Minutes of 61 st SEAC meeting - Environment Clearance
Minutes of 61 st SEAC meeting - Environment Clearance
Minutes of 61 st SEAC meeting - Environment Clearance
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
State Level Expert Appraisal Committee (<strong>SEAC</strong>)<br />
held on 10 th to 12 th October, 2012 at 10:00 A.M.<br />
The following members were present for the committee <strong>meeting</strong>.<br />
1. Dr. Sukumar Devotta<br />
2. Er. G. K. Deshpande<br />
3. Ar. Mukund S. Athavale<br />
4. Dr. Prashant P. Bhave<br />
5. Pr<<strong>st</strong>rong>of</<strong>st</strong>rong>. Tarun Kant<br />
6. Dr. Jay S. Samant<br />
7. Er. Chandrakant I. Sambutwad<br />
8. Er. Balbir Singh Sehgal<br />
9. Shri A. R. Parshurame<br />
... Chairman 10 th to 12 th October, 2012<br />
… Member 10 th to 12 th October, 2012<br />
… Member 10 th to 12 th October, 2012<br />
… Member 10 th to 12 th October, 2012<br />
… Member 10 th to 12 th October, 2012<br />
… Member 10 th to 12 th October, 2012<br />
… Member 10 th to 12 th October, 2012<br />
… Member 10 th to 12 th October, 2012<br />
… Member<br />
Secretary<br />
Member Secretary <strong>SEAC</strong>, <strong>Environment</strong> Department welcomed the members <<strong>st</strong>rong>of</<strong>st</strong>rong> the committee.<br />
Chairman<br />
1<br />
10 th to 12 th October, 2012
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 1<br />
Subject: <strong>Environment</strong>al <strong>Clearance</strong> for the proposed con<strong>st</strong>ruction project "Royal Jade<br />
Garden" at S. No.132(P), at Wakad, Pune by M/s. S.P.Developers<br />
(File No.: <strong>SEAC</strong> 2011/CR-802/TC-2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : Royal Jade Garden<br />
Project Proponent : M/s. S.P.Developers<br />
Consultant : MITCON Consultancy & Engineers Pvt. Ltd<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
: Sr. No. 132 (P) Wakad, Tal Haveli, Di<strong>st</strong> Pune<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Housing project<br />
Category : 8 (b), B1<br />
Whether in<br />
Corporation /<br />
Municipal / Other<br />
area<br />
Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
DCR<br />
Total plot area<br />
(Sq.m)<br />
Deductions<br />
Net plot area<br />
Permissible FSI<br />
(including TDR etc.)<br />
Proposed Built –UP<br />
Area (FSI & Non<br />
FSI)<br />
Ground – coverage<br />
percentage (%)<br />
(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
plot not open to sky)<br />
E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />
configuration (s)<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />
and shops<br />
Pimpri Chinchwad Muncipal Corporation<br />
PCMC, DCR<br />
Total Area <<strong>st</strong>rong>of</<strong>st</strong>rong> the Plot: 138757 Sq. M<br />
15<<strong>st</strong>rong>61</<strong>st</strong>rong>34 Sq.M.<br />
Proposed B/U Area: 310744.17 Sq. M (FSI+Non FSI )<br />
32 %<br />
595.45 crores<br />
13 Buildings with 18 floors+ 1 no commercial building + 1no school<br />
1260 FLATS<br />
Chairman<br />
2
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />
residents / users<br />
Tenant density per<br />
hector<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
building(s)<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
20233<br />
1458 tenents/ha.<br />
60 meter<br />
Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way 24.00 Mt. WIDE D.P Road on North, Ea<strong>st</strong> side & 18m in South <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
Proposed Site.<br />
Turning radius for 6 m width and a turning radius <<strong>st</strong>rong>of</<strong>st</strong>rong> 7.5 m<br />
easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />
tender movement<br />
from all around the<br />
building excluding<br />
the width for the<br />
plantation<br />
Total Water<br />
1490.4 m<br />
Requirement<br />
3 / day<br />
Rain Water<br />
Total no. <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge bores16 nos.<br />
Harve<strong>st</strong>ing (RWH) Size <<strong>st</strong>rong>of</<strong>st</strong>rong> pit 3.0 x 3.0 x 1.5<br />
Strom water<br />
Overflow/surplus water from the recharge pit will be discharged into<br />
drainage<br />
<strong>st</strong>orm water drainage.<br />
Sewage and wa<strong>st</strong>e Sewage generation (CMD): 1192.4 m<br />
water<br />
3<br />
• STP technology: MBBR Process<br />
• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD): -<br />
4 No <<strong>st</strong>rong>of</<strong>st</strong>rong> STPs<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
Solid wa<strong>st</strong>e<br />
Dry wa<strong>st</strong>e – 3.64 T/day<br />
Management<br />
Wet wa<strong>st</strong>e – 5.4 T/day<br />
4 nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> 'SAVECO 1000' to treated the Bio Wa<strong>st</strong>e generated for<br />
compo<strong>st</strong>ing.<br />
Green Belt<br />
Landscape area will be 42158 Sq. M<br />
Development<br />
(19.6 %)<br />
1000 No. <<strong>st</strong>rong>of</<strong>st</strong>rong> trees will be planted.<br />
Energy During con<strong>st</strong>ruction:<br />
Total Demanded load For Project = 120 KVA 2 DG set<br />
During Operation:<br />
Source :- MSCEDCL<br />
Run Load in KW-11821<br />
Alternative Back 100% : Diesel Generator<br />
(DG) Set for lifts, Common Lighting, Water pumps & other essential<br />
services. Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> D.G. Set for Common Amenities<br />
DG sets Capacity with No.s: 125 KVA -3,160 KVA-4,1000 KVA -4<br />
Chairman<br />
3
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Traffic Management Parking details:<br />
• Number and area <<strong>st</strong>rong>of</<strong>st</strong>rong> podia: 1<br />
• Total Parking area: 40,698.85 Sq.m<br />
• Area per car<br />
• 2-Wheelar: 2887 Nos.<br />
• 4-Wheeler: 1627 Nos.<br />
Cycles: 2887 Nos.<br />
Bus: 183 Nos.<br />
• Public Transport<br />
<strong>Environment</strong>al<br />
Management plan<br />
Budgetary<br />
Allocation<br />
Decision:<br />
Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal roads (m): 12m<br />
• Capital co<strong>st</strong>: 1458 Lakhs<br />
• O & M co<strong>st</strong>: 154.5 Lakhs<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed. <strong>SEAC</strong> noted that there are discrepancies in the shape <<strong>st</strong>rong>of</<strong>st</strong>rong> the plot shown in different<br />
drawings and EIA report. The plot area is not clear. PP informed that a new plot has been added<br />
and NA order is yet to be obtained. <strong>SEAC</strong> further noted that earlier sugge<strong>st</strong>ion <<strong>st</strong>rong>of</<strong>st</strong>rong> furnishing li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
(#2100) trees per species has not been complied with.<br />
The PP is directed to comply with the following observations:<br />
1. Finalize the project and submit plot area details demarcating all reservations<br />
2. Submit the revised EIA report.<br />
3. Submit consent for water and drainage with timelines from competent authorities.<br />
4. Submit a letter from competent authority regarding the possible completion date <<strong>st</strong>rong>of</<strong>st</strong>rong> 24 m<br />
DP road.<br />
<strong>SEAC</strong> may visit the site in the near future and take up full appraisal after the compliance is<br />
received.<br />
Chairman<br />
4
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 2<br />
Subject: <strong>Environment</strong>al clearance for the proposed proposed con<strong>st</strong>ruction project at<br />
Wagholi, by M/s. Wagholi Properties Pvt. Ltd<br />
(File No.: <strong>SEAC</strong> 2011/CR-696 /TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : A Township project<br />
Project Proponent : M/s. Wagholi Properties Pvt. Ltd.<br />
Consultant : M/s Mitcon Consultancy Limited, Pune.<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Con<strong>st</strong>ruction project<br />
Category : 8 (b), B1<br />
Whether in<br />
Corporation /<br />
Municipal / Other<br />
area<br />
Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
DCR<br />
Total plot area<br />
(Sq.m)<br />
Deductions<br />
Net plot area<br />
Permissible FSI<br />
(including TDR etc.)<br />
Proposed Built –UP<br />
Area (FSI & Non<br />
FSI)<br />
Ground – coverage<br />
percentage (%)<br />
(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
plot not open to sky)<br />
E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
: Gut No. 1281, 1283, 1277, 1278 Village Wagholi, Taluka Haveli,<br />
Di<strong>st</strong>rict Pune<br />
Gram panchayat<br />
Special Township Policy ( Urban Development Department)<br />
453,100.00 Sq. M<br />
1<br />
Proposed B/U Area: 57<<strong>st</strong>rong>61</<strong>st</strong>rong>70.3 Sq. M (FSI+Non FSI )<br />
21.795 %<br />
400 Cr<br />
Chairman<br />
5
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />
configuration (s)<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />
and shops<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />
residents / users<br />
Tenant density per<br />
hector<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
building(s)<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
1528<br />
<<strong>st</strong>rong>61</<strong>st</strong>rong>28<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
floors<br />
Type-C Type-D Type-R Type-S High Rise Club House<br />
Luxury<br />
Villa<br />
Mid<br />
luxury<br />
Villa<br />
Chairman<br />
6<br />
Row<br />
House<br />
Super<br />
Luxury<br />
Villa<br />
H1<br />
(4<br />
BHK)<br />
H2<br />
(3<br />
BHK)<br />
W<br />
(4 BHK)<br />
Entr<br />
ance<br />
C1<br />
2 2 2 3 30 30 26 2 2<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> Units 25 131 16 8 636 424 288 1 1<br />
Population per<br />
unit<br />
4 4 4 6 4 4 4 - -<br />
Total Population 100 524 64 48 2544 1696 1152 - -<br />
Not defined<br />
100 mts<br />
Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way 30m<br />
Turning radius for<br />
easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />
tender movement<br />
from all around the<br />
building excluding<br />
the width for the<br />
plantation<br />
Total Water<br />
Requirement<br />
12m<br />
NO. OF UNITS-1528 NO. OF PERSONS - <<strong>st</strong>rong>61</<strong>st</strong>rong>28<br />
Description Water<br />
Requirem<br />
ent<br />
m 3 /day<br />
Dome<strong>st</strong>ic<br />
for<br />
residence<br />
(@ 90<br />
LPCD )<br />
Loss<br />
m 3 /da<br />
y<br />
Sewag<br />
e<br />
genera<br />
tion<br />
m 3 /da<br />
y<br />
Water Use<br />
m 3 /day<br />
Fresh Recycl<br />
ed<br />
551.52 82.73 468.79 551.5<br />
2<br />
Nil<br />
Podiu<br />
m C2
Rain Water<br />
Harve<strong>st</strong>ing (RWH)<br />
Strom water<br />
drainage<br />
Sewage and wa<strong>st</strong>e<br />
water<br />
Solid wa<strong>st</strong>e<br />
Management<br />
Green Belt<br />
Development<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Flushing for<br />
residence<br />
(@ 45<br />
LPCD )<br />
275.76 41.37 234.39 Nil 275.76<br />
Landscaping 447.82 Nil Nil Nil 447.82<br />
Club house 24 3.6 20.4 24 Nil<br />
TOTAL 1299.1 127.7 723.58 575.5<br />
2<br />
Total no. <<strong>st</strong>rong>of</<strong>st</strong>rong> pits is 165.<br />
Size <<strong>st</strong>rong>of</<strong>st</strong>rong> pit 3.0x3.0x2.5 M<br />
Chairman<br />
7<br />
723.58<br />
In total 2 nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> rain water harve<strong>st</strong>ing tanks are proposed within the<br />
plot premises with total holding volume <<strong>st</strong>rong>of</<strong>st</strong>rong> 3,20,000 litres.<br />
Capital co<strong>st</strong> – 80 (Rs, in Lacs)<br />
O & M co<strong>st</strong> – 7 (Rs.in Lacs/Yr)<br />
Overflow/surplus water from the recharge pit will be discharged into<br />
<strong>st</strong>orm water drainage<br />
Sewage generation: 723.58 m 3 / day<br />
STP Technology: MBR process<br />
STP: 750 m 3 / day<br />
Capital co<strong>st</strong> – 100 (Rs, in Lacs)<br />
O & M co<strong>st</strong> – 10 (Rs.in Lacs/Yr)<br />
Dry wa<strong>st</strong>e – 1.1 T/d<br />
Wet wa<strong>st</strong>e – 1.66 T/d<br />
Biodegradable and non biodegradable wa<strong>st</strong>e will be segregated. Dry<br />
wa<strong>st</strong>e will be sent for recycling and wet wa<strong>st</strong>e will be treated by<br />
‘Organic Wa<strong>st</strong>e Converter’ for compo<strong>st</strong>ing.<br />
45-50 kg /day<br />
Extensively used as manure for development <<strong>st</strong>rong>of</<strong>st</strong>rong> green belt and<br />
landscape development<br />
Capital co<strong>st</strong> – 45 (Rs, in Lacs)<br />
O & M co<strong>st</strong> – 5 (Rs.in Lacs/Yr)<br />
Green belt area: 67245 Sq. M (15 %)<br />
2000 No. <<strong>st</strong>rong>of</<strong>st</strong>rong> trees will be planted.<br />
Capital co<strong>st</strong> – 100 (Rs, in Lacs)<br />
O & M co<strong>st</strong> – 12 (Rs.in Lacs/Yr)<br />
Energy During Con<strong>st</strong>ruction<br />
• Total Demanded load For Project = 200KW.<br />
During Operation<br />
• Total Demanded load For the Project = 18000 KVA.<br />
During con<strong>st</strong>ruction: Total Demanded load For Project is 200 KW.<br />
Alternative Back Up feeder <<strong>st</strong>rong>of</<strong>st</strong>rong> LT cable form LT panel – 300Sq.mm
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
A2XFY1100V.<br />
During Operation:<br />
• Total Connected load: 10X2000 KVA)<br />
• HSD 150 lits / Hr / DG set<br />
Traffic Management Total Parking for 2 Wheelers: 6945<br />
4 Wheelers: 5102<br />
<strong>Environment</strong>al<br />
Management plan<br />
Budgetary<br />
Allocation<br />
Cycles: 3473<br />
Capital co<strong>st</strong>: 325 Lakhs<br />
O & M co<strong>st</strong>: 34<br />
Decision:<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed. <strong>SEAC</strong> noted that Government Order for special township is yet to be obtained.<br />
Government permission for drinking water from river is obtained. It was noted that PP has since<br />
modified the project increase con<strong>st</strong>ruction area sub<strong>st</strong>antially.<br />
The proponent is directed to comply with the following observations:<br />
1. Submit permission from Government for special township and also compliance <strong>st</strong>atements<br />
with all conditions mentioned there<<strong>st</strong>rong>of</<strong>st</strong>rong>.<br />
2. As per the Pune Regional Plan, permissible maximum height is 36m. Submit special<br />
permission for the proposed 100m from competent authority.<br />
3. Submit an undertaking that treated wa<strong>st</strong>ewater shall not be discharged into nearby water<br />
bodies.<br />
4. Submit NOC from RRZ<br />
5. Submit consent for drainage with timelines from competent authority. Ponding <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
wa<strong>st</strong>ewater is not acceptable as a su<strong>st</strong>ainable solution.<br />
6. Submit green belt plan showing plantation <<strong>st</strong>rong>of</<strong>st</strong>rong> Salix species & Termanilia arjuna along the<br />
river front area<br />
This will be deferred until further the Government order is obtained.<br />
Full appraisal <<strong>st</strong>rong>of</<strong>st</strong>rong> the project will be taken up only after compliance <<strong>st</strong>rong>of</<strong>st</strong>rong> the above.<br />
Chairman<br />
8
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 3<br />
Subject: <strong>Environment</strong> clearance for the expansion <<strong>st</strong>rong>of</<strong>st</strong>rong> Residential project at villge Boisar,<br />
Tal Palghar, Di<strong>st</strong> Thane by M/s. Vatsalya Developers<br />
(File No.: <strong>SEAC</strong> 2011 / CR -1000 / TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : “Dream City”- Residential Township<br />
Project Proponent : M/s.Vatsalya Developers<br />
Consultant : M/s. Enviro Analy<strong>st</strong>s & Engineers Pvt. Ltd.<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
: S. No. 74,75,76, 85 at Village Boisar, Tal-Palghar, Di<strong>st</strong>Thane<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : ResidentialTownship Project<br />
Category : 8 (a), B2<br />
Whether in<br />
Corporation /<br />
Municipal / Other<br />
area<br />
Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
DCR<br />
Total plot area<br />
(Sq.m)<br />
Deductions<br />
Net plot area<br />
Permissible FSI<br />
(including TDR etc.)<br />
Proposed Built –UP<br />
Area (FSI & Non<br />
FSI)<br />
Ground – coverage<br />
percentage (%)<br />
(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
plot not open to sky)<br />
E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />
configuration (s)<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />
and shops<br />
Grampanchayat<br />
Town planning<br />
1,14,558.00<br />
90,954.86<br />
0.75<br />
Total BUA Area: 90,954.86<br />
24%<br />
98 Cr.<br />
42 No <<strong>st</strong>rong>of</<strong>st</strong>rong> Buildings<br />
G+3 & G+2<br />
No <<strong>st</strong>rong>of</<strong>st</strong>rong> flats: 2268<br />
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> Shops:262<br />
Chairman<br />
9
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />
residents / users<br />
Tenant density per<br />
hector<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
building(s)<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
School:01<br />
Hospital: 01<br />
12,219<br />
196/hector<br />
15<br />
Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way 6m<br />
Total Water<br />
Requirement<br />
Rain Water<br />
Harve<strong>st</strong>ing (RWH)<br />
Strom water<br />
drainage<br />
Dry Season:<br />
• Fresh water (CMD) & source: 1044CMD by MIDC<br />
• Grampanchayat<br />
• Recycled water (CMD): 622 CMD<br />
• Total Water Requirement (CMD): 1,579 CMD<br />
• Fire fighting (Cum): UG Tanks = 25 cum, OH Tanks = 9 No <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
5cum<br />
Wet Season:<br />
• Fresh Water (CMD) & Source: 1044 CMD by MIDC<br />
• Grampanchayat<br />
• Recycled Water (CMD):535 CMD<br />
• Total Water Requirement (CMD):1579 CMD<br />
• Swimming pool make up (CMD):NA<br />
• Fire fighting (Cum): UG Tanks = 25 cum, OH Tanks = 9 No <<strong>st</strong>rong>of</<strong>st</strong>rong> 5<br />
cum<br />
Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the ground water table – 3 m<br />
Size and no <<strong>st</strong>rong>of</<strong>st</strong>rong> RWH tank(s) and quantity: 2 Nos, 500 cu.m<br />
Borewell Recharge pits: 27nos<br />
Size: 3m x3m x3m<br />
Percolation pit: 201<br />
Size: 0.5m x 0.5m x 2m<br />
Budgetary allocation (capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
Capital co<strong>st</strong>: Rs. 15 Lakhs<br />
O & M Co<strong>st</strong> : Rs. 0.5 Lakhs<br />
Natural water drainage pattern:<br />
• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water: 4424.3CMD<br />
• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD:<br />
Percolation Trench Length: 3941 mtrs<br />
Width: 0.50 mtrs<br />
Fixed Depth: 1.00 mtrs<br />
Size: 500 mm wide percolation pit<br />
Facility <<strong>st</strong>rong>of</<strong>st</strong>rong> water holding pond, capacity 43.0 Million Lit ( 14,290.00<br />
sq.mt<br />
x 3.0 m effective depth)<br />
Chairman<br />
10
Sewage and wa<strong>st</strong>e<br />
water<br />
Solid wa<strong>st</strong>e<br />
Management<br />
Green Belt<br />
Development<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Sewage generation: 1263 KLD<br />
• STP Technology: SAFF Technology<br />
• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD): 1300 KLD<br />
• Budgetary allocation:<br />
Capital Co<strong>st</strong>: Rs. 100 Lakhs<br />
O&M Co<strong>st</strong>: Rs10 Lakhs<br />
• Dry wa<strong>st</strong>e (Kg/day):1879Kg/Day<br />
• Wet wa<strong>st</strong>e (Kg/day):2759 Kg/Day<br />
• Biomedical wa<strong>st</strong>e (Kg/month) (if applicable): 20kg.day<br />
• STP sludge (Dry sludge) (Kg/Day): 310 Kg/Day<br />
Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> Wa<strong>st</strong>e:<br />
• Dry wa<strong>st</strong>e:segregated/sale/Collection by local authority<br />
• Wet Wa<strong>st</strong>e:Will be processed converted to manure by processing<br />
in compo<strong>st</strong>ing pits.<br />
• Hazardous Wa<strong>st</strong>e: Used oil from DG Sets<br />
• Biomedical Wa<strong>st</strong>e: will be handed over to MPCB authorized<br />
dealer for disposal<br />
Budgetary allocation (capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
For Solid wa<strong>st</strong>e management :<br />
Capital Co<strong>st</strong> : Rs. 10 Lakhs<br />
O & M Co<strong>st</strong> : Rs.1.5 Lakhs<br />
Total R.G. Area:<br />
RG on Ground: 12459 sq.m<br />
Total No. <<strong>st</strong>rong>of</<strong>st</strong>rong> trees: 279<br />
Energy Power Supply:<br />
• Maximum Demand: 3.84 MVA<br />
• Connected Load: 7.68 MVA<br />
• Source: MSEB<br />
DG set will be provided for backup power to emergency facilities.<br />
Energy saving by Non-conventional method:<br />
Energy Conservation Measures:<br />
• Ro<<strong>st</strong>rong>of</<strong>st</strong>rong>s will be insulated to minimize heat gain with 80 mm<br />
expanded<br />
• poly<strong>st</strong>yrene or equivalent insulation.<br />
• Light fixtures will be used with energy saving CFL & T5<br />
• fluorescent tube with electronic chocks.<br />
• DG sets shall be PLC controlled to optimize their usage based on<br />
• the actual load requirements<br />
• Use <<strong>st</strong>rong>of</<strong>st</strong>rong> Solar energy for <strong>st</strong>reet & landscape lightings.<br />
• Small capacity transformers having low no load and load losses.<br />
• Selection <<strong>st</strong>rong>of</<strong>st</strong>rong> Energy efficient equipments (BEE STAR RATED).<br />
Traffic Management Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> the junction to the main road & design <<strong>st</strong>rong>of</<strong>st</strong>rong> confluence:<br />
5 Entires and Exits<br />
One main approach road exi<strong>st</strong>ing<br />
Parking Details:<br />
• Total parking area:<br />
Chairman<br />
11
<strong>Environment</strong>al<br />
Management plan<br />
Budgetary<br />
Allocation<br />
Decision:<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
• Area per Car:<br />
• 4-wheelers:576 nos<br />
• Public Transport:<br />
Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal roads (m):9m, 12m & 15m wide internal<br />
roads<br />
Capital co<strong>st</strong>: 367 Lakhs<br />
O & M co<strong>st</strong>: 18.35 Lakhs<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed.<br />
<strong>SEAC</strong> noted that EC was accorded to the Phase I <<strong>st</strong>rong>of</<strong>st</strong>rong> the project and now PP approached for the<br />
entire project including Phase I & Phase II.<br />
The proponent is directed to comply with the following observations:<br />
1. It is noted that the current right <<strong>st</strong>rong>of</<strong>st</strong>rong> way is 6 m. Accordingly, the maximum height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
building shall be re<strong>st</strong>ricted to 15m as per MoEF OM dated 7 th February 2012.<br />
2. Phase-I was approved with a temporary holding pond for treated wa<strong>st</strong>ewater. This is not a<br />
su<strong>st</strong>ainable solution and was approved only as a temporary measure. This cannot be<br />
agreed for Phase II also. Submit consent for su<strong>st</strong>ainable arrangement for disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> excess<br />
treated wa<strong>st</strong>e water with timelines from competent authority as this will be mandatory.<br />
3. Submit compliance with the EC conditions accorded for Phase I.<br />
4. Submit revised water balances for dry and wet seasons without <strong>st</strong>orage pond<br />
5. Submit point wise compliance report to ECBC guidelines<br />
6. Submit RWH calculations with geotechnical and hydrogeological reports; also include<br />
terrace water harve<strong>st</strong>ing<br />
7. Increase O & M <<strong>st</strong>rong>of</<strong>st</strong>rong> EMP budget sub<strong>st</strong>antially and submit the revised EMP budget<br />
8. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> biomedical wa<strong>st</strong>e and disposal according to the BMW Rules<br />
9. Landscape plan should show location <<strong>st</strong>rong>of</<strong>st</strong>rong> different tree species (#600 trees) proposed on<br />
site map<br />
10. Submit SWD details<br />
11. Consider providing a gap <<strong>st</strong>rong>of</<strong>st</strong>rong> 6 m between buildings (for about 40 m length <<strong>st</strong>rong>of</<strong>st</strong>rong> the building)<br />
for better access, ventilation and lighting<br />
Chairman<br />
12
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 4<br />
Subject: <strong>Environment</strong>al clearance for the proposed “Vermont” residential Project Gat No.<br />
1204 (2138), 1205 (2139), 1206 (2140), 1208 (2194), opp wagheshware Temple,<br />
BAIF road, college, Wagholi, tal Haveli, Di<strong>st</strong> Pune by M/s. Sia Developers<br />
(File No. <strong>SEAC</strong> 2011/ CR-169/ TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : “Vermont”<br />
Project Proponent : M/s. Sia Developers<br />
Consultant : M/s. Saitech Research & Development Organization<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
: Gat No.1204 ( 2138), 1205 ( 2139) ,1206 ( 2140) , 1207 (2141) ,<br />
1208(2194), Opp. Wagheshwar Temple, BAIF Road, College, Wagholi,<br />
Tal.- Haveli , Di<strong>st</strong>. - Pune.<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Residential & Commercial<br />
Category : 8 (a) B2<br />
Whether in<br />
Corporation /<br />
Municipal / Other<br />
area<br />
Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
DCR<br />
Total plot area<br />
(Sq.m)<br />
Deductions<br />
Net plot area<br />
Permissible FSI<br />
(including TDR etc.) 0.75<br />
Proposed Built –UP<br />
Area (FSI & Non<br />
FSI)<br />
Ground – coverage<br />
percentage (%)<br />
(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
plot not open to sky)<br />
E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
Grampanchayat<br />
Town Planning<br />
Plot Area – 24,500 m 2<br />
Deductions -3675.0 m 2<br />
Net Plot Area - 20825.0 m 2<br />
47327.64 m 2 ( FSI – 26581.15 m 2 + Non - FSI – 20746.49 m 2 )<br />
5047.05 m 2 i.e. 20.60 % <<strong>st</strong>rong>of</<strong>st</strong>rong> Total Plot Area & 24.23% <<strong>st</strong>rong>of</<strong>st</strong>rong> Net plot area<br />
Rs.48 crore<br />
Chairman<br />
13
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />
configuration (s)<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />
and shops<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />
residents / users<br />
Tenant density per<br />
hector<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
building(s)<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
A- Type – P+11 floors – 64 Tenements<br />
B- Type –P+12 floors –134 Tenements<br />
C- Type –P+12 floors –114 Tenements<br />
D & E –Type - P+11 floors – 86 Tenements Each<br />
Commercial 1 – LG+UG+1 Floor<br />
Commercial 2 – LG+UG+1 Floor<br />
A- Type – 64 Tenements<br />
B- Type –134 Tenements<br />
C- Type – 114 Tenements<br />
D & E –Type - 86 Tenements Each<br />
Total Tenements -484 Nos.<br />
Commercial Buildings – 2Nos.<br />
Residential – 2420 Nos.<br />
Commercial – 567 Nos.<br />
Floating Population – 150 Nos.<br />
Total = 3137 Nos.<br />
250 Nos.<br />
39.0 M<br />
Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way 12.0 m<br />
Turning radius for<br />
easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />
tender movement<br />
from all around the<br />
building excluding<br />
the width for the<br />
plantation<br />
Total Water<br />
Requirement<br />
Rain Water<br />
Harve<strong>st</strong>ing (RWH)<br />
7.5 m<br />
Dry season :<br />
• Fresh water (CMD) : 242.14 m 3 /day <<strong>st</strong>rong>of</<strong>st</strong>rong> Source: Grampanchayat<br />
• Recycled water (CMD): 140.58 m 3 /day<br />
• Total water Requirement (CMD): 382.72 m 3 /day<br />
• Club-house & Swimming pool make up (Cum):- 10.0 m 3 /day<br />
• Fire fighting (Cum): 20,000 cu.m.<br />
Wet Season:<br />
• Fresh water (CMD) : 242.14 m 3 /day & Source: Grampanchayat<br />
• Recycled water (CMD): 140.58 m 3 /day<br />
• Total water Requirement (CMD): 382.72 m 3 /day<br />
• Swimming pool make up (Cum): 10.0 m 3 /day<br />
• Fire fighting (Cum): 20,000 cu.m.<br />
• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table – SW - 3m & NE - 10 M , NW –<br />
50M below ground level<br />
Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge Bore – 10 Nos.<br />
Chairman<br />
14
Strom water<br />
drainage<br />
Sewage and wa<strong>st</strong>e<br />
water<br />
Solid wa<strong>st</strong>e<br />
Management<br />
Green Belt<br />
Development<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Quantity – 10063.65 m 3 /Year<br />
Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Bore Dia – 1.5 mX 1.5 m X 1.5 m<br />
Budgetary allocation ( Capital co<strong>st</strong> and O & M co<strong>st</strong>)-<br />
Capital co<strong>st</strong>: 10.0 Lakh<br />
O & M Co<strong>st</strong> : 4.0 Lakh/Year<br />
Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water - Volume – 10063.65 m 3 /Year<br />
Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD - Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Bore Dia. – 1.5 mX 1.5 m X 1.5 m<br />
• Sewage generation (CMD) – 323.07 CMD<br />
• STP technology – MMBR(Moving Media Bio Reactor)<br />
• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD) – 325 CMD<br />
• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP – Refer Storm & drainage layout<br />
• DG sets (during emergency) - 140 KVA x 1 No.<br />
Budgetary allocation (Capital co<strong>st</strong> and O & M co<strong>st</strong>) –<br />
Capital co<strong>st</strong>: 35.0 Lakh.<br />
O & M Co<strong>st</strong> : 10.0 Lakh / Year<br />
Wa<strong>st</strong>e generation in the pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction phase:<br />
• Wa<strong>st</strong>e generation: 26000 m 3<br />
Operation phase:<br />
• Dry wa<strong>st</strong>e (Kg/day): 564.66 Kg/day<br />
• Wet wa<strong>st</strong>e (Kg/day): 846.99 Kg/day<br />
• Hazardous wa<strong>st</strong>e (Kg/month): Spent oil – 65 Lit/ yr<br />
• Biomedical wa<strong>st</strong>e (Kg/month) (If applicable):Not Applicable<br />
• STP Sludge (Dry sludge) (Kg/day): 29.07 Kg/Day ( 100% Dry )<br />
Budgetary allocation( capital Co<strong>st</strong> & O&M co<strong>st</strong>)<br />
Capital co<strong>st</strong>: 24.0 Lakh<br />
O & M Co<strong>st</strong> : 7.0 Lakh / Year<br />
Total RG area: 2981.54 m 2<br />
RG area under green belt: 2,129.80 m 2<br />
Total Lawn area = 636.47 Sq. M<br />
Total Plantation area = 1,493.27 Sq. M<br />
3.Total Hardscape area on ground = 8,51.73 Sq. M<br />
• Number & li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> trees species to be planted in the ground RG: - 344<br />
Nos.<br />
• Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />
Capital co<strong>st</strong>: Rs. 34.38 Lakh<br />
O & M Co<strong>st</strong> : Rs. 5.50 Lakh / Year<br />
Energy Power Supply:<br />
• Maximum demand –2362 KW<br />
• Connected Demand – 2362 KW<br />
Source - Maharashtra State Electricity Di<strong>st</strong>ribution Company<br />
Limited(MSEDCL)<br />
Energy saving by non-conventional method:<br />
Chairman<br />
15
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
• Energy Saving measures – CFL, LED, Solar, etc.<br />
• Details Calculation & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving – 25%<br />
• % saving by Solar Water – 96%<br />
• Compliance <<strong>st</strong>rong>of</<strong>st</strong>rong> the ECBC guideline( YES/NO) (If yes then submit<br />
compliance in tabular - No<br />
• Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />
Capital co<strong>st</strong>: 25.0 Lakh .<br />
O & M Co<strong>st</strong> : 8.0 Lakh / Year<br />
DG Set:<br />
• Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used - 140 KVA x 1No.<br />
• Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used - HSD - 28 Lit./Hr<br />
During Operation –<br />
Transformer – 630 KVA x 4 Nos.<br />
Traffic Management Required parking Area – 8770.0 m 2<br />
Proposed parking Area – 11<<strong>st</strong>rong>61</<strong>st</strong>rong>8.85 m 2 ( including Driveways)<br />
• 2- Wheeler – 575 Nos.<br />
• 4-Wheeler – 312 Nos.<br />
• Public Transport – 575 Nos.<br />
<strong>Environment</strong>al<br />
Management plan<br />
Budgetary<br />
Allocation<br />
Decision:<br />
Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal road(m):<br />
Driveways <<strong>st</strong>rong>of</<strong>st</strong>rong> 6.0 & 7.5 m<br />
Con<strong>st</strong>ruction Phase ( With break up):<br />
Capital Co<strong>st</strong> - STP – Rs. 35.0 Lakh<br />
RWH – Rs. 10.0 Lakh<br />
MSW – Rs. 24.0 Lakh<br />
Solar sy<strong>st</strong>em – Rs. 25.0 Lakh<br />
Landscape – Rs. 34.38 Lakh<br />
• O& M co<strong>st</strong> ( Please ensure manpower and other details): -<br />
Operation Phase:<br />
O & M co<strong>st</strong>:<br />
STP – Rs.10.0 Lakh / Year<br />
RWH – Rs. 4.0 Lakh / Year<br />
MSW – Rs. 7.0 Lakh / Year<br />
Solar sy<strong>st</strong>em – Rs. 8.0 Lakh / Year<br />
Landscape – Rs. 5.50 Lakh / Year<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed.<br />
Chairman<br />
16
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
PP informed that con<strong>st</strong>ruction was initiated at the site as per NA approval with FSI 12797 sq.m<br />
and total BUA 19,900 sq.m including Non-FSI area. This is a violation <<strong>st</strong>rong>of</<strong>st</strong>rong> EIA Notification, 2006.<br />
<strong>Environment</strong> Department may look into the matter and take an appropriate action.<br />
<strong>SEAC</strong> noted that-<br />
1. The current right <<strong>st</strong>rong>of</<strong>st</strong>rong> way is 12m. As per MoEF OM dated 7 th February 2012, the maximum<br />
height allowed is 15m but the proposed (and also the exi<strong>st</strong>ing building) maximum height<br />
is 39m.<br />
2. Proposed FSI 0.9 is not yet approved.<br />
3. Consent for water and drainage from competent authority are not yet obtained.<br />
Considering this, <strong>SEAC</strong> is con<strong>st</strong>rained to recommend the rejection <<strong>st</strong>rong>of</<strong>st</strong>rong> prior environmental<br />
clearance to the proposal.<br />
Chairman<br />
17
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 5<br />
Subject: <strong>Environment</strong>al clearance for proposed Barshi Lift Irrigation Scheme (with<br />
irrigable command <<strong>st</strong>rong>of</<strong>st</strong>rong> 15,000 hectares), Taluka Barshi, Di<strong>st</strong>rict Solapur<br />
(File No. <strong>SEAC</strong> 2010/ CR-751 /TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : A lift irrigation scheme with lifting <<strong>st</strong>rong>of</<strong>st</strong>rong> water from Ridhore K.T. weir in<br />
two <strong>st</strong>ages, providing irrigation benefits to 15000 ha <<strong>st</strong>rong>of</<strong>st</strong>rong> area in Barshi &<br />
Madha <<strong>st</strong>rong>of</<strong>st</strong>rong> Solapur Di<strong>st</strong>rict by canals.<br />
Project Proponent : Ujjani Canal Division No. 8, Solapur, MKVDC Pune<br />
Consultant : M/s. Voyants Solutions Pvt. Ltd<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
: Pump house <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>age I <<strong>st</strong>rong>of</<strong>st</strong>rong> this lift irrigation scheme is proposed on the<br />
left bank <<strong>st</strong>rong>of</<strong>st</strong>rong> river Sina at Ridhore K.T. weir, Tal Madha, Di<strong>st</strong> Solapur.<br />
This weir is situated near village Ridhore on Sina River.<br />
Pump house <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>age II <<strong>st</strong>rong>of</<strong>st</strong>rong> this lift irrigation scheme is proposed near<br />
village Lakshchiwadi, Tal Barshi.<br />
Command area <<strong>st</strong>rong>of</<strong>st</strong>rong> scheme lies both the on the Gorda nallah and barshi<br />
Kuradwadi railway line<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Irrigation project<br />
Category : 1 (c), B1<br />
Command area Command GCA CCA ICA Villages<br />
area<br />
Benefited<br />
Barshi 24260 19410 12550 20<br />
Madha 4740 3790 2450 5<br />
Total 29000 23200 15000 25<br />
Decision:<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed. PP <strong>st</strong>ated that the project has been granted the admini<strong>st</strong>rative approval or technical<br />
sanction by competent authorities.<br />
Chairman<br />
18
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
<strong>SEAC</strong> deliberated the issues related to the project and EIA submitted. PP shall revise EIA<br />
incorporating the following observations:<br />
1. Submit hi<strong>st</strong>ory <<strong>st</strong>rong>of</<strong>st</strong>rong> the project as PP informed that about 50% work has been completed<br />
prior to EIA Notification, 2006.<br />
2. Consider the cumulative impact <<strong>st</strong>rong>of</<strong>st</strong>rong> few other projects proposed in the same region.<br />
3. Include in the impact assessment impacts <<strong>st</strong>rong>of</<strong>st</strong>rong> diversion <<strong>st</strong>rong>of</<strong>st</strong>rong> water from the river to other<br />
valley and provide full ju<strong>st</strong>ification with impacts on common areas. .<br />
4. Submit more details on ecology, biodiversity and social and economic aspects.<br />
5. Submit benefit- co<strong>st</strong> ratio details<br />
6. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> quarries and barrow pit required for banking work and its treatment after<br />
use.<br />
7. Submit the plan for disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> extra excavated material.<br />
8. Avoid excessive land acquisition <<strong>st</strong>rong>of</<strong>st</strong>rong> land for dumping the material and other purposes.<br />
Chairman<br />
19
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 6<br />
Subject: <strong>Environment</strong>al clearance for proposed Ashti Lift Irrigation Scheme (with irrigable<br />
command <<strong>st</strong>rong>of</<strong>st</strong>rong> 12,500 hectares), Taluka Mohol, Di<strong>st</strong>rict Solapur<br />
(File No. <strong>SEAC</strong> 2010/ CR-747 /TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : Ujjawani <strong>st</strong>orage water 1.0 TMC available at Ashti tank through Ujjani<br />
LBC and 0.55 TMC from Ashti self catchment.<br />
Project Proponent : Ujjani Canal Division No. 8, Solapur, MKVDC Pune<br />
Consultant : M/s. Voyants Solutions Pvt. Ltd<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
: Ashti M.I. Tank is con<strong>st</strong>ructed near village Yewati, Tal Mohol, Di<strong>st</strong><br />
Solapur<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Irrigation project<br />
Category : 1 (c), B1<br />
Ashti nalla originates near village Bhend, Tal Madha, Di<strong>st</strong> Solapur.<br />
It flows from north to south and it joins river Bhima near village<br />
Ajansond, Tal Pandharpur, Di<strong>st</strong> Solapur.<br />
Command area Command GCA CCA ICA Villages<br />
area<br />
Benefited<br />
Mohol 11833 10650 8520 12<br />
Madha 667 600 480 3<br />
Total 12500 11250 9000 15<br />
Decision:<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed. PP <strong>st</strong>ated that the project has been granted the admini<strong>st</strong>rative approval or technical<br />
sanction by competent authorities.<br />
<strong>SEAC</strong> deliberated issues related to the project and EIA submitted. PP shall submit revised EIA<br />
incorporating the following observations:<br />
Chairman<br />
20
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
1. Submit hi<strong>st</strong>ory <<strong>st</strong>rong>of</<strong>st</strong>rong> the project as PP informed that about 50% work has been completed<br />
prior to EIA Notification, 2006.<br />
2. Consider the cumulative impact <<strong>st</strong>rong>of</<strong>st</strong>rong> few other projects proposed in the same region.<br />
3. Include in the impact assessment impacts <<strong>st</strong>rong>of</<strong>st</strong>rong> diversion <<strong>st</strong>rong>of</<strong>st</strong>rong> water from the river to other<br />
valley and provide full ju<strong>st</strong>ification with impacts on common areas. .<br />
4. More details on ecology, biodiversity and social and economic aspects.<br />
5. Submit benefit- co<strong>st</strong> ratio details<br />
6. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> quarries and barrow pit required for banking work and its treatment after<br />
use.<br />
7. Submit the plan for disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> extra excavated material.<br />
8. Avoid excessive land acquisition <<strong>st</strong>rong>of</<strong>st</strong>rong> land for dumping the material and other purposes.<br />
Chairman<br />
21
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 7<br />
Subject: <strong>Environment</strong>al clearance Proposed Residential Building on plot bearing Sr. No.<br />
19/1 to 4 & 19/5/1 & 19/5/2, at po<strong>st</strong> Pisoli, Tal Haveli, Di<strong>st</strong>. Pune by M/s. Tricon<br />
Builders<br />
(File No. <strong>SEAC</strong> 2211/CR-130/TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : “Sunshine Hills” (Expansion Project)<br />
Project Proponent : M/s. Tricon Builders<br />
Consultant : M/s. Saitech Research & Development Organization<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the : Sr. No.19/1 to 4, 19/5//1 & 19/5/2 at Po<strong>st</strong> - Pisoli, Taluka – Haveli,<br />
project<br />
Pune, Maharashtra.<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Housing Project<br />
Category : 8 (a) B2<br />
Whether in<br />
Corporation /<br />
Municipal / Other<br />
area<br />
Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
DCR<br />
Total plot area<br />
(Sq.m)<br />
Deductions<br />
Net plot area<br />
Permissible FSI<br />
(including TDR etc.)<br />
Proposed Built –UP<br />
Area (FSI & Non<br />
FSI)<br />
Town Planning<br />
Regional Planning<br />
20300 m 2<br />
1138.52 m 2<br />
191<<strong>st</strong>rong>61</<strong>st</strong>rong>.48 m 2<br />
19488.51 m 2<br />
Before Expansion<br />
FSI area (m 2 ): 11622.18 m 2<br />
FSI Club House Area: 243.19 m 2<br />
Non FSIA area (m 2 ): 8013.92 m 2<br />
Total BUA area (m 2 ): 19879.29 m 2<br />
After Expansion<br />
FSI area (m 2 ): 19487.68 m 2<br />
FSI Club House Area: 243.19 m 2<br />
Non FSIA area (m 2 ): 13072.29 m 2<br />
Total BUA area (m 2 ): 32803.16 m 2<br />
Chairman<br />
22
Ground – coverage<br />
percentage (%)<br />
(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
plot not open to sky)<br />
E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />
configuration (s)<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />
and shops<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />
residents / users<br />
Tenant density per<br />
hector<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
building(s)<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
25 %<br />
. 60 Crores<br />
Residential: - Total Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> Buildings = 9 nos.<br />
Building Configuration:<br />
Buildings A1, A2, A3, B1, B2, B3: P + 7<br />
Buildings A4, A5 & A6: P + 9<br />
Total tenants: 366 nos.<br />
Residential Population: 1830 persons<br />
30 m<br />
Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way 15.00 m<br />
Turning radius for<br />
easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />
tender movement<br />
from all around the<br />
building excluding<br />
the width for the<br />
plantation<br />
Total Water<br />
Requirement<br />
9 m<br />
Dry season:<br />
• Source: Grampanchayat<br />
• Fresh water : 148 m 3 /day<br />
• Recycled water (Flushing) : 99 m 3 /day<br />
• Recycled water (Gardening) : 30 m 3 /day<br />
• Total Water Requirement : 277 m 3 /day<br />
• Fire fighting : 200 m 3<br />
• Excess treated water : 60 m 3 /day<br />
Wet Season:<br />
• Source : Grampanchayat<br />
• Fresh water : 148 m 3 /day<br />
• Recycled water (Flushing) : 99 m 3 /day<br />
Chairman<br />
23
Rain Water<br />
Harve<strong>st</strong>ing (RWH)<br />
Strom water<br />
drainage<br />
Sewage and wa<strong>st</strong>e<br />
water<br />
Solid wa<strong>st</strong>e<br />
Management<br />
Green Belt<br />
Development<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
• Total Water Requirement : 247 m 3 /day<br />
• Swimming pool make up : NA<br />
• Fire fighting : 200 m 3<br />
• Excess treated water : 90 m 3 /day<br />
Size <<strong>st</strong>rong>of</<strong>st</strong>rong> the recharge pit = 0.6 m x 0.6 m x 3 m<br />
No <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pit proposed = 30 Nos.<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
Capital Co<strong>st</strong>: 10 Lakhs<br />
O & M Co<strong>st</strong> per Annum: 0.75 Lakhs<br />
• Natural water drainage pattern :<br />
• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water :<br />
• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD: Appropriate size <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water drainage channels<br />
provide.<br />
• Sewage generation : 222 m 3 /day<br />
• STP technology : Activated Sludge Process<br />
• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP : 225 m 3 /day<br />
• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP : On Ground<br />
• DG sets (during emergency): 1 no. X 100 KVA<br />
1 no. X 50 KVA<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>) :<br />
• Capital Co<strong>st</strong>: Rs. 40 Lakhs<br />
• O & M Co<strong>st</strong> per Annum: Rs 5.50 Lakhs<br />
Wa<strong>st</strong>e generation in the Pre Con<strong>st</strong>ruction & Con<strong>st</strong>ruction phase:<br />
• Wa<strong>st</strong>e generation : 25 kg /day<br />
Wa<strong>st</strong>e generation in the operation Phase:<br />
• Dry wa<strong>st</strong>e : 330 kg/day<br />
• Wet wa<strong>st</strong>e : 494 kg/day<br />
• STP Sludge (Dry sludge) : 2 kg/day<br />
Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>e:<br />
• Dry wa<strong>st</strong>e : Handed over to authorized recycler for further handling<br />
and disposal<br />
• Wet wa<strong>st</strong>e: converted to compo<strong>st</strong> using Organic Wa<strong>st</strong>e Processor<br />
[OWP] model no. EPL 500<br />
• E – wa<strong>st</strong>e : Handed over to authorized Vendor<br />
2. Total area provided for the <strong>st</strong>orage & Treatment <<strong>st</strong>rong>of</<strong>st</strong>rong> the solid wa<strong>st</strong>e :<br />
For EPL 500 - 100 m 2<br />
3. Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
Capital Co<strong>st</strong> : 17 Lakhs<br />
O & M Co<strong>st</strong>: 4 Lakhs/Annum<br />
Total RG area: 2500 m 2<br />
RG on the ground : 2500 m 2<br />
Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>) :<br />
Capital Co<strong>st</strong> : 22 Lakhs<br />
O & M Co<strong>st</strong> : 2 Lakh/annum<br />
Chairman<br />
24
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Energy Sr. No. Power Requirement<br />
1 Source <<strong>st</strong>rong>of</<strong>st</strong>rong> power supply :Maharashtra State Electricity<br />
Di<strong>st</strong>ribution Company Ltd.<br />
2 During Con<strong>st</strong>ruction Phase<br />
a) Demand Load<br />
3 During Operation Phase,<br />
a) Demand Load<br />
b) Connected Load<br />
4 DG set as Power Back – up during<br />
operation phase<br />
Chairman<br />
25<br />
20 KW<br />
1421.33 KVA<br />
1599 KW<br />
1 no. x 100 KVA<br />
1 no. x 50 KVA<br />
5 Transformer 3 nos. x 630 KVA<br />
6 Fuel used Diesel<br />
• Energy saving measures<br />
• Maximize the use <<strong>st</strong>rong>of</<strong>st</strong>rong> natural lighting & ventilation through design.<br />
• CFL based lighting will be done in the common areas, landscape<br />
areas, signage’s, Entry gates and boundary compound walls etc.<br />
• Acou<strong>st</strong>ic enclosures to D.G. sets for prevention <<strong>st</strong>rong>of</<strong>st</strong>rong> noise.<br />
• Solar Water Heating Sy<strong>st</strong>em will be provided for all buildings.<br />
• Auto Timer Switches Will Be Provided for Street Lights, Garden<br />
Lights, Parking & Staircase Lights & Other Common Area Lights.<br />
Wiring & Controlling shall be done for full, ½ & 1/3 rd use <<strong>st</strong>rong>of</<strong>st</strong>rong> lights<br />
in common area, for saving electrical energy.<br />
• Automatic water pumps to ensure optimum use <<strong>st</strong>rong>of</<strong>st</strong>rong> electricity & to<br />
avoid water tank overflows.<br />
• To create awareness among<strong>st</strong> residence <<strong>st</strong>rong>of</<strong>st</strong>rong> society regarding<br />
operation <<strong>st</strong>rong>of</<strong>st</strong>rong> all electrical sy<strong>st</strong>ems & for use <<strong>st</strong>rong>of</<strong>st</strong>rong> energy efficient<br />
light fittings i.e. use <<strong>st</strong>rong>of</<strong>st</strong>rong> CFL Lamps, T5 Tubes & LED Lights. in<br />
their flats for the energy saving.
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
DG Set:<br />
• Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used :<br />
During Con<strong>st</strong>ruction Phase: 1 no. X 30 KVA<br />
During Operational phase: 1 no. X 100 KVA<br />
• Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used : Diesel<br />
Traffic Management Total parking area: 5640 sq.m<br />
<strong>Environment</strong>al<br />
Management plan<br />
Budgetary<br />
Allocation<br />
Decision:<br />
Capital co<strong>st</strong>: 129.67 Lakha<br />
O & M co<strong>st</strong>: 20.66 Lakhs<br />
Chairman<br />
26<br />
1 no. X 50 KVA<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed. PP informed that con<strong>st</strong>ruction was initiated at the site as per NA approval with a total<br />
BUA 19,878 sq.m including Non-FSI area. This is a violation <<strong>st</strong>rong>of</<strong>st</strong>rong> EIA Notification, 2006.<br />
<strong>Environment</strong> Department may look into the violation and take appropriate action.<br />
<strong>SEAC</strong> noted that-<br />
1. The current right <<strong>st</strong>rong>of</<strong>st</strong>rong> way is 9m. As per MoEF OM dated 7 th February 201, the maximum<br />
height allowed is 15m but the proposed maximum height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building (including the<br />
completed ones) is 30m.<br />
2. Proposed FSI <<strong>st</strong>rong>of</<strong>st</strong>rong> 0.9 is not yet approved.<br />
3. Consent for water and drainage from competent authority has not yet been obtained.<br />
Considering this, <strong>SEAC</strong> is con<strong>st</strong>rained to recommend the rejection <<strong>st</strong>rong>of</<strong>st</strong>rong> prior environmental<br />
clearance to the proposal.
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 8<br />
Subject: <strong>Environment</strong> clearance for proposed project “Simplicity” residential &<br />
Commercial Development at Handewadi, Pune by M/s. J.K.P. Developers<br />
(File No. <strong>SEAC</strong> 2211/CR-133 /TC2)<br />
PP was absent<br />
Chairman<br />
27
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 9<br />
Subject: TOR for proposed Kondane Irrigation Project at villages Kondane & Chochi, Tal.<br />
Karjat,Di<strong>st</strong>t.Raigad by M/s. Water Resources Deptt., Superintending Engineer,<br />
Thane Irrigation Circle, Thane<br />
(File No. <strong>SEAC</strong> 2412/ CR-210/ TC2)<br />
PP was absent<br />
Chairman<br />
28
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 10<br />
Subject: TOR for proposed proposed Sangola Lift Irrigation Project at village Tandulwadii,<br />
Tal. Malshiras Di<strong>st</strong>t.Solapur by Executive Engineer,Ujjani Canal Division No.9<br />
(File No. <strong>SEAC</strong> 2412/ CR-211/ TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : Lift irrigation scheme with lifting water from to exi<strong>st</strong>ing in single <strong>st</strong>age,<br />
irrigation about 6525 ha area in Tal Sangola Di<strong>st</strong> Solapur<br />
Project Proponent : Ujjani Canal Division No. 9, Solapur.<br />
Consultant : M/s. Voyants Solutions Pvt. Ltd<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
: Village Chincholi, Tal Malshiras<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Irrigation project<br />
Category : 1 (c), B1<br />
Command area GCA: 24667 ha<br />
CCA:17876<br />
ICA: 6525<br />
Decision:<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. <strong>SEAC</strong> decided to<br />
consider the project under category B1. Besides the model TOR (http://ec.maharashtra.gov.in),<br />
the project proponent shall also cover following points during the preparation <<strong>st</strong>rong>of</<strong>st</strong>rong> EIA:<br />
1. Consider cumulative impact <<strong>st</strong>rong>of</<strong>st</strong>rong> few other projects proposed in the same region.<br />
2. Include in the impact assessment impacts <<strong>st</strong>rong>of</<strong>st</strong>rong> diversion <<strong>st</strong>rong>of</<strong>st</strong>rong> water from the river to other<br />
valley and provide full ju<strong>st</strong>ification with impacts on common areas.<br />
3. Submit more details on ecology, biodiversity and social and economic aspects.<br />
4. Submit benefit- co<strong>st</strong> ratio details<br />
5. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> quarries and barrow pit required for banking work and its treatment after<br />
use.<br />
6. Submit the plan for disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> extra excavated material<br />
7. Avoid excessive land acquisition for dumping the material<br />
While preparing EIA following points also should be considered.<br />
• Where the documents provided in a language other than English, an English translation should<br />
be provided for information to public.<br />
Chairman<br />
29
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
• These TORs should be considered for the preparation <<strong>st</strong>rong>of</<strong>st</strong>rong> draft EIA including other information<br />
as per the generic <strong>st</strong>ructure given in the EIA Notification, 2006.<br />
• The environmental consultant to be engaged for preparation <<strong>st</strong>rong>of</<strong>st</strong>rong> EIA/EMP report should be<br />
accredited by Quality Council <<strong>st</strong>rong>of</<strong>st</strong>rong> India (QCI)/ NABET. For data collection and analysis only<br />
MoEF or NABL approved laboratories should be used.<br />
• Consultant should include a Certificate in the EIA report, li<strong>st</strong>ing the various experts involved<br />
and their contributions to EIA Report and data generated by other organization(s)/ Laboratories<br />
(<strong>st</strong>atus <<strong>st</strong>rong>of</<strong>st</strong>rong> approval <<strong>st</strong>rong>of</<strong>st</strong>rong> such laboratories).<br />
As soon as the draft EIA report is prepared, the same may be submitted to the Maharashtra<br />
Pollution Control Board (MPCB) for conducting public hearing as per EIA Notification, 2006.<br />
On revising the EIA Report, addressing all concerns raised during the public hearing/public<br />
consultation, the same shall be submitted to the <strong>SEAC</strong>, Maharashtra for appraisal.<br />
Chairman<br />
30
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 11<br />
Subject: <strong>Environment</strong> clearance for proposed con<strong>st</strong>ruction project at Gat No.166,167,271 to<br />
291 <<strong>st</strong>rong>of</<strong>st</strong>rong>f Pune-Nagpur Road,Sanaswadi, Tal.Shirur,Di<strong>st</strong>t.Pune by M/s. John deer<br />
Pvt. Ltd by M/s. John Deere India Pvt.Ltd<br />
(File No. <strong>SEAC</strong> 2212/ CR-38 / TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : John Deere India<br />
Project Proponent : M/s. John Deere India Pvt.Ltd<br />
Consultant : M/s. Ultra- Tech <strong>Environment</strong>al Consultancy & Laboratory<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the : Gat No.166,167,271 to 291 <<strong>st</strong>rong>of</<strong>st</strong>rong>f Pune-Nagpur Road, Sanaswadi,<br />
project<br />
Tal.Shirur,Di<strong>st</strong>t.Pune<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Con<strong>st</strong>ruction project<br />
Category : 8 (a), B2<br />
Previous<br />
consideration/s<br />
Whether in<br />
Corporation /<br />
Municipal / Other<br />
area<br />
Total plot area<br />
Deductions<br />
Net plot area<br />
Permissible FSI<br />
(including TDR etc.)<br />
Proposed Built –UP<br />
Area (FSI & Non<br />
FSI)<br />
Ground – coverage<br />
percentage (%)<br />
(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
New case<br />
Planning Authority: Town Planning Department, Pune.<br />
Jurisdiction : Collector, Pune in Village Sanaswadi<br />
Plot Area: 4, 54, 200 Sq. mtr.<br />
Deductions :<br />
• Road widening: 6434 Sq.mtr.<br />
• 24 m wide T.P Road: - 25713 Sq. mtr.<br />
• Area under Canal: 5916 Sq. mtr.<br />
Total Deduction area: 38064Sq.mtr.<br />
Net Plot Area : 397435 Sq.mt.<br />
90279 Sq. Mt.<br />
Total Con<strong>st</strong>ructed:67535 Sq. Mtr<br />
Proposed:- 13209 Sq.mtr<br />
Total: - 80743 Sq. mtr.<br />
FSI<br />
Indu<strong>st</strong>rial Land : 0.5 FSI<br />
Agricultural Land : 0.2 FSI<br />
Exi<strong>st</strong>ing: 64962.64 Sq.mtr.<br />
Proposed: 11153.00 Sq.mt.<br />
Total : 7<<strong>st</strong>rong>61</<strong>st</strong>rong>15.64 Sq.mt.19.15%<br />
Chairman<br />
31
plot not open to sky)<br />
E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />
configuration (s)<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Rs. 516 Crores<br />
Building Configuration Exi<strong>st</strong>ing<br />
Sr. No. Building Name<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> Building in<br />
Mtr.<br />
1 Vehicle Assembly and Paint Shop (G+1) 14<br />
2 Engine 12<br />
3 Transmission 12<br />
4 PV & V Lab (G+1) 12<br />
5 Utility Bldg 1 & 2 4<br />
6 Tractor Shipping Dock (Export & Dome<strong>st</strong>ic) 6<br />
7 132 Sub<strong>st</strong>ation Control Room (G+2) 8<br />
8 E-Coat Paint Shop and Sub<strong>st</strong>ation (G+1) 18<br />
9 Aggregate Paint Shop 14<br />
10 Thinner Store 4<br />
11 Main Gate Bldg & Security Office 6<br />
12 Canteen 4<br />
13 Admin Bldg 6<br />
14 Photoshop 5<br />
15 Jig <strong>st</strong>ripping 9<br />
16 Day Tank Platform 6<br />
17 Paint Shop Dock 6<br />
18 Cooling Tower Pump & Haz. Material Shed 4<br />
19 Ca<strong>st</strong>rol Room 3<br />
20 Hot Water Shed 7<br />
21 Weigh Bridge Cabin 3<br />
22 Toilet Block Near Dock 7 4<br />
23 Roller Te<strong>st</strong> Bench 4<br />
24 Desludge Pit & Paint Storage Shed 6<br />
25 ETP Shed 5<br />
26 Chemical Storage Room ED ETP 3<br />
27 Panel Room ED ETP 3<br />
28 Haz Storage Shed 5<br />
29 Security Cabin PV & V 4<br />
30 Water Cooler Platform 3<br />
31 ETP Chemical House 3<br />
32 Meter Room<br />
Total<br />
4<br />
Building Configuration Proposed<br />
Sr.<br />
No.<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Building Height <<strong>st</strong>rong>of</<strong>st</strong>rong> Building (Mtr.)<br />
1 Engine <<strong>st</strong>rong>of</<strong>st</strong>rong>fice (G+1) 9<br />
2 Transmission <<strong>st</strong>rong>of</<strong>st</strong>rong>fice (G+1) 9<br />
3 Dome<strong>st</strong>ic dock <<strong>st</strong>rong>of</<strong>st</strong>rong>fice 6<br />
4 Dome<strong>st</strong>ic dispatch docks 6<br />
Chairman<br />
32
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
building(s)<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
5 Transmission dock 6<br />
6 Engine ca<strong>st</strong>ing <strong>st</strong>orage dock -14 6<br />
7 Extension <<strong>st</strong>rong>of</<strong>st</strong>rong> engine dock-12 6<br />
8 Aggregate paint shop dock 6.5<br />
9 Agg paint shop - dispatch area 6.5<br />
10 E- coat new dock for sheet metal 6<br />
11 Finished goods <strong>st</strong>orage & packaging shed 7.5<br />
12 Project <strong>st</strong>ore shed 6<br />
13 Canteen (G+1)<br />
Creche / medical center future expansion<br />
10<br />
14 (G+1) 4<br />
15 Coolant treatment plant 6<br />
16 Jig <strong>st</strong>ripping relocation 8<br />
17 Tyre <strong>st</strong>orage shed<br />
Building Configuration Exi<strong>st</strong>ing<br />
9<br />
Sr. No. Building Name<br />
Vehicle Assembly and Paint Shop<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> Building in Mtr.<br />
1 (G+1) 14<br />
2 Engine 12<br />
3 Transmission 12<br />
4 PV & V Lab (G+1) 12<br />
5 Utility Bldg 1 & 2<br />
Tractor Shipping Dock (Export &<br />
4<br />
6 Dome<strong>st</strong>ic) 6<br />
7 132 Sub<strong>st</strong>ation Control Room (G+2)<br />
E-Coat Paint Shop and Sub<strong>st</strong>ation<br />
8<br />
8 (G+1) 18<br />
9 Aggregate Paint Shop 14<br />
10 Thinner Store 4<br />
11 Main Gate Bldg & Security Office 6<br />
12 Canteen 4<br />
13 Admin Bldg 6<br />
14 Photoshop 5<br />
15 Jig <strong>st</strong>ripping 9<br />
16 Day Tank Platform 6<br />
17 Paint Shop Dock<br />
Cooling Tower Pump & Haz. Material<br />
6<br />
18 Shed 4<br />
19 Ca<strong>st</strong>rol Room 3<br />
20 Hot Water Shed 7<br />
21 Weigh Bridge Cabin 3<br />
22 Toilet Block Near Dock 7 4<br />
23 Roller Te<strong>st</strong> Bench 4<br />
24 Desludge Pit & Paint Storage Shed 6<br />
25 ETP Shed 5<br />
26 Chemical Storage Room ED ETP 3<br />
27 Panel Room ED ETP 3<br />
28 Haz Storage Shed 5<br />
29 Security Cabin PV & V 4<br />
Chairman<br />
33
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
30 Water Cooler Platform 3<br />
31 ETP Chemical House 3<br />
32 Meter Room 4<br />
Total<br />
Building Configuration Proposed<br />
Sr.<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Building<br />
No.<br />
1 Engine <<strong>st</strong>rong>of</<strong>st</strong>rong>fice (G+1) 9<br />
2 Transmission <<strong>st</strong>rong>of</<strong>st</strong>rong>fice (G+1) 9<br />
3 Dome<strong>st</strong>ic dock <<strong>st</strong>rong>of</<strong>st</strong>rong>fice 6<br />
4 Dome<strong>st</strong>ic dispatch docks 6<br />
5 Transmission dock 6<br />
6 Engine ca<strong>st</strong>ing <strong>st</strong>orage dock -14 6<br />
7 Extension <<strong>st</strong>rong>of</<strong>st</strong>rong> engine dock-12 6<br />
8 Aggregate paint shop dock 6.5<br />
9 Agg paint shop - dispatch area 6.5<br />
10 E- coat new dock for sheet metal 6<br />
11 Finished goods <strong>st</strong>orage & packaging shed 7.5<br />
12 Project <strong>st</strong>ore shed 6<br />
13 Canteen (G+1)<br />
Creche / medical center future expansion<br />
10<br />
14 (G+1) 4<br />
15 Coolant treatment plant 6<br />
16 Jig <strong>st</strong>ripping relocation 8<br />
Chairman<br />
34<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> Building<br />
(Mtr.)<br />
17 Tyre <strong>st</strong>orage shed 9<br />
Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way 60 mt. wide road- MIDC Fire Station 25 Km towards Nagar Road.<br />
Turning radius for<br />
easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />
tender movement<br />
from all around the<br />
building excluding<br />
the width for the<br />
plantation<br />
Total Water<br />
Requirement<br />
14 M<br />
Dry Season<br />
Fresh water (CMD):<br />
Exi<strong>st</strong>ing : 769, Proposed : 872<br />
Source: Bhima River<br />
Recycled water (CMD):<br />
Exi<strong>st</strong>ing : 343 , Proposed : 462<br />
Total water requirement (CMD):
Rain Water<br />
Harve<strong>st</strong>ing (RWH)<br />
Strom water<br />
drainage<br />
Sewage and wa<strong>st</strong>e<br />
water<br />
Solid wa<strong>st</strong>e<br />
Management<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Exi<strong>st</strong>ing : 1112 , Proposed : 1334<br />
Fire fighting(cum): 1480 cum<br />
Wet Season<br />
Fresh water (CMD): 464 Source: Bhima River<br />
Recycled water (CMD): 462 ( from RWH)<br />
Total water requirement (CMD): 926<br />
Fire fighting(cum): 1480 cum<br />
Size and no <<strong>st</strong>rong>of</<strong>st</strong>rong> RWH tank and Quantity<br />
Storage Pond -1 – 320.95 CUM<br />
Storage pond -2 – 274.75 CUM<br />
Storage Pond-3- 175.84 CUM<br />
Storage Tank-1- 507.00 CUM<br />
Storage Tank-2- 468 CUM<br />
Storage Tank-3- 468 CUM<br />
Storage Tank-4- 507 CUM<br />
Size, nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits and Quantity: 13 nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> Recharge pits <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
size - 4.25m x 4.25m x 3 m ht (704.43 cum)<br />
• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water: Run <<strong>st</strong>rong>of</<strong>st</strong>rong>f after development : 1<<strong>st</strong>rong>61</<strong>st</strong>rong>8.84 cum<br />
• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD: <strong>st</strong>arts with width 600mm x depth 600 mm<br />
• Exi<strong>st</strong>ing Sewage: 140 M 3 /day<br />
• Exi<strong>st</strong>ing Effluent: 207 M 3/day<br />
• Proposed Sewage (Exi<strong>st</strong>ing + Proposed): 198 M 3/day<br />
• Proposed Effluent (Exi<strong>st</strong>ing + Proposed): 273 M 3/day<br />
STP Technology : Fluidized Aerobic Bioreactor<br />
Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP : 2 Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> STP each <<strong>st</strong>rong>of</<strong>st</strong>rong> capacity 150 m3<br />
Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> ETP : 350 M3<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />
Capital Co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> STP : Rs. 73.74 lacs<br />
O & M Co<strong>st</strong> : Rs. 12 lacs/annum<br />
Capital Co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> ETP : Rs. 189.27 lacs<br />
O & M Co<strong>st</strong> : Rs. 60 lacs/Annum<br />
Wa<strong>st</strong>e generation in Pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction Phase<br />
Wa<strong>st</strong>e generation :<br />
Cutting = 15000 Cubic Meter<br />
Filling = 32000 Cubic Meter<br />
Top soil preservation/conservation:<br />
• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> the top soil to be preserved: 11000 Cu. M<br />
Wa<strong>st</strong>e generation in the operation Phase:<br />
Wa<strong>st</strong>e Exi<strong>st</strong>ing<br />
kg/day<br />
Chairman<br />
35<br />
Proposed<br />
Kg/day<br />
Total<br />
Kg/day
Green Belt<br />
Development<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Canteen wa<strong>st</strong>e 200 50 250<br />
Paper/Pla<strong>st</strong>ic/wood etc 1000 200 1200<br />
Biomedical wa<strong>st</strong>e 0.500 0.200 0.700<br />
STP sludge 200 50 250<br />
Hazardous wa<strong>st</strong>e details<br />
Sr.<br />
no.<br />
Item no.<br />
as per<br />
HW<br />
Schedule<br />
Chairman<br />
36<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>e Quantity Disposal<br />
1 5.1 Used / Spent Oil 920 Kg/day To Authorized<br />
2 5.2 Wa<strong>st</strong>e/ residue containing Oil<br />
(wa<strong>st</strong>e oil / skimmed oil/ Coolant<br />
oil)<br />
3 5.2 Wa<strong>st</strong>e/ residue containing Oil<br />
(oil soaked & cotton wa<strong>st</strong>e &<br />
miscellaneous items)<br />
Reprocessor<br />
3146 kg/day To Authorized<br />
Reprocessor<br />
870 kg/day To CHWTSDF<br />
4. 12.5 Phosphate sludge 160 kg/day To CHWTSDF<br />
5. 20.1 Contaminated aromatic, aliphatic<br />
or nepthenic solvents (spent<br />
thinner)<br />
770 Lit/day To Authorized<br />
Reprocessor/<br />
To CHWTSDF<br />
6. 21.1 Wa<strong>st</strong>e residue <<strong>st</strong>rong>of</<strong>st</strong>rong> paints 2700 Kg/day To CHWTSDF<br />
7. 33.3 Empty discarded containers/<br />
barrels/ Liners contaminated<br />
with Hazardous wa<strong>st</strong>e chemicals<br />
8. 34.2 Toxic metal containg residue<br />
from water purification<br />
9 ETP<br />
sludge<br />
Chemical sludge from wa<strong>st</strong>e<br />
water treatment<br />
570 Kg/day To Authorized<br />
Reprocessor/<br />
To CHWTSDF<br />
240 Kg/day To Authorized<br />
Reprocessor/<br />
To CHWTSDF<br />
1200 kg/day To CHWTSDF<br />
10 --- Used scrap batteries 8 nos/day To Authorized<br />
11 --- E-Wa<strong>st</strong>e 1000 kg/<br />
annum<br />
Total RG area: 1, 07,562 Sq.mt.<br />
RG area under green belt: : 1,07,562 Sq.mt.<br />
S<<strong>st</strong>rong>of</<strong>st</strong>rong>tscape area: 103979 Sq.mt.<br />
Water Body Area: 2000 Sq.mt.<br />
Hardscape Area: 1583 Sq.mt.<br />
Reprocessor<br />
To Authorized<br />
Reprocessor
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Plantation:<br />
• Number and li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> trees species to be planted in the ground RG:<br />
SR.<br />
NO<br />
TREE DETAILS<br />
NAME OF TREE NOS.<br />
1 NEEM TREE 50<br />
2 APTA TREE 50<br />
3 SUBABHUL TREE 0<br />
4 GULMOHAR TREE 50<br />
5 UMBER TREE --<br />
6 ASHOK TREE 50<br />
7 SURU TREE 50<br />
8 CHAFA TREE 50<br />
9 BABUL TREE 0<br />
10 PAM TREE 0<br />
11 BADAM TREE 50<br />
12 PAPAYE TREE 0<br />
13 MANGO TREE 0<br />
PELTO FOR U COPPER 0<br />
14 PELTO FOR U COPPER 0<br />
15 NILMOHAR TREE 0<br />
16 BOTTAL TREE 50<br />
17 KARANJ TREE 50<br />
18 TABOBIA ROISIA TREE 50<br />
19 RAIN TREE 50<br />
20 HADDU TREE 0<br />
21 SITA ASHOKA TREE 50<br />
22 NILAGIRI TREE 50<br />
23 CHANDAN TREE 0<br />
24 CADIA TREE 0<br />
25 SPEIS OF CASIA 0<br />
26 PANGARA TREE 0<br />
27 SINGAPURI CHERI 0<br />
28 FICUS <strong>SEAC</strong>ES 50<br />
29 SISOO TREE<br />
30 TUBOIA ARGENTA<br />
31 POWER PUF<br />
32 TACOMA<br />
0<br />
33 CHIKU TREE 50<br />
34 SAPTAPARIN 50<br />
35 BITTI 0<br />
36 SISILPHENIA 0<br />
37 LAGESTRO NIA THERO LIE<br />
38 LAGESTRO NIA THERO<br />
0<br />
Chairman<br />
37
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
LIELANC ESTRA<br />
39 DINKA RAJA<br />
40 UPHORBLAULBA<br />
41 TRAVELLERPAUM<br />
42 PAPAI<br />
43 FICUS BLACK<br />
44 CASIA BIOFLORA 50<br />
45 BOKAR TREE<br />
46 MAHUGANI<br />
47 CASA MULTIJUGA<br />
48 BAMBAX<br />
49 ASHOKA MINCHIRA<br />
50 JAMBUL TREE 50<br />
51 GOLLDEN BAMBU<br />
52 FISH TAIL PAM 50<br />
53 VAD TREE<br />
TOTA<br />
1000<br />
L<br />
Trees to be cut 40 nos.<br />
Trees to be transplanted 40 nos.<br />
TREE DETAILS<br />
SR. NO NAME OF TREE NOS.<br />
1. NEEM TREE 850<br />
2. APTA TREE 104<br />
3. SUBABHUL TREE 80<br />
4. GULMOHAR TREE 375<br />
5. UMBER TREE 8<br />
6. ASHOK TREE 124<br />
7. SURU TREE 31<br />
8. CHAFA TREE 219<br />
9. BABUL TREE 1293<br />
10. PAM TREE 19<br />
11. BADAM TREE 4<br />
12. PAPAYE TREE 22<br />
13. MANGO TREE 30<br />
14. PELTO FOR U COPPER 44<br />
15. PELTO FOR U COPPER 42<br />
16. NILMOHAR TREE 13<br />
17. BOTTAL TREE 54<br />
18. KARANJ TREE 9<br />
19. TABOBIA ROISIA TREE 44<br />
20. RAIN TREE 31<br />
21. HADDU TREE 2<br />
22. SITA ASHOKA TREE 2<br />
23. NILAGIRI TREE 5<br />
Chairman<br />
38
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
24. CHANDAN TREE 51<br />
25. CADIA TREE 2<br />
26. SPEIS OF CASIA 15<br />
27. PANGARA TREE 45<br />
28. SINGAPURI CHERI 28<br />
29. FICUS <strong>SEAC</strong>ES 155<br />
30. SISOO TREE 5<br />
31. TUBOIA ARGENTA 53<br />
32. POWER PUF 31<br />
33. TACOMA 103<br />
34. CHIKU TREE 1<br />
35. SAPTAPARIN 27<br />
36. BITTI 41<br />
37. SISILPHENIA 11<br />
38. LAGESTRO NIA THERO LIE 7<br />
39.<br />
LAGESTRO NIA THERO<br />
LIELANC ESTRA<br />
8<br />
40. DINKA RAJA 1<br />
41. UPHORBLAULBA 1<br />
42. TRAVELLERPAUM 6<br />
43. PAPAI 23<br />
44. FICUS BLACK 8<br />
45. CASIA BIOFLORA 2<br />
46. BOKAR TREE 57<br />
47. MAHUGANI 10<br />
48. CASA MULTIJUGA 16<br />
49. BAMBAX 2<br />
50. ASHOKA MINCHIRA 1<br />
51. JAMBUL TREE 3<br />
52. GOLLDEN BAMBU 1<br />
53. FISH TAIL PAM 2<br />
54. VAD TREE 5<br />
total 4126<br />
Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />
Capital Co<strong>st</strong> :Rs. 200 Lakhs<br />
O & M Co<strong>st</strong> : Rs 20 Lakhs/ Year<br />
Energy Power supply:<br />
Connected Load : 17769 kW<br />
Maximum demand : 5500 kVA<br />
Source: MSEDCL<br />
Energy saving by non-conventional method<br />
Details calculations & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving<br />
Chairman<br />
39
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
• All light fixture will be equipped with the electronic balla<strong>st</strong> to<br />
improve the power factor and controlled voltage will be through<br />
Electromizer to reduce the power consumption.<br />
• Power factor will be maintained to Unity so as to lower the<br />
Maximum Dermand,Cable losses because <<strong>st</strong>rong>of</<strong>st</strong>rong> lagging power<br />
factor.<br />
• Maximum motors used in this facility will be <<strong>st</strong>rong>of</<strong>st</strong>rong> Energy<br />
efficienent class 1 to improve Efficiency & reduce losses.<br />
• Power & Di<strong>st</strong>ribution Transformers will be selected as per the<br />
ECBC <strong>st</strong>andard to lower the core & copper losses as compare to<br />
the conventional transformers.<br />
• All AHUs and majority <<strong>st</strong>rong>of</<strong>st</strong>rong> the continuous running pumps will be<br />
equipped with the variable frequency drives, it will maintain good<br />
power factor near unity and reduce the losses.<br />
Detail calculations & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving:<br />
Exi<strong>st</strong>ing :<br />
# Description<br />
1 Elimination <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
external power pack<br />
2 Avoid idle running <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
ring press machine<br />
3 ED Paint shop photo<br />
sensor in<strong>st</strong>allation<br />
4 ED Paint shop limit<br />
switch in<strong>st</strong>allation<br />
5 PV&V lab LED light<br />
in<strong>st</strong>allation<br />
6 PV&V lab Cooling<br />
Tower automation<br />
7 Engine removed<br />
unnecessary heat<br />
conditioning<br />
8 Engine switching Off<br />
blower in idle mode<br />
9 Engine T5 light<br />
in<strong>st</strong>allation<br />
10 Engine CMM<br />
removing external<br />
compressor<br />
Chairman<br />
40<br />
KWH<br />
Saving<br />
Annual<br />
Total Co<strong>st</strong><br />
Saving<br />
(Rs in Lacs)<br />
Saving<br />
tCO2/<br />
Mwh<br />
14976 0.87 12<br />
164736 9.60 135<br />
57720 3.37 47<br />
39936 2.33 33<br />
101130 5.90 83<br />
75423<br />
45000<br />
70000<br />
2986<br />
13585<br />
4.40<br />
2.62<br />
4.08<br />
0.17<br />
0.79<br />
62<br />
37<br />
57<br />
3<br />
11
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
11 Engine J hook<br />
lighting modification<br />
12 PV&V lab VFD<br />
in<strong>st</strong>allation for<br />
Ventilation<br />
13 Elctromizer panel for<br />
Shop, Street & Office<br />
lighting<br />
Proposed :<br />
Chairman<br />
41<br />
9600<br />
2496<br />
200000<br />
0.56<br />
0.15<br />
9<br />
8<br />
2<br />
164<br />
Total 597588 43.84 654<br />
# Description<br />
KWH<br />
Saving<br />
%<br />
Savin<br />
g<br />
Annual<br />
Total<br />
Co<strong>st</strong><br />
Saving<br />
(Rs in<br />
Lacs)<br />
Saving in<br />
tCo2/Mwh<br />
1 Replacement <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
400w MH lighting<br />
by T5 lighting 770328 3.1 53 624<br />
2 Replacement <<strong>st</strong>rong>of</<strong>st</strong>rong> V<br />
belt Drive by flat<br />
belt<br />
3 Air compressed<br />
sy<strong>st</strong>em, Intermittent<br />
air controller<br />
in<strong>st</strong>allation<br />
206981 0.8 14 168<br />
181125 0.7 13 147<br />
4 Wind mill credit in<br />
Electricity bill 571429 2.3 40 463<br />
5 Automation <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
<<strong>st</strong>rong>of</<strong>st</strong>rong>fice lighting 150000 0.6 10.5 122<br />
Total 187986<br />
3<br />
Capital Co<strong>st</strong> :<br />
Exi<strong>st</strong>ing :35.67 Lakhs<br />
Proposed : Rs. 70 Lakhs<br />
O & M Co<strong>st</strong> : --<br />
Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used<br />
7.5 130.5 1524
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
1500 kVA - 2 Nos.<br />
1800 kVA - 1 No.<br />
500 kVA - 1 No.<br />
320 kVA - 1 No.<br />
160 kVA- 1 No.<br />
• Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used: HSD<br />
Traffic Management Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> the junction to the main road & design <<strong>st</strong>rong>of</<strong>st</strong>rong> confluence<br />
Nagar Highway Proposed road is 60M wide, Entrance to Factory is 30<br />
M wide Road & internal road is 12 m wide Road.<br />
Parking details:<br />
• Total Parking area: 26054.37 Sq. Mtr.<br />
• 4 Wheeler: 808 nos.<br />
• 2 Wheeler : 808 Nos.<br />
• Public Transport: 25 nos.<br />
<strong>Environment</strong>al<br />
Management plan<br />
Budgetary<br />
Allocation<br />
Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal roads (m): 12 mt. to 15 mt. wide road<br />
Con<strong>st</strong>ruction phase (with Break-up):<br />
• Capital co<strong>st</strong>--<br />
• O & M co<strong>st</strong> (Please ensure manpower and other details)—<br />
SR. NO. PARAMETERS<br />
Chairman<br />
42<br />
TOTAL COST<br />
(Rs. In Lacs)<br />
1 water for du<strong>st</strong> suppression 8.00<br />
2 site sanitation & safety 4.00<br />
3 <strong>Environment</strong>al monitoring 4.00<br />
4 Disinfection 2.00<br />
5 Health check up 2.00<br />
TOTAL 20.00<br />
Operation Phase (with Break-up)-<br />
• Capital co<strong>st</strong><br />
• O&M co<strong>st</strong> (Please ensure manpower and other details)<br />
# PARAMETER<br />
SET UP<br />
COST<br />
Rs. In lacs<br />
OPERATIONAL<br />
&<br />
MAINTAINACE<br />
COST (Rs. In<br />
lacs/annum)<br />
1 Recycled Plant 550 60<br />
2 Rain Water Harve<strong>st</strong>ing 200 10
Decision:<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
3<br />
<strong>Environment</strong>al<br />
Monitoring by MoEF<br />
Approved Laboratory<br />
Chairman<br />
43<br />
MoEF<br />
Recognized<br />
Laboratory 12<br />
4 Solar Lights 10 6<br />
5 Gardening 200 20<br />
6 Solid wa<strong>st</strong>e Management ---- 120<br />
Total co<strong>st</strong> Rs in lacs 960 226<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed.<br />
PP informed that in the year 2000, <strong>Environment</strong> Department had issued a letter <strong>st</strong>ating that EC is<br />
not applicable to this project. The EC is sought under category 8 (a). PP also <strong>st</strong>ated that the<br />
con<strong>st</strong>ruction done before 2006 was 47,793sq.m. After 2006, an additional 19,741 sq.m<br />
con<strong>st</strong>ruction was added without EC. Prima-facie it appears to be a violation <<strong>st</strong>rong>of</<strong>st</strong>rong> EIA Notification,<br />
2006, as the TBUA exceeded 20,000 m2. <strong>Environment</strong> Department may look into the matter and<br />
take appropriate action.<br />
The current proposal is for further expansion.<br />
The proponent is directed to comply with the following observations:<br />
1. Submit extract <<strong>st</strong>rong>of</<strong>st</strong>rong> relevant rules/ letter from competent authority for the use <<strong>st</strong>rong>of</<strong>st</strong>rong> 0.2 FSI on<br />
the agricultural land for the proposed project, as NA Order is yet to be obtained.<br />
2. Submit undertaking that nalla adjacent to the plot shall neither be diverted nor used to<br />
discharge treated wa<strong>st</strong>ewater<br />
3. Submit revised water balance <strong>st</strong>atement with appropriate details and ju<strong>st</strong>ification as it is<br />
shown that 181 CMD is lo<strong>st</strong> in the indu<strong>st</strong>rial cooling area (this is very high water loss) and<br />
488 CMD is designated for gardening without any supporting calculations.<br />
4. STP & ETP treated wa<strong>st</strong>ewaters are combined and used for gardening and excess water is<br />
<strong>st</strong>ored in a pond. Ponding <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>e water is not a su<strong>st</strong>ainable solution. Arrange for<br />
alternative arrangements. Consider only STP treated wa<strong>st</strong>ewater for land use applications;<br />
explore the possibility <<strong>st</strong>rong>of</<strong>st</strong>rong> utilizing ETP treated wa<strong>st</strong>ewater independently as it may <strong>st</strong>ill<br />
have some chemical contamination. Alternatively, the ETP treated wa<strong>st</strong>ewater<br />
characteri<strong>st</strong>ics should match with those <<strong>st</strong>rong>of</<strong>st</strong>rong> STP treated wa<strong>st</strong>ewater for combined handling.<br />
5. Ensure that surface run-<<strong>st</strong>rong>of</<strong>st</strong>rong>f water is free from any chemical contamination before feeding<br />
to RWH pits.<br />
6. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> Energy conservation measure and ECBC compliances
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
7. Detail plan for the exi<strong>st</strong>ing trees and proposed trees to be submitted on a map. This should<br />
include location <<strong>st</strong>rong>of</<strong>st</strong>rong> tree species. Trees to be planted which should be large evergreen trees.<br />
Fruit tree species to be avoided. Suitable tree species like Salix species, Termanalia<br />
species to be planted along the nallah boundary.<br />
<strong>SEAC</strong> may visit the site in the near future and take up full appraisal after the compliance is<br />
received.<br />
Chairman<br />
44
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 12<br />
Subject: TOR for Proposed Chanera Irrigation Project at Chanera,Tal.Roha, Di<strong>st</strong>t. Raigad<br />
by M/s. Kokan Irrigation Development Corp.Thane<br />
(File No. <strong>SEAC</strong> 2412/ CR-222/ TC2)<br />
Decision:<br />
PP <strong>st</strong>ated that Phansad wild life sanctuary, which is a protected area under the Wild Life<br />
Protection Act 1972, is adjacent to the project site. As per the general conditions <<strong>st</strong>rong>of</<strong>st</strong>rong> the schedule<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong> EIA Notification 2006, <strong>SEAC</strong> decided that the project falls under Category A and is not under<br />
the purview <<strong>st</strong>rong>of</<strong>st</strong>rong> this committee. PP is advised to approach MoEF for prior EC including TOR for<br />
EIA.<br />
Chairman<br />
45
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 13<br />
Subject: TOR for proposed project <<strong>st</strong>rong>of</<strong>st</strong>rong> manufacturing <<strong>st</strong>rong>of</<strong>st</strong>rong> cold rolled <strong>st</strong>eel sheets &<br />
coils/Galvanised/Al-Zn & Colour Coated Coils/Sheets alongwith genertion <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
'Natural Gas based Captive Power 24 MW(8MW x 3 )" at village Dahivali,Tal .<br />
Khalapur,Di<strong>st</strong>t. Raigad by M/s Asian Colour Coated Ispat Pvt.Ltd.<br />
(File No. <strong>SEAC</strong> 2011/ CR-172 / TC2)<br />
Decision:<br />
PP clarified that the proposal which was submitted to the department vide letter dated 22 nd<br />
March, 2011 has now been revised. PP claimed that the revised proposal is only for con<strong>st</strong>ruction<br />
work for the indu<strong>st</strong>rial activity and has to be treated under category 8. Consultant (Ultra Tech<br />
<strong>Environment</strong> Consultancy & Laboratory Pvt. Ltd, Pune) claimed that he has submitted revised<br />
application to the department<br />
<strong>SEAC</strong> noted from the records that the consultant submitted a letter for change <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
consultant vide letter dated 10 th July, 2012. The letter was also for the metallurgical unit with<br />
captive power generation 24 MW (8 MW x 3) using natural gas. The consultant agreed that a hard<br />
copy <<strong>st</strong>rong>of</<strong>st</strong>rong> the revised application for the project was not yet <<strong>st</strong>rong>of</<strong>st</strong>rong>ficially submitted.<br />
PP and consultant <strong>st</strong>ated that the proposed indu<strong>st</strong>rial activity, including cold rolling,<br />
galvanizing and colour coating <<strong>st</strong>rong>of</<strong>st</strong>rong> coils and sheets, is not covered under EIA Notification 2006<br />
and the revised proposal is only for con<strong>st</strong>ruction for indu<strong>st</strong>rial activity. <strong>SEAC</strong> deliberated the<br />
issue and directed PP to seek clarification from MoEF about the applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> EC for the<br />
proposed indu<strong>st</strong>rial activity and submit the application to the appropriate committee for EC<br />
accordingly.<br />
Chairman<br />
46
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 14<br />
Subject: <strong>Environment</strong> clearance for proposed Residential Project on Gat No. 298, 304 & 319<br />
at PO Pirangut, Pune by M/s. Sai Yugal Atul Enterprises<br />
(File No. <strong>SEAC</strong> 2211/ CR-13 / TC2)<br />
PP was absent<br />
Chairman<br />
47
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 15<br />
Subject: <strong>Environment</strong> clearance for proposed project “Vi<strong>st</strong>a Luxuria” at S No. 162, Majri,<br />
Pune by M/s Parmar Indus Associates<br />
(File No. <strong>SEAC</strong> 2011/CR- 171/TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project “Vi<strong>st</strong>a Luxuria”<br />
Name , Contact<br />
number & address<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong> Proponent<br />
M/s. Parmar Indus Associates<br />
Consultant M/s. Saitech Research & Development Organization<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project :<br />
Housing project /<br />
Indu<strong>st</strong>rial E<strong>st</strong>ate /<br />
SRA scheme /<br />
MAHADA /<br />
Township or others<br />
Residential Con<strong>st</strong>ruction Project<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
Sr. No. 162, Village - Manjari, Tehsil – Haveli, Di<strong>st</strong> - Pune.<br />
Whether in<br />
Corporation /<br />
Municipal / Other<br />
area<br />
Grampanchayat<br />
Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
DCR<br />
Town Planning<br />
Note on the initiated Total Con<strong>st</strong>ructed area 14245.2 m<br />
work (If applicable)<br />
2<br />
(FSI Area 9104.7 m 2 + NON FSI Area 5140.5 m 2 )<br />
Buildings – A, B, C (P + 10) floors completed.<br />
LOI / NOC from<br />
MHADA / Other<br />
approvals(If<br />
applicable)<br />
Total plot area<br />
(Sq.m)<br />
Deductions<br />
Net plot area<br />
Permissible FSI<br />
(including TDR etc.)<br />
Proposed Built –UP<br />
Area (FSI & Non<br />
Not Applicable<br />
Plot Area – 21000.00 m 2<br />
Deductions -9105.80 m 2<br />
Net Plot Area - 11894.20 m 2<br />
22886.52 m 2<br />
FSI area (m 2 ) : 22475.50 m 2<br />
NON FSI area (m 2 ) : 14484.27 m 2<br />
,<br />
Chairman<br />
48
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
FSI) Total Built up area (m2) : 36959.77 m 2<br />
Ground – coverage<br />
percentage (%)<br />
(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
plot not open to sky)<br />
E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />
configuration (s)<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />
and shops<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />
residents / users<br />
Tenant density per<br />
hector<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
building(s)<br />
Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way (width<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong> the road from the<br />
neare<strong>st</strong> fire <strong>st</strong>ation to<br />
the proposed<br />
building(s)<br />
Turning radius for<br />
easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />
tender movement<br />
from all around the<br />
building excluding<br />
the width for the<br />
plantation<br />
Total Water<br />
Requirement<br />
2892.74 m 2<br />
13.78% <<strong>st</strong>rong>of</<strong>st</strong>rong> Total plot area(21000.00 m 2 )<br />
24.32 % <<strong>st</strong>rong>of</<strong>st</strong>rong> Net Plot Area (11894.20 m 2 )<br />
66 Cr.<br />
Total Buildings = 6 Nos.<br />
Buildings A, B, C, D, E, F (P + 11)<br />
Total Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> Tenements - 436 Nos.<br />
Total Tenements - 436 Nos.<br />
2180 Nos.<br />
250<br />
36.00 M<br />
9m<br />
7.62 m.<br />
Dry season :<br />
• Fresh water (CMD) : 206.20 m 3 /day <<strong>st</strong>rong>of</<strong>st</strong>rong> Source: Grampanchayat<br />
• Recycled water (CMD): 112.59 m 3 /day<br />
• Total water Requirement (CMD): 318.79 m 3 /day<br />
• Club-house & Swimming pool make up (Cum):- 10.00 m 3 /day<br />
• Fire fighting (Cum): 20,000 cu.m.<br />
Wet Season:<br />
• Fresh water (CMD) : 206.20 m 3 /day & Source: Grampanchayat<br />
• Recycled water (CMD): 112.59 m 3 /day<br />
• Total water Requirement (CMD): 318.79 m 3 /day<br />
• Swimming pool make up (Cum): 10.00 m 3 /day<br />
• Fire fighting (Cum): 20,000 cu.m.<br />
Chairman<br />
49
Rain Water<br />
Harve<strong>st</strong>ing (RWH)<br />
Strom water<br />
drainage<br />
Sewage and wa<strong>st</strong>e<br />
water<br />
Solid wa<strong>st</strong>e<br />
Management<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table –<br />
Approx. 0.1 to 0.3 m below the ground level.<br />
• Size, no <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits and Quality- 8 Nos.<br />
• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Recharge pits – 1.5 x 1.5 x 1.5m<br />
• Size , nos <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge Bore and quantity – 5279.99 m 3 /Year<br />
Budgetary allocation ( Capital co<strong>st</strong> and O & M co<strong>st</strong>)-<br />
Capital co<strong>st</strong> : 7.5 lakh<br />
O & M Co<strong>st</strong> : 1 lakh<br />
• Natural water drainage pattern - Refer Storm Water Layout<br />
• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water - Volume – 5279.99 m 3 /Year<br />
• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD - Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Recharge pits. – 1.5 x 1.5 x 1.5m<br />
• Sewage generation (CMD) – 264.87 CMD<br />
• STP technology – MMBR(Moving Media Bio Reactor)<br />
• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD) – 275 CMD<br />
• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP – Refer Storm & drainage layout<br />
• DG sets (during emergency) - 125 KVA x 1 No.<br />
• Budgetary allocation (Capital co<strong>st</strong> and O & M co<strong>st</strong>) –<br />
Capital co<strong>st</strong>: 75 lakh<br />
O & M Co<strong>st</strong> : 11.4 lakh<br />
Wa<strong>st</strong>e generation in the pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction phase:<br />
• Wa<strong>st</strong>e generation – 981 m 3<br />
Wa<strong>st</strong>e generation in the operation phase:<br />
• Dry wa<strong>st</strong>e (Kg/day): 588.6 Kg/day<br />
• Wet wa<strong>st</strong>e (Kg/day): 392.4 Kg/day<br />
• E – wa<strong>st</strong>e (Kg/month): Not Applicable<br />
• Hazardous wa<strong>st</strong>e (Kg/month): Spent oil – 80.0 Lit/ yr<br />
• STP Sludge (Dry sludge) (Kg/day): 23.839 Kg/Day ( 100% Dry )<br />
Mode Of Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> Wa<strong>st</strong>e:<br />
• Dry wa<strong>st</strong>e (Kg/day): Sold Out<br />
• Wet wa<strong>st</strong>e (Kg/day): Organic Wa<strong>st</strong>e Convertor (Saveco)<br />
Area requirement:<br />
Location (s)& total area provided for the <strong>st</strong>orage & treatment <<strong>st</strong>rong>of</<strong>st</strong>rong> solid<br />
Wa<strong>st</strong>e; 15m 2<br />
Budgetary allocation( capital Co<strong>st</strong> & O&M co<strong>st</strong>)<br />
Capital co<strong>st</strong>: 10 Lakh<br />
O & M Co<strong>st</strong> : 5 Lakh / Year<br />
Chairman<br />
50
Green Belt<br />
Development<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Total RG area: 2415.0 m 2 i.e. about 20.30% <<strong>st</strong>rong>of</<strong>st</strong>rong> net plot area<br />
RG area under green belt: 2415.0 m 2<br />
Plantation:<br />
• Number & li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> trees species to be planted in the ground RG:<br />
248Nos.<br />
Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />
Capital co<strong>st</strong>: 13.64 lakh<br />
O & M Co<strong>st</strong>: 2.28 Lakh / Year<br />
Energy Power Supply:<br />
• Maximum demand – 1481.3 KW<br />
• Connected Demand – 1666.5 KW<br />
• Source - Maharashtra State Electricity Di<strong>st</strong>ribution Company<br />
Limited(MSEDCL)<br />
Energy saving by non-conventional method:<br />
• Energy Saving measures – CFL, LED, Solar, etc.<br />
• Details Calculation & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving – 2359. 6 KWH /Annum<br />
• Compliance <<strong>st</strong>rong>of</<strong>st</strong>rong> the ECBC guideline (YES/NO) (If yes then<br />
submit Compliance e in tabular - Yes & Sheet Enclosed.<br />
• Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />
Capital co<strong>st</strong>: Rs. 20.12 lakh<br />
O & M Co<strong>st</strong>: Rs. 0.4 Lakh/Year<br />
(2% Of Capital Co<strong>st</strong>)<br />
DG Set:<br />
• Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used - 1 No.<br />
1) 125 KVA With Canopy – 1 No<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used – Diesel<br />
• During Con<strong>st</strong>ruction - Fuel Consumption / Hr. <<strong>st</strong>rong>of</<strong>st</strong>rong> 30KVA DG Set<br />
6.5 Litrs/hr. for 100 % load<br />
3.6 Litrs/hr for 50 % load.<br />
• During Operation - Fuel Consumption / Hr. <<strong>st</strong>rong>of</<strong>st</strong>rong> 125 KVA DG Set<br />
22.7 Litrs/hr. for 100 % load<br />
12 Litrs/hr for 50 % load.<br />
Traffic Management Parking details:<br />
• Total parking area - 6487.60 m 2<br />
• Area per car – 20 m 2<br />
• 2- Wheeler – 872 Nos.<br />
• 4-Wheeler - 176 Nos.<br />
• Public Transport - 129 Nos.<br />
Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal road(m): 9.00 mtr.<br />
Chairman<br />
51
<strong>Environment</strong>al<br />
Management plan<br />
Budgetary<br />
Allocation<br />
Decision:<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Con<strong>st</strong>ruction Phase ( With break up):<br />
• Capital Co<strong>st</strong> - STP – Rs. 75 Lakh<br />
RWH – Rs. 7.5 Lakh<br />
MSW – Rs. 10 Lakh<br />
Solar sy<strong>st</strong>em – Rs 20.12 Lakh<br />
Landscape – Rs. 13.64 Lakh.<br />
Operation Phase( with break Up)-<br />
• O & M co<strong>st</strong>( Please ensure manpower and other details)-<br />
STP – Rs. 11.4 Lakh / Year<br />
RWH – Rs. 1 Lakh / Year<br />
MSW – Rs. 6.0 Lakh/Year<br />
Solar sy<strong>st</strong>em – Rs. 40 ,000/Annum<br />
Landscape – Rs 2.28 Lakh / Year<br />
• Responsibility for Further O&M - 2 years<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed.<br />
PP informed that con<strong>st</strong>ruction was initiated at the site with a total BUA <<strong>st</strong>rong>of</<strong>st</strong>rong> 14245.2 sq.m and<br />
completed with the approval <<strong>st</strong>rong>of</<strong>st</strong>rong> local authority. It is noted that three buildings with height <<strong>st</strong>rong>of</<strong>st</strong>rong> 30 m<br />
with a right <<strong>st</strong>rong>of</<strong>st</strong>rong> way <<strong>st</strong>rong>of</<strong>st</strong>rong> 9 m (as per MoEF OM dated 7 th February 2012, the maximum height<br />
allowed is 15m) has been completed and foundation work <<strong>st</strong>rong>of</<strong>st</strong>rong> other proposed buildings is also<br />
almo<strong>st</strong> completed. It appears to be a violation <<strong>st</strong>rong>of</<strong>st</strong>rong> EIA Notification, 2006. <strong>Environment</strong><br />
Department may look into the matter and take an appropriate action.<br />
<strong>SEAC</strong> noted that-<br />
1. The current right <<strong>st</strong>rong>of</<strong>st</strong>rong> way is 9m. As per MoEF OM dated 7 th February 2012, the maximum<br />
height allowed is 15m but the proposed maximum height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building is 36m.<br />
2. Consent for water and drainage from competent authority are not yet obtained.<br />
Considering this, <strong>SEAC</strong> is con<strong>st</strong>rained to recommend the rejection <<strong>st</strong>rong>of</<strong>st</strong>rong> prior environment<br />
clearance to the proposal.<br />
Chairman<br />
52
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 16<br />
Subject: <strong>Environment</strong> clearance for proposed "Insignia"Residential Township Project at<br />
S.No. 25, 26 & 27, Sus, Tal. Mulshi, Di<strong>st</strong>. Pune by M/s Vilas Javdekar Eco Homes<br />
(File No. <strong>SEAC</strong> 2011/ CR-174 / TC2)<br />
PP was absent<br />
Chairman<br />
53
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 17<br />
Subject: <strong>Environment</strong> clearance for proposed Residential Project "Yashawant" on plot<br />
bearing Survey No. 911, Kasaba Bawada, New Tarabai Park, Behind Dream<br />
World Water Park by M/s. Vilas Javdekar Eco Homes<br />
(File No. <strong>SEAC</strong> 2011/ CR-168/ TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Yashwant – Expansion Project”<br />
Project Proponent M/s. Vilas Javdekar Eco Homes<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> consultants M/s. Saitech Research & Development Organization<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project Housing Project<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project Sr.No. 911, Kasaba Bawada, New Tarabai Park, Behind Dream World<br />
Water Park, Kolhapur- 416 006<br />
Whether in<br />
Corporation/<br />
Municipal/other area<br />
Kolhapur Municipal Corporation [KMC]<br />
Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
DCR<br />
KMC DCR<br />
Total Plot Area 19730 m 2<br />
Net Plot area 19730 m 2<br />
Net Permissible FSI 20716.50 m 2<br />
Proposed Built up area Exi<strong>st</strong>ing (Phase I & Phase II)<br />
(FSI & Non FSI)<br />
Total BUA area (m 2 ): 14,549.98 m 2<br />
Ground-coverage<br />
Percentage (%)<br />
Proposed (Phase III)<br />
Total BUA area (m 2 ): 17083.15 m 2<br />
Total (Phase I + Phase II + Phase III)<br />
• FSI area (m 2 ): 20716.50 m 2<br />
• Non FSI area m 2 ): 10916.63 m 2<br />
• Total BUA area : 31633.13 m 2<br />
30.93 %<br />
Chairman<br />
54
(Note: Percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
plot not open to sky)<br />
E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> buildings & its<br />
configurations<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Rs. 35.30 Crores (Approx)<br />
Residential: - Total Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> Buildings = 6 nos.<br />
Bungalows = 33 no.<br />
Exi<strong>st</strong>ing:<br />
Phase I:<br />
16 Bungalows: G + 1<br />
2 Buildings: Stilt + 7 upper Floors<br />
Phase II:<br />
16 Bungalows: G + 1<br />
1 Building: Stilt + 7 upper Floors<br />
Proposed:<br />
Phase III:<br />
1 Bungalow: G + 1<br />
3 Buildings: Stilt + 7 upper Floors<br />
Total tenants: 313 nos.<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants and<br />
shops<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected Residential Population: 1565 persons<br />
residents / users<br />
Tenant density per 793.21 per hector<br />
hector<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building 24 m<br />
Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way (Width <<strong>st</strong>rong>of</<strong>st</strong>rong> 30 m. In addition fire protection and prevention sy<strong>st</strong>em is in<strong>st</strong>alled.<br />
the road from the<br />
neare<strong>st</strong> fire <strong>st</strong>ation to<br />
the proposed<br />
building(s))<br />
Turning radius for Min. 7.5m to Max 9m.<br />
easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />
tender movement from<br />
all around the building<br />
excluding the width for<br />
the plantation<br />
Exi<strong>st</strong>ing <strong>st</strong>ructure Phase I:<br />
16 Bungalows<br />
2 Buildings: Stilt + 7 upper Floors<br />
Phase II:<br />
16 Bungalows<br />
1 Building: Stilt + 7 upper Floors<br />
Chairman<br />
55
Total Water<br />
Requirement<br />
Rain Water<br />
Harve<strong>st</strong>ing (RWH)<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
have already been con<strong>st</strong>ructed because at that time Con<strong>st</strong>ruction Built up<br />
Area was below 20000 m 2<br />
Dry season:<br />
• Source: Kolhapur Municipal Corporation [KMC]<br />
• Fresh water : 141 m 3 /day<br />
• Recycled water (Flushing) : 70 m 3 /day<br />
• Recycled water (Gardening) : 15 m 3 /day<br />
• Total Water Requirement : 226 m 3 /day<br />
• Fire fighting : 75 m 3<br />
• Excess treated water : 96 m 3 /day<br />
Wet Season:<br />
• Source : Kolhapur Municipal Corporation [KMC]<br />
• Fresh water : 141 m 3 /day<br />
• Recycled water (Flushing) : 70 m 3 /day<br />
• Total Water Requirement : 211 m 3 /day<br />
• Fire fighting : 75 m 3<br />
• Excess treated water : 111 m 3 /day<br />
• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table : 6 m<br />
• Size and no <<strong>st</strong>rong>of</<strong>st</strong>rong> RWH pit(s) and Quantity: 9m x 9m x 2m – 1 nos.<br />
• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the RWH tank(s) : Near Building F<br />
• Size, no <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits and Quantity :<br />
Size <<strong>st</strong>rong>of</<strong>st</strong>rong> the recharge pit = 1.2 m x 1.2 m x 1.2 m<br />
No <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pit proposed = 16 Nos.<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
Capital Co<strong>st</strong>: 5 Lakhs<br />
O & M Co<strong>st</strong> per Annum: 0.5 Lakhs<br />
Storm water drainage • Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water : <<strong>st</strong>rong>61</<strong>st</strong>rong>9 m 3 /hr<br />
Sewage and Wa<strong>st</strong>e<br />
water<br />
Solid wa<strong>st</strong>e<br />
Management<br />
• Sewage generation : (1565 x 135lpcd x 0.9) = 190 m 3 /day<br />
• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP : 210 m 3 /day<br />
• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP: Underground.<br />
• DG sets (during emergency): 2 No. X 125 KVA<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>) :<br />
• Capital Co<strong>st</strong>: Rs. 40.00 Lakhs<br />
• O & M Co<strong>st</strong> per Annum: Rs. 1.00 Lakhs<br />
Wa<strong>st</strong>e generation in the Pre Con<strong>st</strong>ruction & Con<strong>st</strong>ruction phase:<br />
• Wa<strong>st</strong>e generation : 40 kg /day<br />
• Dry wa<strong>st</strong>e : 282 kg/day<br />
• Wet wa<strong>st</strong>e : 422 kg/day<br />
Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>e:<br />
• Dry wa<strong>st</strong>e : Handed over to authorized recycler for further handling and<br />
Chairman<br />
56
Decision:<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
disposal<br />
• Wet wa<strong>st</strong>e: Will be converted to compo<strong>st</strong> using Organic Wa<strong>st</strong>e Processor<br />
[OWP] model no. EPL 500<br />
• E – wa<strong>st</strong>e : Handed over to authorized Vendor<br />
• Hazardous wa<strong>st</strong>e : Handed over to authorized Vendor<br />
• STP Sludge (Dry sludge) : used as manure for gardening<br />
Area requirement:<br />
Total area provided for the <strong>st</strong>orage & Treatment <<strong>st</strong>rong>of</<strong>st</strong>rong> the solid wa<strong>st</strong>e : For EPL<br />
500 - 100 m 2<br />
Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
Capital Co<strong>st</strong> : 8 Lakhs<br />
O & M Co<strong>st</strong>: 3 Lakhs/Annum<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed.<br />
PP informed that Phase I and II <<strong>st</strong>rong>of</<strong>st</strong>rong> the project completed and occupied also. The project under<br />
consideration is in totality i.e. including exi<strong>st</strong>ing Phase I, Phase II and the proposed Phase III.<br />
During the presentation, <strong>SEAC</strong> noted that currently sewage from the site is disposed through<br />
septic tanks and soak pits. PP agreed to provide STP to take care <<strong>st</strong>rong>of</<strong>st</strong>rong> sewage <<strong>st</strong>rong>of</<strong>st</strong>rong> all three phases.<br />
1. Re<strong>st</strong>rict the maximum height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building to 15 m as per MoEF OM dated 7 th February<br />
2012, as the exi<strong>st</strong>ing right <<strong>st</strong>rong>of</<strong>st</strong>rong> way is 12 m.<br />
2. Consent for water and drainage from competent authorities.<br />
3. Clarify the applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> TDR and FSI as per Kolhapur DC Rules with relevant extract<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong> the rules.<br />
Full appraisal <<strong>st</strong>rong>of</<strong>st</strong>rong> the project will be taken up only after compliance <<strong>st</strong>rong>of</<strong>st</strong>rong> the above.<br />
Chairman<br />
57
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 18<br />
Subject: <strong>Environment</strong>al clearance for the proposed residential Scheme “Atria Grande” at<br />
S.No. 2/2/1, 2/1/1, 6/3/4 Autade Handewadi by M/s. Atria Con<strong>st</strong>ructions<br />
(File No. <strong>SEAC</strong> 2011/CR-981 /TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : Proposed residential Scheme “Atria Grande”<br />
Project Proponent : M/s. Atria Con<strong>st</strong>ructions<br />
Consultant : M/s. Saitech Research & Development Organization<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
: S.No. 2/2/1, 2/1/1, 6/3/4 Autade Handewadi<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Con<strong>st</strong>ruction project<br />
Category : 8(a) B2<br />
Previous<br />
consideration/s<br />
Whether in<br />
Corporation /<br />
Municipal / Other<br />
area<br />
Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
DCR<br />
Total plot area (Sq.m)<br />
Deductions<br />
Net plot area<br />
Permissible FSI<br />
(including TDR etc.)<br />
Proposed Built –UP<br />
Area (FSI & Non FSI)<br />
Ground – coverage<br />
percentage (%)<br />
(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
plot not open to sky)<br />
E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
58 th <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong><br />
Grampanchyat<br />
Town Planning<br />
31973.00 sq. m.<br />
5909.16 sq.m.<br />
26063.84 sq.m.<br />
28345.65 sq. m.<br />
• FSI area (Sq.m) :28330.06<br />
• Non FSI (Sq.m) :12239.78<br />
• Total BUA area (Sq.m) :40569.84<br />
30.77<br />
66 crores<br />
Chairman<br />
58
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />
configuration (s)<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />
and shops<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />
residents / users<br />
Tenant density per<br />
hector<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
building(s)<br />
Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way (width <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
the road from the<br />
neare<strong>st</strong> fire <strong>st</strong>ation to<br />
the proposed<br />
building(s))<br />
Turning radius for<br />
easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />
tender movement<br />
from all around the<br />
building excluding the<br />
width for the<br />
plantation<br />
Total Water<br />
Requirement<br />
Rain Water<br />
Harve<strong>st</strong>ing (RWH)<br />
Sewage and wa<strong>st</strong>e<br />
water<br />
05 buildings (A ,B, C, D, E,) each <<strong>st</strong>rong>of</<strong>st</strong>rong> 11 floors and<br />
01 building (F) <<strong>st</strong>rong>of</<strong>st</strong>rong> 9 floors.<br />
Provision for parking at ground floor for all buildings except<br />
Provision for additional parking in <strong>st</strong>ilt at building C.<br />
494<br />
2470<br />
787<br />
250 Tenements/ Hectare x 31495.17/10000<br />
Building A P+11 34.20 m<br />
Building B P+11 34.20 m<br />
Building C B+P+11 36.00 m<br />
Building D P+11 34.20 m<br />
Building E P+11 34.20 m<br />
Building F P+9 28.50 m<br />
• 24.0 m wide RP road connects to Saswad Katraj State<br />
Highway<br />
• The neare<strong>st</strong> fire <strong>st</strong>ation is located in the Hadapsar Indu<strong>st</strong>rial<br />
E<strong>st</strong>ate which is approximately 5.0 Km drive from the<br />
proposed site<br />
7.5m<br />
Dry Season Wet Season<br />
Fresh Water (CMD) 224.55 224.55<br />
Recycled Water<br />
(CMD)<br />
147.09 111.15<br />
Total 371.64 335.7<br />
Swimming Pool 0 0<br />
Fire Fighting 250 250<br />
• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table : 8~10 M<br />
• Size, no <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits and Quality : 2m wide * 3 m<br />
deep - 5 Nos.<br />
• Budgetary allocation ( Capital co<strong>st</strong> and O & M co<strong>st</strong>) :<br />
Capital Co<strong>st</strong> –Rs 5.15 Lakhs<br />
O&M -Rs 2500/month<br />
• Sewage generation (CMD) :302.13<br />
• STP technology :Fludised Aerobic Bed reactor<br />
Chairman<br />
59
Solid wa<strong>st</strong>e<br />
Management<br />
Green Belt<br />
Development<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD) :305<br />
• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP :South Ea<strong>st</strong> corner <<strong>st</strong>rong>of</<strong>st</strong>rong> Project<br />
DG sets (during emergency) :1 * 200 KVA<br />
• Budgetary allocation (Capital co<strong>st</strong> and O & M co<strong>st</strong>) =<br />
Capital Co<strong>st</strong> : Rs 50 Lakhs<br />
O& M Co<strong>st</strong> : Rs 82000/ month<br />
Wa<strong>st</strong>e generation in the pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction<br />
phase:<br />
• Wa<strong>st</strong>e generation :- Excavated soil will be used for leveling<br />
• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> the top soil to be preserved: 3909.45 cu m <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
excavated topsoil shall be preserved for future use in green<br />
areas.<br />
• Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> the con<strong>st</strong>ruction way debris: No debris<br />
Wa<strong>st</strong>e generation in the operation phase:<br />
• Dry wa<strong>st</strong>e (Kg/day):444.6 kg/day<br />
• Wet wa<strong>st</strong>e (Kg/day): 666.9 kg/day<br />
• STP Sludge (Dry sludge) (Kg/day):20.7 Kg/day<br />
Mode Of Disposal<br />
Dry wa<strong>st</strong>e (Kg/day): Sent to Kabadiwada<br />
• Wet wa<strong>st</strong>e (Kg/day): Converted to compo<strong>st</strong> by Mechanical<br />
Method<br />
Budgetary allocation( capital Co<strong>st</strong> & O&M co<strong>st</strong>):<br />
Capital co<strong>st</strong> : Rs 9 Lakhs<br />
O & M co<strong>st</strong> : Rs 30,000 per month<br />
• Total RG area:<br />
1. RG area other than green belt ((please specify for<br />
playground,etc) : 1743.23sq.m.( Jogging<br />
Track+ Sand Pit + Pebble Walkway+ Pathways +<br />
Basket Ball court + Amphitheatre + Pergola Seating)<br />
2. Specify the details<br />
• RG on the ground (sq.m) : 5990 sq m<br />
Energy Power Supply:<br />
• Maximum demand – 1976 KW + 365 KW = 2341 KW<br />
• Connected Demand – 5457 KW<br />
• Source –MSDECL<br />
Energy saving by non-conventional method:<br />
• Solar energy will be used for landscape lighting.<br />
• The controls <<strong>st</strong>rong>of</<strong>st</strong>rong> all the electrical points in the flats will be<br />
provided at the entrance with the provision <<strong>st</strong>rong>of</<strong>st</strong>rong> the Key Tag<br />
Switch.<br />
• All Fluorescent lights (used in common areas) with<br />
• Electronic balla<strong>st</strong> in place <<strong>st</strong>rong>of</<strong>st</strong>rong> Copper chokes & Tube - T5<br />
type, in place <<strong>st</strong>rong>of</<strong>st</strong>rong> T8 type, to reduce the power consumption<br />
by 10 watts per lamp.<br />
Chairman<br />
60
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Minimized voltage drop in long cables.<br />
• Lighting control sy<strong>st</strong>ems will be used to control parking area<br />
lights.<br />
• Detail calculations & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving: 9.37%<br />
• Compliance <<strong>st</strong>rong>of</<strong>st</strong>rong> the ECBC guidelines: Yes<br />
• Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>)<br />
Capital Co<strong>st</strong> – 10.0 Lakhs (Solar Lighting)<br />
O & M Co<strong>st</strong> – 0.2 Lakhs/annum (Solar Lighting)<br />
DG Set:<br />
• Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used – 1x200<br />
KVA<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used – Diesel<br />
Traffic Management Parking details:<br />
• Total parking area : 8333.60 sq.m.<br />
• Difference between the parking area mentioned and actual<br />
available<br />
• Area per car :<br />
• 2- wheeler :3.00 sq.m.<br />
• Cycle : 1.40 sq.m.<br />
• 4-wheeler :20.0 sq.m.<br />
Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal road(m): 9m (minimum)<br />
<strong>Environment</strong>al<br />
Management plan<br />
Budgetary<br />
Allocation<br />
Decision:<br />
Con<strong>st</strong>ruction Phase ( With break up):<br />
1 Water for du<strong>st</strong> supression 5,40,000.00<br />
2 Site Sanitation & Safety Measures 5,00,000.00<br />
3 Disinfection 3,60,000.00<br />
4 Health Check up 6,00,000.00<br />
5 Site Barracading 12,00,000.00<br />
Rs<br />
Operation Phase ( With break up):<br />
32,00,000.00<br />
Sr. No Parameter Capital Co<strong>st</strong> O&M Co<strong>st</strong><br />
1 STP Co<strong>st</strong> Rs 50,00,000.00 Rs 82000.00/ month<br />
2 RWH Rs 5,15,000.00 Rs 2500.00 / month<br />
3 WTP Rs 8,00,000.00 Rs 41000.00/ month<br />
4 Solar Lighting Rs 10,00,000.00 Rs. 500/ month<br />
5 Gardening Rs 33,00,000.00 Rs 22,000.00 / month<br />
6 Solid wa<strong>st</strong>e management Rs 9,00,000.00 Rs 30,000/ month<br />
7 Safety and firefighting Rs 24,00,000.00 Rs 9,000.00/ month<br />
Total Rs 1,39,15,000.00 Rs 1,87,000.00 / month<br />
Rs 22,44,000/ annum .<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed. It is noted that PP complied with the observations made in the 58 th <strong>SEAC</strong> <strong>meeting</strong>.<br />
Chairman<br />
<<strong>st</strong>rong>61</<strong>st</strong>rong>
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
<strong>SEAC</strong> decided to recommend the proposal for <strong>Environment</strong>al <strong>Clearance</strong> only after complying<br />
with the following conditions:<br />
1. There is a proposal for a DP road <<strong>st</strong>rong>of</<strong>st</strong>rong> 24 m. PP has given an undertaking, vide their letter 2 nd<br />
September, 2012, that they will con<strong>st</strong>ruct the 24 m DP road at their own co<strong>st</strong>, if not done by<br />
local authority. Occupation Certificate shall be issued only after the completion <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
con<strong>st</strong>ruction <<strong>st</strong>rong>of</<strong>st</strong>rong> 24 m DP road.<br />
2. Submit supporting documents, drawings and recent photographs to the claim that drainage<br />
line is connected to an exi<strong>st</strong>ing public drainage network and water supply line is also<br />
available near the proposed site.<br />
3. Submit li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> species large/ tall tree (total <<strong>st</strong>rong>of</<strong>st</strong>rong> 510) in<strong>st</strong>ead <<strong>st</strong>rong>of</<strong>st</strong>rong> small/ dwarf trees/ shrubs.<br />
Chairman<br />
62
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 19<br />
Subject: TOR for the proposed indu<strong>st</strong>rial project at At Plot No. F-24, M.I.D.C., Gondia<br />
Indu<strong>st</strong>rial Area, Village- Mundipar, Tahsil-Tumsar, Di<strong>st</strong>rict- Gondia by M/s<br />
Vidhya Minerals & Processors<br />
(File No. <strong>SEAC</strong> 2011/ CR-976/ TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project Proposed mineral benefication indu<strong>st</strong>rial project<br />
Project Proponent M/s Vidhya Minerals & Processors<br />
Consultant MITCON Consultancy & Engineering Services Ltd<br />
New Project / Expansion New Project<br />
in exi<strong>st</strong>ing project/<br />
Modernization/<br />
Diversification in exiting<br />
project<br />
Activity schedule in the 2(b), B2<br />
EIA Notification<br />
Area Details • Total plot area (sq. m.): 2100<br />
• Built up area (Sq. m.): 325.25<br />
•<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Notified GONDIA MIDC Area<br />
Indu<strong>st</strong>rial area / MIDC<br />
area<br />
E<strong>st</strong>imated capital co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> 25 Lakhs<br />
the Project (including<br />
co<strong>st</strong> for land, building,<br />
plant and machinery<br />
separately)<br />
Location details <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
the project :<br />
Di<strong>st</strong>ance from Protected<br />
Areas / Critically<br />
Polluted<br />
areas / Eco-sensitive<br />
areas<br />
• Latitude : 21 0 28’20.06”N<br />
• Longitude : 80 0 08’02.33”E<br />
• Location : At Plot No. F-24, M.I.D.C., Gondia Indu<strong>st</strong>rial Area,<br />
Village- Mundipar, Tahsil-Gondia, Di<strong>st</strong>rict- Gondia<br />
• Elevation above Mean Sea Level: 315 meter<br />
There are no Protected areas / Critically polluted areas / Eco-<br />
Sensitive areas/ inter-<strong>st</strong>ate boundaries within 10 Km radial area<br />
Chairman<br />
63
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
/ inter-State boundaries<br />
Raw materials<br />
(including<br />
process chemicals,<br />
cataly<strong>st</strong>s, & additives).<br />
Production details<br />
Process details /<br />
manufacturing details<br />
Total Water<br />
Requirement<br />
Sewage generation and<br />
treatment<br />
Solid wa<strong>st</strong>e Management<br />
Li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
raw<br />
materials<br />
to<br />
be used<br />
Manganese<br />
Ore<br />
‘Physical<br />
and<br />
chemical<br />
nature <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
raw<br />
material<br />
Lumps or<br />
fines<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Products,<br />
By products and<br />
Intermediate<br />
Products<br />
Main Products<br />
1. Manganese Oxide<br />
2. Manganese Di-Oxide<br />
By-Products<br />
Intermediate<br />
Products<br />
1. Jigging<br />
2. Roa<strong>st</strong>ing (Reuction)<br />
Chairman<br />
64<br />
‘Quantity<br />
(tonnes/<br />
year) full<br />
production<br />
capacity<br />
Source<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong><br />
materials<br />
6000 Nearby<br />
Mines<br />
Exi<strong>st</strong>ing<br />
(T/Year)<br />
0<br />
0<br />
Nil<br />
Proposed<br />
activity<br />
(new/<br />
modernization/<br />
expansion)<br />
(T/Year)<br />
3000<br />
1500<br />
Nil<br />
Total water requirement:<br />
• Fresh water (CMD) : 7 & Source: MIDC<br />
• Recycled water (CMD): 5<br />
Use <<strong>st</strong>rong>of</<strong>st</strong>rong> the water:<br />
• Process (CMD): 3<br />
• Du<strong>st</strong> Suppression (CMD): 2<br />
• Drinking (CMD): 0.8<br />
• Green belt (CMD): 1<br />
• Others (CMD): 0.2<br />
Means <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
transportation<br />
(Source to<br />
<strong>st</strong>orage<br />
site) with<br />
ju<strong>st</strong>ification<br />
By Tarpaulin<br />
covered truck<br />
Total<br />
(T/Year)<br />
3000<br />
1500<br />
• Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> sewage generation (CMD) :0.6<br />
• Proposed treatment for the sewage : Septic tanks followed by Soak<br />
Pits<br />
Sr. Source Qty Form Composition<br />
Nil
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Atmospheric Emissions<br />
(Flue gas characteri<strong>st</strong>ics<br />
SPM, SO2, NOX, CO,<br />
etc.)<br />
Stack emission Details:<br />
<strong>Environment</strong>al<br />
Management plan<br />
Budgetary Allocation<br />
Decision:<br />
No<br />
1. Raw water<br />
treatment<br />
plant<br />
Chairman<br />
65<br />
(TPM)<br />
(Sludge / Dry /<br />
Slurry etc.)<br />
-- -- --<br />
2. ETP -- -- --<br />
3. Process 50<br />
(Tailings)<br />
4. Spent<br />
Cataly<strong>st</strong><br />
5. Oily<br />
Sludge<br />
6. Others like<br />
Battery<br />
wa<strong>st</strong>e,<br />
ewa<strong>st</strong>e<br />
etc (Pl.<br />
Specify)<br />
Sr. Pollutant<br />
No.<br />
Fines Silica,<br />
Aluminium<br />
etc<br />
-- -- --<br />
-- -- --<br />
-- -- --<br />
Source<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong><br />
Emission<br />
Emission<br />
rate<br />
(kg/hr)<br />
Concentration<br />
in flue gas<br />
(g/sec)<br />
1 SPM Stack 0.125 0.035<br />
2 SO2 Stack Below<br />
detectable<br />
limit<br />
Below<br />
detectable<br />
limit<br />
3 NOX Stack Concentration in flue gas will<br />
be 100 mg/Nm 3<br />
4 CO Stack NA NA<br />
Plant<br />
Section<br />
& units<br />
Stack<br />
No.<br />
Height<br />
from<br />
ground<br />
level<br />
(m)<br />
Internal<br />
Diameter<br />
(Top)(m)<br />
Emission<br />
Rate<br />
(kg /hr)<br />
Temp.<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong><br />
Exhau<strong>st</strong><br />
Gases<br />
( 0 C)<br />
Roa<strong>st</strong>ing<br />
Furnace<br />
30 0.2 0.125 120<br />
• Green belt area (Sq. m.): 1000<br />
• Number and species <<strong>st</strong>rong>of</<strong>st</strong>rong> trees to be planted : 75<br />
1 <strong>st</strong>
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed.<br />
PP clarified that they decided to drop Ferro manganese from their proposed product li<strong>st</strong> and<br />
submitted the revised forms accordingly.<br />
<strong>SEAC</strong> decided to recommend the proposal for <strong>Environment</strong>al <strong>Clearance</strong> only after complying<br />
with the following conditions:<br />
1. Submit a copy <<strong>st</strong>rong>of</<strong>st</strong>rong> the approved layout<br />
2. Submit revised green belt plan with large broad leaf trees (#100) all around the boundary.<br />
Chairman<br />
66
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 20<br />
Subject: <strong>Environment</strong> clearance for manufacturing Bulk drugs/ Active pharmaceuticals<br />
intermediates by M/s. Precise Chemipharma Pvt. Ltd<br />
(File No. <strong>SEAC</strong> 2011/ CR-164 / TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project Bulk Drugs & Intermediates<br />
Project Proponent M/s. Precise Chemipharma Pvt. Ltd<br />
Name, address, e-mail &<br />
contact number <<strong>st</strong>rong>of</<strong>st</strong>rong> Consultant<br />
Project proponent Present the case<br />
New Project / Expansion in<br />
exi<strong>st</strong>ing<br />
project/Modernization/Divers<br />
ification in exiting project<br />
New Project<br />
Activity schedule in the EIA<br />
Notification<br />
5 (f) , B-2<br />
Area Details • Total plot area (sq. m.): 2013 Sq. Mt.<br />
• Built up area (Sq. m.): 1599 Sq. Mt.<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Notified MIDC TTC Pawane, Navi Mumbai<br />
Indu<strong>st</strong>rial area / MIDC area<br />
E<strong>st</strong>imated capital co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
Project (including co<strong>st</strong> for<br />
land, building, plant<br />
and machinery separately)<br />
1.71 Crs.<br />
Location details <<strong>st</strong>rong>of</<strong>st</strong>rong> the • Latitude : 19<br />
project :<br />
0 04’ 43.46” N<br />
• Longitude: 73° 01’ 46.58” E<br />
• Location: TTC Indu<strong>st</strong>rial Area<br />
• Elevation above Mean Sea Level (meters): 108 Ft<br />
Production details Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Exi<strong>st</strong>ing Proposed Total<br />
Products, By (T/Year) Activity (new/ (T/Year)<br />
products and<br />
modernization<br />
Intermediate<br />
/ expansion)<br />
Products<br />
(T/Year)<br />
Zolpidem<br />
Tartrate<br />
NA<br />
3.0 MT 3.0 MT<br />
Clonazepam NA 0.6 MT 0.6 MT<br />
Lorazepam NA 0.6 MT 0.6 MT<br />
Illaprazole NA 3.0 MT 3.0 MT<br />
Febuxo<strong>st</strong>at NA 6.0 MT 6.0 MT<br />
Levoclopera<strong>st</strong>i<br />
ne Fendizoate<br />
NA<br />
6.0 MT 6.0 MT<br />
Zaltopr<<strong>st</strong>rong>of</<strong>st</strong>rong>en NA 6.0 MT 6.0 MT<br />
Chairman<br />
67
Rain Water Harve<strong>st</strong>ing<br />
(RWH)<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table: 6 Mt<br />
• Size, nos <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits and Quantity: 4 Nos. 3.14 x 2.2 x 3.5<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>): 1 Lac.<br />
Total Water Requirement Total water requirement: 35 CMD<br />
• Fresh water (CMD): 35 & Source: MIDC<br />
• Recycled water (CMD): 0<br />
Sewage generation and<br />
treatment<br />
Use <<strong>st</strong>rong>of</<strong>st</strong>rong> the water:<br />
• Process (CMD):17.3 CMD<br />
• Cooling water (CMD):12 CMD<br />
• DM Water (CMD): Nil<br />
• Cleaning: 4 CMD<br />
• Drinking (CMD): 1 CMD<br />
• Green belt (CMD): 0.7 CMD<br />
• Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> sewage generation (CMD): 0.9 CMD<br />
• Proposed treatment for the sewage: Septic Tank fallowed by Soak<br />
Pit<br />
Effluent characteri<strong>st</strong>ic Sr. No Parameters Inlet Treated Unit<br />
1. pH 7-8 5.5-9.0<br />
2. COD 2000 250 Mg/lit<br />
3. BOD 1200 100 Mg/lit<br />
4. Suspended solids 500 100 Mg/lit<br />
5. Oil & Grease 10-15 10 Mg/lit<br />
ETP details • Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> effluent generation (CMD): 18.17 CMD<br />
• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the ETP (CMD): 20 CMD<br />
• Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> treated effluent recycled (CMD):16 CMD<br />
Note on ETP technology to<br />
be used<br />
• Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> water send to the CETP (CMD): 16 CMD<br />
Effluent Treatment Process & Operations:<br />
• Effluent from various <strong>st</strong>reams and washings and blow down is<br />
collected in a partitioned collection tank.<br />
• This is fed to neutralization tank A or B. These will be <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
capacity 10 m3 each Dimensions shall be 2.0 m x 2 m x 2.5<br />
m SWD with 0.5 m free boards. This will be <<strong>st</strong>rong>of</<strong>st</strong>rong> RCC<br />
con<strong>st</strong>ruction.<br />
• When tank A is full effluent is pumped to tank B and vice<br />
versa.<br />
• Filled tank A or B is subjected to pH correction /<br />
neutralization.<br />
• The neutralization <<strong>st</strong>rong>of</<strong>st</strong>rong> acidic effluent will be carried out with<br />
Lime and sodium Hydroxide.<br />
• During neutralization compressed air is used for aeration in<br />
Tank [A] and [B].<br />
• Suspended solids will be settled in primary settling tank. It<br />
Chairman<br />
68
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> the ETP sludge Dispose to CHWTSDF<br />
will be <<strong>st</strong>rong>of</<strong>st</strong>rong> 4 m3 capacity with dimensions <<strong>st</strong>rong>of</<strong>st</strong>rong> 1.75 m dia X 1.5<br />
m SWD. It will have a hopper <<strong>st</strong>rong>of</<strong>st</strong>rong> 0.75 m height. 0.3 m free<br />
board will be provided. It shall be <<strong>st</strong>rong>of</<strong>st</strong>rong> M S epoxy con<strong>st</strong>ruction.<br />
• The sludge separated will be used for land filling.<br />
• After settling the effluent shall overflow to bio-reactor. It will<br />
be <<strong>st</strong>rong>of</<strong>st</strong>rong> capacity 20 m 3 . Dimensions shall be 4 m x 2.5 m x 2.5<br />
m SWD with 0.5 m free boards. This will be <<strong>st</strong>rong>of</<strong>st</strong>rong> RCC<br />
con<strong>st</strong>ruction. Air supply shall be through diffused aeration<br />
sy<strong>st</strong>em and an air blower <<strong>st</strong>rong>of</<strong>st</strong>rong> suitable capacity.<br />
• Mixed liquor from bioreactor will be passes on to secondary<br />
settling tank where biomass will be settled and returned to bio<br />
reactor. Its dimensions shall be 1.75 m dia X 1.5 m SWD . It<br />
will have hopper bottom <<strong>st</strong>rong>of</<strong>st</strong>rong> 0.7 m height.<br />
• Sludge from primary settling tank and secondary settling tank<br />
shall be wa<strong>st</strong>ed on sludge drying beds. These will be <<strong>st</strong>rong>of</<strong>st</strong>rong> two<br />
nos. with size 1.5 m x 1.5 m in Brick work con<strong>st</strong>ruction.<br />
• Overflow from secondary settling tank shall be collected in an<br />
intermediate tank. From here it will be send to tertiary<br />
treatment.<br />
• For tertiary treatment one pressure sand filter <<strong>st</strong>rong>of</<strong>st</strong>rong> size 200 mm<br />
dia and height 1200 mm and carbon filter <<strong>st</strong>rong>of</<strong>st</strong>rong> same dimensions<br />
will be used. These will be filled with filter media and<br />
activated carbon.<br />
• The clear effluent will be discharged to common effluent<br />
treatment plant.<br />
Chairman<br />
69
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Solid wa<strong>st</strong>e Management Sr.<br />
N<br />
Atmospheric Emissions (Flue<br />
gas characteri<strong>st</strong>ics (SPM,<br />
SO2, NOx, CO, etc.)<br />
Stack emission Details:<br />
(All the <strong>st</strong>acks attached to<br />
process units, Boilers,<br />
captive power plant, D.G.<br />
Sets, Incinerator both for<br />
exi<strong>st</strong>ing and proposed<br />
activity). Please indicate the<br />
specific section to which the<br />
<strong>st</strong>ack is attached. e.g.:<br />
Process section, D.G. Set,<br />
Boiler, Power Plant,<br />
incinerator etc. Emission rate<br />
(kg/hr.) for each pollutant<br />
o.<br />
1 Raw water<br />
Treatment<br />
plant<br />
Source Qty<br />
(TPM)<br />
2 ETP 15<br />
Kg/Mo<br />
Chairman<br />
70<br />
Form (Sludge /<br />
Dry / Slurry etc.)<br />
Compositi<br />
on<br />
Nil Nil Nil<br />
nth<br />
3 Process 35<br />
Kg/Mo<br />
nth<br />
Sludge Chemical<br />
Residue &<br />
Wa<strong>st</strong>e<br />
4 Spent Cataly<strong>st</strong> Nil Nil Nil<br />
5 Oily Sludge 10<br />
lit/mont<br />
h<br />
Wa<strong>st</strong>e Oil -<br />
6 Activated 150 Dry -<br />
Carbon Kg/Mo<br />
nth<br />
Sr.<br />
No.<br />
Pollutant Source<br />
Of<br />
Emissio<br />
n<br />
Emission Rate<br />
(kg/hr)<br />
1 SPM Boiler &<br />
DG Set<br />
2 SO2 Boiler &<br />
DG Set<br />
36 kg/day<br />
3 NOx Boiler &<br />
DG Set<br />
4 CO Boiler &<br />
DG Set<br />
5 Others -<br />
Plant Stac Height Internal Emissio<br />
Section k From Diameter n<br />
& units No. ground<br />
level (m)<br />
(Top)(M) Rate<br />
Boiler 1 12 m 275 m Dia 36<br />
kg/day<br />
DG Set 2 9 m 150 mm<br />
Dia<br />
-<br />
Concentrat<br />
ion in flue<br />
gas (g/m3)<br />
Negligible Negligible<br />
Negligible Negligible<br />
Negligible Negligible<br />
SO2<br />
0.66<br />
kg/day<br />
SO2<br />
Temp. <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
Exhau<strong>st</strong><br />
Gases<br />
120 0 C
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
(SPM, SO2, NOx etc. should<br />
be specified<br />
Emission Standard Pollutant<br />
s<br />
(SPM,SO<br />
2..etc)<br />
Chairman<br />
71<br />
Emission<br />
Standard<br />
Limit<br />
(mg/Nm3)<br />
Propose<br />
d limit<br />
(mg/Nm<br />
3)<br />
MPCB<br />
Consent<br />
(mg/Nm3)<br />
SPM 200 250 150<br />
SO2 -- 280<br />
kg/day<br />
--<br />
RSPM Included in Included Included in<br />
SPM in SPM SPM<br />
NOX Negligible Negligib<br />
le<br />
Negligible<br />
CO Negligible Negligib<br />
le<br />
Negligible<br />
Ambient Air Quality Data Pollutant Permissible Proposed Remarks<br />
Standard Concentration<br />
(in<br />
(in<br />
µ/m3.) µ/m3.)<br />
SPM 200
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
<strong>Environment</strong>al Management<br />
plan Budgetary Allocation<br />
Decision:<br />
1 Air<br />
control<br />
sy<strong>st</strong>em<br />
NA Stack<br />
2 Water NA ETP<br />
3 Noise NA Acou<strong>st</strong>ic<br />
enclosure to<br />
DG<br />
4 Solid Wa<strong>st</strong>e NA CHWTSDF<br />
• Capital co<strong>st</strong> (With break up): 6.35 Lacs<br />
• O&M co<strong>st</strong> (With break up): Rs 3.45 Lacs<br />
# PARTICULARS CAPITAL COST<br />
1. For Air Pollution Control<br />
Scrubber & Stacks<br />
Rs. 1,25,000<br />
2. For Water Pollution Control<br />
Co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> ETP<br />
Rs. 5,00,000<br />
3. For Noise Pollution Control<br />
Acou<strong>st</strong>ic Enclosures for D.G.<br />
Sets<br />
Rs.25,000<br />
4. For Soil Pollution Control Rs.20,000<br />
5<br />
(Solid/HW)<br />
Gardening Rs.15,000<br />
Total Rs. 6,85,000.00<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed. Considering the project size and products, <strong>SEAC</strong> appraised the project under<br />
Categeory B2.<br />
<strong>SEAC</strong> noted that MPCB granted consent to e<strong>st</strong>ablished to the project and civil work was<br />
completed accordingly. <strong>SEAC</strong> further noted that it is a GMP (Good Manufacturing Process) unit,<br />
as per FDA norms.<br />
<strong>SEAC</strong> decided to recommend the proposal for <strong>Environment</strong>al <strong>Clearance</strong> only after complying<br />
with the following observations:<br />
1. Minimize the water loss in indu<strong>st</strong>rial process as it is almo<strong>st</strong> 50%<br />
2. Submit package ETP details along with influent and effluent parameters.<br />
3. Submit green belt plan with 50 evergreen, large, broad leaf trees along the boundary <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
plot.<br />
4. Relocate the fir<strong>st</strong> aid room from the current location (below <strong>st</strong>aircase) and open the<br />
<strong>st</strong>aircase for exit.<br />
Chairman<br />
72
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 21<br />
Subject: TOR for Proposed Re heating furnace [Capacity 20000(MT/M)], mechanical<br />
rolling <strong>st</strong>ations at Plot No. E-12, Butibori MIDC,Di<strong>st</strong>t.Nagpur by M/s.<br />
Shardashree Ispat Ltd<br />
(File No. <strong>SEAC</strong> 2011/CR-518 /TC2)<br />
PP was absent<br />
Chairman<br />
73
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 22<br />
Subject: TOR for Proposed con<strong>st</strong>ruction <<strong>st</strong>rong>of</<strong>st</strong>rong> earthen dam and allied works at (1) Chondhi L<br />
M I project Tal Sangrampur, Di<strong>st</strong> Buldhana, (2) Darangwadi (Ijad), Tal Chikhali,<br />
Di<strong>st</strong> Buldhana (ii) Alewadi, Tal Sangrampur, Di<strong>st</strong> Buldhana (iv) Durgbori Tal<br />
Mehakarr, Di<strong>st</strong> Buldhana, (v) Kacheri LMI project at village Sonala, Di<strong>st</strong><br />
Sangrmpur, Di<strong>st</strong> Buldhana by M/s. Executive Engineer, Minor Irrigation Division,<br />
Buldhana.<br />
(File No. <strong>SEAC</strong> 2412/CR-224 /TC2)<br />
PP was absent<br />
Chairman<br />
74
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 23<br />
Subject: <strong>Environment</strong> clearance for residential Con<strong>st</strong>ruction Project "Hills & Dales Phase<br />
III" at S.No. 13(P), 14(P), 15(P) & 19(P) Village Undri, Tal. Haveli, Di<strong>st</strong>. Pune by<br />
M/s. Ankit Enterprises.<br />
(File No. <strong>SEAC</strong> 2011/CR-170 /TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : Hills & Dales<br />
Project Proponent : M/s. Ankit Enterprises<br />
Consultant : M/s. Mahabal Environ Engineers Pvt. Ltd<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the project : S. No. 13 (P), 14(P), 15(P) & 19 (P)<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Housing project<br />
Category : 8 (a), B2<br />
Whether in<br />
Corporation /<br />
Municipal / Other<br />
area<br />
Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
DCR<br />
Total plot area (Sq.m)<br />
Deductions<br />
Net plot area<br />
Permissible FSI<br />
(including TDR etc.)<br />
Proposed Built –UP<br />
Area (FSI & Non FSI)<br />
Ground – coverage<br />
percentage (%)<br />
(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
plot not open to sky)<br />
E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />
configuration (s)<br />
Town Planning<br />
Town Planing<br />
1,30,100.00<br />
10,300.00<br />
1,19,800.00<br />
1<br />
• FSI area (sq. m.): 80,263.04<br />
• Non FSI area (sq. m.): 34,456.00 + Amenity 13,526.92 sq.m<br />
• Total BUA area (sq. m.): 1,28,245.96<br />
21%<br />
176 Cr<br />
16 No. P+7 & 2P+12 with 1 and 2 BHK apartments with amenity<br />
development with School, Dispensary & community Hall<br />
Chairman<br />
75
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />
and shops<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />
residents / users<br />
Tenant density per<br />
hector<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
building(s)<br />
Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Turning radius for<br />
easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />
tender movement<br />
from all around the<br />
building excluding the<br />
width for the<br />
plantation<br />
Total Water<br />
Requirement<br />
Rain Water<br />
Harve<strong>st</strong>ing (RWH)<br />
586 Tenements<br />
5625<br />
45<br />
P + 7: 23.95 m<br />
2P + 12: 36 m<br />
15 m<br />
7.5 m<br />
Dry season:<br />
• Fresh water (CMD): 312 &<br />
Source: PMC through Undri Grampanchayat<br />
• Recycled water (CMD): 285<br />
• Total Water Requirement (CMD): <<strong>st</strong>rong>61</<strong>st</strong>rong>9<br />
• Swimming pool make up (Cum): 3<br />
• Fire fighting (Cum): 200<br />
Wet Season:<br />
• Fresh water (CMD): 318 &<br />
Source: PMC through Undri Grampanchayat<br />
• Recycled water (CMD): 208<br />
• Total Water Requirement (CMD): 517<br />
• Swimming pool make up (CMD): 3<br />
• Fire fighting (CMD): 200<br />
• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table: 6m<br />
• Size, no <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits and Quantity: 2m Length X 0.9 m width, 26 No<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
Capital co<strong>st</strong>: 6,50,000/-<br />
O&M co<strong>st</strong>: 15,000/- p.a.<br />
Strom water drainage • quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water : 46965 KL/yr<br />
• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD: 300 to 600 mm<br />
Sewage and wa<strong>st</strong>e • Sewage generation (CMD) : 489<br />
water<br />
• STP technology: Extended Aeration Sy<strong>st</strong>em<br />
• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD) :<br />
STP I: 395 & STP II: 105<br />
• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP : Plan enclosed<br />
• DG sets (during emergency): 160 KVA X 1 No.<br />
Chairman<br />
76
Solid wa<strong>st</strong>e<br />
Management<br />
Green Belt<br />
Development<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
Capital Co<strong>st</strong>: 62,00,000/-<br />
O & M Co<strong>st</strong>: 12,00,000/- p.a.<br />
Wa<strong>st</strong>e generation in the Pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction phase:<br />
• Wa<strong>st</strong>e generation<br />
• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> the top soil to be preserved: 11000 CUM<br />
• Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> the con<strong>st</strong>ruction way debris: Land filling on the same site<br />
Wa<strong>st</strong>e generation in the operation Phase:<br />
• Dry wa<strong>st</strong>e (Kg/day): 649<br />
• Wet wa<strong>st</strong>e (Kg/day): 1104<br />
• STP Sludge (Dry sludge) (Kg/day): 70<br />
Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>e:<br />
• Dry wa<strong>st</strong>e: Through Authorized vendors<br />
• Wet wa<strong>st</strong>e: OWC<br />
•Total Area: 227 Sq. m<br />
Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
Capital Co<strong>st</strong>: 9,00,000/-<br />
O&M co<strong>st</strong> : 50,000/-p. a<br />
Total RG area:<br />
RG area on ground:17, 064.8 sq.m<br />
Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
Capital co<strong>st</strong>: 1,00,00,000/-<br />
O&M co<strong>st</strong>: 60,00,000/- p.a.<br />
Energy Power supply:<br />
• Maximum demand : 2400 KW<br />
• Connected load : 2400 KW<br />
• Source : MSEDCL<br />
Energy saving by non-conventional method:<br />
• Energy saving measures<br />
1. Using CFL in Parking area, lift-lobby and <strong>st</strong>air-case.<br />
2. Using Low Wattage CFL in Place <<strong>st</strong>rong>of</<strong>st</strong>rong> Metal Halide in External Lights.<br />
3. Providing Solar Water Heater in each flat.<br />
Thus total energy saving will be 4060.12 unit/ day<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
Capital co<strong>st</strong>: 65,00,000/-<br />
O&M co<strong>st</strong>: 85,000/- p.a.<br />
DG Set:<br />
• Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used :<br />
160 KVA (1No)<br />
• Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used : Diesel<br />
Traffic Management Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> the junction to the main road & design <<strong>st</strong>rong>of</<strong>st</strong>rong> confluence: 1 No.<br />
Parking details:<br />
• Total Parking area : 20,800.80 Sq m<br />
• Area per car<br />
• 2-Wheelar : 1346 No.<br />
• 4-Wheeler : 704 No.<br />
Chairman<br />
77
<strong>Environment</strong>al<br />
Management plan<br />
Budgetary<br />
Allocation<br />
Decision:<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Bicycles: 1694<br />
• Public Transport<br />
Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal roads (m): 24 m &12 m<br />
Con<strong>st</strong>ruction phase (with Break-up):<br />
• Capital co<strong>st</strong><br />
STP : 62,00,000/-<br />
RWH : 6,50,000/-<br />
OWC : 9,00,000/-<br />
Landscape : 1,00,00,000/-<br />
Renewable Energy use : 62,00,000/-<br />
TOTAL: 2,39,50,000/-<br />
Operation Phase (with Break-up)-<br />
• O&M co<strong>st</strong> (Please ensure manpower and other details)<br />
STP : 12,00,000/-<br />
RWH : 15,000/-<br />
OWC : 50,000/-<br />
Landscape : 60,00,000/-<br />
Renewable Energy use : 85,000/-<br />
TOTAL: 73,50,000/-<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed.<br />
PP informed that this is an expansion project and some con<strong>st</strong>ruction done as per accorded EC.<br />
However <strong>SEAC</strong> noted that PP has modified the approved layout, including relocation <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
buildings, without obtaining amendment to the accorded EC. <strong>Environment</strong> Department may look<br />
into the matter regarding possible violation and take appropriate action.<br />
The proponent is directed to comply with the following observations:<br />
1. Submit approval for additional FSI, which has been already considered by PP and may be<br />
available only after complying with the conditions <strong>st</strong>ipulated in the NA order.<br />
2. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> car parking and lay out plan with calculations and re<strong>st</strong>rict the numbers as<br />
per norms<br />
3. Relocate STP and UG tank for better and easy fire tender movement, provide 7.5 m<br />
clearance all around the building and submit the revised drawings.<br />
4. Submit point wise compliance report to ECBC guidelines<br />
5. Submit water balance for the entire project<br />
Chairman<br />
78
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
6. Submit consent for the required quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> water for the entire project from competent<br />
authority<br />
7. Submit revised green belt plan including li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> exi<strong>st</strong>ing and proposed trees to be planted<br />
(#900) around the boundary <<strong>st</strong>rong>of</<strong>st</strong>rong> plot, new buildings, amenity area and gaps in new DP road<br />
Chairman<br />
79
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 24<br />
Subject: <strong>Environment</strong> clearance for proposed project at Sr. No. 175/3, 172/2 Wakad link<br />
road, Next to Omega, behind hotel Shivaji, Wakad by M/s. Sanskruti & Essen<br />
Associates<br />
(File No. <strong>SEAC</strong> 2211/ CR-135 / TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : “Shone<strong>st</strong> Tower”<br />
Project Proponent : M/s. Sanskruti & Essen Associates<br />
Consultant : M/s. Saitech Research & Development Organization<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the : Sr. No. 175/3,(172/2) Wakad Link Road, Next to Omega Paradise,<br />
project<br />
Behind hotel Sayaji , Wakad , Pune 411027<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Con<strong>st</strong>ruction project<br />
Category : 8 (a), B2<br />
Previous<br />
consideration/s<br />
Whether in<br />
Corporation /<br />
Municipal / Other<br />
area<br />
Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
DCR<br />
Total plot area<br />
Deductions<br />
Net plot area<br />
Permissible FSI<br />
(including TDR etc.)<br />
Proposed Built –UP<br />
Area (FSI & Non<br />
FSI)<br />
Ground – coverage<br />
percentage (%)<br />
(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
plot not open to sky)<br />
New case<br />
Pimpri Chinchwad Municipal Corporation<br />
Pimpri Chinchwad Municipal Corporation<br />
Plot Area – 20900.00 m 2<br />
Deductions – 5594.1m 2<br />
Net Plot Area - 15305.90 m 2<br />
25321.70 m 2<br />
43104.88 m 2 ( FSI – 24975.39 m 2 + Non - FSI – 18129.49 m 2 )<br />
47%<br />
Chairman<br />
80
E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />
configuration (s)<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />
and shops<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />
residents / users<br />
Tenant density per<br />
hector<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
building(s)<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
125 Cr.<br />
Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way 24m<br />
Turning radius for<br />
easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />
tender movement<br />
from all around the<br />
building excluding<br />
the width for the<br />
plantation<br />
Total Water<br />
Requirement<br />
Rain Water<br />
Harve<strong>st</strong>ing (RWH)<br />
Residential & Commercial Buildings (11 Nos.) Wing.A+B, Wing D+G,<br />
Bldg.C=G+6<br />
Wing E,F,H,J,K,I = P+12<br />
Commercial (5 Nos.- On Gr.Floor <<strong>st</strong>rong>of</<strong>st</strong>rong> Wing.A+B, Wing D+G,<br />
Bldg.C=G+6)<br />
Tenements - 439 Nos.<br />
Total Commercial Area-905.31 m 2<br />
Residential – 2195 Nos.<br />
Commercial – 302 Nos.<br />
Total - 2497 Nos.<br />
286<br />
38.90 M<br />
Driveway 6.0m & 7.5 m<br />
Dry season :<br />
• Fresh water (CMD) : 197.0 CMD <<strong>st</strong>rong>of</<strong>st</strong>rong> Source: PCMC ( Pimpri<br />
Chinchwad Municipal Corporation)<br />
• Recycled water (CMD): 113.0 CMD<br />
• Total water Requirement (CMD):320. 0 CMD<br />
• Landscape (CMD):--10.0 CMD<br />
• Swimming Pool (CMD): 10.0 CMD<br />
Wet Season:<br />
• Fresh water (CMD) : 197.0 CMD <<strong>st</strong>rong>of</<strong>st</strong>rong> Source: PCMC ( Pimpri<br />
Chinchwad Municipal Corporation)<br />
• Recycled water (CMD): 113.0 CMD<br />
• Total water Requirement (CMD):320. 0 CMD<br />
• Landscape (CMD):-10.0 CMD<br />
• Swimming Pool (CMD): 10.0 CMD<br />
• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table – Approx. 8 mts. to 25 mts.<br />
Size , nos <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge Bore and quantity – 8Nos.<br />
Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Bore Dia –Depth 150’ to 300’ mm<br />
Chairman<br />
81
Strom water<br />
drainage<br />
Sewage and wa<strong>st</strong>e<br />
water<br />
Solid wa<strong>st</strong>e<br />
Management<br />
Green Belt<br />
Development<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Budgetary allocation ( Capital co<strong>st</strong> and O & M co<strong>st</strong>)-<br />
Capital co<strong>st</strong>: 27.75 Lakh<br />
O & M Co<strong>st</strong> : 6.0 Lakh/Year<br />
Discharge Before Development – 170.07 m 3 /day<br />
Discharge After Development – 276.96 m 3 /day<br />
Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD - Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Bore Dia. – Depth 150’ to 300’ mm<br />
• Sewage generation (CMD) – 279.0 CMD<br />
• STP technology - SMBR( Suspended Media Bio Reactor )<br />
• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD) – 279.0CMD<br />
• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP - Refer Storm & drainage layout<br />
• DG sets (during emergency) - 100 KVA X 1 No.<br />
70 KVA X 1 No.<br />
• Budgetary allocation (Capital co<strong>st</strong> and O & M co<strong>st</strong>) –<br />
Capital co<strong>st</strong>: 55.5 Lakh<br />
O & M Co<strong>st</strong> : 14.0 Lakh / Year<br />
Wa<strong>st</strong>e generation in the pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction phase:<br />
• Wa<strong>st</strong>e generation – Excavated Material 4000m 3<br />
Wa<strong>st</strong>e generation in the operation phase:<br />
• Dry wa<strong>st</strong>e (Kg/day): 449.46 Kg/day<br />
• Wet wa<strong>st</strong>e (Kg/day): 674.19 Kg/day<br />
• E – wa<strong>st</strong>e (Kg/month): Not Applicable<br />
• Hazardous wa<strong>st</strong>e (Kg/month): Spent oil – 80.0 Lit/ yr<br />
• STP Sludge (Dry sludge) (Kg/day): 25.11 Kg/Day<br />
Mode Of Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> Wa<strong>st</strong>e:<br />
• Wet wa<strong>st</strong>e (Kg/day): Organic Wa<strong>st</strong>e Convertor<br />
Budgetary allocation( capital Co<strong>st</strong> & O&M co<strong>st</strong>)<br />
Capital co<strong>st</strong>: 25.0 Lakh<br />
O & M Co<strong>st</strong> : 12.0 Lakh / Year<br />
Total RG area: 2184.87 m 2 i.e. about 14.27 % Net Plot Area)<br />
RG area under green belt:<br />
• RG on the Ground (Sq.M) – 784.12 m 2<br />
• RG on Slab Podium (Sq.M) – 1400.75 m 2<br />
3. Plantation:<br />
• Number & li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> trees species to be planted in the ground RG:<br />
241Nos.<br />
• Number & li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> shrubs & bushes species planted in the podium RG;<br />
NA<br />
Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />
Capital co<strong>st</strong>: 65.0 Lakh<br />
O & M Co<strong>st</strong> : 5.0 Lakh / Year<br />
Energy Power Supply:<br />
• Maximum demand – 2042.7 KVA<br />
• Connected Demand –2298.0 KW<br />
Source - Maharashtra State Electricity Di<strong>st</strong>ribution Company<br />
Limited(MSEDCL)<br />
Chairman<br />
82
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Energy saving by non-conventional method:<br />
• Energy Saving measures – CFL & LED Lamps, Solar etc.<br />
• Details Calculation & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving - 686929.15 KWH /Annum<br />
• Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />
Capital co<strong>st</strong>: 70.50 Lakh<br />
O & M Co<strong>st</strong> : 18.5 Lakh / Year<br />
DG Set:<br />
• Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used - 100 KVA X 1No.<br />
70 KVA X 1No.<br />
• Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used - Disel - 100 KVA DG set – 22 Litrs./hr. for<br />
100% load & 11.4 Litrs/hr. for 50% load.<br />
• 70 KVA DG set – 14.2 Litrs./hr. for 100% load & 9.4 Litrs/hr. for<br />
50% load.<br />
Traffic Management Nos. Of the Junction to the main road & design <<strong>st</strong>rong>of</<strong>st</strong>rong> confluence - Refer<br />
Parking & Traffic Management Plan.<br />
Parking details:<br />
• Number & area <<strong>st</strong>rong>of</<strong>st</strong>rong> podium - 2 Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> 2684.88 m 2<br />
• Total parking area -<br />
Required parking Area – 7113.80 m 2<br />
Proposed parking Area – 7115.05 m 2<br />
• Area per car – 12.5 m 2<br />
Including drive way - 21.55 m 2 for Open Parking & 20.08 m 2 for<br />
Covered Parking<br />
• 2- Wheelers - 942Nos.<br />
• 4-wheeler - 242 Nos.<br />
• Public Transport - 902 Nos.<br />
<strong>Environment</strong>al<br />
Management plan<br />
Budgetary<br />
Allocation<br />
Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal road(m): 6.0 mtr.<br />
Con<strong>st</strong>ruction Phase ( With break up):<br />
Capital Co<strong>st</strong> - STP – Rs. 55.5 Lakh<br />
RWH – Rs. 27.75 Lakh<br />
MSW – Rs. 32.0 Lakh<br />
Solar sy<strong>st</strong>em – Rs. 70.50 Lakh<br />
Landscape – Rs. 65.0 Lakh<br />
Operation Phase( with break Up)-<br />
• O & M co<strong>st</strong>( Please ensure manpower and other details)-<br />
STP – Rs. 14.0 Lakh / Year<br />
RWH – Rs. 6.0 Lakh / Year<br />
MSW – Rs. 18.0 Lakh / Year<br />
Solar sy<strong>st</strong>em – Rs. 18.5 Lakh / Year<br />
Landscape – Rs.5.0 Lakh / Year<br />
Chairman<br />
83
Decision:<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed.<br />
PP <strong>st</strong>ated that some con<strong>st</strong>ruction has been initiated and a total built up area <<strong>st</strong>rong>of</<strong>st</strong>rong> 20,046sq.m<br />
completed. It appears to be a violation <<strong>st</strong>rong>of</<strong>st</strong>rong> EIA Notification, 2006, as the TBUA exceeded 20,000<br />
m2. <strong>Environment</strong> Department may look into the possible violation and take appropriate action.<br />
The proponent is directed to comply with the following observations:<br />
1. Reduce the podium area and use the freed space for the required green belt development.<br />
2. Reduce the ground coverage as much as possible<br />
3. Increase the width <<strong>st</strong>rong>of</<strong>st</strong>rong> internal road to 7.5 m for easy fire tender movement.<br />
4. Shift OWC from across DP road to the residential side <<strong>st</strong>rong>of</<strong>st</strong>rong> the project<br />
5. Revise the green belt plan including trees (#250) <<strong>st</strong>rong>of</<strong>st</strong>rong> mixed type on ground RG. Plant<br />
shrubs and bushes <<strong>st</strong>rong>of</<strong>st</strong>rong> ecologically importance on the podium.<br />
Chairman<br />
84
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 25<br />
Subject: <strong>Environment</strong>al <strong>Clearance</strong> for proposed Group Housing project at S.No. 66, 69/1-5<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong> village Mouja Bhokhare, Tal.Nagpur (Rural), Di<strong>st</strong>t. Nagpur by M/s. Ramnath<br />
Developers Ltd<br />
(File No. <strong>SEAC</strong> 2010/CR-901/TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project Group housing Project (Phase 1)<br />
Name, contact<br />
number &<br />
M/s. Ramnath Developers Pvt. Ltd<br />
address <<strong>st</strong>rong>of</<strong>st</strong>rong> Proponent<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Consultant M/s. Pollution and Ecology Control Services,<br />
Category 8 (a), B2<br />
Previous<br />
consideration/s<br />
• 13th <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the State Level Expert Appraisal Committee<br />
(<strong>SEAC</strong>) held on 8th July, 2009<br />
• 35th <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the State Level Expert Appraisal Committee<br />
(<strong>SEAC</strong>) held on 18th October 2010<br />
• 42nd <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>SEAC</strong><br />
• 47th <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>SEAC</strong><br />
• 42nd <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the SEIAA held on 8th/9th December, 2011<br />
• 44th <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the SEIAA held on the 23rd / 24th February,<br />
2012<br />
• 57th <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the State Level Expert Appraisal Committee<br />
(<strong>SEAC</strong>) held on 19th to 22nd June, 2012<br />
59 th Type <<strong>st</strong>rong>of</<strong>st</strong>rong> project:<br />
Meeting <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong><br />
Group Housing Project (Phase 1)<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the Survey No. 66 & 69/1-5, Mouza- Bhokhara, P.H. No. 12- A,<br />
project<br />
Whether in<br />
Tehsil - Nagpur (Rural), Di<strong>st</strong>. - Nagpur, Maharashtra.<br />
Corporation/<br />
Municipal/ Other area<br />
Nagpur Metro region Area<br />
Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the NMC- DCR<br />
Chairman<br />
85
DCR<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Note on the initiated<br />
work ( If applicable)<br />
Total Plot Area<br />
(sq.m.) Deductions<br />
Net Plot area<br />
Permissible FSI<br />
(including TDR etc.)<br />
Proposed Built-up<br />
Area (FSI & Non FSI)<br />
Ground-coverage<br />
Percentage (%)<br />
(Note: Percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
plot not open to sky)<br />
FSI area(sq m) 28741.586 sqm<br />
Non FSI<br />
Premium 00.00 sq.m<br />
Balcony 2753.712 sq.m<br />
Layout approved by NIT, letter no-EE(Metro) 496,<br />
dated.19/01/2012 and NIT requires EC approval for further<br />
sanctioning <<strong>st</strong>rong>of</<strong>st</strong>rong> building plans. The said project entire campus total<br />
built up area is 31495.29 sqm in which built up area <<strong>st</strong>rong>of</<strong>st</strong>rong> each<br />
building is less than 20000 sq.ft.<br />
Earlier Project approved by Collector, Nagpur under Con<strong>st</strong>ruction<br />
permission letter No.947/2010, Mouza- Bhokhara, P.H. No. 12-<br />
A, Tehsil - Nagpur (Rural), R.M. No. 97/M.R.C.-81/(M.R.T.P –<br />
2000/Con<strong>st</strong>ruction Permission)/2009-2010, Collector, Nagpur<br />
dated 14/05/2010.<br />
Total plot Area Phase 1 Phase 2<br />
80500 sq.m 48672.28 sqm 31827.72 sq.m<br />
Chairman<br />
86<br />
Phase 1<br />
29210.72 sq.m<br />
Phase 1<br />
FSI area(sq m) 28741.586 sqm<br />
Non FSI Premium 00.00 sq.m<br />
18.24%<br />
E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project 49 crore<br />
Balcony 2753.712 sq.m<br />
TOTAL 31495.29 sqm<br />
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />
configuration(s) Total buildings 31 Nos.<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />
and shops<br />
266 tenants<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />
residents/users<br />
1330<br />
Tenant density per<br />
hectare<br />
55<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building<br />
(S) in m<br />
24 m<br />
Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way (Width 18 m
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong> the road from the<br />
neare<strong>st</strong> fire <strong>st</strong>ation to<br />
the proposed<br />
building(s))<br />
Turning radius for<br />
easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />
tender movement<br />
from all around the<br />
building excluding the<br />
width for the<br />
plantation<br />
Total water<br />
requirement<br />
Rain Water<br />
Harve<strong>st</strong>ing(RWH)<br />
Strom water drainage<br />
Sewage and Wa<strong>st</strong>e<br />
water<br />
Chairman<br />
87<br />
6 m<br />
Dry Season : Quantity<br />
Fresh water (CMD) 120 CMD<br />
Recycled water (CMD) 146 CMD<br />
Total Water Requirement<br />
(CMD)<br />
294 CMD<br />
Swimming pool make up<br />
(Cum)<br />
17.5 CMD<br />
Fire Fighting(Cum) 25 CMD<br />
Wet Season: Quantity<br />
Fresh water (CMD) 120 CMD<br />
Recycled water (CMD) 60 CMD<br />
Total Water Requirement<br />
(CMD)<br />
180 CMD<br />
Fire Fighting (Cum) 25 CMD<br />
Level <<strong>st</strong>rong>of</<strong>st</strong>rong> Ground water<br />
table<br />
Size and no <<strong>st</strong>rong>of</<strong>st</strong>rong> RWH<br />
tanks and quantity<br />
6-8 m<br />
Ground Water Recharging Tank<br />
1 Nos <<strong>st</strong>rong>of</<strong>st</strong>rong> 6 m dia & 3 m deep<br />
1 Nos <<strong>st</strong>rong>of</<strong>st</strong>rong> 6 m dia & 2 m deep<br />
1 exi<strong>st</strong>ing dug well 3 dia<br />
Size, no <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits<br />
125 Pits :-<br />
and quantity<br />
0.6 m × 0.6 m<br />
Budgetary allocation (capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />
Capital co<strong>st</strong> 15 lacs<br />
O & M 1.5 lacs<br />
Natural water<br />
drainage pattern<br />
Gravity<br />
Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water 38938 m 3 /yr<br />
Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD 900 mm dia<br />
Sewage generation<br />
(CMD)<br />
162 CMD<br />
STP technology Conventional STP
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Solid wa<strong>st</strong>e<br />
Management<br />
Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP 200 CMD<br />
DG sets(during<br />
emergency)<br />
1<br />
Budgetary allocation (capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />
Capital 35 lacs<br />
O & M 15 lacs<br />
Wa<strong>st</strong>e generation in the Pre-con<strong>st</strong>ruction and con<strong>st</strong>ruction<br />
Wa<strong>st</strong>e Generation: Quantity<br />
1)Brickwork<br />
2)Sand<br />
140 trucks for 4 lacs sq.ft<br />
a)In Brickwork 636 m 3<br />
b)In concrete 800 m 3<br />
c)In Pla<strong>st</strong>er 480 m 3<br />
3)Aggregate 800 m 3<br />
4)Cement 10 trucks<br />
5)Pla<strong>st</strong>er <<strong>st</strong>rong>of</<strong>st</strong>rong> Paris 600 m 3<br />
6)Tile 8 trucks<br />
7)Shuttering 20 trucks<br />
Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> the top soil to<br />
be preserved<br />
218000 cubic ft for 10 acre<br />
Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
con<strong>st</strong>ruction way debris<br />
Through vendors<br />
Wa<strong>st</strong>e generation in the<br />
Quantity<br />
operation Phase:<br />
Dry wa<strong>st</strong>e(Kg/day) 319 kg<br />
Wet wa<strong>st</strong>e (Kg/day) 213 kg<br />
STP Sludge (Dry sludge)<br />
(kg/day)<br />
70<br />
Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>e:<br />
Dry wa<strong>st</strong>e Handed over to authorized recycler<br />
Wet wa<strong>st</strong>e Treated by Vermi-compo<strong>st</strong><br />
STP Sludge (Dry sludge) As manure<br />
Area requirement:<br />
Total area provided for<br />
the <strong>st</strong>orage and treatment<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong> the solid wa<strong>st</strong>e<br />
Chairman<br />
88<br />
Vermi-compo<strong>st</strong> plant<br />
(6m X 20m)<br />
Budgetary allocation (capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />
Capital co<strong>st</strong> 5 lacs
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Green Belt<br />
Development<br />
O & M co<strong>st</strong> 2 lacs<br />
Total RG area: 8163.98 sq.m<br />
RG area other than green belt:<br />
Around amenity 5916.405 sq.m<br />
Around residential(PH-1) 4851.374 sq.m<br />
RG area under green belt:<br />
RG on the ground (sq.m.) 8163.98 sq.m<br />
No <<strong>st</strong>rong>of</<strong>st</strong>rong> Trees & Shrubs : 1037<br />
Capital Co<strong>st</strong> 1 crore<br />
O&M 5 Lacs<br />
Energy Power Supply<br />
Maximum demand 1860.75 KW<br />
Connected load 400 KVA<br />
Source MSEDCL<br />
Energy saving by non-conventional method:<br />
Energy saving<br />
measures<br />
Chairman<br />
89<br />
• All artificial light source &<br />
fixture proposed for each<br />
unit is CFL with electronic<br />
balla<strong>st</strong>.<br />
• By using CFL fittings the<br />
watt/sq.ft. for units is as<br />
follows:<br />
1) Semi detached unit 0.99<br />
w/sq.ft.<br />
2) Row house unit 0.69 w/sq.ft.<br />
3) 3BHK apartment 0.86<br />
w/sq.ft.<br />
4) 2BHK apartment 0.76<br />
w/sq.ft.<br />
Thus our overall lighting<br />
density is less than 1w/sq.ft. and is<br />
as per ASHRAE requirements.<br />
• Di<strong>st</strong>ribution <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>reet lights<br />
is controlled by using timers<br />
so that the <strong>st</strong>reet lights shall<br />
be made on & <<strong>st</strong>rong>of</<strong>st</strong>rong>f as per the<br />
requirement from 6.00 PM to<br />
6.00 AM saving the common<br />
utility energy. .
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
<strong>Environment</strong><br />
Management Plan<br />
Budgetary Allocation<br />
Budgetary allocation (capital co<strong>st</strong> and O&M co<strong>st</strong>):-<br />
Capital Co<strong>st</strong> 2.5 Crores<br />
O&M co<strong>st</strong> 15 Lacs<br />
DG set:<br />
Number and capacity<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be<br />
25 KW<br />
used<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used Diesel<br />
Con<strong>st</strong>ruction phase<br />
(with Break-up):<br />
Capital Co<strong>st</strong> Break –up Details:-<br />
Chairman<br />
90<br />
Capital Co<strong>st</strong>:-35 lacs<br />
No. Item Details Capital Co<strong>st</strong>(lacs)<br />
1<br />
Temporary shade for Storing<br />
con<strong>st</strong>ruction materials<br />
2 Sprinklers 1<br />
3<br />
Temporary arrangement for<br />
Water supply<br />
4 Generator set 25<br />
5<br />
Repair & Recon<strong>st</strong>ruction <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
exi<strong>st</strong>ing dug well<br />
TOTAL 35<br />
Operation Phase (with break-up)<br />
No Item Details<br />
Capital Co<strong>st</strong><br />
(lacs)<br />
2<br />
5<br />
2<br />
O & M (lacs)<br />
1. STP 35 15.00<br />
2.<br />
3.<br />
4.<br />
Solid Wa<strong>st</strong>e<br />
Management<br />
Rain Water<br />
Harve<strong>st</strong>ing<br />
Green Belt<br />
Development<br />
5 2.00<br />
15 1.50<br />
100 5.00<br />
5. Energy Sy<strong>st</strong>ems 250 15.00<br />
Total 405 38.5<br />
Quantum and 1000/-
Decision:<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
generation <<strong>st</strong>rong>of</<strong>st</strong>rong> Corpus<br />
fund and Commitment<br />
per month/House owner<br />
Responsibility for O &<br />
M<br />
Society formed by Township Owner<br />
Traffic Management Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> the junction to<br />
the main road &<br />
design <<strong>st</strong>rong>of</<strong>st</strong>rong> confluence<br />
1<br />
Total parking area 4965.80 sq m<br />
Area per car 12.50 sq m<br />
2-wheeler<br />
Scooter<br />
Cycle<br />
532<br />
532<br />
4- wheeler 210<br />
Public Transport No<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed.<br />
<strong>SEAC</strong> noted that right <<strong>st</strong>rong>of</<strong>st</strong>rong> way <<strong>st</strong>rong>of</<strong>st</strong>rong> access is through service road <<strong>st</strong>rong>of</<strong>st</strong>rong> a highway, having a width 12 m<br />
and the proposed height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building is 26 m. Considering the con<strong>st</strong>raint <<strong>st</strong>rong>of</<strong>st</strong>rong> required right <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
way for availability <<strong>st</strong>rong>of</<strong>st</strong>rong> access in cases <<strong>st</strong>rong>of</<strong>st</strong>rong> service lanes, adjacent to any highway, <strong>SEAC</strong> accepted<br />
the proposal for the proposed height 26m.<br />
<strong>SEAC</strong> decided to recommend the proposal for <strong>Environment</strong>al <strong>Clearance</strong> only after complying<br />
with the following conditions:<br />
1. Pond for the <strong>st</strong>orage <<strong>st</strong>rong>of</<strong>st</strong>rong> treated wa<strong>st</strong>ewater disposal will be only temporary arrangement. PP is<br />
directed to submit the consent for sewer line.<br />
2. Provide 0.3m free board for the pond.<br />
3. Relocate UG tank (60 in the plan) for easy fire tender movement.<br />
4. Submit green belt plan with details <<strong>st</strong>rong>of</<strong>st</strong>rong> tree (#829) species and shrubs (#208) with locations.<br />
Plants like Kadipatta, Lime and Pappaya may be included in the proposed shrubs plantation.<br />
Temporary pond area, when is not needed and is a part <<strong>st</strong>rong>of</<strong>st</strong>rong> green belt should be subsequently<br />
used for plantation only.<br />
Chairman<br />
91
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 26<br />
Subject: <strong>Environment</strong> clearance for Proposed Project at Gat No.572, 573, 574, 575, 576, 578,<br />
579, 580, 581, 582, 583,584, 585, 586, 587, 588, 589, 590, 594, 595, 597, 598 & <<strong>st</strong>rong>61</<strong>st</strong>rong>7,<br />
Wagholi, Haveli, Pune by M/s. Sukhawani Promoters & Builders<br />
(File No. <strong>SEAC</strong> 2211/ CR-138 / TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Project : “Sukhwani Palm”<br />
Project Proponent : M/s. Sukhwani Promoters & Buildres<br />
Consultant : M/s. Saitech Research & Development Organization<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the : Gat No. 572-<<strong>st</strong>rong>61</<strong>st</strong>rong>2 Near Life hospital , Pune -Nagar Road, Wagholi.<br />
project<br />
Pune<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> Project : Con<strong>st</strong>ruction project<br />
Category : 8 (a), B2<br />
Whether in<br />
Corporation /<br />
Municipal / Other<br />
area<br />
Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
DCR<br />
Total plot area<br />
Deductions<br />
Net plot area<br />
Permissible FSI<br />
(including TDR etc.)<br />
Proposed Built –UP<br />
Area (FSI & Non<br />
FSI)<br />
Ground – coverage<br />
percentage (%)<br />
(Note : percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
plot not open to sky)<br />
E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />
configuration (s)<br />
Grampanchayat<br />
Town Planning<br />
Plot Area – 18800.00 m 2<br />
Deductions -2820 m 2<br />
Net Plot Area - 15980.0 m 2<br />
11985.0 m 2<br />
24730.36 m 2 ( FSI – 15646.52 m 2 + Non - FSI – 9083.84 m 2 )<br />
2808.43m 2 i.e. 15.57% <<strong>st</strong>rong>of</<strong>st</strong>rong> Net Plot Area - 15980.0 m 2 )<br />
` 50.0 crore<br />
Total bldg. = 4 Nos.<br />
Type I- A, B, C - (P+5) – 1No.<br />
Type II- D,E,F - (P+8) – 1No.<br />
Chairman<br />
92
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants<br />
and shops<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />
residents / users<br />
Tenant density per<br />
hector<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
building(s)<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Type III- G,H - (P+8) – 1No<br />
Type IV- I,J - (P+8) – 1No<br />
340 Nos.<br />
1700 Nos.<br />
200<br />
26.25 M<br />
Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way Pune Nagar Road-60 M<br />
Entrance Road-15 M<br />
Turning radius for<br />
easy access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire<br />
tender movement<br />
from all around the<br />
building excluding<br />
the width for the<br />
plantation<br />
Total Water<br />
Requirement<br />
Rain Water<br />
Harve<strong>st</strong>ing (RWH)<br />
Strom water<br />
drainage<br />
7.50 m<br />
Dry season :<br />
• Fresh water (CMD) : 168.00 m 3 /day <<strong>st</strong>rong>of</<strong>st</strong>rong> Source: Grampanchayat<br />
• Recycled water (CMD): 99.<<strong>st</strong>rong>61</<strong>st</strong>rong> m 3 /day<br />
• Total water Requirement (CMD):267.<<strong>st</strong>rong>61</<strong>st</strong>rong> m 3 /day<br />
• Club-house & Gym make up (Cum):- 15.0 m 3 /day<br />
• Landscaping – 23.11 m 3 /day<br />
• Fire fighting (Cum): 20,000 cu.m.<br />
Wet Season:<br />
• Fresh water (CMD) : 168.00m 3 /day & Source: Grampanchayat<br />
• Recycled water (CMD): 99.<<strong>st</strong>rong>61</<strong>st</strong>rong> m 3 /day<br />
• Total water Requirement (CMD): 267.<<strong>st</strong>rong>61</<strong>st</strong>rong> m 3 /day<br />
• Club-house & Gym make up (Cum): 15.0 m 3 /day<br />
• Landscaping – 23.11 m 3 /day<br />
• Fire fighting (Cum): 20,000 cu.m.<br />
Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge Bore – 15 Nos.<br />
Quantity – 557.48 m 3 /Year<br />
Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Bore Dia – 1.2X1.2X1.2M<br />
• Budgetary allocation ( Capital co<strong>st</strong> and O & M co<strong>st</strong>)-<br />
Capital co<strong>st</strong>: 16.0 Lakh<br />
O & M Co<strong>st</strong> : 4.0 Lakh/Year<br />
Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water - Volume – 557.48 m 3 /Year<br />
Chairman<br />
93
Sewage and wa<strong>st</strong>e<br />
water<br />
Solid wa<strong>st</strong>e<br />
Management<br />
Green Belt<br />
Development<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD - Size <<strong>st</strong>rong>of</<strong>st</strong>rong> Bore Dia. – 1.2X1.2X1.2M<br />
• Sewage generation (CMD) – 206.55 CMD<br />
STP technology – MMBR(Moving Media Bio Reactor)<br />
• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD) – 210.0 CMD<br />
• DG sets (during emergency) – 125 KVA x 1 No.<br />
62.5 KVA x 1No.<br />
• Budgetary allocation (Capital co<strong>st</strong> and O & M co<strong>st</strong>) –<br />
Capital co<strong>st</strong>: 38.70 Cr.<br />
O & M Co<strong>st</strong> : 9.95 Lakh / Year<br />
Wa<strong>st</strong>e generation in the pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction phase:<br />
• Wa<strong>st</strong>e generation – 12369.0 m 3<br />
Wa<strong>st</strong>e generation in the operation phase:<br />
• Dry wa<strong>st</strong>e (Kg/day): 306.0 Kg/day<br />
• Wet wa<strong>st</strong>e (Kg/day): 459.0 Kg/day<br />
• Hazardous wa<strong>st</strong>e (Kg/month): Spent oil – 80.0 Lit/ yr<br />
• STP Sludge (Dry sludge) (Kg/day): 18.58 Kg/Day ( 100% Dry )<br />
Budgetary allocation( capital Co<strong>st</strong> & O&M co<strong>st</strong>)<br />
Capital co<strong>st</strong>:22.0 Lakh<br />
O & M Co<strong>st</strong> : 10.0 Lakh / Year<br />
Total RG area: 3851.83 m 2 i.e. about 24.10 % <<strong>st</strong>rong>of</<strong>st</strong>rong> net plot area<br />
RG area under green belt: 3851.83 m 2<br />
Plantation:<br />
• Number & li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> trees species to be planted in the ground RG:<br />
250Nos.<br />
• Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />
Capital co<strong>st</strong>: Rs. 15.0 Lakh<br />
O & M Co<strong>st</strong> : Rs 5.0 Lakh / Year<br />
Energy Power Supply:<br />
• Maximum demand –1205.41 KVA<br />
• Connected Demand – 1607.22 KW<br />
Source - Maharashtra State Electricity Di<strong>st</strong>ribution Company<br />
Limited(MSEDCL)<br />
Energy saving by non-conventional method:<br />
• Energy Saving measures – CFL, LED, Solar, etc.<br />
• Details Calculation & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving – 126300 KWH /Annum<br />
• Budgetary allocation( capital Co<strong>st</strong>& O& M Co<strong>st</strong>) -<br />
Capital co<strong>st</strong>: 16.80 Lakh .<br />
O & M Co<strong>st</strong> : 8.0 Lakh / Year<br />
During Con<strong>st</strong>ruction - Fuel Consumption / Hr. <<strong>st</strong>rong>of</<strong>st</strong>rong> 15KVA DG Set –<br />
2.69 Litrs/hr.<br />
During Operation –<br />
Fuel Consumption / Hr. <<strong>st</strong>rong>of</<strong>st</strong>rong> 125KVA DG Set<br />
Fuel Consumption / Hr. <<strong>st</strong>rong>of</<strong>st</strong>rong> 62.5 KVA DG Set<br />
Traffic Management Parking details:<br />
• Total parking area -<br />
Chairman<br />
94
<strong>Environment</strong>al<br />
Management plan<br />
Budgetary<br />
Allocation<br />
Decision:<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Parking Area – 5121.20 m 2<br />
Phase I -<br />
• Area per car – 20 m 2<br />
• 2- Wheeler – 523 Nos.<br />
• 4-Wheeler – 141 Nos.<br />
• Public Transport – 523 Nos.<br />
Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal road(m):9.0 M<br />
Con<strong>st</strong>ruction Phase ( With break up):<br />
Capital Co<strong>st</strong> - STP – Rs. 38.70 Cr.<br />
RWH – Rs. 16.0 Lakh<br />
MSW – Rs. 22.0 Lakh<br />
Solar sy<strong>st</strong>em – Rs. 16.80 Lakh<br />
Landscape – Rs. 15.0 Lakh<br />
Operation Phase( with break Up)-<br />
• O & M co<strong>st</strong>( Please ensure manpower and other details)-<br />
STP – Rs.9.95 Lakh / Year<br />
RWH – Rs. 4.0 Lakh / Year<br />
MSW – Rs. 10.0 Lakh / Year<br />
Solar sy<strong>st</strong>em – Rs. 8.0 Lakh / Year<br />
Landscape – Rs. 5.0 Lakh / Year<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed. <strong>SEAC</strong> noted that PP has already initiated con<strong>st</strong>ruction work. It appears to be a violation<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong> EIA Notification, 2006. <strong>Environment</strong> Department may look into the violation and take<br />
appropriate action.<br />
The proponent is directed to comply with the following observations:<br />
1. The current right <<strong>st</strong>rong>of</<strong>st</strong>rong> way is 9m. As per MoEF OM dated 7 th February 2012, the maximum<br />
height allowed is 15m.<br />
2. Consent for water and drainage from competent authority are not yet obtained.<br />
Full appraisal <<strong>st</strong>rong>of</<strong>st</strong>rong> the project will be taken up only after compliance <<strong>st</strong>rong>of</<strong>st</strong>rong> the above.<br />
Chairman<br />
95
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 27<br />
Subject: <strong>Environment</strong>al clearance <strong>Environment</strong> clearance for Proposed residential<br />
project” Marvel Izara" on the plot bearing S.No.4(pt),21(pt), 24(pt) at Undri,<br />
Tal.Haveli, Di<strong>st</strong> Pune by Marvel Zeta Developers Pvt.Ltd.<br />
(File No. <strong>SEAC</strong> 2011/CR-165 /TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Marvel Izara”<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Proponent M/s. Marvel Zeta Developers Pvt. Ltd.<br />
Name, contact number &<br />
address <<strong>st</strong>rong>of</<strong>st</strong>rong> Consultant<br />
M/s. Mahabal Enviro Engineers Pvt. Ltd.<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> project Residential Con<strong>st</strong>ruction Project<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the project<br />
Whether in Corporation<br />
/<br />
M unicipal / other area<br />
Total Plot Area (sq. m.)<br />
Deductions<br />
Net Plot area<br />
Permissible FSI<br />
(including<br />
TDR etc.)<br />
Proposed Built-up Area<br />
(FSI & Non-FSI)<br />
Ground-coverage<br />
Percentage (%)<br />
(Note: Percentage <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
plot not open to sky)<br />
E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project<br />
Survey No. 04(parts), 21(parts), 24(parts), Undri,<br />
Tq – Haveli, Di<strong>st</strong>: Pune<br />
Department <<strong>st</strong>rong>of</<strong>st</strong>rong> Town Planning, Pune<br />
Total Plot Area - 87581.00 m 2<br />
Deductions<br />
- Amenities Space 12528.47 m 2<br />
- Area Under 18m Road 4057.87 m 2<br />
Net Plot Area - 70994.66 m 2<br />
75170.82m 2<br />
• FSI area (sq. m.) : 75170.82 m 2<br />
• Non FSI area (sq. m.) : 63373.16 m 2<br />
• Total BUA area (sq. m.) : 138543.98 m 2<br />
Building Footprint 13311.24 (18.75%)<br />
+ Podium 7531.69 (10.<<strong>st</strong>rong>61</<strong>st</strong>rong>%)<br />
= 20842.93 SQM (29.36%)<br />
INR 235 Cr<br />
Chairman<br />
96
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />
configuration(s)<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Residential Building configuration:<br />
T1 to T8 +<br />
T12 to T14 + T16 to T20<br />
Chairman<br />
97<br />
B + 12<br />
T9 to T11 B + S + 12<br />
T15 B + 11<br />
EWS Buildings S + 12 Floors<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenements Residential Tenements: 707 Nos.<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />
residents / users<br />
Tenement density per<br />
hectare<br />
3712<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building(s) 36.9 M<br />
Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way (Width <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
the road from the neare<strong>st</strong><br />
fire <strong>st</strong>ation to the<br />
proposed building(s)<br />
Turning radius for easy<br />
access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire tender<br />
movement from all<br />
around the building<br />
excluding the width for<br />
the plantation<br />
523 Persons / Hectare<br />
18 M<br />
9 M
Total Water<br />
Requirement<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Rain Water Harve<strong>st</strong>ing<br />
(RWH)<br />
Dry season:<br />
1. Total Water Requirement<br />
a. Fresh Water: 334 KL<br />
Source: Gram Panchayat<br />
b. Recycled Water<br />
• Flushing :- 167 KL<br />
• Gardening:- 221 KL<br />
Fire fighting :- 460 KL OHT + 500 KL UGT<br />
Wet Season:<br />
1. Total Water Requirement<br />
a. Fresh Water: 334 KL<br />
Source: Gram Panchayat<br />
b. Recycled Water<br />
• Flushing :- 167 KL<br />
• Gardening:- 221 KL<br />
• Cooling Tower Makeup (MLD):- NA<br />
2. Swimming pool makeup (MLD):-NA<br />
3. Fire fighting :- 460 KL OHT + 500 KL UGT<br />
• Size and no <<strong>st</strong>rong>of</<strong>st</strong>rong> RWH tank and Quantity<br />
Run<<strong>st</strong>rong>of</<strong>st</strong>rong>f from the premises will be discharged to recharging<br />
pits<br />
Annual RWH Potential- 24,212 KL<br />
• Size, nos <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits and Quantity<br />
Pit Size: 2.5m dia X 75 m depth bore well<br />
No <<strong>st</strong>rong>of</<strong>st</strong>rong> Recharge Pits: 7 Nos.<br />
Storage tank 500KLX 2 nos<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
Capital co<strong>st</strong>: 24,00,000/-INR<br />
O & M co<strong>st</strong>: 3,00,000/- Annum<br />
Chairman<br />
98
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Storm water drainage<br />
Sewage and Wa<strong>st</strong>e<br />
water<br />
II. Storm water drainage<br />
• Natural water drainage pattern<br />
a. Natural water Drainage pattern: Storm water drainage<br />
sy<strong>st</strong>em varying from 600 mm to 900 mm will be<br />
provided for collection <<strong>st</strong>rong>of</<strong>st</strong>rong> Storm Water<br />
b. Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water: Total Rain water harve<strong>st</strong>ing<br />
potential 500 KL per day rain water will be harve<strong>st</strong>ed<br />
through recharge pits and <strong>st</strong>ore<br />
c. Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD: Internal Strom water drainage line <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
600mm x 600mm<br />
• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water: 28323 KL / Annum<br />
I. Sewage generation: 467 KL<br />
II. STP technology: FBBR (Fluidized Bed Bio Reactors)<br />
III. Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP: 475 KL<br />
IV. DG sets (during emergency): 2000 KVA<br />
V. Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
Capital co<strong>st</strong>: 95,00,000/- INR<br />
O&M co<strong>st</strong>: 25,00,000/-Annum<br />
Chairman<br />
99
Solid wa<strong>st</strong>e<br />
Management<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
I. Pre Con<strong>st</strong>ruction and Con<strong>st</strong>ruction phase<br />
• Wa<strong>st</strong>e: -<br />
a) Debris: Since demolition is not involved Debris will not be<br />
generated. Other con<strong>st</strong>ruction wa<strong>st</strong>e will be used as filling<br />
material for leveling.<br />
b. Top soil preservation / conservation: Preserved and used<br />
for landscape<br />
II. Operation Phase<br />
• Segregate garbage<br />
a. Dry quantity Kg/day:- 650<br />
b. Wet quantity Kg/day:- 1058<br />
• Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal: Use <<strong>st</strong>rong>of</<strong>st</strong>rong> Organic Wa<strong>st</strong>e Converter and<br />
disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> compo<strong>st</strong> in own landscape.<br />
• E-Wa<strong>st</strong>e & Hazardous wa<strong>st</strong>e<br />
• STP Sludge (Dry sludge)<br />
a. Quantity kg/day:- 45 Kg /day<br />
b. Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal:- Dige<strong>st</strong>ed and used as manure<br />
III. Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
� Capital co<strong>st</strong>: 19,00,000/- INR<br />
� O&M co<strong>st</strong> 17,00,000/- Annum<br />
Chairman<br />
100
Green Belt<br />
Development<br />
Energy<br />
Decision:<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
I. Total R.G area in sqm. & in (%):<br />
36901.762m 2 51.96% <<strong>st</strong>rong>of</<strong>st</strong>rong> total plot area<br />
• RG area on the ground (sqm):29370.073<br />
• RG area on the slab (sqm):7531.689<br />
II. Exi<strong>st</strong>ing trees, trees to be cut, trees to be transplanted<br />
and trees to be planted (nos., size, age, species):<br />
Exi<strong>st</strong>ing Total No <<strong>st</strong>rong>of</<strong>st</strong>rong> trees: 98 Nos<br />
Exi<strong>st</strong>ing Trees: 98 Nos out <<strong>st</strong>rong>of</<strong>st</strong>rong> which 26 trees come under<br />
buiding line which will be replanted<br />
Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
Capital co<strong>st</strong>: 70,00,000/- INR<br />
O&M co<strong>st</strong>: 7,90,000/-Annum<br />
Energy saving by non-conventional method<br />
• Details Calculations & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving: by using solar<br />
hot water sy<strong>st</strong>em and Solar PV panels<br />
= 3<<strong>st</strong>rong>61</<strong>st</strong>rong>3 units/day + 30 units/day<br />
= 3643 units / day (Overall 34% Energy Saved)<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
Capital co<strong>st</strong>: 1,75,81,000/-<br />
O&M co<strong>st</strong>: 8,00,000/-<br />
ii. Sources <<strong>st</strong>rong>of</<strong>st</strong>rong> power and supply capacity: MSEDCL<br />
9814<br />
iii. units/day.<br />
iii. Di<strong>st</strong>ribution Sy<strong>st</strong>em: MSEDCL<br />
iv. Alternate supply for essential services: DG SETS<br />
v. DG Set: Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used and capacity: 500 KVA X 4<br />
NOS<br />
Chairman<br />
101
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed.<br />
<strong>SEAC</strong> noted that NA order is yet to be obtained. PP could not submit regional plan/ document<br />
approved by competent authority showing the minimum required right <<strong>st</strong>rong>of</<strong>st</strong>rong> way for access for the<br />
proposed height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building. Consent for the required quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> water from competent<br />
authority is not yet obtained.<br />
Considering this, <strong>SEAC</strong> decided to appraise the case only after complying with the above<br />
observations<br />
Chairman<br />
102
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 28<br />
Subject: <strong>Environment</strong>al clearance for the Proposed Housing project ‘Sanghvi Paradise’ at<br />
survey No. 152/4, Behind Nirmal Nagar and Tulasi Vihar Park, Near Asangaon<br />
Railway Station, Asangaon (E) by M/s. Magnum Builder (M/s. Valram<br />
Development Corporation)<br />
(File No.:<strong>SEAC</strong> 2010 /CR -745/ TC2)<br />
PP was absent.<br />
Chairman<br />
103
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 29<br />
Subject: TOR for proposed Ferro Alloys unit, at Khasra No. 234/2, Village Chicholi, Tal<br />
Tumsar, Di<strong>st</strong> Bhandara M/s Shree Minerals and Chemicals<br />
(File No. <strong>SEAC</strong> 2011/ CR-520 / TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project Manganese Ore Beneficiation<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Proponent<br />
M/s Shree Minerals and chemicals<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Consultant<br />
Activity schedule in the<br />
EIA Notification<br />
Area Details<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Notified<br />
Indu<strong>st</strong>rial area / MIDC<br />
area<br />
E<strong>st</strong>imated capital co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
the Project (including<br />
co<strong>st</strong> for land, building,<br />
plant and machinery<br />
separately)<br />
Location details <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
the project :<br />
Di<strong>st</strong>ance from Protected<br />
Areas / Critically<br />
MITCON Consultancy & Engineering Services Ltd.<br />
2(b), B2<br />
• Total plot area (sq. m.): 4200<br />
• Built up area (Sq. m.): 141.60<br />
Proposed plant is located on private land at Khasra No. 234/2,<br />
Village-Bagheda Road Chicholi, Tahsil- Tumsar, Di<strong>st</strong>rict- Bhandra<br />
Particulars Rs. In Lacs<br />
Land 0.00<br />
Land Development 0.00<br />
Factory Building 3.00<br />
Plant & Machinery 15.00<br />
MSEB Deposits & Charges 0.53<br />
Pre- Operative Expenses 0.22<br />
Working Capital 6.25<br />
Total 25<br />
• Latitude : 21 0 28’33.35”N<br />
• Longitude : 79 0 41’55.57”E<br />
• Location : At Khasra No. 234/2, Village-Bagheda Road<br />
Chicholi, Tahsil- Tumsar, Di<strong>st</strong>rict- Bhandra<br />
• Elevation above Mean Sea Level: 298.4 meter<br />
There are no Protected areas / Critically polluted areas / Eco-<br />
Sensitive areas/ inter-<strong>st</strong>ate boundaries within 10 Km radial area<br />
Chairman<br />
104
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Polluted<br />
areas / Eco-sensitive<br />
areas<br />
/ inter-State boundaries<br />
Raw materials<br />
(including<br />
process chemicals,<br />
cataly<strong>st</strong>s, & additives).<br />
Production details<br />
Process details /<br />
manufacturing details<br />
Rain Water Harve<strong>st</strong>ing<br />
(RWH)<br />
Total Water<br />
Requirement<br />
Li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
raw<br />
materials<br />
to<br />
be used<br />
Manganese<br />
Ore<br />
‘Physical<br />
and<br />
chemical<br />
nature <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
raw<br />
material<br />
Lumps or<br />
fines<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Products,<br />
By products and<br />
Intermediate<br />
Products<br />
Main Products<br />
1. Manganese Oxide<br />
2. Manganese Di-Oxide<br />
By-Products<br />
Intermediate<br />
Products<br />
Chairman<br />
105<br />
‘Quantity<br />
(tonnes/<br />
year) full<br />
production<br />
capacity<br />
Source<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong><br />
materials<br />
9000 Nearby<br />
Mines<br />
Exi<strong>st</strong>ing<br />
(T/Year)<br />
0<br />
0<br />
Nil<br />
1.Jigging<br />
2. Reduction process in roa<strong>st</strong>ing kiln<br />
Proposed<br />
activity<br />
(new/<br />
modernization/<br />
expansion)<br />
(T/Year)<br />
3600<br />
3600<br />
Nil<br />
Means <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
transportation<br />
(Source to<br />
<strong>st</strong>orage<br />
site) with<br />
ju<strong>st</strong>ification<br />
By Tarpaulin<br />
covered truck<br />
Total<br />
(T/Year)<br />
3600<br />
3600<br />
In the factory premises ro<<strong>st</strong>rong>of</<strong>st</strong>rong> top area will be determined and<br />
subsequently rain water harve<strong>st</strong>ing potential will be calculated.<br />
However detailed design and engineering <<strong>st</strong>rong>of</<strong>st</strong>rong> the RWH sy<strong>st</strong>em will<br />
be undertaken during implementation <strong>st</strong>age.<br />
Nil<br />
Total water requirement:<br />
• Fresh water (CMD) : 8 & Source: Borewells<br />
• Recycled water (CMD): 6
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Sewage generation and<br />
treatment<br />
Effluent characteri<strong>st</strong>ic<br />
ETP details<br />
Note on ETP technology<br />
to be used<br />
Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> the ETP<br />
sludge (If applicable)<br />
Solid wa<strong>st</strong>e Management<br />
Atmospheric Emissions<br />
(Flue gas characteri<strong>st</strong>ics<br />
Use <<strong>st</strong>rong>of</<strong>st</strong>rong> the water:<br />
• Process (CMD): 4<br />
• Du<strong>st</strong> Suppression (CMD): 2<br />
• Drinking (CMD): 0.8<br />
• Green belt (CMD): 1<br />
• Others (CMD): 0.2<br />
• Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> sewage generation (CMD) :0.6<br />
• Proposed treatment for the sewage : Septic tanks followed by Soak<br />
Pits<br />
NA as there is no effluent generation due to the proposed activity<br />
Sr.<br />
No<br />
Source<br />
1. Raw water<br />
treatment<br />
plant<br />
Solid wa<strong>st</strong>e generated in the form <<strong>st</strong>rong>of</<strong>st</strong>rong> tailings it is recycled in roa<strong>st</strong>ing<br />
furnace during reduction process for production <<strong>st</strong>rong>of</<strong>st</strong>rong> Manganese Oxide<br />
Sr. Pollutant Source Emission Concentration<br />
Chairman<br />
106<br />
Qty<br />
(TPM)<br />
Form<br />
(Sludge / Dry /<br />
Slurry etc.)<br />
Composition<br />
-- -- --<br />
2. ETP -- -- --<br />
3. Process 75<br />
(Tailings)<br />
4. Spent<br />
Cataly<strong>st</strong><br />
5. Oily<br />
Sludge<br />
6. Others like<br />
Battery<br />
wa<strong>st</strong>e,<br />
e wa<strong>st</strong>e<br />
etc (Pl.<br />
Specify)<br />
Fines Particles <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
MnO2 , Silica,<br />
etc<br />
-- -- --<br />
-- -- --<br />
-- -- --
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
SPM, SO2, NOX, CO, etc.)<br />
Stack emission Details:<br />
(All the <strong>st</strong>acks attached to<br />
process units, Boilers,<br />
captive power plant, D.G.<br />
Sets, Incinerator both for<br />
exi<strong>st</strong>ing and proposed<br />
activity). Please indicate<br />
the specific section to<br />
which the <strong>st</strong>ack is<br />
attached.<br />
e.g.: Process section, D.G.<br />
Set, Boiler, Power Plant,<br />
incinerator etc. Emission<br />
rate (kg/hr.) for each<br />
pollutant (SPM, SO2,<br />
NOx, etc. should be<br />
specified<br />
No.<br />
Chairman<br />
107<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong><br />
Emission<br />
rate<br />
(kg/hr)<br />
in flue gas<br />
(g/sec)<br />
1 SPM Stack 0.125 0.035<br />
2 SO2 Stack Negligible Negligible<br />
amount amount<br />
3 NOX Stack Concentration in flue gas will<br />
be 100 mg/Nm 3<br />
4 CO Stack NA NA<br />
Plant<br />
Section<br />
& units<br />
Roa<strong>st</strong>ing<br />
Furnace<br />
Emission Standard N.A<br />
Ambient Air Quality Data<br />
Pollutant<br />
PM10<br />
PM2.5<br />
SO2<br />
NOX<br />
Stack<br />
No.<br />
1 <strong>st</strong><br />
Permissible<br />
Standard<br />
µg/m 3<br />
Height<br />
from<br />
ground<br />
level<br />
(m)<br />
Internal<br />
Diameter<br />
(Top)(m)<br />
Emission<br />
Rate<br />
(kg /hr)<br />
30 0.2 0.125 120<br />
Proposed<br />
Concentration<br />
(in µg/m 3 )<br />
Remarks<br />
Temp.<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong><br />
Exhau<strong>st</strong><br />
Gases<br />
( 0 C)<br />
100 18 Due to proposed<br />
activity there is<br />
60 8 slightly increase in<br />
pollution activity it<br />
80 Negligible will be mitigate by<br />
amount providing pollution<br />
80 -<br />
control equipments<br />
such as wet<br />
scrubber & du<strong>st</strong><br />
suppression method<br />
& by developing<br />
green belt around<br />
the factory and<br />
within the premises
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Details <<strong>st</strong>rong>of</<strong>st</strong>rong> Fuel to be used:<br />
Energy<br />
Green Belt Development<br />
Details <<strong>st</strong>rong>of</<strong>st</strong>rong> Pollution<br />
Control Sy<strong>st</strong>ems:<br />
<strong>Environment</strong>al<br />
Management plan<br />
Budgetary Allocation<br />
Sr.<br />
No<br />
Fuel<br />
1 Gas<br />
2 Naphtha<br />
3 HSD<br />
4 Fuel Oil<br />
5 Coal<br />
6 Lignite<br />
Daily Consumption<br />
(TPD/KLD)<br />
Exi<strong>st</strong>ing Proposed<br />
7 Fire<br />
2 TPD - 0.3- Trace<br />
Wood<br />
1%<br />
• Source <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel: Fire Wood : Saw Mill<br />
• Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> transportation <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel to site: Tractor trolley with<br />
tarpaulin covered truck<br />
Power supply:<br />
• Proposed power requirement: 8 hp<br />
Power supply from MSEDCL.<br />
Chairman<br />
108<br />
Calorific<br />
value<br />
(Kcals<br />
/kg)<br />
%<br />
Ash<br />
- - - -<br />
• Green belt area (Sq. m.): 1300<br />
• Number and species <<strong>st</strong>rong>of</<strong>st</strong>rong> trees to be planted : 125 nos<br />
Sr.<br />
No.<br />
Exi<strong>st</strong>ing<br />
pollution<br />
control<br />
sy<strong>st</strong>em<br />
Proposed to be<br />
in<strong>st</strong>alled<br />
%<br />
Sulphur<br />
1 Air -- Wet Scrubber<br />
2 Water<br />
-- Septic tanks followed<br />
by Soak Pits<br />
3 Noise<br />
-- Acou<strong>st</strong>ic Enclosures<br />
will be provided<br />
4 Solid Wa<strong>st</strong>e<br />
-- It will be recycled in<br />
the reduction process<br />
• Capital co<strong>st</strong> (With break up): 1 Lakhs<br />
• O&M co<strong>st</strong> (With break up): 25 Thousand
Decision:<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Sr.<br />
No.<br />
Chairman<br />
109<br />
Recurring Co<strong>st</strong><br />
per annum<br />
(Rs Thousand)<br />
Air Pollution Control 10 55<br />
Water Pollution Control 4 10<br />
Noise Pollution Control 2 5<br />
<strong>Environment</strong> Monitoring<br />
and Management<br />
5 15<br />
Reclamation<br />
borrow/mined area (If<br />
applicable)<br />
--- ---<br />
Occupational Health 2 5<br />
Green Belt 2 10<br />
Solid wa<strong>st</strong>e management<br />
Others ( Pl. Specify)<br />
- ---<br />
Total 25 100<br />
Capital<br />
Co<strong>st</strong> (Rs<br />
Thousand)<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed.<br />
Considering the project size (small unit) and products details and <strong>SEAC</strong> decided to consider it<br />
under Category B2<br />
<strong>SEAC</strong> decided to recommend the proposal for <strong>Environment</strong>al <strong>Clearance</strong> only after complying<br />
with the following condition:<br />
1. Submit letter from Fore<strong>st</strong> Department clarifying the boundary <<strong>st</strong>rong>of</<strong>st</strong>rong> the fore<strong>st</strong> from the<br />
proposed site and submit NOC, if needed.<br />
2. Submit NA order<br />
3. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>ewater treatment<br />
4. Submit green belt area details showing large broad leaf trees all around the boundary.
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 30<br />
Subject: TOR for proposed expansion <<strong>st</strong>rong>of</<strong>st</strong>rong> "Shree Bhimeshwai Ispat Pvt Ltd." Located at J-<br />
17,Additional MIDC Satara by M/s. Shree Bhimeshwari Ispat Pvt. Ltd<br />
(File No. <strong>SEAC</strong> 2011/ CR-521 / TC2)<br />
PP was absent<br />
Chairman<br />
110
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 31<br />
Subject: TOR for proposed Ferro Alloys unit, at Plot No A-7, to A-11, MIDC area, Village<br />
Tahsil Tumsar, Di<strong>st</strong> Bhandara by M/s Minerals and Techno Product<br />
(File No. <strong>SEAC</strong> 2011/ CR-175 / TC2)<br />
PP was absent<br />
Chairman<br />
111
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 32<br />
Subject: TOR for proposed manufacture <<strong>st</strong>rong>of</<strong>st</strong>rong> synthetic organic chemicals at plot no. 18,<br />
additional MIDC indu<strong>st</strong>rial area, Ambernath by M/s. Hemindas<br />
(File No. <strong>SEAC</strong> 2011/ CR-166 / TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project Synthetic organic chemicals<br />
Project Proponent M/s. Hemindas<br />
Consultant<br />
M/s. Sadekar Enviro Engineers Pvt. Ltd.<br />
New Project / Expansion New Project<br />
in exi<strong>st</strong>ing project/<br />
Modernization/<br />
Diversification in exiting<br />
project<br />
Activity schedule in the<br />
EIA Notification<br />
5 (f) – B2<br />
Area Details 2100.00 sq .m<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> the Notified<br />
Indu<strong>st</strong>rial area / MIDC<br />
Area<br />
MIDC, Additional Ambernath<br />
E<strong>st</strong>imated capital co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> 75 Lacs<br />
the Project (including<br />
co<strong>st</strong> for land, building,<br />
plant and machinery<br />
separately)<br />
Location details <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
project :<br />
Raw materials (including<br />
N-18, MIDC , Additional Ambernath, Thane<br />
process chemicals,<br />
cataly<strong>st</strong>s, & additives).<br />
Sr.<br />
No Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Raw<br />
Quantity<br />
Stored at<br />
Mode <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
Storage Location<br />
. Material<br />
a time<br />
(MT)<br />
1. Meta chloroaniline 1.0 Fiber<br />
Drum<br />
RM Stores<br />
2 Bromo benzene 0.75 Fiber<br />
Drum<br />
RM Stores<br />
3 Formic acid 1.0 S.S.Tank/<br />
M.SDrum<br />
RM Stores<br />
4 Toluene 3.0 M.S. Solvent<br />
Tank Yard<br />
5 Sulphuric acid 1.0 HDPE<br />
Carboy<br />
RM Stores<br />
Chairman<br />
112
Production details<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
6 Hydrochloric acid 1.0 HDPE<br />
Carboy<br />
RM Stores<br />
7 Monochloro benzene 1.0 HDPE Solvent<br />
Drum Yard<br />
8 Sulphur 1.0 Bags RM Stores<br />
9 Iodine 0.2 Bags RM Stores<br />
10 Potassium Carbonate 0.5 Bags RM Stores<br />
11 Sodium thiosulphate 1.0 Bags RM Stores<br />
12 Cau<strong>st</strong>ic 1.5 Bags RM Stores<br />
13 Activated carbon 0.5 Bags RM Stores<br />
14 Hydroquinone 0.5 Kraft<br />
paper bag<br />
RM Stores<br />
15 Methanol 2.0 M.S. Solvent<br />
Tank Yard<br />
16 Diethyl amine 1.0 HDPE<br />
Drum<br />
RM Stores<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Products,<br />
By products and<br />
Intermediate<br />
Products<br />
Chlorpromazine<br />
Hydrochloride<br />
Chairman<br />
113<br />
Proposed<br />
activity (new/<br />
modernization<br />
/ expansion)<br />
New<br />
Total<br />
(TPM)<br />
5.0<br />
Ethamsylate New<br />
Total 5.0<br />
Total Water<br />
Total water requirement: 07 CMD<br />
Requirement<br />
• Fresh water (CMD): 07 & Source MIDC<br />
• Recycled water (CMD): NA<br />
Use <<strong>st</strong>rong>of</<strong>st</strong>rong> the water:<br />
• Process (CMD): 01<br />
• Cooling water (CMD): 03<br />
• DM Water (CMD): Nil<br />
• Du<strong>st</strong> Suppression (CMD): Nil<br />
• Drinking (CMD): 01<br />
• Green belt (CMD): 01<br />
• Fire service (CM: 0.5<br />
Storm water drainage • Natural water drainage pattern : Through MIDC drain<br />
• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water : 08 cum/min<br />
• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD: 600 x 800 mm<br />
Sewage generation and<br />
treatment<br />
Effluent characteri<strong>st</strong>ic<br />
Septic tank & over flow diverted to MIDC drain<br />
Sr. Parameters Inlet effluent Outlet Effluent<br />
No. (pH, BOD, characteri<strong>st</strong>ic effluent discharge<br />
COD, heavy<br />
charac. <strong>st</strong>andards<br />
metal, etc)<br />
(CPCB
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
1 pH 6.2 7.5<br />
/MPCB)<br />
5.5-9.0<br />
2 BOD 350 65.0 mg/lit 100 mg/l<br />
3 COD 1050 190 mg/lit 250 mg/l<br />
4 SS 180 56.0 mg/lit 100 mg/l<br />
ETP details Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> effluent generation (CMD): 1<br />
• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the ETP (CMD) : 05<br />
• Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> treated effluent recycled (CMD): Nil<br />
• Amount <<strong>st</strong>rong>of</<strong>st</strong>rong> water send to the CETP (CMD): 0.5<br />
• Membership <<strong>st</strong>rong>of</<strong>st</strong>rong> the CETP (If require): Yes<br />
Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> the ETP<br />
sludge (If applicable)<br />
Sent to CHWTSDF, Taloja<br />
Solid wa<strong>st</strong>e Management<br />
Atmospheric Emissions<br />
(Flue gas characteri<strong>st</strong>ics<br />
SPM, SO2, NOx, CO,<br />
etc.)<br />
Stack emission Details:<br />
(All the <strong>st</strong>acks attached to<br />
process units, Boilers,<br />
captive power plant, D.G.<br />
Sets, Incinerator both for<br />
exi<strong>st</strong>ing and proposed<br />
activity). Please indicate<br />
the specific section to<br />
which the <strong>st</strong>ack is<br />
attached. e.g.: Process<br />
section, D.G. Set, Boiler,<br />
Power Plant, incinerator<br />
etc. Emission rate (kg/hr.)<br />
for each pollutant (SPM,<br />
SO2, NOx etc. should be<br />
Sr.<br />
No.<br />
Source Qty<br />
(TPM)<br />
Chairman<br />
114<br />
Form<br />
(Sludge /Dry<br />
/ Slurry etc.)<br />
1 ETP 0.025 Sludge 33.4<br />
2 Process<br />
Residue<br />
0.075 Slurry 36.4<br />
3 Spent<br />
Cataly<strong>st</strong><br />
0.2 Dry 28.2<br />
4 Empty<br />
Containers<br />
50 No - 33.3<br />
Sr.<br />
No.<br />
Pollutant Source <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
Emissions<br />
Emission<br />
rate<br />
(kg/hr)<br />
1 SPM Fuel 0.15 kg/hr -<br />
2 SO2 Fuel 0.12 kg/hr -<br />
3 NOx Fuel 0.81 kg/hr -<br />
# Plant<br />
Sections<br />
and unit<br />
Stack<br />
No.<br />
Height<br />
from<br />
ground<br />
level<br />
Inte<br />
dia<br />
Composition<br />
Concentration<br />
in flue gas<br />
(g/m3)<br />
Emis<br />
s rate<br />
1 Boiler 1 10.0 m 0.5 m 15<br />
m/s<br />
2 D.G 1 4.5 m -<br />
Temp.<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong><br />
Exhau<br />
<strong>st</strong><br />
Gases<br />
130 0 C
specified<br />
Emission Standard<br />
Ambient Air Quality<br />
Data<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Details <<strong>st</strong>rong>of</<strong>st</strong>rong> Fuel to be used:<br />
Sr.<br />
No.<br />
Pollutant<br />
Chairman<br />
115<br />
Emission<br />
Standard<br />
Limit<br />
(µg/Nm3)<br />
MPCB<br />
Consent<br />
(mg/Nm3)<br />
1 SPM 500 150<br />
2 SO2 80 7.92 kg/hr<br />
3 NOx 80 -<br />
4 CO 02 -<br />
5 Others<br />
Sr.<br />
No.<br />
Pollutant<br />
(SPM,<br />
SOx)<br />
Permissible<br />
Standard<br />
Proposed<br />
Concentration<br />
(in µg/m 3 )<br />
Remarks<br />
1 SPM 500 1.2 Within limit<br />
2 SO2 80 0.8 Within limit<br />
3 NOx 80 1.6 Within limit<br />
4 CO 02 -<br />
5 Others<br />
# Fuel Consumption<br />
(TPD/KLD)<br />
Exi<strong>st</strong>ing Proposed<br />
Calorific<br />
value<br />
(Kcals<br />
/kg)<br />
%<br />
Ash<br />
1 LDO - 0.1 10,700 0.02 1.2<br />
Source <<strong>st</strong>rong>of</<strong>st</strong>rong> Fuel : Local Vendor<br />
Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> transportation <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel to site: By Road<br />
Energy Power supply:<br />
• Proposed power requirement: 250 KVA<br />
DG sets:<br />
• Number and capacity DG sets to be used : 50 KVA x 01<br />
Green Belt Development Green belt area (Sq. m.): 345.00 sq. m<br />
Details <<strong>st</strong>rong>of</<strong>st</strong>rong> Pollution<br />
Control Sy<strong>st</strong>ems:<br />
<strong>Environment</strong>al<br />
Management plan<br />
Budgetary Allocation<br />
• Number and species <<strong>st</strong>rong>of</<strong>st</strong>rong> trees to be planted :105 No<br />
# Particul Exi<strong>st</strong>ing Pollution Proposed to be<br />
ar control sy<strong>st</strong>em in<strong>st</strong>alled<br />
1 Air - Scrubber<br />
2 Water - ETP (05 KLD)<br />
3 Noise Acou<strong>st</strong>ic<br />
enclosures<br />
4 Solid<br />
Segregate & sent<br />
Wa<strong>st</strong>e<br />
to CHWTSDF<br />
# Particular Recurring<br />
Co<strong>st</strong> per<br />
Capital<br />
Co<strong>st</strong> (lacs)<br />
%<br />
S
Decision:<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
1 Air Pollution Control<br />
annum<br />
(lacs)<br />
01 06<br />
2 Water Pollution Control 02 08<br />
3 Noise Pollution Control 0.5 02<br />
4 <strong>Environment</strong> Monitoring 0.5 -<br />
and Management<br />
5 Occupational Health 0.5 04<br />
6 Green Belt 0.5 01<br />
7 Solid wa<strong>st</strong>e Management 0.5 01<br />
9 Total 5.5 22<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues related<br />
to environment, including air, water, land, soil, ecology, biodiversity and social aspects were<br />
discussed.<br />
Considering the project size and its location in notified indu<strong>st</strong>rial area and <strong>SEAC</strong> decided to<br />
considered it under Category B2<br />
<strong>SEAC</strong> decided to recommend the proposal for <strong>Environment</strong>al <strong>Clearance</strong> only after complying<br />
with the following condition:<br />
1. Submit hazardous material li<strong>st</strong> and required safety measures.<br />
Chairman<br />
116
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Item No. 33<br />
Subject: <strong>Environment</strong> clearance for proposed Residential Project atS.No.54, Undri, Tal.<br />
Haveli, Di<strong>st</strong>t.Pune by M/s Amit Enterprises Housing Ltd<br />
(File No. <strong>SEAC</strong> 2011/ CR-542 / TC2)<br />
The Project Proponent explained the proposal before the committee and committee noted<br />
project details furnished by the Project Proponent as:<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Proponent M/s. Amit Purvant Joint Venture<br />
Name, contact number &<br />
address <<strong>st</strong>rong>of</<strong>st</strong>rong> Consultant<br />
M/s. Ultra-Tech <strong>Environment</strong>al Consultancy & Laboratory<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong> project Mixed use Development<br />
Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the project S. No. 54, Village Undri, Tehsil- Haveli, Di<strong>st</strong>.-Pune, State –<br />
Maharashtra.<br />
Whether in Corporation /<br />
Municipal / other area<br />
Town Planning Department.<br />
Whether in Corporation /<br />
Municipal / other area<br />
Town Planning Department.<br />
Applicability <<strong>st</strong>rong>of</<strong>st</strong>rong> the DCR A class municipal Corporation in 10 km radius.<br />
Total Plot Area (sq. m.) Total Plot Area: 74025.00 Sq. Mt.<br />
Deductions<br />
Deductions :-<br />
Net Plot area<br />
Road Widening: 9279.87 Sq. Mt.<br />
Encroachment: 5567.75 Sq. Mt.<br />
Net Plot Area : 59177.38 Sq. Mt.<br />
Permissible FSI Residential and commercial: 59230.66 Sq. Mt.<br />
(including<br />
TDR etc.)<br />
Amenity :8876.<<strong>st</strong>rong>61</<strong>st</strong>rong> Sq. Mt.<br />
Proposed Built-up Area FSI :<br />
(FSI & Non-FSI) Residential and commercial :57558.65 Sq.Mt.<br />
Amenity : 5939.04 Sq. Mt.<br />
Non FSI :<br />
Residential and commercial: 47220.74 Sq. Mt.<br />
Amenity : 7145.51Sq. Mt.<br />
Total Con<strong>st</strong>ruction built up area<br />
Residential and commercial : 104779.39 Sq. Mt.<br />
Amenity : 13084.55 Sq. Mt.<br />
Ground-coverage Residential and commercial development : 11477.18 Sq. Mt.<br />
Percentage (%)<br />
(25.8 % <<strong>st</strong>rong>of</<strong>st</strong>rong> plot area available for the residential and<br />
(Note: Percentage <<strong>st</strong>rong>of</<strong>st</strong>rong> plot commercial development)<br />
not open to sky)<br />
Amenity : 2200 Sq. Mt (24.8 % <<strong>st</strong>rong>of</<strong>st</strong>rong> the plot area available for<br />
the development <<strong>st</strong>rong>of</<strong>st</strong>rong> amenity)<br />
E<strong>st</strong>imated co<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the Rs. 163.32/- Corers<br />
Chairman<br />
117
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project<br />
project<br />
“Mixed use Development ”<br />
No. <<strong>st</strong>rong>of</<strong>st</strong>rong> building & its<br />
configuration(s)<br />
No. Phase<br />
Type <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
building<br />
No. <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
bldg<br />
No <<strong>st</strong>rong>of</<strong>st</strong>rong> floors<br />
1 1 Residential 2 P +10 Upper floors<br />
2 Residential 10 P +11 Upper floors<br />
3 Commercial 1 G + 1 upper floor<br />
4<br />
2 Government<br />
Building<br />
Residential<br />
1 P + 5 upper floors<br />
5 Bungalows 2 G + 1 upper floor<br />
8 3 Shops<br />
9 Re<strong>st</strong>aurant<br />
10 Banquet Hall<br />
11 Studios<br />
Chairman<br />
118<br />
1<br />
2 basement + 4 upper<br />
floors<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> tenants and<br />
shops<br />
No. Phase Type <<strong>st</strong>rong>of</<strong>st</strong>rong> building Total Tenements<br />
1 1 Residential 120<br />
2<br />
Residential 880<br />
3 Commercial 2 showrooms<br />
4<br />
2 Government Building<br />
60<br />
Residential<br />
5 Bungalows 2<br />
8 3 Shops 29<br />
9 Re<strong>st</strong>aurant 1<br />
10 Banquet Hall 1<br />
11 Studios 64<br />
Number <<strong>st</strong>rong>of</<strong>st</strong>rong> expected<br />
residents / users<br />
6519 Nos.<br />
Tenant density per hector 239 No. <<strong>st</strong>rong>of</<strong>st</strong>rong> tenement per hector<br />
Height <<strong>st</strong>rong>of</<strong>st</strong>rong> the building(s) 37 m<br />
Right <<strong>st</strong>rong>of</<strong>st</strong>rong> way (Width <<strong>st</strong>rong>of</<strong>st</strong>rong> The plot is abutting to the 60 m wide road on north side and 15<br />
the road from the neare<strong>st</strong> m wide road on ea<strong>st</strong> side and 24 m wide road on South side.<br />
fire <strong>st</strong>ation to the<br />
proposed building(s))<br />
Turning radius for easy 9 m (Fire NOC is sought and provisional fire NOC is<br />
access <<strong>st</strong>rong>of</<strong>st</strong>rong> fire tender received)<br />
movement from all<br />
around the building<br />
excluding the width for<br />
the plantation<br />
Exi<strong>st</strong>ing <strong>st</strong>ructure(s) No exi<strong>st</strong>ing <strong>st</strong>ructures on site.<br />
Total Water Dry season:
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />
Requirement • Fresh water (CMD):<br />
Phase 1: 54<br />
Phase 2 : 432<br />
Phase 3 : 36<br />
& Source: PMC via Grampanchayt <<strong>st</strong>rong>of</<strong>st</strong>rong> Undri under scheme<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong> Bharat Nirman Yojna./Tankers<br />
• Recycled water (CMD):<br />
Phase 1: 38<br />
Phase 2 : 266<br />
Phase 3 : 49<br />
• Total Water Requirement (CMD):<br />
Phase 1: 92<br />
Phase 2 : 698<br />
Phase 3 : 85<br />
• Swimming pool make up (Cum):<br />
Phase 2 : 5<br />
• Fire fighting (Cum):<br />
Phase 1: 100<br />
Phase 2 : 350<br />
Phase 3 : 100<br />
Wet Season:<br />
• Fresh water (CMD):<br />
Phase 1: 54<br />
Phase 2 : 432<br />
Phase 3 : 36<br />
& Source: PMC via Grampanchayt <<strong>st</strong>rong>of</<strong>st</strong>rong> Undri under scheme<br />
<<strong>st</strong>rong>of</<strong>st</strong>rong> Bharat Nirman Yojna.<br />
• Recycled water (CMD):<br />
Phase 1: 27<br />
Phase 2 : 218<br />
Phase 3 : 30<br />
• Total Water Requirement (CMD):<br />
Phase 1: 81<br />
Phase 2 : 693<br />
Phase 3 : 66<br />
• Swimming pool make up (CMD):<br />
Phase 2 : 5<br />
• Fire fighting (CMD):<br />
Phase 1: 100<br />
Chairman<br />
119
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />
Phase 2 : 350<br />
Rain Water Harve<strong>st</strong>ing<br />
(RWH)<br />
Phase 3 : 100<br />
• Level <<strong>st</strong>rong>of</<strong>st</strong>rong> the Ground water table: 9.10 m.<br />
• Surface run <<strong>st</strong>rong>of</<strong>st</strong>rong>f will be recharged to ground through with<br />
25 Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> recharge pits out <<strong>st</strong>rong>of</<strong>st</strong>rong> which 10 will be with bores<br />
(depth 15m) & 15 will be without bore in the form <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
chamber with increased sizes (2.0 M x 2.0M x 2.0M).<br />
• 39843 m 3 /season rain water harve<strong>st</strong>ing is planned.<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />
- Capital Co<strong>st</strong> : Rs. 11.25 Lakh<br />
- O & M Co<strong>st</strong>: Rs. 0.5 Lakh/ Annum<br />
UGT tanks • Location(s) <<strong>st</strong>rong>of</<strong>st</strong>rong> the UGT tank(s):<br />
- 3 Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> UG tanks are provided one is near amenity<br />
space, second is near building E and third is near twin<br />
bungalows.<br />
Storm water drainage • Natural water drainage pattern: land gently sloping towards<br />
south<br />
• Quantity <<strong>st</strong>rong>of</<strong>st</strong>rong> <strong>st</strong>orm water: 0.16 m 3 /min<br />
• Size <<strong>st</strong>rong>of</<strong>st</strong>rong> SWD: Internal SWD Capacity : 750 mm dia<br />
Sewage and Wa<strong>st</strong>e<br />
water<br />
channel having slope 1:200<br />
• Sewage generation (CMD):<br />
Phase 1: 73<br />
Phase 2 : 580<br />
Phase 3 : 60<br />
• STP technology: Fluidized Aerobic Bio-Reactor (FAB)<br />
• Capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> STP (CMD) :<br />
Phase 1: 75<br />
Phase 2 : 580<br />
Phase 3 : 60<br />
• Location <<strong>st</strong>rong>of</<strong>st</strong>rong> the STP: 3 Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> STP, one is near A<br />
building, second is near K building and third is near<br />
commercial building.<br />
• DG sets (during emergency): Load considered in the<br />
Common D.G. Set<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>)<br />
- Capital Co<strong>st</strong> : Rs. 94 Lakhs<br />
- O & M : Rs. 37.60 Lakhs/ Annum<br />
Chairman<br />
120
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />
Solid wa<strong>st</strong>e Management Wa<strong>st</strong>e generation in the Pre Con<strong>st</strong>ruction and<br />
Con<strong>st</strong>ruction phase:<br />
• Wa<strong>st</strong>e generation<br />
a. Debris:<br />
Excavation quantity : 123094.62 m 3 (approx)<br />
This material shall be used for back filling and leveling <<strong>st</strong>rong>of</<strong>st</strong>rong> the<br />
plot within the site premises.<br />
b. Top soil preservation / conservation: 10652 m 3 (approx)<br />
Shall be preserved and reused within the site for landscaping.<br />
Wa<strong>st</strong>e generation in the operation Phase:<br />
• Dry wa<strong>st</strong>e (Kg/day):<br />
Phase 1: 110<br />
Phase 2 : 910<br />
Phase 3 : 200<br />
• Wet wa<strong>st</strong>e (Kg/day):<br />
Phase 1: 170<br />
Phase 2 : 1360<br />
Phase 3 : 210<br />
STP Sludge (Dry sludge) (Kg/day):<br />
Phase 1: 11<br />
Phase 2 : 87<br />
Phase 3 : 9<br />
Mode <<strong>st</strong>rong>of</<strong>st</strong>rong> Disposal <<strong>st</strong>rong>of</<strong>st</strong>rong> wa<strong>st</strong>e:<br />
• Dry wa<strong>st</strong>e: will be handed over to authorize Contractors.<br />
• Wet wa<strong>st</strong>e: will be treated in Organic Wa<strong>st</strong>e Converter<br />
(OWC).<br />
• E – wa<strong>st</strong>e: send to Authorized contractor<br />
• Hazardous wa<strong>st</strong>e: Wa<strong>st</strong>e oil which is generated due to<br />
usage <<strong>st</strong>rong>of</<strong>st</strong>rong> DG sets shall be <strong>st</strong>ored and subsequently given to<br />
the authorized hazardous wa<strong>st</strong>e management agencies<br />
recognized by MPCB.<br />
• STP Sludge (Dry sludge): Dried sludge from STP will be<br />
used as manure.<br />
Area requirement:<br />
Phase 1: 25 Sq.Mt<br />
Phase 2 : 185 Sq.Mt<br />
Phase 3 : 30 Sq.Mt<br />
- 3 Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> OWCs one is near A building, second is near<br />
K building and third is near commercial building.<br />
Chairman<br />
121
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />
Green Belt<br />
Development<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />
- Capital Co<strong>st</strong> : Rs. 23 Lakhs<br />
- O & M : Rs. 5.4 Lakhs/ Annum<br />
Total RG area:<br />
1. RG area other than green belt (Please specify for<br />
Playground, etc.): Not applicable.<br />
2. RG area under green belt:<br />
• RG on the ground (sq. m.):<br />
Phase 1 : 1682.27 Sq. Mt.<br />
Phase 2 : 7315.43 Sq. Mt.<br />
Phase 3 : 3257 Sq. Mt.<br />
Total : 12254.70 Sq. Mt.<br />
Hardscape Area: 1075.79 Sq. Mt.<br />
Ground R.G. is 25 % <<strong>st</strong>rong>of</<strong>st</strong>rong> the Net Plot Area.<br />
• RG on the podium (sq. m.): Not Applicable<br />
3. Plantation:<br />
• Number and li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> trees species to be planted in the ground<br />
RG: 725 Nos.<br />
Chairman<br />
122
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />
Chairman<br />
123
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />
• Number and li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> shrubs and bushes species to be<br />
Planted in the podium RG: not applicable<br />
• Number and li<strong>st</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> trees species to be planted around the<br />
border <<strong>st</strong>rong>of</<strong>st</strong>rong> nallah / <strong>st</strong>ream / pond (If any): Not Applicable.<br />
• Number, size, age and species <<strong>st</strong>rong>of</<strong>st</strong>rong> trees to be cut, trees to be<br />
transplanted:<br />
There total 22 trees exi<strong>st</strong>ing tress on the site.<br />
Trees to be retained on place : 22 Nos.<br />
Chairman<br />
124
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />
Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />
- Capital Co<strong>st</strong> : Rs. 69.05 Lakhs<br />
- O & M Co<strong>st</strong> : Rs. 11.05 Lakhs/ Annum<br />
Energy Power supply:<br />
• Maximum demand:<br />
Phase 1 : 1450 KW<br />
Phase 2 : 10782 KW<br />
Phase 3 : 1000 KW<br />
• Connected load :<br />
Phase 1 : 590 KW<br />
Phase 2 : 4334 KW<br />
Phase 3 : 435 KW<br />
• Source: M.S.E.D.C.L.<br />
Energy saving by non-conventional method:<br />
• Energy saving measures:<br />
- Using CFL in Parking area, lift-lobby and <strong>st</strong>reet<br />
lighting.<br />
- Use <<strong>st</strong>rong>of</<strong>st</strong>rong> PP cement.<br />
- Cross ventilation.<br />
- Solar Water Heating.<br />
• Detail calculations & % <<strong>st</strong>rong>of</<strong>st</strong>rong> saving:<br />
- The Overall savings by using all the Energy saving<br />
Measures will be<br />
24.6 % by in using CFL in Staircase and parking.<br />
17 % by using CFL in <strong>st</strong>reet lighting.<br />
Sr.<br />
No<br />
Section<br />
No.<br />
1 6.2.1<br />
2 6.2.2<br />
3 7.2<br />
Chairman<br />
125<br />
Requirement<br />
Solar water heating for<br />
minimum<br />
capacity<br />
20% design<br />
Equipment efficiency<br />
<strong>st</strong>andards<br />
Lighting for common area<br />
controls occupancy<br />
sensors.<br />
4 7.2.1.2 Space control for lighting<br />
5 7.2.1.4<br />
Exterior lighting to be<br />
controlled by time switch<br />
Comp<br />
liance<br />
Compl<br />
ies.<br />
Compl<br />
ies.<br />
Compl<br />
ies.<br />
Compl<br />
ies.<br />
Compl<br />
ies.<br />
6 7.3 Interior lighting power to Compl
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />
be within specified limits ies.<br />
<strong>Environment</strong>al<br />
Management plan<br />
Budgetary<br />
Allocation<br />
7 7.4<br />
8 8.2.1.1<br />
Chairman<br />
126<br />
Exterior lighting power to<br />
be within specified limits<br />
Maximum allowable power<br />
loss from transformer to be<br />
within specified limits.<br />
9 8.2.2 Energy efficient motors.<br />
10 8.2.3<br />
Power factor be maintained<br />
between 0.95 and unity<br />
11 8.2.4 Check metering<br />
12 8.2.5<br />
Power di<strong>st</strong>ribution sy<strong>st</strong>em<br />
losses to be maintained<br />
less than 1%<br />
• Budgetary allocation (Capital co<strong>st</strong> and O&M co<strong>st</strong>):<br />
Solar heating<br />
- Capital Co<strong>st</strong> : Rs. 230.54 Lakhs<br />
- O & M Co<strong>st</strong> : Rs. 3.96 Lakhs/ Annum<br />
DG Set:<br />
• Number and capacity <<strong>st</strong>rong>of</<strong>st</strong>rong> the DG sets to be used:<br />
Phase 1 : 1 No. <<strong>st</strong>rong>of</<strong>st</strong>rong> 250 KVA capacity<br />
Phase 2 : 2 Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> 250 KVA capacity each<br />
Phase 3 : 1 No. <<strong>st</strong>rong>of</<strong>st</strong>rong> 250 KVA capacity<br />
Compl<br />
ies.<br />
Compl<br />
ies.<br />
Compl<br />
ies.<br />
Compl<br />
ies.<br />
Compl<br />
ies.<br />
Compl<br />
ies.<br />
• Type <<strong>st</strong>rong>of</<strong>st</strong>rong> fuel used : LSD<br />
Con<strong>st</strong>ruction phase (with Break-up):<br />
• Capital co<strong>st</strong>:<br />
• O& M co<strong>st</strong> (Please ensure manpower and other details)<br />
Sr.<br />
No. Parameter<br />
Total Co<strong>st</strong><br />
(Rs. In Lacs)<br />
1<br />
Water For Du<strong>st</strong><br />
Suppression<br />
0.24<br />
2 Site Sanitation 0.5<br />
3 <strong>Environment</strong>al<br />
Monitoring<br />
0.36<br />
4 Disinfection 0.6<br />
5 Health Check Up 2.4<br />
Total Co<strong>st</strong> 4.1<br />
Operation Phase (with Break-up)-
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
Name <<strong>st</strong>rong>of</<strong>st</strong>rong> Project “Mixed use Development ”<br />
• Capital co<strong>st</strong><br />
• O&M co<strong>st</strong> (Please ensure manpower and other details)<br />
Parameter<br />
Total Set Up<br />
Co<strong>st</strong> (Rs. In<br />
Lacs)<br />
STP Co<strong>st</strong> 94 37.60<br />
Rain Water<br />
Harve<strong>st</strong>ing<br />
<strong>Environment</strong>al<br />
Monitoring<br />
Chairman<br />
127<br />
11.25 0.5<br />
MoEF<br />
approved<br />
laboratory<br />
Operational And<br />
Maintenance Co<strong>st</strong><br />
Per Yr (Rs. In<br />
Lacs)<br />
22.34<br />
Solar hot water<br />
sy<strong>st</strong>em<br />
230.54 3.96<br />
Gardening 69.05 11.05<br />
Solid Wa<strong>st</strong>e<br />
Management<br />
23 5.40<br />
Total 427.84 80.85<br />
• Quantum and generation <<strong>st</strong>rong>of</<strong>st</strong>rong> Corpus fund and<br />
Commitment<br />
Project proponent shall operate and maintain EMF for 3 years<br />
after giving possession and shall also generate corpus fund<br />
during 3 years for O & M <<strong>st</strong>rong>of</<strong>st</strong>rong> Rs. 242.55 lacs (i.e. 80.85 lacs x<br />
3 years).<br />
• Responsibility for further O &M:<br />
Corpus fund shall be handed over to the party. While handing<br />
over <strong>Environment</strong>al Management Facilities M.O.U. shall be<br />
made with society to accept responsibility <<strong>st</strong>rong>of</<strong>st</strong>rong> further O & M <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
EMF.<br />
Traffic Management Nos. <<strong>st</strong>rong>of</<strong>st</strong>rong> the junction to the main road & design <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
confluence: Traffic generated from this project will confluent<br />
on 15 m wide road on Ea<strong>st</strong> side and 60 m wide road on North<br />
side and 24 m wide road on South side.<br />
Parking details:<br />
• Number and area <<strong>st</strong>rong>of</<strong>st</strong>rong> basement: 2 Nos. in commercial<br />
building.<br />
• Number and area <<strong>st</strong>rong>of</<strong>st</strong>rong> podia: Not Applicable<br />
• Total Parking area: 14730.66 Sq. Mt.<br />
• Area per car: 25.98 Sq.mt.<br />
• 2-Wheelar: 1328 Nos.<br />
• 4-Wheeler: 636 Nos.<br />
• Public Transport : Nil<br />
Width <<strong>st</strong>rong>of</<strong>st</strong>rong> all Internal roads (m): 6 m wide Internal Roads.
Decision:<br />
<<strong>st</strong>rong>Minutes</<strong>st</strong>rong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <<strong>st</strong>rong>61</<strong>st</strong>rong> <strong>st</strong> <strong>meeting</strong> <<strong>st</strong>rong>of</<strong>st</strong>rong> the <strong>SEAC</strong> held on 10 th to 12 th October, 2012<br />
The case was discussed on the basis <<strong>st</strong>rong>of</<strong>st</strong>rong> the presentation made by the proponent. All issues<br />
related to environment, including air, water, land, soil, ecology, biodiversity and social<br />
aspects were discussed. The proposal is indicated as only for phase iii, however a review is<br />
required to be taken for the entire project at the time <<strong>st</strong>rong>of</<strong>st</strong>rong> appraisal.It is therefore necessary<br />
for the PP to submit the details <<strong>st</strong>rong>of</<strong>st</strong>rong> the entire plot,its hi<strong>st</strong>ory,the present <strong>st</strong>ate <<strong>st</strong>rong>of</<strong>st</strong>rong><br />
development and conveyance <<strong>st</strong>rong>of</<strong>st</strong>rong> earlier phases along with the compliance with<br />
environmental norms etc.The pp should therefore submit these details on a a large<br />
drawing.,superimposed on contour map.The proponent also directed to comply with the<br />
following observations:<br />
1. Submit the revised plot area calculations as PP agreed to widen the 15 m right <<strong>st</strong>rong>of</<strong>st</strong>rong> way to<br />
18 m by including the exi<strong>st</strong>ing setback from their plot.<br />
2. Submit compliance report to the terms and conditions <<strong>st</strong>rong>of</<strong>st</strong>rong> the Special Land Scheme<br />
(Vishesh Bhumi Yojana) mentioned in Collector’s letter dated 11/04/2012.<br />
3. Submit details regarding the plot area to be handed over to the Government. Indicate the<br />
same on the layout plan<br />
4. Submit the revised NA Order as PP clarified that NA permission which was grated in 2007<br />
is being revised<br />
5. Ju<strong>st</strong>ify the parking calculations as two basements and two <strong>st</strong>ilts are provided in different<br />
buildings, if possible reduce a basement.<br />
6. Submit the location <<strong>st</strong>rong>of</<strong>st</strong>rong> STP including calculations and plant layout, along with a cross<br />
section and dimensions <<strong>st</strong>rong>of</<strong>st</strong>rong> various treatment units. STP shall be with proper ventilation<br />
and side clearances for O & M<br />
7. Ju<strong>st</strong>ify the area provided for OWC with calculations and details<br />
8. Avoid car parking on the we<strong>st</strong>ern side <<strong>st</strong>rong>of</<strong>st</strong>rong> the plot and relocate UG tank for better fire<br />
tender movement<br />
9. Submit details <<strong>st</strong>rong>of</<strong>st</strong>rong> natural lighting and ventilation for the LIG building<br />
10. Submit scheme <<strong>st</strong>rong>of</<strong>st</strong>rong> lighting and ventilation for two level basement.<br />
11. Submit revised green belt plan <<strong>st</strong>rong>of</<strong>st</strong>rong> trees to be planted (#725) on ground RG and after<br />
widening the 15m road.<br />
Chairman<br />
128