<strong>st</strong>rong>of</<strong>st</strong>rong> the schedule<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong> EIA Notification 2006, <strong>SEAC</strong> decided that the project falls under Category A and is not under<br />

the purview <<strong>st</strong>rong>of</<strong>st</strong>rong> this committee. PP is advised to approach MoEF for prior EC including TOR for<br />

EIA.<br />

Chairman<br />

45


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 13<br />

Subject: TOR for proposed project <<strong>st</strong>rong>of</<strong>st</strong>rong> manufacturing <<strong>st</strong>rong>of</<strong>st</strong>rong> cold rolled <strong>st</strong>eel sheets &<br />

coils/Galvanised/Al-Zn & Colour Coated Coils/Sheets alongwith genertion <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

'Natural Gas based Captive Power 24 MW(8MW x 3 )" at village Dahivali,Tal .<br />

Khalapur,Di<strong>st</strong>t. Raigad by M/s Asian Colour Coated Ispat Pvt.Ltd.<br />

(File No. <strong>SEAC</strong> 2011/ CR-172 / TC2)<br />

Decision:<br />

PP clarified that the proposal which was submitted to the department vide letter dated 22 nd<br />

March, 2011 has now been revised. PP claimed that the revised proposal is only for con<strong>st</strong>ruction<br />

work for the indu<strong>st</strong>rial activity and has to be treated under category 8. Consultant (Ultra Tech<br />

<strong>Environment</strong> Consultancy & Laboratory Pvt. Ltd, Pune) claimed that he has submitted revised<br />

application to the department<br />

<strong>SEAC</strong> noted from the records that the consultant submitted a letter for change <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

consultant vide letter dated 10 th July, 2012. The letter was also for the metallurgical unit with<br />

captive power generation 24 MW (8 MW x 3) using natural gas. The consultant agreed that a hard<br />

copy <<strong>st</strong>rong>of</<strong>st</strong>rong> the revised application for the project was not yet <<strong>st</strong>rong>of</<strong>st</strong>rong>ficially submitted.<br />

PP and consultant <strong>st</strong>ated that the proposed indu<strong>st</strong>rial activity, including cold rolling,<br />

galvanizing and colour coating <<strong>st</strong>rong>of</<strong>st</strong>rong> coils and sheets, is not covered under EIA Notification 2006<br />

and the revised proposal is only for con<strong>st</strong>ruction for indu<strong>st</strong>rial activity. <strong>SEAC</strong> deliberated the<br />

issue and directed PP to seek clarification from MoEF about the applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> EC for the<br />

proposed indu<strong>st</strong>rial activity and submit the application to the appropriate committee for EC<br />

accordingly.<br />

Chairman<br />

46


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 14<br />

Subject: <strong>Environment</strong> clearance for proposed Residential Project on Gat No. 298, 304 & 319<br />

at PO Pirangut, Pune by M/s. Sai Yugal Atul Enterprises<br />

(File No. <strong>SEAC</strong> 2211/ CR-13 / TC2)<br />

PP was absent<br />

Chairman<br />

47


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 15<br />

Subject: <strong>Environment</strong> clearance for proposed project “Vi<strong>st</strong>a Luxuria” at S No. 162, Majri,<br />

Pune by M/s Parmar Indus Associates<br />

(File No. <strong>SEAC</strong> 2011/CR- 171/TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project “Vi<strong>st</strong>a Luxuria”<br />

Name , Contact<br />

number & address<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong> Proponent<br />

M/s. Parmar Indus Associates<br />

Consultant M/s. Saitech Research & Development Organization<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project :<br />

Housing project /<br />

Indu<strong>st</strong>rial E<strong>st</strong>ate /<br />

SRA scheme /<br />

MAHADA /<br />

Township or others<br />

Residential Con<strong>st</strong>ruction Project<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

Sr. No. 162, Village - Manjari, Tehsil – Haveli, Di<strong>st</strong> - Pune.<br />

Whether in<br />

Corporation /<br />

Municipal / Other<br />

area<br />

Grampanchayat<br />

Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

DCR<br />

Town Planning<br />

Note on the initiated Total Con<strong>st</strong>ructed area 14245.2 m<br />

work (If applicable)<br />

2<br />

(FSI Area 9104.7 m 2 + NON FSI Area 5140.5 m 2 )<br />

Buildings – A, B, C (P + 10) floors completed.<br />

LOI / NOC from<br />

MHADA / Other<br />

approvals(If<br />

applicable)<br />

Total plot area<br />

(Sq.m)<br />

Deductions<br />

Net plot area<br />

Permissible FSI<br />

(including TDR etc.)<br />

Proposed Built –UP<br />

Area (FSI & Non<br />

Not Applicable<br />

Plot Area – 21000.00 m 2<br />

Deductions -9105.80 m 2<br />

Net Plot Area - 11894.20 m 2<br />

22886.52 m 2<br />

FSI area (m 2 ) : 22475.50 m 2<br />

NON FSI area (m 2 ) : 14484.27 m 2<br />

,<br />

Chairman<br />

48


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

FSI) Total Built up area (m2) : 36959.77 m 2<br />

Ground – coverage<br />

percentage (%)<br />

(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

plot not open to sky)<br />

E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />

configuration (s)<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />

and shops<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />

residents / users<br />

Tenant density per<br />

hector<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

building(s)<br />

Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way (width<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong> the road from the<br />

neare<strong>st</strong> fire <strong>st</strong>ation to<br />

the proposed<br />

building(s)<br />

Turning radius for<br />

easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />

tender movement<br />

from all around the<br />

building excluding<br />

the width for the<br />

plantation<br />

Total Water<br />

Requirement<br />

2892.74 m 2<br />

13.78% <<strong>st</strong>rong>of</<strong>st</strong>rong> Total plot area(21000.00 m 2 )<br />

24.32 % <<strong>st</strong>rong>of</<strong>st</strong>rong> Net Plot Area (11894.20 m 2 )<br />

66 Cr.<br />

Total Buildings = 6 Nos.<br />

Buildings A, B, C, D, E, F (P + 11)<br />

Total Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> Tenements - 436 Nos.<br />

Total Tenements - 436 Nos.<br />

2180 Nos.<br />

250<br />

36.00 M<br />

9m<br />

7.62 m.<br />

Dry season :<br />

• Fresh water (CMD) : 206.20 m 3 /day <<strong>st</strong>rong>of</<strong>st</strong>rong> Source: Grampanchayat<br />

• Recycled water (CMD): 112.59 m 3 /day<br />

• Total water Requirement (CMD): 318.79 m 3 /day<br />

• Club-house & Swimming pool make up (Cum):- 10.00 m 3 /day<br />

• Fire fighting (Cum): 20,000 cu.m.<br />

Wet Season:<br />

• Fresh water (CMD) : 206.20 m 3 /day & Source: Grampanchayat<br />

• Recycled water (CMD): 112.59 m 3 /day<br />

• Total water Requirement (CMD): 318.79 m 3 /day<br />

• Swimming pool make up (Cum): 10.00 m 3 /day<br />

• Fire fighting (Cum): 20,000 cu.m.<br />

Chairman<br />

49


Rain Water<br />

Harve<strong>st</strong>ing (RWH)<br />

Strom water<br />

drainage<br />

Sewage and wa<strong>st</strong>e<br />

water<br />

Solid wa<strong>st</strong>e<br />

Management<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table –<br />

Approx. 0.1 to 0.3 m below the ground level.<br />

• Size, no <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits and Quality- 8 Nos.<br />

• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Recharge pits – 1.5 x 1.5 x 1.5m<br />

• Size , nos <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge Bore and quantity – 5279.99 m 3 /Year<br />

Budgetary allocation ( Capital co<strong>st</strong> and O & M co<strong>st</strong>)-<br />

Capital co<strong>st</strong> : 7.5 lakh<br />

O & M Co<strong>st</strong> : 1 lakh<br />

• Natural water drainage pattern - Refer Storm Water Layout<br />

• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water - Volume – 5279.99 m 3 /Year<br />

• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD - Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Recharge pits. – 1.5 x 1.5 x 1.5m<br />

• Sewage generation (CMD) – 264.87 CMD<br />

• STP technology – MMBR(Moving Media Bio Reactor)<br />

• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD) – 275 CMD<br />

• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP – Refer Storm & drainage layout<br />

• DG sets (during emergency) - 125 KVA x 1 No.<br />

• Budgetary allocation (Capital co<strong>st</strong> and O & M co<strong>st</strong>) –<br />

Capital co<strong>st</strong>: 75 lakh<br />

O & M Co<strong>st</strong> : 11.4 lakh<br />

Wa<strong>st</strong>e generation in the pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction phase:<br />

• Wa<strong>st</strong>e generation – 981 m 3<br />

Wa<strong>st</strong>e generation in the operation phase:<br />

• Dry wa<strong>st</strong>e (Kg/day): 588.6 Kg/day<br />

• Wet wa<strong>st</strong>e (Kg/day): 392.4 Kg/day<br />

• E – wa<strong>st</strong>e (Kg/month): Not Applicable<br />

• Hazardous wa<strong>st</strong>e (Kg/month): Spent oil – 80.0 Lit/ yr<br />

• STP Sludge (Dry sludge) (Kg/day): 23.839 Kg/Day ( 100% Dry )<br />

Mode Of Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> Wa<strong>st</strong>e:<br />

• Dry wa<strong>st</strong>e (Kg/day): Sold Out<br />

• Wet wa<strong>st</strong>e (Kg/day): Organic Wa<strong>st</strong>e Convertor (Saveco)<br />

Area requirement:<br />

Location (s)& total area provided for the <strong>st</strong>orage & treatment <<strong>st</strong>rong>of</<strong>st</strong>rong> solid<br />

Wa<strong>st</strong>e; 15m 2<br />

Budgetary allocation( capital Co<strong>st</strong> & O&M co<strong>st</strong>)<br />

Capital co<strong>st</strong>: 10 Lakh<br />

O & M Co<strong>st</strong> : 5 Lakh / Year<br />

Chairman<br />

50


Green Belt<br />

Development<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Total RG area: 2415.0 m 2 i.e. about 20.30% <<strong>st</strong>rong>of</<strong>st</strong>rong> net plot area<br />

RG area under green belt: 2415.0 m 2<br />

Plantation:<br />

• Number & li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> trees species to be planted in the ground RG:<br />

248Nos.<br />

Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />

Capital co<strong>st</strong>: 13.64 lakh<br />

O & M Co<strong>st</strong>: 2.28 Lakh / Year<br />

Energy Power Supply:<br />

• Maximum demand – 1481.3 KW<br />

• Connected Demand – 1666.5 KW<br />

• Source - Maharashtra State Electricity Di<strong>st</strong>ribution Company<br />

Limited(MSEDCL)<br />

Energy saving by non-conventional method:<br />

• Energy Saving measures – CFL, LED, Solar, etc.<br />

• Details Calculation & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving – 2359. 6 KWH /Annum<br />

• Compliance <<strong>st</strong>rong>of</<strong>st</strong>rong> the ECBC guideline (YES/NO) (If yes then<br />

submit Compliance e in tabular - Yes & Sheet Enclosed.<br />

• Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />

Capital co<strong>st</strong>: Rs. 20.12 lakh<br />

O & M Co<strong>st</strong>: Rs. 0.4 Lakh/Year<br />

(2% Of Capital Co<strong>st</strong>)<br />

DG Set:<br />

• Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used - 1 No.<br />

1) 125 KVA With Canopy – 1 No<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used – Diesel<br />

• During Con<strong>st</strong>ruction - Fuel Consumption / Hr. <<strong>st</strong>rong>of</<strong>st</strong>rong> 30KVA DG Set<br />

6.5 Litrs/hr. for 100 % load<br />

3.6 Litrs/hr for 50 % load.<br />

• During Operation - Fuel Consumption / Hr. <<strong>st</strong>rong>of</<strong>st</strong>rong> 125 KVA DG Set<br />

22.7 Litrs/hr. for 100 % load<br />

12 Litrs/hr for 50 % load.<br />

Traffic Management Parking details:<br />

• Total parking area - 6487.60 m 2<br />

• Area per car – 20 m 2<br />

• 2- Wheeler – 872 Nos.<br />

• 4-Wheeler - 176 Nos.<br />

• Public Transport - 129 Nos.<br />

Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal road(m): 9.00 mtr.<br />

Chairman<br />

51


<strong>Environment</strong>al<br />

Management plan<br />

Budgetary<br />

Allocation<br />

Decision:<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Con<strong>st</strong>ruction Phase ( With break up):<br />

• Capital Co<strong>st</strong> - STP – Rs. 75 Lakh<br />

RWH – Rs. 7.5 Lakh<br />

MSW – Rs. 10 Lakh<br />

Solar sy<strong>st</strong>em – Rs 20.12 Lakh<br />

Landscape – Rs. 13.64 Lakh.<br />

Operation Phase( with break Up)-<br />

• O & M co<strong>st</strong>( Please ensure manpower and other details)-<br />

STP – Rs. 11.4 Lakh / Year<br />

RWH – Rs. 1 Lakh / Year<br />

MSW – Rs. 6.0 Lakh/Year<br />

Solar sy<strong>st</strong>em – Rs. 40 ,000/Annum<br />

Landscape – Rs 2.28 Lakh / Year<br />

• Responsibility for Further O&M - 2 years<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed.<br />

PP informed that con<strong>st</strong>ruction was initiated at the site with a total BUA <<strong>st</strong>rong>of</<strong>st</strong>rong> 14245.2 sq.m and<br />

completed with the approval <<strong>st</strong>rong>of</<strong>st</strong>rong> local authority. It is noted that three buildings with height <<strong>st</strong>rong>of</<strong>st</strong>rong> 30 m<br />

with a right <<strong>st</strong>rong>of</<strong>st</strong>rong> way <<strong>st</strong>rong>of</<strong>st</strong>rong> 9 m (as per MoEF OM dated 7 th February 2012, the maximum height<br />

allowed is 15m) has been completed and foundation work <<strong>st</strong>rong>of</<strong>st</strong>rong> other proposed buildings is also<br />

almo<strong>st</strong> completed. It appears to be a violation <<strong>st</strong>rong>of</<strong>st</strong>rong> EIA Notification, 2006. <strong>Environment</strong><br />

Department may look into the matter and take an appropriate action.<br />

<strong>SEAC</strong> noted that-<br />

1. The current right <<strong>st</strong>rong>of</<strong>st</strong>rong> way is 9m. As per MoEF OM dated 7 th February 2012, the maximum<br />

height allowed is 15m but the proposed maximum height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building is 36m.<br />

2. Consent for water and drainage from competent authority are not yet obtained.<br />

Considering this, <strong>SEAC</strong> is con<strong>st</strong>rained to recommend the rejection <<strong>st</strong>rong>of</<strong>st</strong>rong> prior environment<br />

clearance to the proposal.<br />

Chairman<br />

52


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 16<br />

Subject: <strong>Environment</strong> clearance for proposed "Insignia"Residential Township Project at<br />

S.No. 25, 26 & 27, Sus, Tal. Mulshi, Di<strong>st</strong>. Pune by M/s Vilas Javdekar Eco Homes<br />

(File No. <strong>SEAC</strong> 2011/ CR-174 / TC2)<br />

PP was absent<br />

Chairman<br />

53


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 17<br />

Subject: <strong>Environment</strong> clearance for proposed Residential Project "Yashawant" on plot<br />

bearing Survey No. 911, Kasaba Bawada, New Tarabai Park, Behind Dream<br />

World Water Park by M/s. Vilas Javdekar Eco Homes<br />

(File No. <strong>SEAC</strong> 2011/ CR-168/ TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Yashwant – Expansion Project”<br />

Project Proponent M/s. Vilas Javdekar Eco Homes<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> consultants M/s. Saitech Research & Development Organization<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project Housing Project<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project Sr.No. 911, Kasaba Bawada, New Tarabai Park, Behind Dream World<br />

Water Park, Kolhapur- 416 006<br />

Whether in<br />

Corporation/<br />

Municipal/other area<br />

Kolhapur Municipal Corporation [KMC]<br />

Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

DCR<br />

KMC DCR<br />

Total Plot Area 19730 m 2<br />

Net Plot area 19730 m 2<br />

Net Permissible FSI 20716.50 m 2<br />

Proposed Built up area Exi<strong>st</strong>ing (Phase I & Phase II)<br />

(FSI & Non FSI)<br />

Total BUA area (m 2 ): 14,549.98 m 2<br />

Ground-coverage<br />

Percentage (%)<br />

Proposed (Phase III)<br />

Total BUA area (m 2 ): 17083.15 m 2<br />

Total (Phase I + Phase II + Phase III)<br />

• FSI area (m 2 ): 20716.50 m 2<br />

• Non FSI area m 2 ): 10916.63 m 2<br />

• Total BUA area : 31633.13 m 2<br />

30.93 %<br />

Chairman<br />

54


(Note: Percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

plot not open to sky)<br />

E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

No. <<strong>st</strong>rong>of</<strong>st</strong>rong> buildings & its<br />

configurations<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Rs. 35.30 Crores (Approx)<br />

Residential: - Total Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> Buildings = 6 nos.<br />

Bungalows = 33 no.<br />

Exi<strong>st</strong>ing:<br />

Phase I:<br />

16 Bungalows: G + 1<br />

2 Buildings: Stilt + 7 upper Floors<br />

Phase II:<br />

16 Bungalows: G + 1<br />

1 Building: Stilt + 7 upper Floors<br />

Proposed:<br />

Phase III:<br />

1 Bungalow: G + 1<br />

3 Buildings: Stilt + 7 upper Floors<br />

Total tenants: 313 nos.<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants and<br />

shops<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected Residential Population: 1565 persons<br />

residents / users<br />

Tenant density per 793.21 per hector<br />

hector<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building 24 m<br />

Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way (Width <<strong>st</strong>rong>of</<strong>st</strong>rong> 30 m. In addition fire protection and prevention sy<strong>st</strong>em is in<strong>st</strong>alled.<br />

the road from the<br />

neare<strong>st</strong> fire <strong>st</strong>ation to<br />

the proposed<br />

building(s))<br />

Turning radius for Min. 7.5m to Max 9m.<br />

easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />

tender movement from<br />

all around the building<br />

excluding the width for<br />

the plantation<br />

Exi<strong>st</strong>ing <strong>st</strong>ructure Phase I:<br />

16 Bungalows<br />

2 Buildings: Stilt + 7 upper Floors<br />

Phase II:<br />

16 Bungalows<br />

1 Building: Stilt + 7 upper Floors<br />

Chairman<br />

55


Total Water<br />

Requirement<br />

Rain Water<br />

Harve<strong>st</strong>ing (RWH)<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

have already been con<strong>st</strong>ructed because at that time Con<strong>st</strong>ruction Built up<br />

Area was below 20000 m 2<br />

Dry season:<br />

• Source: Kolhapur Municipal Corporation [KMC]<br />

• Fresh water : 141 m 3 /day<br />

• Recycled water (Flushing) : 70 m 3 /day<br />

• Recycled water (Gardening) : 15 m 3 /day<br />

• Total Water Requirement : 226 m 3 /day<br />

• Fire fighting : 75 m 3<br />

• Excess treated water : 96 m 3 /day<br />

Wet Season:<br />

• Source : Kolhapur Municipal Corporation [KMC]<br />

• Fresh water : 141 m 3 /day<br />

• Recycled water (Flushing) : 70 m 3 /day<br />

• Total Water Requirement : 211 m 3 /day<br />

• Fire fighting : 75 m 3<br />

• Excess treated water : 111 m 3 /day<br />

• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table : 6 m<br />

• Size and no <<strong>st</strong>rong>of</<strong>st</strong>rong> RWH pit(s) and Quantity: 9m x 9m x 2m – 1 nos.<br />

• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the RWH tank(s) : Near Building F<br />

• Size, no <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits and Quantity :<br />

Size <<strong>st</strong>rong>of</<strong>st</strong>rong> the recharge pit = 1.2 m x 1.2 m x 1.2 m<br />

No <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pit proposed = 16 Nos.<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

Capital Co<strong>st</strong>: 5 Lakhs<br />

O & M Co<strong>st</strong> per Annum: 0.5 Lakhs<br />

Storm water drainage • Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water : <<strong>st</strong>rong>61</<strong>st</strong>rong>9 m 3 /hr<br />

Sewage and Wa<strong>st</strong>e<br />

water<br />

Solid wa<strong>st</strong>e<br />

Management<br />

• Sewage generation : (1565 x 135lpcd x 0.9) = 190 m 3 /day<br />

• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP : 210 m 3 /day<br />

• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP: Underground.<br />

• DG sets (during emergency): 2 No. X 125 KVA<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>) :<br />

• Capital Co<strong>st</strong>: Rs. 40.00 Lakhs<br />

• O & M Co<strong>st</strong> per Annum: Rs. 1.00 Lakhs<br />

Wa<strong>st</strong>e generation in the Pre Con<strong>st</strong>ruction & Con<strong>st</strong>ruction phase:<br />

• Wa<strong>st</strong>e generation : 40 kg /day<br />

• Dry wa<strong>st</strong>e : 282 kg/day<br />

• Wet wa<strong>st</strong>e : 422 kg/day<br />

Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>e:<br />

• Dry wa<strong>st</strong>e : Handed over to authorized recycler for further handling and<br />

Chairman<br />

56


Decision:<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

disposal<br />

• Wet wa<strong>st</strong>e: Will be converted to compo<strong>st</strong> using Organic Wa<strong>st</strong>e Processor<br />

[OWP] model no. EPL 500<br />

• E – wa<strong>st</strong>e : Handed over to authorized Vendor<br />

• Hazardous wa<strong>st</strong>e : Handed over to authorized Vendor<br />

• STP Sludge (Dry sludge) : used as manure for gardening<br />

Area requirement:<br />

Total area provided for the <strong>st</strong>orage & Treatment <<strong>st</strong>rong>of</<strong>st</strong>rong> the solid wa<strong>st</strong>e : For EPL<br />

500 - 100 m 2<br />

Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

Capital Co<strong>st</strong> : 8 Lakhs<br />

O & M Co<strong>st</strong>: 3 Lakhs/Annum<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed.<br />

PP informed that Phase I and II <<strong>st</strong>rong>of</<strong>st</strong>rong> the project completed and occupied also. The project under<br />

consideration is in totality i.e. including exi<strong>st</strong>ing Phase I, Phase II and the proposed Phase III.<br />

During the presentation, <strong>SEAC</strong> noted that currently sewage from the site is disposed through<br />

septic tanks and soak pits. PP agreed to provide STP to take care <<strong>st</strong>rong>of</<strong>st</strong>rong> sewage <<strong>st</strong>rong>of</<strong>st</strong>rong> all three phases.<br />

1. Re<strong>st</strong>rict the maximum height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building to 15 m as per MoEF OM dated 7 th February<br />

2012, as the exi<strong>st</strong>ing right <<strong>st</strong>rong>of</<strong>st</strong>rong> way is 12 m.<br />

2. Consent for water and drainage from competent authorities.<br />

3. Clarify the applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> TDR and FSI as per Kolhapur DC Rules with relevant extract<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong> the rules.<br />

Full appraisal <<strong>st</strong>rong>of</<strong>st</strong>rong> the project will be taken up only after compliance <<strong>st</strong>rong>of</<strong>st</strong>rong> the above.<br />

Chairman<br />

57


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 18<br />

Subject: <strong>Environment</strong>al clearance for the proposed residential Scheme “Atria Grande” at<br />

S.No. 2/2/1, 2/1/1, 6/3/4 Autade Handewadi by M/s. Atria Con<strong>st</strong>ructions<br />

(File No. <strong>SEAC</strong> 2011/CR-981 /TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : Proposed residential Scheme “Atria Grande”<br />

Project Proponent : M/s. Atria Con<strong>st</strong>ructions<br />

Consultant : M/s. Saitech Research & Development Organization<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

: S.No. 2/2/1, 2/1/1, 6/3/4 Autade Handewadi<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Con<strong>st</strong>ruction project<br />

Category : 8(a) B2<br />

Previous<br />

consideration/s<br />

Whether in<br />

Corporation /<br />

Municipal / Other<br />

area<br />

Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

DCR<br />

Total plot area (Sq.m)<br />

Deductions<br />

Net plot area<br />

Permissible FSI<br />

(including TDR etc.)<br />

Proposed Built –UP<br />

Area (FSI & Non FSI)<br />

Ground – coverage<br />

percentage (%)<br />

(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

plot not open to sky)<br />

E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

58 th <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong><br />

Grampanchyat<br />

Town Planning<br />

31973.00 sq. m.<br />

5909.16 sq.m.<br />

26063.84 sq.m.<br />

28345.65 sq. m.<br />

• FSI area (Sq.m) :28330.06<br />

• Non FSI (Sq.m) :12239.78<br />

• Total BUA area (Sq.m) :40569.84<br />

30.77<br />

66 crores<br />

Chairman<br />

58


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />

configuration (s)<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />

and shops<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />

residents / users<br />

Tenant density per<br />

hector<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

building(s)<br />

Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way (width <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

the road from the<br />

neare<strong>st</strong> fire <strong>st</strong>ation to<br />

the proposed<br />

building(s))<br />

Turning radius for<br />

easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />

tender movement<br />

from all around the<br />

building excluding the<br />

width for the<br />

plantation<br />

Total Water<br />

Requirement<br />

Rain Water<br />

Harve<strong>st</strong>ing (RWH)<br />

Sewage and wa<strong>st</strong>e<br />

water<br />

05 buildings (A ,B, C, D, E,) each <<strong>st</strong>rong>of</<strong>st</strong>rong> 11 floors and<br />

01 building (F) <<strong>st</strong>rong>of</<strong>st</strong>rong> 9 floors.<br />

Provision for parking at ground floor for all buildings except<br />

Provision for additional parking in <strong>st</strong>ilt at building C.<br />

494<br />

2470<br />

787<br />

250 Tenements/ Hectare x 31495.17/10000<br />

Building A P+11 34.20 m<br />

Building B P+11 34.20 m<br />

Building C B+P+11 36.00 m<br />

Building D P+11 34.20 m<br />

Building E P+11 34.20 m<br />

Building F P+9 28.50 m<br />

• 24.0 m wide RP road connects to Saswad Katraj State<br />

Highway<br />

• The neare<strong>st</strong> fire <strong>st</strong>ation is located in the Hadapsar Indu<strong>st</strong>rial<br />

E<strong>st</strong>ate which is approximately 5.0 Km drive from the<br />

proposed site<br />

7.5m<br />

Dry Season Wet Season<br />

Fresh Water (CMD) 224.55 224.55<br />

Recycled Water<br />

(CMD)<br />

147.09 111.15<br />

Total 371.64 335.7<br />

Swimming Pool 0 0<br />

Fire Fighting 250 250<br />

• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table : 8~10 M<br />

• Size, no <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits and Quality : 2m wide * 3 m<br />

deep - 5 Nos.<br />

• Budgetary allocation ( Capital co<strong>st</strong> and O & M co<strong>st</strong>) :<br />

Capital Co<strong>st</strong> –Rs 5.15 Lakhs<br />

O&M -Rs 2500/month<br />

• Sewage generation (CMD) :302.13<br />

• STP technology :Fludised Aerobic Bed reactor<br />

Chairman<br />

59


Solid wa<strong>st</strong>e<br />

Management<br />

Green Belt<br />

Development<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD) :305<br />

• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP :South Ea<strong>st</strong> corner <<strong>st</strong>rong>of</<strong>st</strong>rong> Project<br />

DG sets (during emergency) :1 * 200 KVA<br />

• Budgetary allocation (Capital co<strong>st</strong> and O & M co<strong>st</strong>) =<br />

Capital Co<strong>st</strong> : Rs 50 Lakhs<br />

O& M Co<strong>st</strong> : Rs 82000/ month<br />

Wa<strong>st</strong>e generation in the pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction<br />

phase:<br />

• Wa<strong>st</strong>e generation :- Excavated soil will be used for leveling<br />

• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> the top soil to be preserved: 3909.45 cu m <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

excavated topsoil shall be preserved for future use in green<br />

areas.<br />

• Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> the con<strong>st</strong>ruction way debris: No debris<br />

Wa<strong>st</strong>e generation in the operation phase:<br />

• Dry wa<strong>st</strong>e (Kg/day):444.6 kg/day<br />

• Wet wa<strong>st</strong>e (Kg/day): 666.9 kg/day<br />

• STP Sludge (Dry sludge) (Kg/day):20.7 Kg/day<br />

Mode Of Disposal<br />

Dry wa<strong>st</strong>e (Kg/day): Sent to Kabadiwada<br />

• Wet wa<strong>st</strong>e (Kg/day): Converted to compo<strong>st</strong> by Mechanical<br />

Method<br />

Budgetary allocation( capital Co<strong>st</strong> & O&M co<strong>st</strong>):<br />

Capital co<strong>st</strong> : Rs 9 Lakhs<br />

O & M co<strong>st</strong> : Rs 30,000 per month<br />

• Total RG area:<br />

1. RG area other than green belt ((please specify for<br />

playground,etc) : 1743.23sq.m.( Jogging<br />

Track+ Sand Pit + Pebble Walkway+ Pathways +<br />

Basket Ball court + Amphitheatre + Pergola Seating)<br />

2. Specify the details<br />

• RG on the ground (sq.m) : 5990 sq m<br />

Energy Power Supply:<br />

• Maximum demand – 1976 KW + 365 KW = 2341 KW<br />

• Connected Demand – 5457 KW<br />

• Source –MSDECL<br />

Energy saving by non-conventional method:<br />

• Solar energy will be used for landscape lighting.<br />

• The controls <<strong>st</strong>rong>of</<strong>st</strong>rong> all the electrical points in the flats will be<br />

provided at the entrance with the provision <<strong>st</strong>rong>of</<strong>st</strong>rong> the Key Tag<br />

Switch.<br />

• All Fluorescent lights (used in common areas) with<br />

• Electronic balla<strong>st</strong> in place <<strong>st</strong>rong>of</<strong>st</strong>rong> Copper chokes & Tube - T5<br />

type, in place <<strong>st</strong>rong>of</<strong>st</strong>rong> T8 type, to reduce the power consumption<br />

by 10 watts per lamp.<br />

Chairman<br />

60


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Minimized voltage drop in long cables.<br />

• Lighting control sy<strong>st</strong>ems will be used to control parking area<br />

lights.<br />

• Detail calculations & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving: 9.37%<br />

• Compliance <<strong>st</strong>rong>of</<strong>st</strong>rong> the ECBC guidelines: Yes<br />

• Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>)<br />

Capital Co<strong>st</strong> – 10.0 Lakhs (Solar Lighting)<br />

O & M Co<strong>st</strong> – 0.2 Lakhs/annum (Solar Lighting)<br />

DG Set:<br />

• Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used – 1x200<br />

KVA<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used – Diesel<br />

Traffic Management Parking details:<br />

• Total parking area : 8333.60 sq.m.<br />

• Difference between the parking area mentioned and actual<br />

available<br />

• Area per car :<br />

• 2- wheeler :3.00 sq.m.<br />

• Cycle : 1.40 sq.m.<br />

• 4-wheeler :20.0 sq.m.<br />

Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal road(m): 9m (minimum)<br />

<strong>Environment</strong>al<br />

Management plan<br />

Budgetary<br />

Allocation<br />

Decision:<br />

Con<strong>st</strong>ruction Phase ( With break up):<br />

1 Water for du<strong>st</strong> supression 5,40,000.00<br />

2 Site Sanitation & Safety Measures 5,00,000.00<br />

3 Disinfection 3,60,000.00<br />

4 Health Check up 6,00,000.00<br />

5 Site Barracading 12,00,000.00<br />

Rs<br />

Operation Phase ( With break up):<br />

32,00,000.00<br />

Sr. No Parameter Capital Co<strong>st</strong> O&M Co<strong>st</strong><br />

1 STP Co<strong>st</strong> Rs 50,00,000.00 Rs 82000.00/ month<br />

2 RWH Rs 5,15,000.00 Rs 2500.00 / month<br />

3 WTP Rs 8,00,000.00 Rs 41000.00/ month<br />

4 Solar Lighting Rs 10,00,000.00 Rs. 500/ month<br />

5 Gardening Rs 33,00,000.00 Rs 22,000.00 / month<br />

6 Solid wa<strong>st</strong>e management Rs 9,00,000.00 Rs 30,000/ month<br />

7 Safety and firefighting Rs 24,00,000.00 Rs 9,000.00/ month<br />

Total Rs 1,39,15,000.00 Rs 1,87,000.00 / month<br />

Rs 22,44,000/ annum .<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed. It is noted that PP complied with the observations made in the 58 th <strong>SEAC</strong> <strong>meeting</strong>.<br />

Chairman<br />

<<strong>st</strong>rong>61</<strong>st</strong>rong>


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

<strong>SEAC</strong> decided to recommend the proposal for <strong>Environment</strong>al <strong>Clearance</strong> only after complying<br />

with the following conditions:<br />

1. There is a proposal for a DP road <<strong>st</strong>rong>of</<strong>st</strong>rong> 24 m. PP has given an undertaking, vide their letter 2 nd<br />

September, 2012, that they will con<strong>st</strong>ruct the 24 m DP road at their own co<strong>st</strong>, if not done by<br />

local authority. Occupation Certificate shall be issued only after the completion <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

con<strong>st</strong>ruction <<strong>st</strong>rong>of</<strong>st</strong>rong> 24 m DP road.<br />

2. Submit supporting documents, drawings and recent photographs to the claim that drainage<br />

line is connected to an exi<strong>st</strong>ing public drainage network and water supply line is also<br />

available near the proposed site.<br />

3. Submit li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> species large/ tall tree (total <<strong>st</strong>rong>of</<strong>st</strong>rong> 510) in<strong>st</strong>ead <<strong>st</strong>rong>of</<strong>st</strong>rong> small/ dwarf trees/ shrubs.<br />

Chairman<br />

62


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 19<br />

Subject: TOR for the proposed indu<strong>st</strong>rial project at At Plot No. F-24, M.I.D.C., Gondia<br />

Indu<strong>st</strong>rial Area, Village- Mundipar, Tahsil-Tumsar, Di<strong>st</strong>rict- Gondia by M/s<br />

Vidhya Minerals & Processors<br />

(File No. <strong>SEAC</strong> 2011/ CR-976/ TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project Proposed mineral benefication indu<strong>st</strong>rial project<br />

Project Proponent M/s Vidhya Minerals & Processors<br />

Consultant MITCON Consultancy & Engineering Services Ltd<br />

New Project / Expansion New Project<br />

in exi<strong>st</strong>ing project/<br />

Modernization/<br />

Diversification in exiting<br />

project<br />

Activity schedule in the 2(b), B2<br />

EIA Notification<br />

Area Details • Total plot area (sq. m.): 2100<br />

• Built up area (Sq. m.): 325.25<br />

•<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Notified GONDIA MIDC Area<br />

Indu<strong>st</strong>rial area / MIDC<br />

area<br />

E<strong>st</strong>imated capital co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> 25 Lakhs<br />

the Project (including<br />

co<strong>st</strong> for land, building,<br />

plant and machinery<br />

separately)<br />

Location details <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

the project :<br />

Di<strong>st</strong>ance from Protected<br />

Areas / Critically<br />

Polluted<br />

areas / Eco-sensitive<br />

areas<br />

• Latitude : 21 0 28’20.06”N<br />

• Longitude : 80 0 08’02.33”E<br />

• Location : At Plot No. F-24, M.I.D.C., Gondia Indu<strong>st</strong>rial Area,<br />

Village- Mundipar, Tahsil-Gondia, Di<strong>st</strong>rict- Gondia<br />

• Elevation above Mean Sea Level: 315 meter<br />

There are no Protected areas / Critically polluted areas / Eco-<br />

Sensitive areas/ inter-<strong>st</strong>ate boundaries within 10 Km radial area<br />

Chairman<br />

63


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

/ inter-State boundaries<br />

Raw materials<br />

(including<br />

process chemicals,<br />

cataly<strong>st</strong>s, & additives).<br />

Production details<br />

Process details /<br />

manufacturing details<br />

Total Water<br />

Requirement<br />

Sewage generation and<br />

treatment<br />

Solid wa<strong>st</strong>e Management<br />

Li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

raw<br />

materials<br />

to<br />

be used<br />

Manganese<br />

Ore<br />

‘Physical<br />

and<br />

chemical<br />

nature <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

raw<br />

material<br />

Lumps or<br />

fines<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Products,<br />

By products and<br />

Intermediate<br />

Products<br />

Main Products<br />

1. Manganese Oxide<br />

2. Manganese Di-Oxide<br />

By-Products<br />

Intermediate<br />

Products<br />

1. Jigging<br />

2. Roa<strong>st</strong>ing (Reuction)<br />

Chairman<br />

64<br />

‘Quantity<br />

(tonnes/<br />

year) full<br />

production<br />

capacity<br />

Source<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong><br />

materials<br />

6000 Nearby<br />

Mines<br />

Exi<strong>st</strong>ing<br />

(T/Year)<br />

0<br />

0<br />

Nil<br />

Proposed<br />

activity<br />

(new/<br />

modernization/<br />

expansion)<br />

(T/Year)<br />

3000<br />

1500<br />

Nil<br />

Total water requirement:<br />

• Fresh water (CMD) : 7 & Source: MIDC<br />

• Recycled water (CMD): 5<br />

Use <<strong>st</strong>rong>of</<strong>st</strong>rong> the water:<br />

• Process (CMD): 3<br />

• Du<strong>st</strong> Suppression (CMD): 2<br />

• Drinking (CMD): 0.8<br />

• Green belt (CMD): 1<br />

• Others (CMD): 0.2<br />

Means <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

transportation<br />

(Source to<br />

<strong>st</strong>orage<br />

site) with<br />

ju<strong>st</strong>ification<br />

By Tarpaulin<br />

covered truck<br />

Total<br />

(T/Year)<br />

3000<br />

1500<br />

• Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> sewage generation (CMD) :0.6<br />

• Proposed treatment for the sewage : Septic tanks followed by Soak<br />

Pits<br />

Sr. Source Qty Form Composition<br />

Nil


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Atmospheric Emissions<br />

(Flue gas characteri<strong>st</strong>ics<br />

SPM, SO2, NOX, CO,<br />

etc.)<br />

Stack emission Details:<br />

<strong>Environment</strong>al<br />

Management plan<br />

Budgetary Allocation<br />

Decision:<br />

No<br />

1. Raw water<br />

treatment<br />

plant<br />

Chairman<br />

65<br />

(TPM)<br />

(Sludge / Dry /<br />

Slurry etc.)<br />

-- -- --<br />

2. ETP -- -- --<br />

3. Process 50<br />

(Tailings)<br />

4. Spent<br />

Cataly<strong>st</strong><br />

5. Oily<br />

Sludge<br />

6. Others like<br />

Battery<br />

wa<strong>st</strong>e,<br />

ewa<strong>st</strong>e<br />

etc (Pl.<br />

Specify)<br />

Sr. Pollutant<br />

No.<br />

Fines Silica,<br />

Aluminium<br />

etc<br />

-- -- --<br />

-- -- --<br />

-- -- --<br />

Source<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong><br />

Emission<br />

Emission<br />

rate<br />

(kg/hr)<br />

Concentration<br />

in flue gas<br />

(g/sec)<br />

1 SPM Stack 0.125 0.035<br />

2 SO2 Stack Below<br />

detectable<br />

limit<br />

Below<br />

detectable<br />

limit<br />

3 NOX Stack Concentration in flue gas will<br />

be 100 mg/Nm 3<br />

4 CO Stack NA NA<br />

Plant<br />

Section<br />

& units<br />

Stack<br />

No.<br />

Height<br />

from<br />

ground<br />

level<br />

(m)<br />

Internal<br />

Diameter<br />

(Top)(m)<br />

Emission<br />

Rate<br />

(kg /hr)<br />

Temp.<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong><br />

Exhau<strong>st</strong><br />

Gases<br />

( 0 C)<br />

Roa<strong>st</strong>ing<br />

Furnace<br />

30 0.2 0.125 120<br />

• Green belt area (Sq. m.): 1000<br />

• Number and species <<strong>st</strong>rong>of</<strong>st</strong>rong> trees to be planted : 75<br />

1 <strong>st</strong>


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed.<br />

PP clarified that they decided to drop Ferro manganese from their proposed product li<strong>st</strong> and<br />

submitted the revised forms accordingly.<br />

<strong>SEAC</strong> decided to recommend the proposal for <strong>Environment</strong>al <strong>Clearance</strong> only after complying<br />

with the following conditions:<br />

1. Submit a copy <<strong>st</strong>rong>of</<strong>st</strong>rong> the approved layout<br />

2. Submit revised green belt plan with large broad leaf trees (#100) all around the boundary.<br />

Chairman<br />

66


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 20<br />

Subject: <strong>Environment</strong> clearance for manufacturing Bulk drugs/ Active pharmaceuticals<br />

intermediates by M/s. Precise Chemipharma Pvt. Ltd<br />

(File No. <strong>SEAC</strong> 2011/ CR-164 / TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project Bulk Drugs & Intermediates<br />

Project Proponent M/s. Precise Chemipharma Pvt. Ltd<br />

Name, address, e-mail &<br />

contact number <<strong>st</strong>rong>of</<strong>st</strong>rong> Consultant<br />

Project proponent Present the case<br />

New Project / Expansion in<br />

exi<strong>st</strong>ing<br />

project/Modernization/Divers<br />

ification in exiting project<br />

New Project<br />

Activity schedule in the EIA<br />

Notification<br />

5 (f) , B-2<br />

Area Details • Total plot area (sq. m.): 2013 Sq. Mt.<br />

• Built up area (Sq. m.): 1599 Sq. Mt.<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Notified MIDC TTC Pawane, Navi Mumbai<br />

Indu<strong>st</strong>rial area / MIDC area<br />

E<strong>st</strong>imated capital co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

Project (including co<strong>st</strong> for<br />

land, building, plant<br />

and machinery separately)<br />

1.71 Crs.<br />

Location details <<strong>st</strong>rong>of</<strong>st</strong>rong> the • Latitude : 19<br />

project :<br />

0 04’ 43.46” N<br />

• Longitude: 73° 01’ 46.58” E<br />

• Location: TTC Indu<strong>st</strong>rial Area<br />

• Elevation above Mean Sea Level (meters): 108 Ft<br />

Production details Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Exi<strong>st</strong>ing Proposed Total<br />

Products, By (T/Year) Activity (new/ (T/Year)<br />

products and<br />

modernization<br />

Intermediate<br />

/ expansion)<br />

Products<br />

(T/Year)<br />

Zolpidem<br />

Tartrate<br />

NA<br />

3.0 MT 3.0 MT<br />

Clonazepam NA 0.6 MT 0.6 MT<br />

Lorazepam NA 0.6 MT 0.6 MT<br />

Illaprazole NA 3.0 MT 3.0 MT<br />

Febuxo<strong>st</strong>at NA 6.0 MT 6.0 MT<br />

Levoclopera<strong>st</strong>i<br />

ne Fendizoate<br />

NA<br />

6.0 MT 6.0 MT<br />

Zaltopr<<strong>st</strong>rong>of</<strong>st</strong>rong>en NA 6.0 MT 6.0 MT<br />

Chairman<br />

67


Rain Water Harve<strong>st</strong>ing<br />

(RWH)<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table: 6 Mt<br />

• Size, nos <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits and Quantity: 4 Nos. 3.14 x 2.2 x 3.5<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>): 1 Lac.<br />

Total Water Requirement Total water requirement: 35 CMD<br />

• Fresh water (CMD): 35 & Source: MIDC<br />

• Recycled water (CMD): 0<br />

Sewage generation and<br />

treatment<br />

Use <<strong>st</strong>rong>of</<strong>st</strong>rong> the water:<br />

• Process (CMD):17.3 CMD<br />

• Cooling water (CMD):12 CMD<br />

• DM Water (CMD): Nil<br />

• Cleaning: 4 CMD<br />

• Drinking (CMD): 1 CMD<br />

• Green belt (CMD): 0.7 CMD<br />

• Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> sewage generation (CMD): 0.9 CMD<br />

• Proposed treatment for the sewage: Septic Tank fallowed by Soak<br />

Pit<br />

Effluent characteri<strong>st</strong>ic Sr. No Parameters Inlet Treated Unit<br />

1. pH 7-8 5.5-9.0<br />

2. COD 2000 250 Mg/lit<br />

3. BOD 1200 100 Mg/lit<br />

4. Suspended solids 500 100 Mg/lit<br />

5. Oil & Grease 10-15 10 Mg/lit<br />

ETP details • Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> effluent generation (CMD): 18.17 CMD<br />

• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the ETP (CMD): 20 CMD<br />

• Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> treated effluent recycled (CMD):16 CMD<br />

Note on ETP technology to<br />

be used<br />

• Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> water send to the CETP (CMD): 16 CMD<br />

Effluent Treatment Process & Operations:<br />

• Effluent from various <strong>st</strong>reams and washings and blow down is<br />

collected in a partitioned collection tank.<br />

• This is fed to neutralization tank A or B. These will be <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

capacity 10 m3 each Dimensions shall be 2.0 m x 2 m x 2.5<br />

m SWD with 0.5 m free boards. This will be <<strong>st</strong>rong>of</<strong>st</strong>rong> RCC<br />

con<strong>st</strong>ruction.<br />

• When tank A is full effluent is pumped to tank B and vice<br />

versa.<br />

• Filled tank A or B is subjected to pH correction /<br />

neutralization.<br />

• The neutralization <<strong>st</strong>rong>of</<strong>st</strong>rong> acidic effluent will be carried out with<br />

Lime and sodium Hydroxide.<br />

• During neutralization compressed air is used for aeration in<br />

Tank [A] and [B].<br />

• Suspended solids will be settled in primary settling tank. It<br />

Chairman<br />

68


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> the ETP sludge Dispose to CHWTSDF<br />

will be <<strong>st</strong>rong>of</<strong>st</strong>rong> 4 m3 capacity with dimensions <<strong>st</strong>rong>of</<strong>st</strong>rong> 1.75 m dia X 1.5<br />

m SWD. It will have a hopper <<strong>st</strong>rong>of</<strong>st</strong>rong> 0.75 m height. 0.3 m free<br />

board will be provided. It shall be <<strong>st</strong>rong>of</<strong>st</strong>rong> M S epoxy con<strong>st</strong>ruction.<br />

• The sludge separated will be used for land filling.<br />

• After settling the effluent shall overflow to bio-reactor. It will<br />

be <<strong>st</strong>rong>of</<strong>st</strong>rong> capacity 20 m 3 . Dimensions shall be 4 m x 2.5 m x 2.5<br />

m SWD with 0.5 m free boards. This will be <<strong>st</strong>rong>of</<strong>st</strong>rong> RCC<br />

con<strong>st</strong>ruction. Air supply shall be through diffused aeration<br />

sy<strong>st</strong>em and an air blower <<strong>st</strong>rong>of</<strong>st</strong>rong> suitable capacity.<br />

• Mixed liquor from bioreactor will be passes on to secondary<br />

settling tank where biomass will be settled and returned to bio<br />

reactor. Its dimensions shall be 1.75 m dia X 1.5 m SWD . It<br />

will have hopper bottom <<strong>st</strong>rong>of</<strong>st</strong>rong> 0.7 m height.<br />

• Sludge from primary settling tank and secondary settling tank<br />

shall be wa<strong>st</strong>ed on sludge drying beds. These will be <<strong>st</strong>rong>of</<strong>st</strong>rong> two<br />

nos. with size 1.5 m x 1.5 m in Brick work con<strong>st</strong>ruction.<br />

• Overflow from secondary settling tank shall be collected in an<br />

intermediate tank. From here it will be send to tertiary<br />

treatment.<br />

• For tertiary treatment one pressure sand filter <<strong>st</strong>rong>of</<strong>st</strong>rong> size 200 mm<br />

dia and height 1200 mm and carbon filter <<strong>st</strong>rong>of</<strong>st</strong>rong> same dimensions<br />

will be used. These will be filled with filter media and<br />

activated carbon.<br />

• The clear effluent will be discharged to common effluent<br />

treatment plant.<br />

Chairman<br />

69


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Solid wa<strong>st</strong>e Management Sr.<br />

N<br />

Atmospheric Emissions (Flue<br />

gas characteri<strong>st</strong>ics (SPM,<br />

SO2, NOx, CO, etc.)<br />

Stack emission Details:<br />

(All the <strong>st</strong>acks attached to<br />

process units, Boilers,<br />

captive power plant, D.G.<br />

Sets, Incinerator both for<br />

exi<strong>st</strong>ing and proposed<br />

activity). Please indicate the<br />

specific section to which the<br />

<strong>st</strong>ack is attached. e.g.:<br />

Process section, D.G. Set,<br />

Boiler, Power Plant,<br />

incinerator etc. Emission rate<br />

(kg/hr.) for each pollutant<br />

o.<br />

1 Raw water<br />

Treatment<br />

plant<br />

Source Qty<br />

(TPM)<br />

2 ETP 15<br />

Kg/Mo<br />

Chairman<br />

70<br />

Form (Sludge /<br />

Dry / Slurry etc.)<br />

Compositi<br />

on<br />

Nil Nil Nil<br />

nth<br />

3 Process 35<br />

Kg/Mo<br />

nth<br />

Sludge Chemical<br />

Residue &<br />

Wa<strong>st</strong>e<br />

4 Spent Cataly<strong>st</strong> Nil Nil Nil<br />

5 Oily Sludge 10<br />

lit/mont<br />

h<br />

Wa<strong>st</strong>e Oil -<br />

6 Activated 150 Dry -<br />

Carbon Kg/Mo<br />

nth<br />

Sr.<br />

No.<br />

Pollutant Source<br />

Of<br />

Emissio<br />

n<br />

Emission Rate<br />

(kg/hr)<br />

1 SPM Boiler &<br />

DG Set<br />

2 SO2 Boiler &<br />

DG Set<br />

36 kg/day<br />

3 NOx Boiler &<br />

DG Set<br />

4 CO Boiler &<br />

DG Set<br />

5 Others -<br />

Plant Stac Height Internal Emissio<br />

Section k From Diameter n<br />

& units No. ground<br />

level (m)<br />

(Top)(M) Rate<br />

Boiler 1 12 m 275 m Dia 36<br />

kg/day<br />

DG Set 2 9 m 150 mm<br />

Dia<br />

-<br />

Concentrat<br />

ion in flue<br />

gas (g/m3)<br />

Negligible Negligible<br />

Negligible Negligible<br />

Negligible Negligible<br />

SO2<br />

0.66<br />

kg/day<br />

SO2<br />

Temp. <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

Exhau<strong>st</strong><br />

Gases<br />

120 0 C


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

(SPM, SO2, NOx etc. should<br />

be specified<br />

Emission Standard Pollutant<br />

s<br />

(SPM,SO<br />

2..etc)<br />

Chairman<br />

71<br />

Emission<br />

Standard<br />

Limit<br />

(mg/Nm3)<br />

Propose<br />

d limit<br />

(mg/Nm<br />

3)<br />

MPCB<br />

Consent<br />

(mg/Nm3)<br />

SPM 200 250 150<br />

SO2 -- 280<br />

kg/day<br />

--<br />

RSPM Included in Included Included in<br />

SPM in SPM SPM<br />

NOX Negligible Negligib<br />

le<br />

Negligible<br />

CO Negligible Negligib<br />

le<br />

Negligible<br />

Ambient Air Quality Data Pollutant Permissible Proposed Remarks<br />

Standard Concentration<br />

(in<br />

(in<br />

µ/m3.) µ/m3.)<br />

SPM 200


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

<strong>Environment</strong>al Management<br />

plan Budgetary Allocation<br />

Decision:<br />

1 Air<br />

control<br />

sy<strong>st</strong>em<br />

NA Stack<br />

2 Water NA ETP<br />

3 Noise NA Acou<strong>st</strong>ic<br />

enclosure to<br />

DG<br />

4 Solid Wa<strong>st</strong>e NA CHWTSDF<br />

• Capital co<strong>st</strong> (With break up): 6.35 Lacs<br />

• O&M co<strong>st</strong> (With break up): Rs 3.45 Lacs<br />

# PARTICULARS CAPITAL COST<br />

1. For Air Pollution Control<br />

Scrubber & Stacks<br />

Rs. 1,25,000<br />

2. For Water Pollution Control<br />

Co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> ETP<br />

Rs. 5,00,000<br />

3. For Noise Pollution Control<br />

Acou<strong>st</strong>ic Enclosures for D.G.<br />

Sets<br />

Rs.25,000<br />

4. For Soil Pollution Control Rs.20,000<br />

5<br />

(Solid/HW)<br />

Gardening Rs.15,000<br />

Total Rs. 6,85,000.00<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed. Considering the project size and products, <strong>SEAC</strong> appraised the project under<br />

Categeory B2.<br />

<strong>SEAC</strong> noted that MPCB granted consent to e<strong>st</strong>ablished to the project and civil work was<br />

completed accordingly. <strong>SEAC</strong> further noted that it is a GMP (Good Manufacturing Process) unit,<br />

as per FDA norms.<br />

<strong>SEAC</strong> decided to recommend the proposal for <strong>Environment</strong>al <strong>Clearance</strong> only after complying<br />

with the following observations:<br />

1. Minimize the water loss in indu<strong>st</strong>rial process as it is almo<strong>st</strong> 50%<br />

2. Submit package ETP details along with influent and effluent parameters.<br />

3. Submit green belt plan with 50 evergreen, large, broad leaf trees along the boundary <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

plot.<br />

4. Relocate the fir<strong>st</strong> aid room from the current location (below <strong>st</strong>aircase) and open the<br />

<strong>st</strong>aircase for exit.<br />

Chairman<br />

72


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 21<br />

Subject: TOR for Proposed Re heating furnace [Capacity 20000(MT/M)], mechanical<br />

rolling <strong>st</strong>ations at Plot No. E-12, Butibori MIDC,Di<strong>st</strong>t.Nagpur by M/s.<br />

Shardashree Ispat Ltd<br />

(File No. <strong>SEAC</strong> 2011/CR-518 /TC2)<br />

PP was absent<br />

Chairman<br />

73


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 22<br />

Subject: TOR for Proposed con<strong>st</strong>ruction <<strong>st</strong>rong>of</<strong>st</strong>rong> earthen dam and allied works at (1) Chondhi L<br />

M I project Tal Sangrampur, Di<strong>st</strong> Buldhana, (2) Darangwadi (Ijad), Tal Chikhali,<br />

Di<strong>st</strong> Buldhana (ii) Alewadi, Tal Sangrampur, Di<strong>st</strong> Buldhana (iv) Durgbori Tal<br />

Mehakarr, Di<strong>st</strong> Buldhana, (v) Kacheri LMI project at village Sonala, Di<strong>st</strong><br />

Sangrmpur, Di<strong>st</strong> Buldhana by M/s. Executive Engineer, Minor Irrigation Division,<br />

Buldhana.<br />

(File No. <strong>SEAC</strong> 2412/CR-224 /TC2)<br />

PP was absent<br />

Chairman<br />

74


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 23<br />

Subject: <strong>Environment</strong> clearance for residential Con<strong>st</strong>ruction Project "Hills & Dales Phase<br />

III" at S.No. 13(P), 14(P), 15(P) & 19(P) Village Undri, Tal. Haveli, Di<strong>st</strong>. Pune by<br />

M/s. Ankit Enterprises.<br />

(File No. <strong>SEAC</strong> 2011/CR-170 /TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : Hills & Dales<br />

Project Proponent : M/s. Ankit Enterprises<br />

Consultant : M/s. Mahabal Environ Engineers Pvt. Ltd<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the project : S. No. 13 (P), 14(P), 15(P) & 19 (P)<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Housing project<br />

Category : 8 (a), B2<br />

Whether in<br />

Corporation /<br />

Municipal / Other<br />

area<br />

Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

DCR<br />

Total plot area (Sq.m)<br />

Deductions<br />

Net plot area<br />

Permissible FSI<br />

(including TDR etc.)<br />

Proposed Built –UP<br />

Area (FSI & Non FSI)<br />

Ground – coverage<br />

percentage (%)<br />

(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

plot not open to sky)<br />

E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />

configuration (s)<br />

Town Planning<br />

Town Planing<br />

1,30,100.00<br />

10,300.00<br />

1,19,800.00<br />

1<br />

• FSI area (sq. m.): 80,263.04<br />

• Non FSI area (sq. m.): 34,456.00 + Amenity 13,526.92 sq.m<br />

• Total BUA area (sq. m.): 1,28,245.96<br />

21%<br />

176 Cr<br />

16 No. P+7 & 2P+12 with 1 and 2 BHK apartments with amenity<br />

development with School, Dispensary & community Hall<br />

Chairman<br />

75


Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />

and shops<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />

residents / users<br />

Tenant density per<br />

hector<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

building(s)<br />

Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Turning radius for<br />

easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />

tender movement<br />

from all around the<br />

building excluding the<br />

width for the<br />

plantation<br />

Total Water<br />

Requirement<br />

Rain Water<br />

Harve<strong>st</strong>ing (RWH)<br />

586 Tenements<br />

5625<br />

45<br />

P + 7: 23.95 m<br />

2P + 12: 36 m<br />

15 m<br />

7.5 m<br />

Dry season:<br />

• Fresh water (CMD): 312 &<br />

Source: PMC through Undri Grampanchayat<br />

• Recycled water (CMD): 285<br />

• Total Water Requirement (CMD): <<strong>st</strong>rong>61</<strong>st</strong>rong>9<br />

• Swimming pool make up (Cum): 3<br />

• Fire fighting (Cum): 200<br />

Wet Season:<br />

• Fresh water (CMD): 318 &<br />

Source: PMC through Undri Grampanchayat<br />

• Recycled water (CMD): 208<br />

• Total Water Requirement (CMD): 517<br />

• Swimming pool make up (CMD): 3<br />

• Fire fighting (CMD): 200<br />

• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table: 6m<br />

• Size, no <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits and Quantity: 2m Length X 0.9 m width, 26 No<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

Capital co<strong>st</strong>: 6,50,000/-<br />

O&M co<strong>st</strong>: 15,000/- p.a.<br />

Strom water drainage • quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water : 46965 KL/yr<br />

• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD: 300 to 600 mm<br />

Sewage and wa<strong>st</strong>e • Sewage generation (CMD) : 489<br />

water<br />

• STP technology: Extended Aeration Sy<strong>st</strong>em<br />

• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD) :<br />

STP I: 395 & STP II: 105<br />

• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP : Plan enclosed<br />

• DG sets (during emergency): 160 KVA X 1 No.<br />

Chairman<br />

76


Solid wa<strong>st</strong>e<br />

Management<br />

Green Belt<br />

Development<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

Capital Co<strong>st</strong>: 62,00,000/-<br />

O & M Co<strong>st</strong>: 12,00,000/- p.a.<br />

Wa<strong>st</strong>e generation in the Pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction phase:<br />

• Wa<strong>st</strong>e generation<br />

• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> the top soil to be preserved: 11000 CUM<br />

• Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> the con<strong>st</strong>ruction way debris: Land filling on the same site<br />

Wa<strong>st</strong>e generation in the operation Phase:<br />

• Dry wa<strong>st</strong>e (Kg/day): 649<br />

• Wet wa<strong>st</strong>e (Kg/day): 1104<br />

• STP Sludge (Dry sludge) (Kg/day): 70<br />

Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>e:<br />

• Dry wa<strong>st</strong>e: Through Authorized vendors<br />

• Wet wa<strong>st</strong>e: OWC<br />

•Total Area: 227 Sq. m<br />

Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

Capital Co<strong>st</strong>: 9,00,000/-<br />

O&M co<strong>st</strong> : 50,000/-p. a<br />

Total RG area:<br />

RG area on ground:17, 064.8 sq.m<br />

Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

Capital co<strong>st</strong>: 1,00,00,000/-<br />

O&M co<strong>st</strong>: 60,00,000/- p.a.<br />

Energy Power supply:<br />

• Maximum demand : 2400 KW<br />

• Connected load : 2400 KW<br />

• Source : MSEDCL<br />

Energy saving by non-conventional method:<br />

• Energy saving measures<br />

1. Using CFL in Parking area, lift-lobby and <strong>st</strong>air-case.<br />

2. Using Low Wattage CFL in Place <<strong>st</strong>rong>of</<strong>st</strong>rong> Metal Halide in External Lights.<br />

3. Providing Solar Water Heater in each flat.<br />

Thus total energy saving will be 4060.12 unit/ day<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

Capital co<strong>st</strong>: 65,00,000/-<br />

O&M co<strong>st</strong>: 85,000/- p.a.<br />

DG Set:<br />

• Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used :<br />

160 KVA (1No)<br />

• Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used : Diesel<br />

Traffic Management Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> the junction to the main road & design <<strong>st</strong>rong>of</<strong>st</strong>rong> confluence: 1 No.<br />

Parking details:<br />

• Total Parking area : 20,800.80 Sq m<br />

• Area per car<br />

• 2-Wheelar : 1346 No.<br />

• 4-Wheeler : 704 No.<br />

Chairman<br />

77


<strong>Environment</strong>al<br />

Management plan<br />

Budgetary<br />

Allocation<br />

Decision:<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Bicycles: 1694<br />

• Public Transport<br />

Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal roads (m): 24 m &12 m<br />

Con<strong>st</strong>ruction phase (with Break-up):<br />

• Capital co<strong>st</strong><br />

STP : 62,00,000/-<br />

RWH : 6,50,000/-<br />

OWC : 9,00,000/-<br />

Landscape : 1,00,00,000/-<br />

Renewable Energy use : 62,00,000/-<br />

TOTAL: 2,39,50,000/-<br />

Operation Phase (with Break-up)-<br />

• O&M co<strong>st</strong> (Please ensure manpower and other details)<br />

STP : 12,00,000/-<br />

RWH : 15,000/-<br />

OWC : 50,000/-<br />

Landscape : 60,00,000/-<br />

Renewable Energy use : 85,000/-<br />

TOTAL: 73,50,000/-<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed.<br />

PP informed that this is an expansion project and some con<strong>st</strong>ruction done as per accorded EC.<br />

However <strong>SEAC</strong> noted that PP has modified the approved layout, including relocation <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

buildings, without obtaining amendment to the accorded EC. <strong>Environment</strong> Department may look<br />

into the matter regarding possible violation and take appropriate action.<br />

The proponent is directed to comply with the following observations:<br />

1. Submit approval for additional FSI, which has been already considered by PP and may be<br />

available only after complying with the conditions <strong>st</strong>ipulated in the NA order.<br />

2. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> car parking and lay out plan with calculations and re<strong>st</strong>rict the numbers as<br />

per norms<br />

3. Relocate STP and UG tank for better and easy fire tender movement, provide 7.5 m<br />

clearance all around the building and submit the revised drawings.<br />

4. Submit point wise compliance report to ECBC guidelines<br />

5. Submit water balance for the entire project<br />

Chairman<br />

78


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

6. Submit consent for the required quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> water for the entire project from competent<br />

authority<br />

7. Submit revised green belt plan including li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> exi<strong>st</strong>ing and proposed trees to be planted<br />

(#900) around the boundary <<strong>st</strong>rong>of</<strong>st</strong>rong> plot, new buildings, amenity area and gaps in new DP road<br />

Chairman<br />

79


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 24<br />

Subject: <strong>Environment</strong> clearance for proposed project at Sr. No. 175/3, 172/2 Wakad link<br />

road, Next to Omega, behind hotel Shivaji, Wakad by M/s. Sanskruti & Essen<br />

Associates<br />

(File No. <strong>SEAC</strong> 2211/ CR-135 / TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : “Shone<strong>st</strong> Tower”<br />

Project Proponent : M/s. Sanskruti & Essen Associates<br />

Consultant : M/s. Saitech Research & Development Organization<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the : Sr. No. 175/3,(172/2) Wakad Link Road, Next to Omega Paradise,<br />

project<br />

Behind hotel Sayaji , Wakad , Pune 411027<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Con<strong>st</strong>ruction project<br />

Category : 8 (a), B2<br />

Previous<br />

consideration/s<br />

Whether in<br />

Corporation /<br />

Municipal / Other<br />

area<br />

Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

DCR<br />

Total plot area<br />

Deductions<br />

Net plot area<br />

Permissible FSI<br />

(including TDR etc.)<br />

Proposed Built –UP<br />

Area (FSI & Non<br />

FSI)<br />

Ground – coverage<br />

percentage (%)<br />

(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

plot not open to sky)<br />

New case<br />

Pimpri Chinchwad Municipal Corporation<br />

Pimpri Chinchwad Municipal Corporation<br />

Plot Area – 20900.00 m 2<br />

Deductions – 5594.1m 2<br />

Net Plot Area - 15305.90 m 2<br />

25321.70 m 2<br />

43104.88 m 2 ( FSI – 24975.39 m 2 + Non - FSI – 18129.49 m 2 )<br />

47%<br />

Chairman<br />

80


E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />

configuration (s)<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />

and shops<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />

residents / users<br />

Tenant density per<br />

hector<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

building(s)<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

125 Cr.<br />

Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way 24m<br />

Turning radius for<br />

easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />

tender movement<br />

from all around the<br />

building excluding<br />

the width for the<br />

plantation<br />

Total Water<br />

Requirement<br />

Rain Water<br />

Harve<strong>st</strong>ing (RWH)<br />

Residential & Commercial Buildings (11 Nos.) Wing.A+B, Wing D+G,<br />

Bldg.C=G+6<br />

Wing E,F,H,J,K,I = P+12<br />

Commercial (5 Nos.- On Gr.Floor <<strong>st</strong>rong>of</<strong>st</strong>rong> Wing.A+B, Wing D+G,<br />

Bldg.C=G+6)<br />

Tenements - 439 Nos.<br />

Total Commercial Area-905.31 m 2<br />

Residential – 2195 Nos.<br />

Commercial – 302 Nos.<br />

Total - 2497 Nos.<br />

286<br />

38.90 M<br />

Driveway 6.0m & 7.5 m<br />

Dry season :<br />

• Fresh water (CMD) : 197.0 CMD <<strong>st</strong>rong>of</<strong>st</strong>rong> Source: PCMC ( Pimpri<br />

Chinchwad Municipal Corporation)<br />

• Recycled water (CMD): 113.0 CMD<br />

• Total water Requirement (CMD):320. 0 CMD<br />

• Landscape (CMD):--10.0 CMD<br />

• Swimming Pool (CMD): 10.0 CMD<br />

Wet Season:<br />

• Fresh water (CMD) : 197.0 CMD <<strong>st</strong>rong>of</<strong>st</strong>rong> Source: PCMC ( Pimpri<br />

Chinchwad Municipal Corporation)<br />

• Recycled water (CMD): 113.0 CMD<br />

• Total water Requirement (CMD):320. 0 CMD<br />

• Landscape (CMD):-10.0 CMD<br />

• Swimming Pool (CMD): 10.0 CMD<br />

• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table – Approx. 8 mts. to 25 mts.<br />

Size , nos <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge Bore and quantity – 8Nos.<br />

Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Bore Dia –Depth 150’ to 300’ mm<br />

Chairman<br />

81


Strom water<br />

drainage<br />

Sewage and wa<strong>st</strong>e<br />

water<br />

Solid wa<strong>st</strong>e<br />

Management<br />

Green Belt<br />

Development<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Budgetary allocation ( Capital co<strong>st</strong> and O & M co<strong>st</strong>)-<br />

Capital co<strong>st</strong>: 27.75 Lakh<br />

O & M Co<strong>st</strong> : 6.0 Lakh/Year<br />

Discharge Before Development – 170.07 m 3 /day<br />

Discharge After Development – 276.96 m 3 /day<br />

Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD - Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Bore Dia. – Depth 150’ to 300’ mm<br />

• Sewage generation (CMD) – 279.0 CMD<br />

• STP technology - SMBR( Suspended Media Bio Reactor )<br />

• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD) – 279.0CMD<br />

• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP - Refer Storm & drainage layout<br />

• DG sets (during emergency) - 100 KVA X 1 No.<br />

70 KVA X 1 No.<br />

• Budgetary allocation (Capital co<strong>st</strong> and O & M co<strong>st</strong>) –<br />

Capital co<strong>st</strong>: 55.5 Lakh<br />

O & M Co<strong>st</strong> : 14.0 Lakh / Year<br />

Wa<strong>st</strong>e generation in the pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction phase:<br />

• Wa<strong>st</strong>e generation – Excavated Material 4000m 3<br />

Wa<strong>st</strong>e generation in the operation phase:<br />

• Dry wa<strong>st</strong>e (Kg/day): 449.46 Kg/day<br />

• Wet wa<strong>st</strong>e (Kg/day): 674.19 Kg/day<br />

• E – wa<strong>st</strong>e (Kg/month): Not Applicable<br />

• Hazardous wa<strong>st</strong>e (Kg/month): Spent oil – 80.0 Lit/ yr<br />

• STP Sludge (Dry sludge) (Kg/day): 25.11 Kg/Day<br />

Mode Of Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> Wa<strong>st</strong>e:<br />

• Wet wa<strong>st</strong>e (Kg/day): Organic Wa<strong>st</strong>e Convertor<br />

Budgetary allocation( capital Co<strong>st</strong> & O&M co<strong>st</strong>)<br />

Capital co<strong>st</strong>: 25.0 Lakh<br />

O & M Co<strong>st</strong> : 12.0 Lakh / Year<br />

Total RG area: 2184.87 m 2 i.e. about 14.27 % Net Plot Area)<br />

RG area under green belt:<br />

• RG on the Ground (Sq.M) – 784.12 m 2<br />

• RG on Slab Podium (Sq.M) – 1400.75 m 2<br />

3. Plantation:<br />

• Number & li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> trees species to be planted in the ground RG:<br />

241Nos.<br />

• Number & li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> shrubs & bushes species planted in the podium RG;<br />

NA<br />

Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />

Capital co<strong>st</strong>: 65.0 Lakh<br />

O & M Co<strong>st</strong> : 5.0 Lakh / Year<br />

Energy Power Supply:<br />

• Maximum demand – 2042.7 KVA<br />

• Connected Demand –2298.0 KW<br />

Source - Maharashtra State Electricity Di<strong>st</strong>ribution Company<br />

Limited(MSEDCL)<br />

Chairman<br />

82


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Energy saving by non-conventional method:<br />

• Energy Saving measures – CFL & LED Lamps, Solar etc.<br />

• Details Calculation & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving - 686929.15 KWH /Annum<br />

• Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />

Capital co<strong>st</strong>: 70.50 Lakh<br />

O & M Co<strong>st</strong> : 18.5 Lakh / Year<br />

DG Set:<br />

• Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used - 100 KVA X 1No.<br />

70 KVA X 1No.<br />

• Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used - Disel - 100 KVA DG set – 22 Litrs./hr. for<br />

100% load & 11.4 Litrs/hr. for 50% load.<br />

• 70 KVA DG set – 14.2 Litrs./hr. for 100% load & 9.4 Litrs/hr. for<br />

50% load.<br />

Traffic Management Nos. Of the Junction to the main road & design <<strong>st</strong>rong>of</<strong>st</strong>rong> confluence - Refer<br />

Parking & Traffic Management Plan.<br />

Parking details:<br />

• Number & area <<strong>st</strong>rong>of</<strong>st</strong>rong> podium - 2 Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> 2684.88 m 2<br />

• Total parking area -<br />

Required parking Area – 7113.80 m 2<br />

Proposed parking Area – 7115.05 m 2<br />

• Area per car – 12.5 m 2<br />

Including drive way - 21.55 m 2 for Open Parking & 20.08 m 2 for<br />

Covered Parking<br />

• 2- Wheelers - 942Nos.<br />

• 4-wheeler - 242 Nos.<br />

• Public Transport - 902 Nos.<br />

<strong>Environment</strong>al<br />

Management plan<br />

Budgetary<br />

Allocation<br />

Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal road(m): 6.0 mtr.<br />

Con<strong>st</strong>ruction Phase ( With break up):<br />

Capital Co<strong>st</strong> - STP – Rs. 55.5 Lakh<br />

RWH – Rs. 27.75 Lakh<br />

MSW – Rs. 32.0 Lakh<br />

Solar sy<strong>st</strong>em – Rs. 70.50 Lakh<br />

Landscape – Rs. 65.0 Lakh<br />

Operation Phase( with break Up)-<br />

• O & M co<strong>st</strong>( Please ensure manpower and other details)-<br />

STP – Rs. 14.0 Lakh / Year<br />

RWH – Rs. 6.0 Lakh / Year<br />

MSW – Rs. 18.0 Lakh / Year<br />

Solar sy<strong>st</strong>em – Rs. 18.5 Lakh / Year<br />

Landscape – Rs.5.0 Lakh / Year<br />

Chairman<br />

83


Decision:<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed.<br />

PP <strong>st</strong>ated that some con<strong>st</strong>ruction has been initiated and a total built up area <<strong>st</strong>rong>of</<strong>st</strong>rong> 20,046sq.m<br />

completed. It appears to be a violation <<strong>st</strong>rong>of</<strong>st</strong>rong> EIA Notification, 2006, as the TBUA exceeded 20,000<br />

m2. <strong>Environment</strong> Department may look into the possible violation and take appropriate action.<br />

The proponent is directed to comply with the following observations:<br />

1. Reduce the podium area and use the freed space for the required green belt development.<br />

2. Reduce the ground coverage as much as possible<br />

3. Increase the width <<strong>st</strong>rong>of</<strong>st</strong>rong> internal road to 7.5 m for easy fire tender movement.<br />

4. Shift OWC from across DP road to the residential side <<strong>st</strong>rong>of</<strong>st</strong>rong> the project<br />

5. Revise the green belt plan including trees (#250) <<strong>st</strong>rong>of</<strong>st</strong>rong> mixed type on ground RG. Plant<br />

shrubs and bushes <<strong>st</strong>rong>of</<strong>st</strong>rong> ecologically importance on the podium.<br />

Chairman<br />

84


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 25<br />

Subject: <strong>Environment</strong>al <strong>Clearance</strong> for proposed Group Housing project at S.No. 66, 69/1-5<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong> village Mouja Bhokhare, Tal.Nagpur (Rural), Di<strong>st</strong>t. Nagpur by M/s. Ramnath<br />

Developers Ltd<br />

(File No. <strong>SEAC</strong> 2010/CR-901/TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project Group housing Project (Phase 1)<br />

Name, contact<br />

number &<br />

M/s. Ramnath Developers Pvt. Ltd<br />

address <<strong>st</strong>rong>of</<strong>st</strong>rong> Proponent<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Consultant M/s. Pollution and Ecology Control Services,<br />

Category 8 (a), B2<br />

Previous<br />

consideration/s<br />

• 13th <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the State Level Expert Appraisal Committee<br />

(<strong>SEAC</strong>) held on 8th July, 2009<br />

• 35th <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the State Level Expert Appraisal Committee<br />

(<strong>SEAC</strong>) held on 18th October 2010<br />

• 42nd <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>SEAC</strong><br />

• 47th <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>SEAC</strong><br />

• 42nd <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the SEIAA held on 8th/9th December, 2011<br />

• 44th <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the SEIAA held on the 23rd / 24th February,<br />

2012<br />

• 57th <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the State Level Expert Appraisal Committee<br />

(<strong>SEAC</strong>) held on 19th to 22nd June, 2012<br />

59 th Type <<strong>st</strong>rong>of</<strong>st</strong>rong> project:<br />

Meeting <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong><br />

Group Housing Project (Phase 1)<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the Survey No. 66 & 69/1-5, Mouza- Bhokhara, P.H. No. 12- A,<br />

project<br />

Whether in<br />

Tehsil - Nagpur (Rural), Di<strong>st</strong>. - Nagpur, Maharashtra.<br />

Corporation/<br />

Municipal/ Other area<br />

Nagpur Metro region Area<br />

Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the NMC- DCR<br />

Chairman<br />

85


DCR<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Note on the initiated<br />

work ( If applicable)<br />

Total Plot Area<br />

(sq.m.) Deductions<br />

Net Plot area<br />

Permissible FSI<br />

(including TDR etc.)<br />

Proposed Built-up<br />

Area (FSI & Non FSI)<br />

Ground-coverage<br />

Percentage (%)<br />

(Note: Percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

plot not open to sky)<br />

FSI area(sq m) 28741.586 sqm<br />

Non FSI<br />

Premium 00.00 sq.m<br />

Balcony 2753.712 sq.m<br />

Layout approved by NIT, letter no-EE(Metro) 496,<br />

dated.19/01/2012 and NIT requires EC approval for further<br />

sanctioning <<strong>st</strong>rong>of</<strong>st</strong>rong> building plans. The said project entire campus total<br />

built up area is 31495.29 sqm in which built up area <<strong>st</strong>rong>of</<strong>st</strong>rong> each<br />

building is less than 20000 sq.ft.<br />

Earlier Project approved by Collector, Nagpur under Con<strong>st</strong>ruction<br />

permission letter No.947/2010, Mouza- Bhokhara, P.H. No. 12-<br />

A, Tehsil - Nagpur (Rural), R.M. No. 97/M.R.C.-81/(M.R.T.P –<br />

2000/Con<strong>st</strong>ruction Permission)/2009-2010, Collector, Nagpur<br />

dated 14/05/2010.<br />

Total plot Area Phase 1 Phase 2<br />

80500 sq.m 48672.28 sqm 31827.72 sq.m<br />

Chairman<br />

86<br />

Phase 1<br />

29210.72 sq.m<br />

Phase 1<br />

FSI area(sq m) 28741.586 sqm<br />

Non FSI Premium 00.00 sq.m<br />

18.24%<br />

E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project 49 crore<br />

Balcony 2753.712 sq.m<br />

TOTAL 31495.29 sqm<br />

No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />

configuration(s) Total buildings 31 Nos.<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />

and shops<br />

266 tenants<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />

residents/users<br />

1330<br />

Tenant density per<br />

hectare<br />

55<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building<br />

(S) in m<br />

24 m<br />

Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way (Width 18 m


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong> the road from the<br />

neare<strong>st</strong> fire <strong>st</strong>ation to<br />

the proposed<br />

building(s))<br />

Turning radius for<br />

easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />

tender movement<br />

from all around the<br />

building excluding the<br />

width for the<br />

plantation<br />

Total water<br />

requirement<br />

Rain Water<br />

Harve<strong>st</strong>ing(RWH)<br />

Strom water drainage<br />

Sewage and Wa<strong>st</strong>e<br />

water<br />

Chairman<br />

87<br />

6 m<br />

Dry Season : Quantity<br />

Fresh water (CMD) 120 CMD<br />

Recycled water (CMD) 146 CMD<br />

Total Water Requirement<br />

(CMD)<br />

294 CMD<br />

Swimming pool make up<br />

(Cum)<br />

17.5 CMD<br />

Fire Fighting(Cum) 25 CMD<br />

Wet Season: Quantity<br />

Fresh water (CMD) 120 CMD<br />

Recycled water (CMD) 60 CMD<br />

Total Water Requirement<br />

(CMD)<br />

180 CMD<br />

Fire Fighting (Cum) 25 CMD<br />

Level <<strong>st</strong>rong>of</<strong>st</strong>rong> Ground water<br />

table<br />

Size and no <<strong>st</strong>rong>of</<strong>st</strong>rong> RWH<br />

tanks and quantity<br />

6-8 m<br />

Ground Water Recharging Tank<br />

1 Nos <<strong>st</strong>rong>of</<strong>st</strong>rong> 6 m dia & 3 m deep<br />

1 Nos <<strong>st</strong>rong>of</<strong>st</strong>rong> 6 m dia & 2 m deep<br />

1 exi<strong>st</strong>ing dug well 3 dia<br />

Size, no <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits<br />

125 Pits :-<br />

and quantity<br />

0.6 m × 0.6 m<br />

Budgetary allocation (capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />

Capital co<strong>st</strong> 15 lacs<br />

O & M 1.5 lacs<br />

Natural water<br />

drainage pattern<br />

Gravity<br />

Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water 38938 m 3 /yr<br />

Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD 900 mm dia<br />

Sewage generation<br />

(CMD)<br />

162 CMD<br />

STP technology Conventional STP


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Solid wa<strong>st</strong>e<br />

Management<br />

Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP 200 CMD<br />

DG sets(during<br />

emergency)<br />

1<br />

Budgetary allocation (capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />

Capital 35 lacs<br />

O & M 15 lacs<br />

Wa<strong>st</strong>e generation in the Pre-con<strong>st</strong>ruction and con<strong>st</strong>ruction<br />

Wa<strong>st</strong>e Generation: Quantity<br />

1)Brickwork<br />

2)Sand<br />

140 trucks for 4 lacs sq.ft<br />

a)In Brickwork 636 m 3<br />

b)In concrete 800 m 3<br />

c)In Pla<strong>st</strong>er 480 m 3<br />

3)Aggregate 800 m 3<br />

4)Cement 10 trucks<br />

5)Pla<strong>st</strong>er <<strong>st</strong>rong>of</<strong>st</strong>rong> Paris 600 m 3<br />

6)Tile 8 trucks<br />

7)Shuttering 20 trucks<br />

Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> the top soil to<br />

be preserved<br />

218000 cubic ft for 10 acre<br />

Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

con<strong>st</strong>ruction way debris<br />

Through vendors<br />

Wa<strong>st</strong>e generation in the<br />

Quantity<br />

operation Phase:<br />

Dry wa<strong>st</strong>e(Kg/day) 319 kg<br />

Wet wa<strong>st</strong>e (Kg/day) 213 kg<br />

STP Sludge (Dry sludge)<br />

(kg/day)<br />

70<br />

Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>e:<br />

Dry wa<strong>st</strong>e Handed over to authorized recycler<br />

Wet wa<strong>st</strong>e Treated by Vermi-compo<strong>st</strong><br />

STP Sludge (Dry sludge) As manure<br />

Area requirement:<br />

Total area provided for<br />

the <strong>st</strong>orage and treatment<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong> the solid wa<strong>st</strong>e<br />

Chairman<br />

88<br />

Vermi-compo<strong>st</strong> plant<br />

(6m X 20m)<br />

Budgetary allocation (capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />

Capital co<strong>st</strong> 5 lacs


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Green Belt<br />

Development<br />

O & M co<strong>st</strong> 2 lacs<br />

Total RG area: 8163.98 sq.m<br />

RG area other than green belt:<br />

Around amenity 5916.405 sq.m<br />

Around residential(PH-1) 4851.374 sq.m<br />

RG area under green belt:<br />

RG on the ground (sq.m.) 8163.98 sq.m<br />

No <<strong>st</strong>rong>of</<strong>st</strong>rong> Trees & Shrubs : 1037<br />

Capital Co<strong>st</strong> 1 crore<br />

O&M 5 Lacs<br />

Energy Power Supply<br />

Maximum demand 1860.75 KW<br />

Connected load 400 KVA<br />

Source MSEDCL<br />

Energy saving by non-conventional method:<br />

Energy saving<br />

measures<br />

Chairman<br />

89<br />

• All artificial light source &<br />

fixture proposed for each<br />

unit is CFL with electronic<br />

balla<strong>st</strong>.<br />

• By using CFL fittings the<br />

watt/sq.ft. for units is as<br />

follows:<br />

1) Semi detached unit 0.99<br />

w/sq.ft.<br />

2) Row house unit 0.69 w/sq.ft.<br />

3) 3BHK apartment 0.86<br />

w/sq.ft.<br />

4) 2BHK apartment 0.76<br />

w/sq.ft.<br />

Thus our overall lighting<br />

density is less than 1w/sq.ft. and is<br />

as per ASHRAE requirements.<br />

• Di<strong>st</strong>ribution <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>reet lights<br />

is controlled by using timers<br />

so that the <strong>st</strong>reet lights shall<br />

be made on & <<strong>st</strong>rong>of</<strong>st</strong>rong>f as per the<br />

requirement from 6.00 PM to<br />

6.00 AM saving the common<br />

utility energy. .


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

<strong>Environment</strong><br />

Management Plan<br />

Budgetary Allocation<br />

Budgetary allocation (capital co<strong>st</strong> and O&M co<strong>st</strong>):-<br />

Capital Co<strong>st</strong> 2.5 Crores<br />

O&M co<strong>st</strong> 15 Lacs<br />

DG set:<br />

Number and capacity<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be<br />

25 KW<br />

used<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used Diesel<br />

Con<strong>st</strong>ruction phase<br />

(with Break-up):<br />

Capital Co<strong>st</strong> Break –up Details:-<br />

Chairman<br />

90<br />

Capital Co<strong>st</strong>:-35 lacs<br />

No. Item Details Capital Co<strong>st</strong>(lacs)<br />

1<br />

Temporary shade for Storing<br />

con<strong>st</strong>ruction materials<br />

2 Sprinklers 1<br />

3<br />

Temporary arrangement for<br />

Water supply<br />

4 Generator set 25<br />

5<br />

Repair & Recon<strong>st</strong>ruction <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

exi<strong>st</strong>ing dug well<br />

TOTAL 35<br />

Operation Phase (with break-up)<br />

No Item Details<br />

Capital Co<strong>st</strong><br />

(lacs)<br />

2<br />

5<br />

2<br />

O & M (lacs)<br />

1. STP 35 15.00<br />

2.<br />

3.<br />

4.<br />

Solid Wa<strong>st</strong>e<br />

Management<br />

Rain Water<br />

Harve<strong>st</strong>ing<br />

Green Belt<br />

Development<br />

5 2.00<br />

15 1.50<br />

100 5.00<br />

5. Energy Sy<strong>st</strong>ems 250 15.00<br />

Total 405 38.5<br />

Quantum and 1000/-


Decision:<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

generation <<strong>st</strong>rong>of</<strong>st</strong>rong> Corpus<br />

fund and Commitment<br />

per month/House owner<br />

Responsibility for O &<br />

M<br />

Society formed by Township Owner<br />

Traffic Management Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> the junction to<br />

the main road &<br />

design <<strong>st</strong>rong>of</<strong>st</strong>rong> confluence<br />

1<br />

Total parking area 4965.80 sq m<br />

Area per car 12.50 sq m<br />

2-wheeler<br />

Scooter<br />

Cycle<br />

532<br />

532<br />

4- wheeler 210<br />

Public Transport No<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed.<br />

<strong>SEAC</strong> noted that right <<strong>st</strong>rong>of</<strong>st</strong>rong> way <<strong>st</strong>rong>of</<strong>st</strong>rong> access is through service road <<strong>st</strong>rong>of</<strong>st</strong>rong> a highway, having a width 12 m<br />

and the proposed height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building is 26 m. Considering the con<strong>st</strong>raint <<strong>st</strong>rong>of</<strong>st</strong>rong> required right <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

way for availability <<strong>st</strong>rong>of</<strong>st</strong>rong> access in cases <<strong>st</strong>rong>of</<strong>st</strong>rong> service lanes, adjacent to any highway, <strong>SEAC</strong> accepted<br />

the proposal for the proposed height 26m.<br />

<strong>SEAC</strong> decided to recommend the proposal for <strong>Environment</strong>al <strong>Clearance</strong> only after complying<br />

with the following conditions:<br />

1. Pond for the <strong>st</strong>orage <<strong>st</strong>rong>of</<strong>st</strong>rong> treated wa<strong>st</strong>ewater disposal will be only temporary arrangement. PP is<br />

directed to submit the consent for sewer line.<br />

2. Provide 0.3m free board for the pond.<br />

3. Relocate UG tank (60 in the plan) for easy fire tender movement.<br />

4. Submit green belt plan with details <<strong>st</strong>rong>of</<strong>st</strong>rong> tree (#829) species and shrubs (#208) with locations.<br />

Plants like Kadipatta, Lime and Pappaya may be included in the proposed shrubs plantation.<br />

Temporary pond area, when is not needed and is a part <<strong>st</strong>rong>of</<strong>st</strong>rong> green belt should be subsequently<br />

used for plantation only.<br />

Chairman<br />

91


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 26<br />

Subject: <strong>Environment</strong> clearance for Proposed Project at Gat No.572, 573, 574, 575, 576, 578,<br />

579, 580, 581, 582, 583,584, 585, 586, 587, 588, 589, 590, 594, 595, 597, 598 & <<strong>st</strong>rong>61</<strong>st</strong>rong>7,<br />

Wagholi, Haveli, Pune by M/s. Sukhawani Promoters & Builders<br />

(File No. <strong>SEAC</strong> 2211/ CR-138 / TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : “Sukhwani Palm”<br />

Project Proponent : M/s. Sukhwani Promoters & Buildres<br />

Consultant : M/s. Saitech Research & Development Organization<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the : Gat No. 572-<<strong>st</strong>rong>61</<strong>st</strong>rong>2 Near Life hospital , Pune -Nagar Road, Wagholi.<br />

project<br />

Pune<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Con<strong>st</strong>ruction project<br />

Category : 8 (a), B2<br />

Whether in<br />

Corporation /<br />

Municipal / Other<br />

area<br />

Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

DCR<br />

Total plot area<br />

Deductions<br />

Net plot area<br />

Permissible FSI<br />

(including TDR etc.)<br />

Proposed Built –UP<br />

Area (FSI & Non<br />

FSI)<br />

Ground – coverage<br />

percentage (%)<br />

(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

plot not open to sky)<br />

E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />

configuration (s)<br />

Grampanchayat<br />

Town Planning<br />

Plot Area – 18800.00 m 2<br />

Deductions -2820 m 2<br />

Net Plot Area - 15980.0 m 2<br />

11985.0 m 2<br />

24730.36 m 2 ( FSI – 15646.52 m 2 + Non - FSI – 9083.84 m 2 )<br />

2808.43m 2 i.e. 15.57% <<strong>st</strong>rong>of</<strong>st</strong>rong> Net Plot Area - 15980.0 m 2 )<br />

` 50.0 crore<br />

Total bldg. = 4 Nos.<br />

Type I- A, B, C - (P+5) – 1No.<br />

Type II- D,E,F - (P+8) – 1No.<br />

Chairman<br />

92


Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />

and shops<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />

residents / users<br />

Tenant density per<br />

hector<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

building(s)<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Type III- G,H - (P+8) – 1No<br />

Type IV- I,J - (P+8) – 1No<br />

340 Nos.<br />

1700 Nos.<br />

200<br />

26.25 M<br />

Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way Pune Nagar Road-60 M<br />

Entrance Road-15 M<br />

Turning radius for<br />

easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />

tender movement<br />

from all around the<br />

building excluding<br />

the width for the<br />

plantation<br />

Total Water<br />

Requirement<br />

Rain Water<br />

Harve<strong>st</strong>ing (RWH)<br />

Strom water<br />

drainage<br />

7.50 m<br />

Dry season :<br />

• Fresh water (CMD) : 168.00 m 3 /day <<strong>st</strong>rong>of</<strong>st</strong>rong> Source: Grampanchayat<br />

• Recycled water (CMD): 99.<<strong>st</strong>rong>61</<strong>st</strong>rong> m 3 /day<br />

• Total water Requirement (CMD):267.<<strong>st</strong>rong>61</<strong>st</strong>rong> m 3 /day<br />

• Club-house & Gym make up (Cum):- 15.0 m 3 /day<br />

• Landscaping – 23.11 m 3 /day<br />

• Fire fighting (Cum): 20,000 cu.m.<br />

Wet Season:<br />

• Fresh water (CMD) : 168.00m 3 /day & Source: Grampanchayat<br />

• Recycled water (CMD): 99.<<strong>st</strong>rong>61</<strong>st</strong>rong> m 3 /day<br />

• Total water Requirement (CMD): 267.<<strong>st</strong>rong>61</<strong>st</strong>rong> m 3 /day<br />

• Club-house & Gym make up (Cum): 15.0 m 3 /day<br />

• Landscaping – 23.11 m 3 /day<br />

• Fire fighting (Cum): 20,000 cu.m.<br />

Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge Bore – 15 Nos.<br />

Quantity – 557.48 m 3 /Year<br />

Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Bore Dia – 1.2X1.2X1.2M<br />

• Budgetary allocation ( Capital co<strong>st</strong> and O & M co<strong>st</strong>)-<br />

Capital co<strong>st</strong>: 16.0 Lakh<br />

O & M Co<strong>st</strong> : 4.0 Lakh/Year<br />

Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water - Volume – 557.48 m 3 /Year<br />

Chairman<br />

93


Sewage and wa<strong>st</strong>e<br />

water<br />

Solid wa<strong>st</strong>e<br />

Management<br />

Green Belt<br />

Development<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD - Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Bore Dia. – 1.2X1.2X1.2M<br />

• Sewage generation (CMD) – 206.55 CMD<br />

STP technology – MMBR(Moving Media Bio Reactor)<br />

• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD) – 210.0 CMD<br />

• DG sets (during emergency) – 125 KVA x 1 No.<br />

62.5 KVA x 1No.<br />

• Budgetary allocation (Capital co<strong>st</strong> and O & M co<strong>st</strong>) –<br />

Capital co<strong>st</strong>: 38.70 Cr.<br />

O & M Co<strong>st</strong> : 9.95 Lakh / Year<br />

Wa<strong>st</strong>e generation in the pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction phase:<br />

• Wa<strong>st</strong>e generation – 12369.0 m 3<br />

Wa<strong>st</strong>e generation in the operation phase:<br />

• Dry wa<strong>st</strong>e (Kg/day): 306.0 Kg/day<br />

• Wet wa<strong>st</strong>e (Kg/day): 459.0 Kg/day<br />

• Hazardous wa<strong>st</strong>e (Kg/month): Spent oil – 80.0 Lit/ yr<br />

• STP Sludge (Dry sludge) (Kg/day): 18.58 Kg/Day ( 100% Dry )<br />

Budgetary allocation( capital Co<strong>st</strong> & O&M co<strong>st</strong>)<br />

Capital co<strong>st</strong>:22.0 Lakh<br />

O & M Co<strong>st</strong> : 10.0 Lakh / Year<br />

Total RG area: 3851.83 m 2 i.e. about 24.10 % <<strong>st</strong>rong>of</<strong>st</strong>rong> net plot area<br />

RG area under green belt: 3851.83 m 2<br />

Plantation:<br />

• Number & li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> trees species to be planted in the ground RG:<br />

250Nos.<br />

• Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />

Capital co<strong>st</strong>: Rs. 15.0 Lakh<br />

O & M Co<strong>st</strong> : Rs 5.0 Lakh / Year<br />

Energy Power Supply:<br />

• Maximum demand –1205.41 KVA<br />

• Connected Demand – 1607.22 KW<br />

Source - Maharashtra State Electricity Di<strong>st</strong>ribution Company<br />

Limited(MSEDCL)<br />

Energy saving by non-conventional method:<br />

• Energy Saving measures – CFL, LED, Solar, etc.<br />

• Details Calculation & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving – 126300 KWH /Annum<br />

• Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />

Capital co<strong>st</strong>: 16.80 Lakh .<br />

O & M Co<strong>st</strong> : 8.0 Lakh / Year<br />

During Con<strong>st</strong>ruction - Fuel Consumption / Hr. <<strong>st</strong>rong>of</<strong>st</strong>rong> 15KVA DG Set –<br />

2.69 Litrs/hr.<br />

During Operation –<br />

Fuel Consumption / Hr. <<strong>st</strong>rong>of</<strong>st</strong>rong> 125KVA DG Set<br />

Fuel Consumption / Hr. <<strong>st</strong>rong>of</<strong>st</strong>rong> 62.5 KVA DG Set<br />

Traffic Management Parking details:<br />

• Total parking area -<br />

Chairman<br />

94


<strong>Environment</strong>al<br />

Management plan<br />

Budgetary<br />

Allocation<br />

Decision:<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Parking Area – 5121.20 m 2<br />

Phase I -<br />

• Area per car – 20 m 2<br />

• 2- Wheeler – 523 Nos.<br />

• 4-Wheeler – 141 Nos.<br />

• Public Transport – 523 Nos.<br />

Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal road(m):9.0 M<br />

Con<strong>st</strong>ruction Phase ( With break up):<br />

Capital Co<strong>st</strong> - STP – Rs. 38.70 Cr.<br />

RWH – Rs. 16.0 Lakh<br />

MSW – Rs. 22.0 Lakh<br />

Solar sy<strong>st</strong>em – Rs. 16.80 Lakh<br />

Landscape – Rs. 15.0 Lakh<br />

Operation Phase( with break Up)-<br />

• O & M co<strong>st</strong>( Please ensure manpower and other details)-<br />

STP – Rs.9.95 Lakh / Year<br />

RWH – Rs. 4.0 Lakh / Year<br />

MSW – Rs. 10.0 Lakh / Year<br />

Solar sy<strong>st</strong>em – Rs. 8.0 Lakh / Year<br />

Landscape – Rs. 5.0 Lakh / Year<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed. <strong>SEAC</strong> noted that PP has already initiated con<strong>st</strong>ruction work. It appears to be a violation<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong> EIA Notification, 2006. <strong>Environment</strong> Department may look into the violation and take<br />

appropriate action.<br />

The proponent is directed to comply with the following observations:<br />

1. The current right <<strong>st</strong>rong>of</<strong>st</strong>rong> way is 9m. As per MoEF OM dated 7 th February 2012, the maximum<br />

height allowed is 15m.<br />

2. Consent for water and drainage from competent authority are not yet obtained.<br />

Full appraisal <<strong>st</strong>rong>of</<strong>st</strong>rong> the project will be taken up only after compliance <<strong>st</strong>rong>of</<strong>st</strong>rong> the above.<br />

Chairman<br />

95


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 27<br />

Subject: <strong>Environment</strong>al clearance <strong>Environment</strong> clearance for Proposed residential<br />

project” Marvel Izara" on the plot bearing S.No.4(pt),21(pt), 24(pt) at Undri,<br />

Tal.Haveli, Di<strong>st</strong> Pune by Marvel Zeta Developers Pvt.Ltd.<br />

(File No. <strong>SEAC</strong> 2011/CR-165 /TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Marvel Izara”<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Proponent M/s. Marvel Zeta Developers Pvt. Ltd.<br />

Name, contact number &<br />

address <<strong>st</strong>rong>of</<strong>st</strong>rong> Consultant<br />

M/s. Mahabal Enviro Engineers Pvt. Ltd.<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> project Residential Con<strong>st</strong>ruction Project<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the project<br />

Whether in Corporation<br />

/<br />

M unicipal / other area<br />

Total Plot Area (sq. m.)<br />

Deductions<br />

Net Plot area<br />

Permissible FSI<br />

(including<br />

TDR etc.)<br />

Proposed Built-up Area<br />

(FSI & Non-FSI)<br />

Ground-coverage<br />

Percentage (%)<br />

(Note: Percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

plot not open to sky)<br />

E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project<br />

Survey No. 04(parts), 21(parts), 24(parts), Undri,<br />

Tq – Haveli, Di<strong>st</strong>: Pune<br />

Department <<strong>st</strong>rong>of</<strong>st</strong>rong> Town Planning, Pune<br />

Total Plot Area - 87581.00 m 2<br />

Deductions<br />

- Amenities Space 12528.47 m 2<br />

- Area Under 18m Road 4057.87 m 2<br />

Net Plot Area - 70994.66 m 2<br />

75170.82m 2<br />

• FSI area (sq. m.) : 75170.82 m 2<br />

• Non FSI area (sq. m.) : 63373.16 m 2<br />

• Total BUA area (sq. m.) : 138543.98 m 2<br />

Building Footprint 13311.24 (18.75%)<br />

+ Podium 7531.69 (10.<<strong>st</strong>rong>61</<strong>st</strong>rong>%)<br />

= 20842.93 SQM (29.36%)<br />

INR 235 Cr<br />

Chairman<br />

96


No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />

configuration(s)<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Residential Building configuration:<br />

T1 to T8 +<br />

T12 to T14 + T16 to T20<br />

Chairman<br />

97<br />

B + 12<br />

T9 to T11 B + S + 12<br />

T15 B + 11<br />

EWS Buildings S + 12 Floors<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenements Residential Tenements: 707 Nos.<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />

residents / users<br />

Tenement density per<br />

hectare<br />

3712<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building(s) 36.9 M<br />

Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way (Width <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

the road from the neare<strong>st</strong><br />

fire <strong>st</strong>ation to the<br />

proposed building(s)<br />

Turning radius for easy<br />

access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire tender<br />

movement from all<br />

around the building<br />

excluding the width for<br />

the plantation<br />

523 Persons / Hectare<br />

18 M<br />

9 M


Total Water<br />

Requirement<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Rain Water Harve<strong>st</strong>ing<br />

(RWH)<br />

Dry season:<br />

1. Total Water Requirement<br />

a. Fresh Water: 334 KL<br />

Source: Gram Panchayat<br />

b. Recycled Water<br />

• Flushing :- 167 KL<br />

• Gardening:- 221 KL<br />

Fire fighting :- 460 KL OHT + 500 KL UGT<br />

Wet Season:<br />

1. Total Water Requirement<br />

a. Fresh Water: 334 KL<br />

Source: Gram Panchayat<br />

b. Recycled Water<br />

• Flushing :- 167 KL<br />

• Gardening:- 221 KL<br />

• Cooling Tower Makeup (MLD):- NA<br />

2. Swimming pool makeup (MLD):-NA<br />

3. Fire fighting :- 460 KL OHT + 500 KL UGT<br />

• Size and no <<strong>st</strong>rong>of</<strong>st</strong>rong> RWH tank and Quantity<br />

Run<<strong>st</strong>rong>of</<strong>st</strong>rong>f from the premises will be discharged to recharging<br />

pits<br />

Annual RWH Potential- 24,212 KL<br />

• Size, nos <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits and Quantity<br />

Pit Size: 2.5m dia X 75 m depth bore well<br />

No <<strong>st</strong>rong>of</<strong>st</strong>rong> Recharge Pits: 7 Nos.<br />

Storage tank 500KLX 2 nos<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

Capital co<strong>st</strong>: 24,00,000/-INR<br />

O & M co<strong>st</strong>: 3,00,000/- Annum<br />

Chairman<br />

98


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Storm water drainage<br />

Sewage and Wa<strong>st</strong>e<br />

water<br />

II. Storm water drainage<br />

• Natural water drainage pattern<br />

a. Natural water Drainage pattern: Storm water drainage<br />

sy<strong>st</strong>em varying from 600 mm to 900 mm will be<br />

provided for collection <<strong>st</strong>rong>of</<strong>st</strong>rong> Storm Water<br />

b. Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water: Total Rain water harve<strong>st</strong>ing<br />

potential 500 KL per day rain water will be harve<strong>st</strong>ed<br />

through recharge pits and <strong>st</strong>ore<br />

c. Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD: Internal Strom water drainage line <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

600mm x 600mm<br />

• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water: 28323 KL / Annum<br />

I. Sewage generation: 467 KL<br />

II. STP technology: FBBR (Fluidized Bed Bio Reactors)<br />

III. Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP: 475 KL<br />

IV. DG sets (during emergency): 2000 KVA<br />

V. Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

Capital co<strong>st</strong>: 95,00,000/- INR<br />

O&M co<strong>st</strong>: 25,00,000/-Annum<br />

Chairman<br />

99


Solid wa<strong>st</strong>e<br />

Management<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

I. Pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction phase<br />

• Wa<strong>st</strong>e: -<br />

a) Debris: Since demolition is not involved Debris will not be<br />

generated. Other con<strong>st</strong>ruction wa<strong>st</strong>e will be used as filling<br />

material for leveling.<br />

b. Top soil preservation / conservation: Preserved and used<br />

for landscape<br />

II. Operation Phase<br />

• Segregate garbage<br />

a. Dry quantity Kg/day:- 650<br />

b. Wet quantity Kg/day:- 1058<br />

• Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal: Use <<strong>st</strong>rong>of</<strong>st</strong>rong> Organic Wa<strong>st</strong>e Converter and<br />

disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> compo<strong>st</strong> in own landscape.<br />

• E-Wa<strong>st</strong>e & Hazardous wa<strong>st</strong>e<br />

• STP Sludge (Dry sludge)<br />

a. Quantity kg/day:- 45 Kg /day<br />

b. Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal:- Dige<strong>st</strong>ed and used as manure<br />

III. Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

� Capital co<strong>st</strong>: 19,00,000/- INR<br />

� O&M co<strong>st</strong> 17,00,000/- Annum<br />

Chairman<br />

100


Green Belt<br />

Development<br />

Energy<br />

Decision:<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

I. Total R.G area in sqm. & in (%):<br />

36901.762m 2 51.96% <<strong>st</strong>rong>of</<strong>st</strong>rong> total plot area<br />

• RG area on the ground (sqm):29370.073<br />

• RG area on the slab (sqm):7531.689<br />

II. Exi<strong>st</strong>ing trees, trees to be cut, trees to be transplanted<br />

and trees to be planted (nos., size, age, species):<br />

Exi<strong>st</strong>ing Total No <<strong>st</strong>rong>of</<strong>st</strong>rong> trees: 98 Nos<br />

Exi<strong>st</strong>ing Trees: 98 Nos out <<strong>st</strong>rong>of</<strong>st</strong>rong> which 26 trees come under<br />

buiding line which will be replanted<br />

Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

Capital co<strong>st</strong>: 70,00,000/- INR<br />

O&M co<strong>st</strong>: 7,90,000/-Annum<br />

Energy saving by non-conventional method<br />

• Details Calculations & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving: by using solar<br />

hot water sy<strong>st</strong>em and Solar PV panels<br />

= 3<<strong>st</strong>rong>61</<strong>st</strong>rong>3 units/day + 30 units/day<br />

= 3643 units / day (Overall 34% Energy Saved)<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

Capital co<strong>st</strong>: 1,75,81,000/-<br />

O&M co<strong>st</strong>: 8,00,000/-<br />

ii. Sources <<strong>st</strong>rong>of</<strong>st</strong>rong> power and supply capacity: MSEDCL<br />

9814<br />

iii. units/day.<br />

iii. Di<strong>st</strong>ribution Sy<strong>st</strong>em: MSEDCL<br />

iv. Alternate supply for essential services: DG SETS<br />

v. DG Set: Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used and capacity: 500 KVA X 4<br />

NOS<br />

Chairman<br />

101


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed.<br />

<strong>SEAC</strong> noted that NA order is yet to be obtained. PP could not submit regional plan/ document<br />

approved by competent authority showing the minimum required right <<strong>st</strong>rong>of</<strong>st</strong>rong> way for access for the<br />

proposed height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building. Consent for the required quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> water from competent<br />

authority is not yet obtained.<br />

Considering this, <strong>SEAC</strong> decided to appraise the case only after complying with the above<br />

observations<br />

Chairman<br />

102


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 28<br />

Subject: <strong>Environment</strong>al clearance for the Proposed Housing project ‘Sanghvi Paradise’ at<br />

survey No. 152/4, Behind Nirmal Nagar and Tulasi Vihar Park, Near Asangaon<br />

Railway Station, Asangaon (E) by M/s. Magnum Builder (M/s. Valram<br />

Development Corporation)<br />

(File No.:<strong>SEAC</strong> 2010 /CR -745/ TC2)<br />

PP was absent.<br />

Chairman<br />

103


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 29<br />

Subject: TOR for proposed Ferro Alloys unit, at Khasra No. 234/2, Village Chicholi, Tal<br />

Tumsar, Di<strong>st</strong> Bhandara M/s Shree Minerals and Chemicals<br />

(File No. <strong>SEAC</strong> 2011/ CR-520 / TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project Manganese Ore Beneficiation<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Proponent<br />

M/s Shree Minerals and chemicals<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Consultant<br />

Activity schedule in the<br />

EIA Notification<br />

Area Details<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Notified<br />

Indu<strong>st</strong>rial area / MIDC<br />

area<br />

E<strong>st</strong>imated capital co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

the Project (including<br />

co<strong>st</strong> for land, building,<br />

plant and machinery<br />

separately)<br />

Location details <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

the project :<br />

Di<strong>st</strong>ance from Protected<br />

Areas / Critically<br />

MITCON Consultancy & Engineering Services Ltd.<br />

2(b), B2<br />

• Total plot area (sq. m.): 4200<br />

• Built up area (Sq. m.): 141.60<br />

Proposed plant is located on private land at Khasra No. 234/2,<br />

Village-Bagheda Road Chicholi, Tahsil- Tumsar, Di<strong>st</strong>rict- Bhandra<br />

Particulars Rs. In Lacs<br />

Land 0.00<br />

Land Development 0.00<br />

Factory Building 3.00<br />

Plant & Machinery 15.00<br />

MSEB Deposits & Charges 0.53<br />

Pre- Operative Expenses 0.22<br />

Working Capital 6.25<br />

Total 25<br />

• Latitude : 21 0 28’33.35”N<br />

• Longitude : 79 0 41’55.57”E<br />

• Location : At Khasra No. 234/2, Village-Bagheda Road<br />

Chicholi, Tahsil- Tumsar, Di<strong>st</strong>rict- Bhandra<br />

• Elevation above Mean Sea Level: 298.4 meter<br />

There are no Protected areas / Critically polluted areas / Eco-<br />

Sensitive areas/ inter-<strong>st</strong>ate boundaries within 10 Km radial area<br />

Chairman<br />

104


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Polluted<br />

areas / Eco-sensitive<br />

areas<br />

/ inter-State boundaries<br />

Raw materials<br />

(including<br />

process chemicals,<br />

cataly<strong>st</strong>s, & additives).<br />

Production details<br />

Process details /<br />

manufacturing details<br />

Rain Water Harve<strong>st</strong>ing<br />

(RWH)<br />

Total Water<br />

Requirement<br />

Li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

raw<br />

materials<br />

to<br />

be used<br />

Manganese<br />

Ore<br />

‘Physical<br />

and<br />

chemical<br />

nature <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

raw<br />

material<br />

Lumps or<br />

fines<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Products,<br />

By products and<br />

Intermediate<br />

Products<br />

Main Products<br />

1. Manganese Oxide<br />

2. Manganese Di-Oxide<br />

By-Products<br />

Intermediate<br />

Products<br />

Chairman<br />

105<br />

‘Quantity<br />

(tonnes/<br />

year) full<br />

production<br />

capacity<br />

Source<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong><br />

materials<br />

9000 Nearby<br />

Mines<br />

Exi<strong>st</strong>ing<br />

(T/Year)<br />

0<br />

0<br />

Nil<br />

1.Jigging<br />

2. Reduction process in roa<strong>st</strong>ing kiln<br />

Proposed<br />

activity<br />

(new/<br />

modernization/<br />

expansion)<br />

(T/Year)<br />

3600<br />

3600<br />

Nil<br />

Means <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

transportation<br />

(Source to<br />

<strong>st</strong>orage<br />

site) with<br />

ju<strong>st</strong>ification<br />

By Tarpaulin<br />

covered truck<br />

Total<br />

(T/Year)<br />

3600<br />

3600<br />

In the factory premises ro<<strong>st</strong>rong>of</<strong>st</strong>rong> top area will be determined and<br />

subsequently rain water harve<strong>st</strong>ing potential will be calculated.<br />

However detailed design and engineering <<strong>st</strong>rong>of</<strong>st</strong>rong> the RWH sy<strong>st</strong>em will<br />

be undertaken during implementation <strong>st</strong>age.<br />

Nil<br />

Total water requirement:<br />

• Fresh water (CMD) : 8 & Source: Borewells<br />

• Recycled water (CMD): 6


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Sewage generation and<br />

treatment<br />

Effluent characteri<strong>st</strong>ic<br />

ETP details<br />

Note on ETP technology<br />

to be used<br />

Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> the ETP<br />

sludge (If applicable)<br />

Solid wa<strong>st</strong>e Management<br />

Atmospheric Emissions<br />

(Flue gas characteri<strong>st</strong>ics<br />

Use <<strong>st</strong>rong>of</<strong>st</strong>rong> the water:<br />

• Process (CMD): 4<br />

• Du<strong>st</strong> Suppression (CMD): 2<br />

• Drinking (CMD): 0.8<br />

• Green belt (CMD): 1<br />

• Others (CMD): 0.2<br />

• Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> sewage generation (CMD) :0.6<br />

• Proposed treatment for the sewage : Septic tanks followed by Soak<br />

Pits<br />

NA as there is no effluent generation due to the proposed activity<br />

Sr.<br />

No<br />

Source<br />

1. Raw water<br />

treatment<br />

plant<br />

Solid wa<strong>st</strong>e generated in the form <<strong>st</strong>rong>of</<strong>st</strong>rong> tailings it is recycled in roa<strong>st</strong>ing<br />

furnace during reduction process for production <<strong>st</strong>rong>of</<strong>st</strong>rong> Manganese Oxide<br />

Sr. Pollutant Source Emission Concentration<br />

Chairman<br />

106<br />

Qty<br />

(TPM)<br />

Form<br />

(Sludge / Dry /<br />

Slurry etc.)<br />

Composition<br />

-- -- --<br />

2. ETP -- -- --<br />

3. Process 75<br />

(Tailings)<br />

4. Spent<br />

Cataly<strong>st</strong><br />

5. Oily<br />

Sludge<br />

6. Others like<br />

Battery<br />

wa<strong>st</strong>e,<br />

e wa<strong>st</strong>e<br />

etc (Pl.<br />

Specify)<br />

Fines Particles <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

MnO2 , Silica,<br />

etc<br />

-- -- --<br />

-- -- --<br />

-- -- --


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

SPM, SO2, NOX, CO, etc.)<br />

Stack emission Details:<br />

(All the <strong>st</strong>acks attached to<br />

process units, Boilers,<br />

captive power plant, D.G.<br />

Sets, Incinerator both for<br />

exi<strong>st</strong>ing and proposed<br />

activity). Please indicate<br />

the specific section to<br />

which the <strong>st</strong>ack is<br />

attached.<br />

e.g.: Process section, D.G.<br />

Set, Boiler, Power Plant,<br />

incinerator etc. Emission<br />

rate (kg/hr.) for each<br />

pollutant (SPM, SO2,<br />

NOx, etc. should be<br />

specified<br />

No.<br />

Chairman<br />

107<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong><br />

Emission<br />

rate<br />

(kg/hr)<br />

in flue gas<br />

(g/sec)<br />

1 SPM Stack 0.125 0.035<br />

2 SO2 Stack Negligible Negligible<br />

amount amount<br />

3 NOX Stack Concentration in flue gas will<br />

be 100 mg/Nm 3<br />

4 CO Stack NA NA<br />

Plant<br />

Section<br />

& units<br />

Roa<strong>st</strong>ing<br />

Furnace<br />

Emission Standard N.A<br />

Ambient Air Quality Data<br />

Pollutant<br />

PM10<br />

PM2.5<br />

SO2<br />

NOX<br />

Stack<br />

No.<br />

1 <strong>st</strong><br />

Permissible<br />

Standard<br />

µg/m 3<br />

Height<br />

from<br />

ground<br />

level<br />

(m)<br />

Internal<br />

Diameter<br />

(Top)(m)<br />

Emission<br />

Rate<br />

(kg /hr)<br />

30 0.2 0.125 120<br />

Proposed<br />

Concentration<br />

(in µg/m 3 )<br />

Remarks<br />

Temp.<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong><br />

Exhau<strong>st</strong><br />

Gases<br />

( 0 C)<br />

100 18 Due to proposed<br />

activity there is<br />

60 8 slightly increase in<br />

pollution activity it<br />

80 Negligible will be mitigate by<br />

amount providing pollution<br />

80 -<br />

control equipments<br />

such as wet<br />

scrubber & du<strong>st</strong><br />

suppression method<br />

& by developing<br />

green belt around<br />

the factory and<br />

within the premises


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Details <<strong>st</strong>rong>of</<strong>st</strong>rong> Fuel to be used:<br />

Energy<br />

Green Belt Development<br />

Details <<strong>st</strong>rong>of</<strong>st</strong>rong> Pollution<br />

Control Sy<strong>st</strong>ems:<br />

<strong>Environment</strong>al<br />

Management plan<br />

Budgetary Allocation<br />

Sr.<br />

No<br />

Fuel<br />

1 Gas<br />

2 Naphtha<br />

3 HSD<br />

4 Fuel Oil<br />

5 Coal<br />

6 Lignite<br />

Daily Consumption<br />

(TPD/KLD)<br />

Exi<strong>st</strong>ing Proposed<br />

7 Fire<br />

2 TPD - 0.3- Trace<br />

Wood<br />

1%<br />

• Source <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel: Fire Wood : Saw Mill<br />

• Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> transportation <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel to site: Tractor trolley with<br />

tarpaulin covered truck<br />

Power supply:<br />

• Proposed power requirement: 8 hp<br />

Power supply from MSEDCL.<br />

Chairman<br />

108<br />

Calorific<br />

value<br />

(Kcals<br />

/kg)<br />

%<br />

Ash<br />

- - - -<br />

• Green belt area (Sq. m.): 1300<br />

• Number and species <<strong>st</strong>rong>of</<strong>st</strong>rong> trees to be planted : 125 nos<br />

Sr.<br />

No.<br />

Exi<strong>st</strong>ing<br />

pollution<br />

control<br />

sy<strong>st</strong>em<br />

Proposed to be<br />

in<strong>st</strong>alled<br />

%<br />

Sulphur<br />

1 Air -- Wet Scrubber<br />

2 Water<br />

-- Septic tanks followed<br />

by Soak Pits<br />

3 Noise<br />

-- Acou<strong>st</strong>ic Enclosures<br />

will be provided<br />

4 Solid Wa<strong>st</strong>e<br />

-- It will be recycled in<br />

the reduction process<br />

• Capital co<strong>st</strong> (With break up): 1 Lakhs<br />

• O&M co<strong>st</strong> (With break up): 25 Thousand


Decision:<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Sr.<br />

No.<br />

Chairman<br />

109<br />

Recurring Co<strong>st</strong><br />

per annum<br />

(Rs Thousand)<br />

Air Pollution Control 10 55<br />

Water Pollution Control 4 10<br />

Noise Pollution Control 2 5<br />

<strong>Environment</strong> Monitoring<br />

and Management<br />

5 15<br />

Reclamation<br />

borrow/mined area (If<br />

applicable)<br />

--- ---<br />

Occupational Health 2 5<br />

Green Belt 2 10<br />

Solid wa<strong>st</strong>e management<br />

Others ( Pl. Specify)<br />

- ---<br />

Total 25 100<br />

Capital<br />

Co<strong>st</strong> (Rs<br />

Thousand)<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed.<br />

Considering the project size (small unit) and products details and <strong>SEAC</strong> decided to consider it<br />

under Category B2<br />

<strong>SEAC</strong> decided to recommend the proposal for <strong>Environment</strong>al <strong>Clearance</strong> only after complying<br />

with the following condition:<br />

1. Submit letter from Fore<strong>st</strong> Department clarifying the boundary <<strong>st</strong>rong>of</<strong>st</strong>rong> the fore<strong>st</strong> from the<br />

proposed site and submit NOC, if needed.<br />

2. Submit NA order<br />

3. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>ewater treatment<br />

4. Submit green belt area details showing large broad leaf trees all around the boundary.


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 30<br />

Subject: TOR for proposed expansion <<strong>st</strong>rong>of</<strong>st</strong>rong> "Shree Bhimeshwai Ispat Pvt Ltd." Located at J-<br />

17,Additional MIDC Satara by M/s. Shree Bhimeshwari Ispat Pvt. Ltd<br />

(File No. <strong>SEAC</strong> 2011/ CR-521 / TC2)<br />

PP was absent<br />

Chairman<br />

110


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 31<br />

Subject: TOR for proposed Ferro Alloys unit, at Plot No A-7, to A-11, MIDC area, Village<br />

Tahsil Tumsar, Di<strong>st</strong> Bhandara by M/s Minerals and Techno Product<br />

(File No. <strong>SEAC</strong> 2011/ CR-175 / TC2)<br />

PP was absent<br />

Chairman<br />

111


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 32<br />

Subject: TOR for proposed manufacture <<strong>st</strong>rong>of</<strong>st</strong>rong> synthetic organic chemicals at plot no. 18,<br />

additional MIDC indu<strong>st</strong>rial area, Ambernath by M/s. Hemindas<br />

(File No. <strong>SEAC</strong> 2011/ CR-166 / TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project Synthetic organic chemicals<br />

Project Proponent M/s. Hemindas<br />

Consultant<br />

M/s. Sadekar Enviro Engineers Pvt. Ltd.<br />

New Project / Expansion New Project<br />

in exi<strong>st</strong>ing project/<br />

Modernization/<br />

Diversification in exiting<br />

project<br />

Activity schedule in the<br />

EIA Notification<br />

5 (f) – B2<br />

Area Details 2100.00 sq .m<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Notified<br />

Indu<strong>st</strong>rial area / MIDC<br />

Area<br />

MIDC, Additional Ambernath<br />

E<strong>st</strong>imated capital co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> 75 Lacs<br />

the Project (including<br />

co<strong>st</strong> for land, building,<br />

plant and machinery<br />

separately)<br />

Location details <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

project :<br />

Raw materials (including<br />

N-18, MIDC , Additional Ambernath, Thane<br />

process chemicals,<br />

cataly<strong>st</strong>s, & additives).<br />

Sr.<br />

No Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Raw<br />

Quantity<br />

Stored at<br />

Mode <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

Storage Location<br />

. Material<br />

a time<br />

(MT)<br />

1. Meta chloroaniline 1.0 Fiber<br />

Drum<br />

RM Stores<br />

2 Bromo benzene 0.75 Fiber<br />

Drum<br />

RM Stores<br />

3 Formic acid 1.0 S.S.Tank/<br />

M.SDrum<br />

RM Stores<br />

4 Toluene 3.0 M.S. Solvent<br />

Tank Yard<br />

5 Sulphuric acid 1.0 HDPE<br />

Carboy<br />

RM Stores<br />

Chairman<br />

112


Production details<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

6 Hydrochloric acid 1.0 HDPE<br />

Carboy<br />

RM Stores<br />

7 Monochloro benzene 1.0 HDPE Solvent<br />

Drum Yard<br />

8 Sulphur 1.0 Bags RM Stores<br />

9 Iodine 0.2 Bags RM Stores<br />

10 Potassium Carbonate 0.5 Bags RM Stores<br />

11 Sodium thiosulphate 1.0 Bags RM Stores<br />

12 Cau<strong>st</strong>ic 1.5 Bags RM Stores<br />

13 Activated carbon 0.5 Bags RM Stores<br />

14 Hydroquinone 0.5 Kraft<br />

paper bag<br />

RM Stores<br />

15 Methanol 2.0 M.S. Solvent<br />

Tank Yard<br />

16 Diethyl amine 1.0 HDPE<br />

Drum<br />

RM Stores<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Products,<br />

By products and<br />

Intermediate<br />

Products<br />

Chlorpromazine<br />

Hydrochloride<br />

Chairman<br />

113<br />

Proposed<br />

activity (new/<br />

modernization<br />

/ expansion)<br />

New<br />

Total<br />

(TPM)<br />

5.0<br />

Ethamsylate New<br />

Total 5.0<br />

Total Water<br />

Total water requirement: 07 CMD<br />

Requirement<br />

• Fresh water (CMD): 07 & Source MIDC<br />

• Recycled water (CMD): NA<br />

Use <<strong>st</strong>rong>of</<strong>st</strong>rong> the water:<br />

• Process (CMD): 01<br />

• Cooling water (CMD): 03<br />

• DM Water (CMD): Nil<br />

• Du<strong>st</strong> Suppression (CMD): Nil<br />

• Drinking (CMD): 01<br />

• Green belt (CMD): 01<br />

• Fire service (CM: 0.5<br />

Storm water drainage • Natural water drainage pattern : Through MIDC drain<br />

• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water : 08 cum/min<br />

• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD: 600 x 800 mm<br />

Sewage generation and<br />

treatment<br />

Effluent characteri<strong>st</strong>ic<br />

Septic tank & over flow diverted to MIDC drain<br />

Sr. Parameters Inlet effluent Outlet Effluent<br />

No. (pH, BOD, characteri<strong>st</strong>ic effluent discharge<br />

COD, heavy<br />

charac. <strong>st</strong>andards<br />

metal, etc)<br />

(CPCB


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

1 pH 6.2 7.5<br />

/MPCB)<br />

5.5-9.0<br />

2 BOD 350 65.0 mg/lit 100 mg/l<br />

3 COD 1050 190 mg/lit 250 mg/l<br />

4 SS 180 56.0 mg/lit 100 mg/l<br />

ETP details Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> effluent generation (CMD): 1<br />

• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the ETP (CMD) : 05<br />

• Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> treated effluent recycled (CMD): Nil<br />

• Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> water send to the CETP (CMD): 0.5<br />

• Membership <<strong>st</strong>rong>of</<strong>st</strong>rong> the CETP (If require): Yes<br />

Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> the ETP<br />

sludge (If applicable)<br />

Sent to CHWTSDF, Taloja<br />

Solid wa<strong>st</strong>e Management<br />

Atmospheric Emissions<br />

(Flue gas characteri<strong>st</strong>ics<br />

SPM, SO2, NOx, CO,<br />

etc.)<br />

Stack emission Details:<br />

(All the <strong>st</strong>acks attached to<br />

process units, Boilers,<br />

captive power plant, D.G.<br />

Sets, Incinerator both for<br />

exi<strong>st</strong>ing and proposed<br />

activity). Please indicate<br />

the specific section to<br />

which the <strong>st</strong>ack is<br />

attached. e.g.: Process<br />

section, D.G. Set, Boiler,<br />

Power Plant, incinerator<br />

etc. Emission rate (kg/hr.)<br />

for each pollutant (SPM,<br />

SO2, NOx etc. should be<br />

Sr.<br />

No.<br />

Source Qty<br />

(TPM)<br />

Chairman<br />

114<br />

Form<br />

(Sludge /Dry<br />

/ Slurry etc.)<br />

1 ETP 0.025 Sludge 33.4<br />

2 Process<br />

Residue<br />

0.075 Slurry 36.4<br />

3 Spent<br />

Cataly<strong>st</strong><br />

0.2 Dry 28.2<br />

4 Empty<br />

Containers<br />

50 No - 33.3<br />

Sr.<br />

No.<br />

Pollutant Source <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

Emissions<br />

Emission<br />

rate<br />

(kg/hr)<br />

1 SPM Fuel 0.15 kg/hr -<br />

2 SO2 Fuel 0.12 kg/hr -<br />

3 NOx Fuel 0.81 kg/hr -<br />

# Plant<br />

Sections<br />

and unit<br />

Stack<br />

No.<br />

Height<br />

from<br />

ground<br />

level<br />

Inte<br />

dia<br />

Composition<br />

Concentration<br />

in flue gas<br />

(g/m3)<br />

Emis<br />

s rate<br />

1 Boiler 1 10.0 m 0.5 m 15<br />

m/s<br />

2 D.G 1 4.5 m -<br />

Temp.<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong><br />

Exhau<br />

<strong>st</strong><br />

Gases<br />

130 0 C


specified<br />

Emission Standard<br />

Ambient Air Quality<br />

Data<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Details <<strong>st</strong>rong>of</<strong>st</strong>rong> Fuel to be used:<br />

Sr.<br />

No.<br />

Pollutant<br />

Chairman<br />

115<br />

Emission<br />

Standard<br />

Limit<br />

(µg/Nm3)<br />

MPCB<br />

Consent<br />

(mg/Nm3)<br />

1 SPM 500 150<br />

2 SO2 80 7.92 kg/hr<br />

3 NOx 80 -<br />

4 CO 02 -<br />

5 Others<br />

Sr.<br />

No.<br />

Pollutant<br />

(SPM,<br />

SOx)<br />

Permissible<br />

Standard<br />

Proposed<br />

Concentration<br />

(in µg/m 3 )<br />

Remarks<br />

1 SPM 500 1.2 Within limit<br />

2 SO2 80 0.8 Within limit<br />

3 NOx 80 1.6 Within limit<br />

4 CO 02 -<br />

5 Others<br />

# Fuel Consumption<br />

(TPD/KLD)<br />

Exi<strong>st</strong>ing Proposed<br />

Calorific<br />

value<br />

(Kcals<br />

/kg)<br />

%<br />

Ash<br />

1 LDO - 0.1 10,700 0.02 1.2<br />

Source <<strong>st</strong>rong>of</<strong>st</strong>rong> Fuel : Local Vendor<br />

Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> transportation <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel to site: By Road<br />

Energy Power supply:<br />

• Proposed power requirement: 250 KVA<br />

DG sets:<br />

• Number and capacity DG sets to be used : 50 KVA x 01<br />

Green Belt Development Green belt area (Sq. m.): 345.00 sq. m<br />

Details <<strong>st</strong>rong>of</<strong>st</strong>rong> Pollution<br />

Control Sy<strong>st</strong>ems:<br />

<strong>Environment</strong>al<br />

Management plan<br />

Budgetary Allocation<br />

• Number and species <<strong>st</strong>rong>of</<strong>st</strong>rong> trees to be planted :105 No<br />

# Particul Exi<strong>st</strong>ing Pollution Proposed to be<br />

ar control sy<strong>st</strong>em in<strong>st</strong>alled<br />

1 Air - Scrubber<br />

2 Water - ETP (05 KLD)<br />

3 Noise Acou<strong>st</strong>ic<br />

enclosures<br />

4 Solid<br />

Segregate & sent<br />

Wa<strong>st</strong>e<br />

to CHWTSDF<br />

# Particular Recurring<br />

Co<strong>st</strong> per<br />

Capital<br />

Co<strong>st</strong> (lacs)<br />

%<br />

S


Decision:<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

1 Air Pollution Control<br />

annum<br />

(lacs)<br />

01 06<br />

2 Water Pollution Control 02 08<br />

3 Noise Pollution Control 0.5 02<br />

4 <strong>Environment</strong> Monitoring 0.5 -<br />

and Management<br />

5 Occupational Health 0.5 04<br />

6 Green Belt 0.5 01<br />

7 Solid wa<strong>st</strong>e Management 0.5 01<br />

9 Total 5.5 22<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />

to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />

discussed.<br />

Considering the project size and its location in notified indu<strong>st</strong>rial area and <strong>SEAC</strong> decided to<br />

considered it under Category B2<br />

<strong>SEAC</strong> decided to recommend the proposal for <strong>Environment</strong>al <strong>Clearance</strong> only after complying<br />

with the following condition:<br />

1. Submit hazardous material li<strong>st</strong> and required safety measures.<br />

Chairman<br />

116


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Item No. 33<br />

Subject: <strong>Environment</strong> clearance for proposed Residential Project atS.No.54, Undri, Tal.<br />

Haveli, Di<strong>st</strong>t.Pune by M/s Amit Enterprises Housing Ltd<br />

(File No. <strong>SEAC</strong> 2011/ CR-542 / TC2)<br />

The Project Proponent explained the proposal before the committee and committee noted<br />

project details furnished by the Project Proponent as:<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Proponent M/s. Amit Purvant Joint Venture<br />

Name, contact number &<br />

address <<strong>st</strong>rong>of</<strong>st</strong>rong> Consultant<br />

M/s. Ultra-Tech <strong>Environment</strong>al Consultancy & Laboratory<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong> project Mixed use Development<br />

Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the project S. No. 54, Village Undri, Tehsil- Haveli, Di<strong>st</strong>.-Pune, State –<br />

Maharashtra.<br />

Whether in Corporation /<br />

Municipal / other area<br />

Town Planning Department.<br />

Whether in Corporation /<br />

Municipal / other area<br />

Town Planning Department.<br />

Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the DCR A class municipal Corporation in 10 km radius.<br />

Total Plot Area (sq. m.) Total Plot Area: 74025.00 Sq. Mt.<br />

Deductions<br />

Deductions :-<br />

Net Plot area<br />

Road Widening: 9279.87 Sq. Mt.<br />

Encroachment: 5567.75 Sq. Mt.<br />

Net Plot Area : 59177.38 Sq. Mt.<br />

Permissible FSI Residential and commercial: 59230.66 Sq. Mt.<br />

(including<br />

TDR etc.)<br />

Amenity :8876.<<strong>st</strong>rong>61</<strong>st</strong>rong> Sq. Mt.<br />

Proposed Built-up Area FSI :<br />

(FSI & Non-FSI) Residential and commercial :57558.65 Sq.Mt.<br />

Amenity : 5939.04 Sq. Mt.<br />

Non FSI :<br />

Residential and commercial: 47220.74 Sq. Mt.<br />

Amenity : 7145.51Sq. Mt.<br />

Total Con<strong>st</strong>ruction built up area<br />

Residential and commercial : 104779.39 Sq. Mt.<br />

Amenity : 13084.55 Sq. Mt.<br />

Ground-coverage Residential and commercial development : 11477.18 Sq. Mt.<br />

Percentage (%)<br />

(25.8 % <<strong>st</strong>rong>of</<strong>st</strong>rong> plot area available for the residential and<br />

(Note: Percentage <<strong>st</strong>rong>of</<strong>st</strong>rong> plot commercial development)<br />

not open to sky)<br />

Amenity : 2200 Sq. Mt (24.8 % <<strong>st</strong>rong>of</<strong>st</strong>rong> the plot area available for<br />

the development <<strong>st</strong>rong>of</<strong>st</strong>rong> amenity)<br />

E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the Rs. 163.32/- Corers<br />

Chairman<br />

117


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project<br />

project<br />

“Mixed use Development ”<br />

No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />

configuration(s)<br />

No. Phase<br />

Type <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

building<br />

No. <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

bldg<br />

No <<strong>st</strong>rong>of</<strong>st</strong>rong> floors<br />

1 1 Residential 2 P +10 Upper floors<br />

2 Residential 10 P +11 Upper floors<br />

3 Commercial 1 G + 1 upper floor<br />

4<br />

2 Government<br />

Building<br />

Residential<br />

1 P + 5 upper floors<br />

5 Bungalows 2 G + 1 upper floor<br />

8 3 Shops<br />

9 Re<strong>st</strong>aurant<br />

10 Banquet Hall<br />

11 Studios<br />

Chairman<br />

118<br />

1<br />

2 basement + 4 upper<br />

floors<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants and<br />

shops<br />

No. Phase Type <<strong>st</strong>rong>of</<strong>st</strong>rong> building Total Tenements<br />

1 1 Residential 120<br />

2<br />

Residential 880<br />

3 Commercial 2 showrooms<br />

4<br />

2 Government Building<br />

60<br />

Residential<br />

5 Bungalows 2<br />

8 3 Shops 29<br />

9 Re<strong>st</strong>aurant 1<br />

10 Banquet Hall 1<br />

11 Studios 64<br />

Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />

residents / users<br />

6519 Nos.<br />

Tenant density per hector 239 No. <<strong>st</strong>rong>of</<strong>st</strong>rong> tenement per hector<br />

Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building(s) 37 m<br />

Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way (Width <<strong>st</strong>rong>of</<strong>st</strong>rong> The plot is abutting to the 60 m wide road on north side and 15<br />

the road from the neare<strong>st</strong> m wide road on ea<strong>st</strong> side and 24 m wide road on South side.<br />

fire <strong>st</strong>ation to the<br />

proposed building(s))<br />

Turning radius for easy 9 m (Fire NOC is sought and provisional fire NOC is<br />

access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire tender received)<br />

movement from all<br />

around the building<br />

excluding the width for<br />

the plantation<br />

Exi<strong>st</strong>ing <strong>st</strong>ructure(s) No exi<strong>st</strong>ing <strong>st</strong>ructures on site.<br />

Total Water Dry season:


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />

Requirement • Fresh water (CMD):<br />

Phase 1: 54<br />

Phase 2 : 432<br />

Phase 3 : 36<br />

& Source: PMC via Grampanchayt <<strong>st</strong>rong>of</<strong>st</strong>rong> Undri under scheme<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong> Bharat Nirman Yojna./Tankers<br />

• Recycled water (CMD):<br />

Phase 1: 38<br />

Phase 2 : 266<br />

Phase 3 : 49<br />

• Total Water Requirement (CMD):<br />

Phase 1: 92<br />

Phase 2 : 698<br />

Phase 3 : 85<br />

• Swimming pool make up (Cum):<br />

Phase 2 : 5<br />

• Fire fighting (Cum):<br />

Phase 1: 100<br />

Phase 2 : 350<br />

Phase 3 : 100<br />

Wet Season:<br />

• Fresh water (CMD):<br />

Phase 1: 54<br />

Phase 2 : 432<br />

Phase 3 : 36<br />

& Source: PMC via Grampanchayt <<strong>st</strong>rong>of</<strong>st</strong>rong> Undri under scheme<br />

<<strong>st</strong>rong>of</<strong>st</strong>rong> Bharat Nirman Yojna.<br />

• Recycled water (CMD):<br />

Phase 1: 27<br />

Phase 2 : 218<br />

Phase 3 : 30<br />

• Total Water Requirement (CMD):<br />

Phase 1: 81<br />

Phase 2 : 693<br />

Phase 3 : 66<br />

• Swimming pool make up (CMD):<br />

Phase 2 : 5<br />

• Fire fighting (CMD):<br />

Phase 1: 100<br />

Chairman<br />

119


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />

Phase 2 : 350<br />

Rain Water Harve<strong>st</strong>ing<br />

(RWH)<br />

Phase 3 : 100<br />

• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table: 9.10 m.<br />

• Surface run <<strong>st</strong>rong>of</<strong>st</strong>rong>f will be recharged to ground through with<br />

25 Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits out <<strong>st</strong>rong>of</<strong>st</strong>rong> which 10 will be with bores<br />

(depth 15m) & 15 will be without bore in the form <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

chamber with increased sizes (2.0 M x 2.0M x 2.0M).<br />

• 39843 m 3 /season rain water harve<strong>st</strong>ing is planned.<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />

- Capital Co<strong>st</strong> : Rs. 11.25 Lakh<br />

- O & M Co<strong>st</strong>: Rs. 0.5 Lakh/ Annum<br />

UGT tanks • Location(s) <<strong>st</strong>rong>of</<strong>st</strong>rong> the UGT tank(s):<br />

- 3 Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> UG tanks are provided one is near amenity<br />

space, second is near building E and third is near twin<br />

bungalows.<br />

Storm water drainage • Natural water drainage pattern: land gently sloping towards<br />

south<br />

• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water: 0.16 m 3 /min<br />

• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD: Internal SWD Capacity : 750 mm dia<br />

Sewage and Wa<strong>st</strong>e<br />

water<br />

channel having slope 1:200<br />

• Sewage generation (CMD):<br />

Phase 1: 73<br />

Phase 2 : 580<br />

Phase 3 : 60<br />

• STP technology: Fluidized Aerobic Bio-Reactor (FAB)<br />

• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD) :<br />

Phase 1: 75<br />

Phase 2 : 580<br />

Phase 3 : 60<br />

• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP: 3 Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> STP, one is near A<br />

building, second is near K building and third is near<br />

commercial building.<br />

• DG sets (during emergency): Load considered in the<br />

Common D.G. Set<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />

- Capital Co<strong>st</strong> : Rs. 94 Lakhs<br />

- O & M : Rs. 37.60 Lakhs/ Annum<br />

Chairman<br />

120


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />

Solid wa<strong>st</strong>e Management Wa<strong>st</strong>e generation in the Pre Con<strong>st</strong>ruction and<br />

Con<strong>st</strong>ruction phase:<br />

• Wa<strong>st</strong>e generation<br />

a. Debris:<br />

Excavation quantity : 123094.62 m 3 (approx)<br />

This material shall be used for back filling and leveling <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />

plot within the site premises.<br />

b. Top soil preservation / conservation: 10652 m 3 (approx)<br />

Shall be preserved and reused within the site for landscaping.<br />

Wa<strong>st</strong>e generation in the operation Phase:<br />

• Dry wa<strong>st</strong>e (Kg/day):<br />

Phase 1: 110<br />

Phase 2 : 910<br />

Phase 3 : 200<br />

• Wet wa<strong>st</strong>e (Kg/day):<br />

Phase 1: 170<br />

Phase 2 : 1360<br />

Phase 3 : 210<br />

STP Sludge (Dry sludge) (Kg/day):<br />

Phase 1: 11<br />

Phase 2 : 87<br />

Phase 3 : 9<br />

Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>e:<br />

• Dry wa<strong>st</strong>e: will be handed over to authorize Contractors.<br />

• Wet wa<strong>st</strong>e: will be treated in Organic Wa<strong>st</strong>e Converter<br />

(OWC).<br />

• E – wa<strong>st</strong>e: send to Authorized contractor<br />

• Hazardous wa<strong>st</strong>e: Wa<strong>st</strong>e oil which is generated due to<br />

usage <<strong>st</strong>rong>of</<strong>st</strong>rong> DG sets shall be <strong>st</strong>ored and subsequently given to<br />

the authorized hazardous wa<strong>st</strong>e management agencies<br />

recognized by MPCB.<br />

• STP Sludge (Dry sludge): Dried sludge from STP will be<br />

used as manure.<br />

Area requirement:<br />

Phase 1: 25 Sq.Mt<br />

Phase 2 : 185 Sq.Mt<br />

Phase 3 : 30 Sq.Mt<br />

- 3 Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> OWCs one is near A building, second is near<br />

K building and third is near commercial building.<br />

Chairman<br />

121


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />

Green Belt<br />

Development<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />

- Capital Co<strong>st</strong> : Rs. 23 Lakhs<br />

- O & M : Rs. 5.4 Lakhs/ Annum<br />

Total RG area:<br />

1. RG area other than green belt (Please specify for<br />

Playground, etc.): Not applicable.<br />

2. RG area under green belt:<br />

• RG on the ground (sq. m.):<br />

Phase 1 : 1682.27 Sq. Mt.<br />

Phase 2 : 7315.43 Sq. Mt.<br />

Phase 3 : 3257 Sq. Mt.<br />

Total : 12254.70 Sq. Mt.<br />

Hardscape Area: 1075.79 Sq. Mt.<br />

Ground R.G. is 25 % <<strong>st</strong>rong>of</<strong>st</strong>rong> the Net Plot Area.<br />

• RG on the podium (sq. m.): Not Applicable<br />

3. Plantation:<br />

• Number and li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> trees species to be planted in the ground<br />

RG: 725 Nos.<br />

Chairman<br />

122


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />

Chairman<br />

123


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />

• Number and li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> shrubs and bushes species to be<br />

Planted in the podium RG: not applicable<br />

• Number and li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> trees species to be planted around the<br />

border <<strong>st</strong>rong>of</<strong>st</strong>rong> nallah / <strong>st</strong>ream / pond (If any): Not Applicable.<br />

• Number, size, age and species <<strong>st</strong>rong>of</<strong>st</strong>rong> trees to be cut, trees to be<br />

transplanted:<br />

There total 22 trees exi<strong>st</strong>ing tress on the site.<br />

Trees to be retained on place : 22 Nos.<br />

Chairman<br />

124


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />

Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />

- Capital Co<strong>st</strong> : Rs. 69.05 Lakhs<br />

- O & M Co<strong>st</strong> : Rs. 11.05 Lakhs/ Annum<br />

Energy Power supply:<br />

• Maximum demand:<br />

Phase 1 : 1450 KW<br />

Phase 2 : 10782 KW<br />

Phase 3 : 1000 KW<br />

• Connected load :<br />

Phase 1 : 590 KW<br />

Phase 2 : 4334 KW<br />

Phase 3 : 435 KW<br />

• Source: M.S.E.D.C.L.<br />

Energy saving by non-conventional method:<br />

• Energy saving measures:<br />

- Using CFL in Parking area, lift-lobby and <strong>st</strong>reet<br />

lighting.<br />

- Use <<strong>st</strong>rong>of</<strong>st</strong>rong> PP cement.<br />

- Cross ventilation.<br />

- Solar Water Heating.<br />

• Detail calculations & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving:<br />

- The Overall savings by using all the Energy saving<br />

Measures will be<br />

24.6 % by in using CFL in Staircase and parking.<br />

17 % by using CFL in <strong>st</strong>reet lighting.<br />

Sr.<br />

No<br />

Section<br />

No.<br />

1 6.2.1<br />

2 6.2.2<br />

3 7.2<br />

Chairman<br />

125<br />

Requirement<br />

Solar water heating for<br />

minimum<br />

capacity<br />

20% design<br />

Equipment efficiency<br />

<strong>st</strong>andards<br />

Lighting for common area<br />

controls occupancy<br />

sensors.<br />

4 7.2.1.2 Space control for lighting<br />

5 7.2.1.4<br />

Exterior lighting to be<br />

controlled by time switch<br />

Comp<br />

liance<br />

Compl<br />

ies.<br />

Compl<br />

ies.<br />

Compl<br />

ies.<br />

Compl<br />

ies.<br />

Compl<br />

ies.<br />

6 7.3 Interior lighting power to Compl


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />

be within specified limits ies.<br />

<strong>Environment</strong>al<br />

Management plan<br />

Budgetary<br />

Allocation<br />

7 7.4<br />

8 8.2.1.1<br />

Chairman<br />

126<br />

Exterior lighting power to<br />

be within specified limits<br />

Maximum allowable power<br />

loss from transformer to be<br />

within specified limits.<br />

9 8.2.2 Energy efficient motors.<br />

10 8.2.3<br />

Power factor be maintained<br />

between 0.95 and unity<br />

11 8.2.4 Check metering<br />

12 8.2.5<br />

Power di<strong>st</strong>ribution sy<strong>st</strong>em<br />

losses to be maintained<br />

less than 1%<br />

• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />

Solar heating<br />

- Capital Co<strong>st</strong> : Rs. 230.54 Lakhs<br />

- O & M Co<strong>st</strong> : Rs. 3.96 Lakhs/ Annum<br />

DG Set:<br />

• Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used:<br />

Phase 1 : 1 No. <<strong>st</strong>rong>of</<strong>st</strong>rong> 250 KVA capacity<br />

Phase 2 : 2 Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> 250 KVA capacity each<br />

Phase 3 : 1 No. <<strong>st</strong>rong>of</<strong>st</strong>rong> 250 KVA capacity<br />

Compl<br />

ies.<br />

Compl<br />

ies.<br />

Compl<br />

ies.<br />

Compl<br />

ies.<br />

Compl<br />

ies.<br />

Compl<br />

ies.<br />

• Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used : LSD<br />

Con<strong>st</strong>ruction phase (with Break-up):<br />

• Capital co<strong>st</strong>:<br />

• O& M co<strong>st</strong> (Please ensure manpower and other details)<br />

Sr.<br />

No. Parameter<br />

Total Co<strong>st</strong><br />

(Rs. In Lacs)<br />

1<br />

Water For Du<strong>st</strong><br />

Suppression<br />

0.24<br />

2 Site Sanitation 0.5<br />

3 <strong>Environment</strong>al<br />

Monitoring<br />

0.36<br />

4 Disinfection 0.6<br />

5 Health Check Up 2.4<br />

Total Co<strong>st</strong> 4.1<br />

Operation Phase (with Break-up)-


<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />

• Capital co<strong>st</strong><br />

• O&M co<strong>st</strong> (Please ensure manpower and other details)<br />

Parameter<br />

Total Set Up<br />

Co<strong>st</strong> (Rs. In<br />

Lacs)<br />

STP Co<strong>st</strong> 94 37.60<br />

Rain Water<br />

Harve<strong>st</strong>ing<br />

<strong>Environment</strong>al<br />

Monitoring<br />

Chairman<br />

127<br />

11.25 0.5<br />

MoEF<br />

approved<br />

laboratory<br />

Operational And<br />

Maintenance Co<strong>st</strong><br />

Per Yr (Rs. In<br />

Lacs)<br />

22.34<br />

Solar hot water<br />

sy<strong>st</strong>em<br />

230.54 3.96<br />

Gardening 69.05 11.05<br />

Solid Wa<strong>st</strong>e<br />

Management<br />

23 5.40<br />

Total 427.84 80.85<br />

• Quantum and generation <<strong>st</strong>rong>of</<strong>st</strong>rong> Corpus fund and<br />

Commitment<br />

Project proponent shall operate and maintain EMF for 3 years<br />

after giving possession and shall also generate corpus fund<br />

during 3 years for O & M <<strong>st</strong>rong>of</<strong>st</strong>rong> Rs. 242.55 lacs (i.e. 80.85 lacs x<br />

3 years).<br />

• Responsibility for further O &M:<br />

Corpus fund shall be handed over to the party. While handing<br />

over <strong>Environment</strong>al Management Facilities M.O.U. shall be<br />

made with society to accept responsibility <<strong>st</strong>rong>of</<strong>st</strong>rong> further O & M <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

EMF.<br />

Traffic Management Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> the junction to the main road & design <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

confluence: Traffic generated from this project will confluent<br />

on 15 m wide road on Ea<strong>st</strong> side and 60 m wide road on North<br />

side and 24 m wide road on South side.<br />

Parking details:<br />

• Number and area <<strong>st</strong>rong>of</<strong>st</strong>rong> basement: 2 Nos. in commercial<br />

building.<br />

• Number and area <<strong>st</strong>rong>of</<strong>st</strong>rong> podia: Not Applicable<br />

• Total Parking area: 14730.66 Sq. Mt.<br />

• Area per car: 25.98 Sq.mt.<br />

• 2-Wheelar: 1328 Nos.<br />

• 4-Wheeler: 636 Nos.<br />

• Public Transport : Nil<br />

Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal roads (m): 6 m wide Internal Roads.


Decision:<br />

<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />

The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues<br />

related to environment, including air, water, land, soil, ecology, biodiversity and social<br />

aspects were discussed. The proposal is indicated as only for phase iii, however a review is<br />

required to be taken for the entire project at the time <<strong>st</strong>rong>of</<strong>st</strong>rong> appraisal.It is therefore necessary<br />

for the PP to submit the details <<strong>st</strong>rong>of</<strong>st</strong>rong> the entire plot,its hi<strong>st</strong>ory,the present <strong>st</strong>ate <<strong>st</strong>rong>of</<strong>st</strong>rong><br />

development and conveyance <<strong>st</strong>rong>of</<strong>st</strong>rong> earlier phases along with the compliance with<br />

environmental norms etc.The pp should therefore submit these details on a a large<br />

drawing.,superimposed on contour map.The proponent also directed to comply with the<br />

following observations:<br />

1. Submit the revised plot area calculations as PP agreed to widen the 15 m right <<strong>st</strong>rong>of</<strong>st</strong>rong> way to<br />

18 m by including the exi<strong>st</strong>ing setback from their plot.<br />

2. Submit compliance report to the terms and conditions <<strong>st</strong>rong>of</<strong>st</strong>rong> the Special Land Scheme<br />

(Vishesh Bhumi Yojana) mentioned in Collector’s letter dated 11/04/2012.<br />

3. Submit details regarding the plot area to be handed over to the Government. Indicate the<br />

same on the layout plan<br />

4. Submit the revised NA Order as PP clarified that NA permission which was grated in 2007<br />

is being revised<br />

5. Ju<strong>st</strong>ify the parking calculations as two basements and two <strong>st</strong>ilts are provided in different<br />

buildings, if possible reduce a basement.<br />

6. Submit the location <<strong>st</strong>rong>of</<strong>st</strong>rong> STP including calculations and plant layout, along with a cross<br />

section and dimensions <<strong>st</strong>rong>of</<strong>st</strong>rong> various treatment units. STP shall be with proper ventilation<br />

and side clearances for O & M<br />

7. Ju<strong>st</strong>ify the area provided for OWC with calculations and details<br />

8. Avoid car parking on the we<strong>st</strong>ern side <<strong>st</strong>rong>of</<strong>st</strong>rong> the plot and relocate UG tank for better fire<br />

tender movement<br />

9. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> natural lighting and ventilation for the LIG building<br />

10. Submit scheme <<strong>st</strong>rong>of</<strong>st</strong>rong> lighting and ventilation for two level basement.<br />

11. Submit revised green belt plan <<strong>st</strong>rong>of</<strong>st</strong>rong> trees to be planted (#725) on ground RG and after<br />

widening the 15m road.<br />

Chairman<br />

128